Block 0290, lot 011
1 Bush St
The 200 most recent permits filed for this property.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 16, 2026 | Completed final sign-off May 2026 | 1 Bush St | Skyline Construction | to obtain final inspection for work approved under pa#: 202501218675. all work is complete | |
| Dec 3, 2025 | Completed final sign-off Dec 2025 | 1 Bush St | Bilcor Inc | 8th floor: remove and relocate 1 ceiling mount speaker strobe to new conference room. install 1 call station. install 1 call station signage with braille. install 1 life safety control relay moduel for security door lock release, 2 way call station to integrate with building 2 way emergency | $1,998 |
| Nov 14, 2025 | In progress issued Nov 2025 | 1 Bush St | Source Planning And Construction Inc | 8/f: new power and signal devices throughtou the space. new title 24 complaint lighting & controls. ref pa# 202510167525. | $25,000 |
| Oct 23, 2025 | Completed final sign-off May 2026 | 1 Bush St | Skyline Construction | 15th fl - revision to pa 202508082627 capture smoke control narritve updates and assorted mechanical revisions including updates to the smoke fire damper matrix | |
| Oct 16, 2025 | Completed final sign-off Jan 2026 | 1 Bush St | Source Planning And Construction Inc | 8th fl - ti include the demo of non-structural partition and building new non-structural partition ny new or revised electrical life safety work will bnd submitted separately | $77,958 |
| Sep 24, 2025 | Completed final sign-off Mar 2026 | 1 Bush St | Skyline Construction | 15th fl - revision to pa 202503051636 provide structural anchorage details for ceiling feature @ servery seating rm-11 | |
| Sep 18, 2025 | In progress issued Nov 2025 | 1 Bush St | Bilcor Inc | 15/f: install 1-booster panel, 13-red ceiling mount speaker/strobes, 29-white ceiling mount speaker/strobes, 115-smoke detectors, 15-duct smoke detectors, 15-control relays, 2-flush mount call station, 2-call station signage, 2-way call station to integrate w/bldg 2-way emergency communication syste | $126,540 |
| Aug 8, 2025 | Completed final sign-off Mar 2026 | 1 Bush St | Skyline Construction | defered mep for approved pa# 2025-0305-1636 15th fl. | $195,000 |
| May 2, 2025 | Completed final sign-off Sep 2025 | 1 Bush St | Anderson, Rowe & Buckley, Inc. | 15/f: ti- existing fire sprinkler system, 3 added, 77 removed & 47 relocated sprinklers. ref pa# 202503051636. | $13,500 |
| May 1, 2025 | Completed final sign-off May 2026 | 1 Bush St | Skyline Construction | 15/f level 15: interior tenant improvement. minor non-structural demo. new non-structural partitions, lighting, finishes, including restrooms. mep deferred. | $3,258,010 |
| Mar 13, 2025 | In progress issued Mar 2025 | 1 Bush St | Msr Mechanical Llc | 19/fl- install (3) cooling towers interior | $850,000 |
| Feb 14, 2025 | In progress issued Feb 2025 | 1 Bush St | Martin Sign Co Inc. | 17th fl ref pa 2024-1213-6818 change in fire sign exit location | |
| Jan 21, 2025 | In progress issued Mar 2025 | 1 Bush St | Skyline Construction | 15th fl structural floor reinforcemnt ada upgrades to restroom (no change in plumbing fixtures) | $70,000 |
| Jan 3, 2025 | In progress issued Jan 2025 | 1 Bush St | Principal Builders Inc. | revision to pa 202407317686 17th fl. fire only occupancy load clarification for assembly space | |
| Dec 13, 2024 | In progress issued Jan 2025 | 1 Bush St | Martin Sign Co Inc. | 17/f: 3- evacuation signs | $2,000 |
| Dec 12, 2024 | Completed final sign-off Dec 2024 | 1 Bush St | Golden Gate Fire Protection Inc | relocate 4 concealed pendent sprinklers 17th floor elevator lobby. as built to #202409191172 | $1,000 |
| Oct 3, 2024 | Completed final sign-off Jan 2025 | 1 Bush St | Bilcor Inc | 17/f: install 65 ceiling mount speakers/strobes.install 4 control relays,1 flush mount call station, 1 duct detector, 1 call station signage, two-way backbon infrastructure under pa 202011199332. ref t.i. pa202407317686. | $47,952 |
| Sep 19, 2024 | In progress issued Oct 2024 | 1 Bush St | Golden Gate Fire Protection Inc | 17/fl- ti 202407127686- relocate 137 pendant sprinklers | $34,250 |
| Aug 8, 2024 | Completed final sign-off Jan 2025 | 1 Bush St | Prima Acquire Inc Dba Lahue And Associat | 11/f: evacuation signs (3) | $1,439 |
| Jul 31, 2024 | Completed final sign-off Feb 2025 | 1 Bush St | Principal Builders Inc. | 17th fl- interior ti includes (n) non structural parititions, ceilings, finishes & mep | $3,073,800 |
| Jul 23, 2024 | In progress filed Jul 2024, not yet issued | 1 Bush St | 11th fl- evacuation sign (3) | ||
