- On San Francisco permits
- Oct 2006 to Jun 2017
11 permits since 2000 (architect on 11 permits): 9 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Owens Design Build Inc (2), Team Commercial Construction Inc. (2), B And D Excavation And Construction, Centric Construction Inc, Fay Construction & Restoration Inc, Mike Cahalan, Mrcc, San Francisco Design & Constr., Soruco Structures
- Engineers
- Michael Hom (2)
Where they worked
- Single-family 7
- Multi-family (2-family, apartments) 1
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 29, 2017 | Completed final sign-off Jan 2018 | 3009 Webster St | Owens Design Build Inc | per field inspector: rev. to pa#201609127396 change of room occupancy from office to cellar on 1/f. remove (e) gate from scope which was included on pa#201611303754.Details
per field inspector: rev. to pa#201609127396 change of room occupancy from office to cellar on 1/f. remove (e) gate from scope which was included on pa#201611303754. | |
| Sep 12, 2016 | Completed final sign-off Aug 2021 | 3009 Webster St | Owens Design Build Inc | interior remodel - relocate corridor & office & create laundry/storage on 1st floor; adding/changing windows on rear on both levels; infill floor at rear 2nd floor to create master bedroom. n/a maher ordinanceDetails
interior remodel - relocate corridor & office & create laundry/storage on 1st floor; adding/changing windows on rear on both levels; infill floor at rear 2nd floor to create master bedroom. n/a maher ordinance | $200,000 |
| Mar 2, 2016 | Completed final sign-off Apr 2019 | 379 Flood Av | Mike Cahalan, Fay Construction & Restoration Inc | horiz. 2 story addition into rear yard (does not encroach on rear yard set back); kitchen remodel; relocation of 3rd bedroom to 2nd floor at rear; electrical, mechanical, plumbing and structural work includedDetails
horiz. 2 story addition into rear yard (does not encroach on rear yard set back); kitchen remodel; relocation of 3rd bedroom to 2nd floor at rear; electrical, mechanical, plumbing and structural work included | $310,000 |
| Jul 17, 2015 | Expired or cancelled withdrawn Nov 2021 | 1973 Greenwich St | to erect a 4 stories of 2 famly dwellings | $1,510,000 | |
| Jun 17, 2014 | Completed final sign-off Sep 2016 | 136 Clipper St | San Francisco Design & Constr., B And D Excavation And Construction | (n) garage & basement, remove (e) one story addition in back & replace w/(n); interior remodel, update mech, elec, plumbing. (n) 3-level addition (including basement) -addition to be within legislated rear yard setback w/permitted obstructions.Details
(n) garage & basement, remove (e) one story addition in back & replace w/(n); interior remodel, update mech, elec, plumbing. (n) 3-level addition (including basement) -addition to be within legislated rear yard setback w/permitted obstructions. | $700,000 |
| May 13, 2014 | Completed final sign-off Mar 2017 | 180 Idora Av | Soruco Structures | new second story deck & stairs; upgrade of existing lower level deck.Details
new second story deck & stairs; upgrade of existing lower level deck. | $25,000 |
| Jun 27, 2012 | Completed final sign-off Dec 2013 | 100 Pine St | Team Commercial Construction Inc. | suite #2800 & 2950-demolition & construct new interior partitions, storefront (interior) & doors, electrical work including new lighting, plumbing work including ada upgrades, hvac work, fire sprinkler & life safety work under separate permit. no structural workDetails
suite #2800 & 2950-demolition & construct new interior partitions, storefront (interior) & doors, electrical work including new lighting, plumbing work including ada upgrades, hvac work, fire sprinkler & life safety work under separate permit. no structural work | $882,650 |
| Jun 15, 2012 | Never finaled issued May 2013, no final | 164 Hartford St | Mrcc | replacement of (e) bonus room including new electrical work & plumbing to accomodate new structure.Details
replacement of (e) bonus room including new electrical work & plumbing to accomodate new structure. | $75,000 |
| Dec 24, 2010 | Completed final sign-off Sep 2011 | 340 Brannan St | Centric Construction Inc | 3rd floor suite 302 -partial inteior demo, new interior partitions, windows & doors, electrical modificatoins, new cabinets. windows and doors not facing street.Details
3rd floor suite 302 -partial inteior demo, new interior partitions, windows & doors, electrical modificatoins, new cabinets. windows and doors not facing street. | $75,000 |
| Dec 21, 2007 | Completed final sign-off May 2008 | 100 Pine St | Team Commercial Construction Inc. | minor tenant improvement on 29th. floor.Details
minor tenant improvement on 29th. floor. | $90,000 |
| Oct 27, 2006 | Completed final sign-off Dec 2007 | 379 Flood Av | addition to house extends into backyard. partial story well be constructed above addition. partial story contains bedroom and full bath. addition to main floor lenghthens kitchen and shifts bedroom. new stair from kitchen ascents to new bedroomDetails
addition to house extends into backyard. partial story well be constructed above addition. partial story contains bedroom and full bath. addition to main floor lenghthens kitchen and shifts bedroom. new stair from kitchen ascents to new bedroom | $200,000 |