Block 3775, lot 015
340 Brannan St
- City’s use
- Commercial Office
- Built
- 1911
- Stories
- 5
- Rooms
- 10 bathrooms
- Building
- 41,880 sq ft
- Lot
- 8,604 sq ft
- Zoning
- MUO
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
51 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 12, 2024 | In progress issued Mar 2024 | 340 Brannan St | Pyro-Comm Systems, Inc. | fire alarm as built to show updated sequence of operation per sffd inspector requirement. pa ref: 202204273094Details
fire alarm as built to show updated sequence of operation per sffd inspector requirement. pa ref: 202204273094 | |
| Apr 27, 2022 | Completed final sign-off Sep 2026 | 340 Brannan St | Pyro-Comm Systems, Inc. | fire alarm this is a voluntary replacement, the (e) fa panel will be replaced with a new est-1064 panel, felguard and 1 monitor module will be added for cellular monitoring of the fa panel, all devices to remain as installedDetails
fire alarm this is a voluntary replacement, the (e) fa panel will be replaced with a new est-1064 panel, felguard and 1 monitor module will be added for cellular monitoring of the fa panel, all devices to remain as installed | $3,000 |
| Jul 12, 2018 | Never finaled issued Jul 2018, no final | 340 Brannan St | J T Electric | 5th flr. new lighting, switching, dimmers, occupancy sensors, receptacles, controlled receptaclesDetails
5th flr. new lighting, switching, dimmers, occupancy sensors, receptacles, controlled receptacles | $26,500 |
| May 31, 2018 | Completed final sign-off Jul 2018 | 340 Brannan St | Indoor Air Design Inc | suite 501: furnish & install new exposed spiral ductwork to condition the proposed market ready space. furnish & install new multizone controls. start up and test (e) a/c units. ref t.i. pa201804206913.Details
suite 501: furnish & install new exposed spiral ductwork to condition the proposed market ready space. furnish & install new multizone controls. start up and test (e) a/c units. ref t.i. pa201804206913. | $24,995 |
| May 25, 2018 | Completed final sign-off Jul 2018 | 340 Brannan St | Gidel & Kocal Construction Co Inc | revision to app#201804206913 to add additional bathroom stall in womens bathroom. n/a for maherDetails
revision to app#201804206913 to add additional bathroom stall in womens bathroom. n/a for maher | $10,000 |
| May 22, 2018 | Completed final sign-off Jul 2018 | 340 Brannan St | Lifeguard Fire Protection Inc. | work is to relocate total of 34 fire sprinklersDetails
work is to relocate total of 34 fire sprinklers | $6,000 |
| Apr 20, 2018 | Completed final sign-off Jul 2018 | 340 Brannan St | Gidel & Kocal Construction Co Inc | suite 501 ,ti demo walls and ceiling, construct new walls per plan. mep and life safety under seperate permit.Details
suite 501 ,ti demo walls and ceiling, construct new walls per plan. mep and life safety under seperate permit. | $150,000 |
| Dec 1, 2017 | Never finaled issued Dec 2017, no final | 340 Brannan St | street space permitDetails
street space permit | ||
| Oct 31, 2017 | Completed final sign-off Feb 2018 | 340 Brannan St | Gidel & Kocal Construction Co Inc | water over existing 27 windows (new flashing). existing windows to remain. replace in kind. maher naDetails
water over existing 27 windows (new flashing). existing windows to remain. replace in kind. maher na | $30,000 |
| Sep 26, 2017 | Never finaled issued Sep 2017, no final | 340 Brannan St | street spaceDetails
street space | ||
| Aug 17, 2017 | Never finaled issued Aug 2017, no final | 340 Brannan St | Pyro-Comm Systems, Inc. | fire alarm ti 1st fl: add (2) strobes to restrooms. connect 9e) fire alarm system. ref pa #201706220115. maher naDetails
fire alarm ti 1st fl: add (2) strobes to restrooms. connect 9e) fire alarm system. ref pa #201706220115. maher na | $1,000 |
| Aug 3, 2017 | Completed final sign-off Aug 2017 | 340 Brannan St | G P Fire Protection | 1st floor: add 2 sprinkler heads and relocate 2 sprinkler heads for new gender bathrooms. ref app#201706220115 n/a for maher.Details
1st floor: add 2 sprinkler heads and relocate 2 sprinkler heads for new gender bathrooms. ref app#201706220115 n/a for maher. | $1,200 |
| Aug 1, 2017 | Expired or cancelled cancelled Jan 2026 | 340 Brannan St | Gidel & Kocal Construction Co Inc | 1/f - t24 for pa#201706220115. n/a ordinance #155-13Details
1/f - t24 for pa#201706220115. n/a ordinance #155-13 | $2,000 |
| Jul 14, 2017 | Completed final sign-off Aug 2017 | 340 Brannan St | Indoor Air Design Inc | furnish and install 2 ceiling mounted exhaust fans and maku up air for 2 new restroomsDetails
furnish and install 2 ceiling mounted exhaust fans and maku up air for 2 new restrooms | $3,400 |
| Jun 22, 2017 | Completed final sign-off Feb 2018 | 340 Brannan St | Gidel & Kocal Construction Co Inc | add 2 restrooms on the 1st floor. n/a for maher.Details
add 2 restrooms on the 1st floor. n/a for maher. | $85,000 |
| Jun 12, 2015 | Never finaled issued Jun 2015, no final | 340 Brannan St | street spaceDetails
street space | ||
| Nov 12, 2014 | Completed final sign-off Jan 2015 | 340 Brannan St | Indoor Air Design Inc | mechanical work associated with t.i. to include: existing water source heat pumps. (ref. pa 2014/0917/6557)Details
mechanical work associated with t.i. to include: existing water source heat pumps. (ref. pa 2014/0917/6557) | |
| Nov 7, 2014 | Completed final sign-off Dec 2014 | 340 Brannan St | Lifeguard Fire Protection | ste 400: 11 relocate pendant sprinklers, 3 add pendant sprinklers, t.i. #201409176557; maher n/aDetails
ste 400: 11 relocate pendant sprinklers, 3 add pendant sprinklers, t.i. #201409176557; maher n/a | $5,000 |
| Oct 20, 2014 | Expired or cancelled cancelled Nov 2014 | 340 Brannan St | Silver Star Electric | #400- dem0 fixtures & receptacles, new led fixtures & receptacles with control circuit. compliance with maher ordinance no 155-13 not required.Details
#400- dem0 fixtures & receptacles, new led fixtures & receptacles with control circuit. compliance with maher ordinance no 155-13 not required. | $130,000 |
| Sep 17, 2014 | Completed final sign-off Jan 2015 | 340 Brannan St | Gidel & Kocal Construction Co Inc | suite 400 - t.i. : demo partitions & construction of new full height partitions & da path of travel upgrades, new finishes. mep & life safety under separate permit.Details
suite 400 - t.i. : demo partitions & construction of new full height partitions & da path of travel upgrades, new finishes. mep & life safety under separate permit. | $350,000 |
| Oct 7, 2013 | Never finaled issued Oct 2013, no final | 340 Brannan St | street spaceDetails
street space | ||
| Jun 11, 2013 | Completed final sign-off Aug 2013 | 340 Brannan St | Au Electric Corporation/Aec Alarms | 2nd floor-fire alarm ti-relocate 1 (e) horn/strobe to new location, 1 control relay will be install for new roll down door at elevator. new relay will be tied into (e) control panel located on 1st floor. arch ti pa# 2013-0513-6728Details
2nd floor-fire alarm ti-relocate 1 (e) horn/strobe to new location, 1 control relay will be install for new roll down door at elevator. new relay will be tied into (e) control panel located on 1st floor. arch ti pa# 2013-0513-6728 | $1,000 |
| Jun 3, 2013 | Completed final sign-off Jun 2013 | 340 Brannan St | Lifeguard Fire Protection | 2nd floor-add 4 pendent sprinklers, replace 10 pendent sprinklers & plug 2 pendent sprinklersDetails
2nd floor-add 4 pendent sprinklers, replace 10 pendent sprinklers & plug 2 pendent sprinklers | $6,000 |
| May 13, 2013 | Completed final sign-off Jun 2013 | 340 Brannan St | Gidel & Kocal Construction Co Inc | 2nd floor-remove (e) non load bearing walls, install roll down fire doors at elevator. install new walls, relocate light fixtures.Details
2nd floor-remove (e) non load bearing walls, install roll down fire doors at elevator. install new walls, relocate light fixtures. | $75,000 |
| Oct 14, 2011 | Completed final sign-off Nov 2011 | 340 Brannan St | Bigham Taylor Roofing Co | reroofingDetails
reroofing | $60,000 |
| Jun 20, 2011 | Never finaled issued Jun 2011, no final | 340 Brannan St | C.R. Fire Line Inc | remove 26 extg sprinkler heads and replace them with new shorter one... ceiling has or will be lowered.Details
remove 26 extg sprinkler heads and replace them with new shorter one... ceiling has or will be lowered. | $5,000 |
| Dec 24, 2010 | Completed final sign-off Sep 2011 | 340 Brannan St | Centric Construction Inc | 3rd floor suite 302 -partial inteior demo, new interior partitions, windows & doors, electrical modificatoins, new cabinets. windows and doors not facing street.Details
3rd floor suite 302 -partial inteior demo, new interior partitions, windows & doors, electrical modificatoins, new cabinets. windows and doors not facing street. | $75,000 |
| Dec 15, 2010 | Never finaled issued Dec 2010, no final | 340 Brannan St | Padilla's Electric**See Notes** | apply title 24 to lighting. ref 201008068290Details
apply title 24 to lighting. ref 201008068290 | $2,000 |
| Oct 20, 2010 | Completed final sign-off May 2011 | 340 Brannan St | Bayside Heating & A/C Inc | replace cooling towers. replace hydronic boiler, no change in equipemnt size, same locations on roof.Details
replace cooling towers. replace hydronic boiler, no change in equipemnt size, same locations on roof. | $65,000 |
| Aug 6, 2010 | Expired or cancelled expired Mar 2013 | 340 Brannan St | build out 3 conference rooms:one kitchen. replace of with hi-lo per ada.Details
build out 3 conference rooms:one kitchen. replace of with hi-lo per ada. | $8,000 | |
| Aug 5, 2010 | Completed final sign-off Oct 2010 | 340 Brannan St | Hatfield Repair And Remodeling | revision to pa #2010-0723-7378: remove wall, build (n) metal stud drywall, door, & window to create storage room.Details
revision to pa #2010-0723-7378: remove wall, build (n) metal stud drywall, door, & window to create storage room. | $400 |
| Jul 23, 2010 | Completed final sign-off Oct 2010 | 340 Brannan St | Hatfield Repair And Remodeling | move wall. build (n) metal stud dry-walls & door to create (n) technician work area.Details
move wall. build (n) metal stud dry-walls & door to create (n) technician work area. | $3,500 |
| Jun 10, 2010 | Completed final sign-off Apr 2011 | 340 Brannan St | Bayside Heating & A/C Inc | reconfigure mechanical @ suite #301.Details
reconfigure mechanical @ suite #301. | $3,000 |
| May 21, 2010 | Never finaled issued May 2010, no final | 340 Brannan St | Bayside Heating & A/C Inc | ste 302 - mechanical permit-extend new duct approx. 24ft. off (e) vav box. bldg. permit #201004150339.Details
ste 302 - mechanical permit-extend new duct approx. 24ft. off (e) vav box. bldg. permit #201004150339. | $2,000 |
| May 20, 2010 | Completed final sign-off Dec 2010 | 340 Brannan St | Carter Brothers Fire & Life Safety | revision to pa# 2009.09.30.7964. this revision (as built) added the 18 existing nac devices back into the scope of work,Details
revision to pa# 2009.09.30.7964. this revision (as built) added the 18 existing nac devices back into the scope of work, | |
| Apr 15, 2010 | Never finaled issued Apr 2010, no final | 340 Brannan St | 4th floor-combine 2 suites into 1 suite on the 4th floor, relocate 1 door & sidelight. move 1 light switchDetails
4th floor-combine 2 suites into 1 suite on the 4th floor, relocate 1 door & sidelight. move 1 light switch | $1,000 | |
| Apr 15, 2010 | Expired or cancelled expired Mar 2013 | 340 Brannan St | 3rd floor-demo non structural, non load bearing walls & doors to combine 4 suites into 2. build 2 new wallsDetails
3rd floor-demo non structural, non load bearing walls & doors to combine 4 suites into 2. build 2 new walls | $1,000 | |
| Sep 30, 2009 | Completed final sign-off Dec 2010 | 340 Brannan St | Carter Brothers Fire & Life Safety | submit fire alarm as builts for emergency panel replacement. ref. appl. 200606285294.Details
submit fire alarm as builts for emergency panel replacement. ref. appl. 200606285294. | $4,100 |
| Jul 2, 2008 | Never finaled issued Jul 2008, no final | 340 Brannan St | street space permit only.Details
street space permit only. | ||
| Jun 3, 2008 | Never finaled issued Jun 2008, no final | 340 Brannan St | Au Electric Corporation/Aec Alarms, Carter Brothers Fire & Life Safety | renew 200606285294 (fire alarm) for final inspection.Details
renew 200606285294 (fire alarm) for final inspection. | |
| May 17, 2007 | Completed final sign-off Jan 2008 | 340 Brannan St | Centric Construction Inc | foundatio for planters and stair wallsDetails
foundatio for planters and stair walls | $10,000 |
| Mar 30, 2007 | Completed final sign-off Jan 2008 | 340 Brannan St | Centric Construction Inc | ground floor-remove (e) lamndscape & foundation. demo (e) flooring, remove (e) handrails, new partitions, fountain, sinage, lobby flooring. handrails cladding at elevator walls. stone column covers, light fixtures & finishes.Details
ground floor-remove (e) lamndscape & foundation. demo (e) flooring, remove (e) handrails, new partitions, fountain, sinage, lobby flooring. handrails cladding at elevator walls. stone column covers, light fixtures & finishes. | $200,000 |
| Jun 28, 2006 | Never finaled issued Jun 2006, no final | 340 Brannan St | Au Electric Corporation/Aec Alarms, Carter Brothers Fire & Life Safety | emergency alarm fire panel erplacewment per action plan attached. emergency replacement . plan of action submitted to capt. michell sffd, ul cretificated req'd no final allowed until fire alarm plans are submitted & approved.Details
emergency alarm fire panel erplacewment per action plan attached. emergency replacement . plan of action submitted to capt. michell sffd, ul cretificated req'd no final allowed until fire alarm plans are submitted & approved. | $40,000 |
| Sep 1, 2004 | Expired or cancelled expired Nov 2005 | 340 Brannan St | oti-1 5th floor spDetails
oti-1 5th floor sp | $20,000 | |
| Jun 15, 2004 | Never finaled issued Jun 2004, no final | 340 Brannan St | street spaceDetails
street space | ||
| Mar 19, 2004 | Expired or cancelled expired Nov 2005 | 340 Brannan St | Krueger Bros Builders Inc. | t-24 improvement to 2nd & 5th floor bathrooms as per joel cantor aia drawings dated 3/17Details
t-24 improvement to 2nd & 5th floor bathrooms as per joel cantor aia drawings dated 3/17 | $65,000 |
| Feb 25, 2004 | Expired or cancelled expired Nov 2005 | 340 Brannan St | Krueger Bros Builders Inc. | provide fire stops per code requirement,original appl#200401093723Details
provide fire stops per code requirement,original appl#200401093723 | $5,000 |
| Feb 17, 2004 | Never finaled issued Feb 2004, no final | 340 Brannan St | street spaceDetails
street space | ||
| Jan 9, 2004 | Expired or cancelled expired Nov 2005 | 340 Brannan St | Krueger Bros Builders Inc. | repair damaged drywall on floors 5,4,3, 2 and 1 damaged by broken sprinkler head on 5/f replaceDetails
repair damaged drywall on floors 5,4,3, 2 and 1 damaged by broken sprinkler head on 5/f replace | $80,000 |
| Jan 31, 2002 | Completed final sign-off Mar 2002 | 340 Brannan St | Colton, Michael Roger | renew appl#200104116537 for final inspectionDetails
renew appl#200104116537 for final inspection | |
| Apr 11, 2001 | Expired or cancelled expired Mar 2002 | 340 Brannan St | Colton, Michael Roger | add 1 additional toilet to existing disabled bathroom add metal studs sheetrock and paint 2nd floorDetails
add 1 additional toilet to existing disabled bathroom add metal studs sheetrock and paint 2nd floor | $7,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Gidel & Kocal Construction Co Inc (7), Carter Brothers Fire & Life Safety (4), Au Electric Corporation/Aec Alarms (3), Bayside Heating & A/C Inc (3), Centric Construction Inc (3), Indoor Air Design Inc (3), Krueger Bros Builders Inc. (3), Pyro-Comm Systems, Inc. (3), Colton, Michael Roger (2), Hatfield Repair And Remodeling (2), Lifeguard Fire Protection (2), Bigham Taylor Roofing Co, C.R. Fire Line Inc, G P Fire Protection, J T Electric, Lifeguard Fire Protection Inc., Padilla's Electric**See Notes**, Silver Star Electric
- Architects
- Rebecca Amato (5), Atm Architect Atm Architecture, Douglas W. Mehl, Leora Goren
- Engineers
- David Chase, Oscar Jones
- Authorized agent-otherss
- Joel Karr
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.