| Jul 11, 2024 | Completed final sign-off Jul 2024 | 1 Bush St | Bilcor Inc | 11th flr ste# 1150 - install (9) ceiling mount speaker - strobe. arch ref ti# 202403218357 | $5,994 |
| Jul 9, 2024 | Completed final sign-off Jan 2025 | 1 Bush St | Source Planning And Construction Inc | 11th fl: ref pa #2024-0508-1653 deferred electrical | $60,000 |
| Jun 5, 2024 | Completed final sign-off Jun 2024 | 1 Bush St | Bilcor Inc | ref pa # 2024-0510-1941 install (6) ceiling mount speaker strobes | $3,996 |
| Jun 3, 2024 | Completed final sign-off Jul 2024 | 1 Bush St | Anderson, Rowe & Buckley, Inc. | 11th floor: fire only: fire sprinkler ti- 2024-0321-8357: adding 2 sprinkler heads: relocate 24 sprinkler heads | $13,000 |
| May 31, 2024 | Completed final sign-off Jan 2025 | 1 Bush St | Source Planning And Construction Inc | ste 1150-ref pa# 2024-0321-8357 deferred mep submittal (fully sprinklered bldg) | $159,120 |
| May 16, 2024 | Completed final sign-off Feb 2025 | 1 Bush St | Principal Builders Inc. | 17/f. non structural interior demo only. per ab 017, area of work to remain vacant until all accesibility featuers have been restored under future permits. | $60,000 |
| May 10, 2024 | Completed final sign-off Jul 2024 | 1 Bush St | Skyline Construction | 15th fl demo only non structural ab017. ti to build out under sep permit | $67,000 |
| May 8, 2024 | Completed final sign-off Jan 2025 | 1 Bush St | Source Planning And Construction Inc | floor 11: interior demo & new construction of non structural elements including doors, finishes & lighting. no exterior bldf, site, landscape use or parking changes proposed. scope does not affect fixture quantities, occupant load, calcs or p.o.t. rrs on previosly approved pa# 2024-0321-8357. | $195,000 |
| Apr 29, 2024 | Completed final sign-off Jun 2024 | 1 Bush St | Anderson, Rowe & Buckley, Inc. | 15th fl demolition plan- existing fire sprinkler system. 61 relocated sprinklers | $16,000 |
| Mar 21, 2024 | Completed final sign-off Jan 2025 | 1 Bush St | Source Planning And Construction Inc | 11/f ti: interior demo and new construction of non-structural elements including but not limited to interior partitions, doors, finishes, celings, deferred mep. | $287,300 |
| Feb 7, 2024 | Completed final sign-off Jun 2024 | 1 Bush St | Bilcor Inc | work is on level 2 and 3: install 14 ceiling mount speaker strobes. level 2: arh. ref pa#202310037914 and level 3 ref arch #202310048030 | $9,324 |
| Nov 1, 2023 | In progress issued Nov 2023 | 1 Bush St | Ayoob & Peery Plumbing Co Inc | 2nd & 3rd fl - fire only. 2nd fl: add 3, relocate 5 fire sprinkler per t.i.. 3rd fl: add 7, relocate 14 fire sprinkler per t.i.. ref pa# 202310037914 (2nd fl). pa# 202310048030 (3rd fl). | $18,012 |
| Oct 4, 2023 | Completed final sign-off Dec 2025 | 1 Bush St | Bcci Construction Company | 3rd fl demo and construction of interior partitoins, open work space and conference rooms. mep included. | $400,000 |
| Oct 3, 2023 | Completed final sign-off Dec 2025 | 1 Bush St | Bcci Construction Company | 2nd/f: interior only office t.i. new open work space, conference rms, meeting rms, renovation of (e) restrooms. mep included | $400,000 |
| Sep 14, 2023 | Completed final sign-off Oct 2023 | 1 Bush St | Powell's Environmental Graphics Llc | new evacuation maps for 18th floor | $2,000 |
| Sep 12, 2023 | Completed final sign-off Oct 2023 | 1 Bush St | Golden Gate Fire Protection Inc | demo feed to (e) pre-action valve, reconnect room 177 to wet system | $6,000 |
| Aug 25, 2023 | Completed final sign-off Apr 2024 | 1 Bush St | Bilcor Inc | (basement) remove (1) smoke detector. remove (3) monitor module. | $2,664 |
| Jun 22, 2023 | Completed final sign-off Aug 2023 | 1 Bush St | Bilcor Inc | install (7) ceiling mount speaker strobes, (1) control relay, (1) surface mount call station and (1) arch ref pa# 2022-1215-8405, mech ref 2023-0608-9545 | $6,600 |
| Jun 22, 2023 | Completed final sign-off Aug 2023 | 1 Bush St | Bilcor Inc | 18/f: install 41-celiing mount speaker strobes, 1-smoke detector, 2-duct detectors, 3-control relays, 1-flush mount call station and 1-sign, ref arch/mech 2023-0321-4057 & backbone ref 2020-1119-9332 | $32,340 |
| Jun 15, 2023 | Never finaled issued Jun 2023, no final | 1 Bush St | Golden Gate Fire Protection Inc | f/s: relocate 3 pendent sprinklers on the 7/f. ti ref pa# 202212158405 | $1,900 |
| Jun 13, 2023 | Completed final sign-off Jan 2025 | 1 Bush St | Bilcor Inc | modify existing fire alarm due to demo of interior stair connecting 17/18th fl arch 202302091705 | $1,360 |
| Jun 8, 2023 | Completed final sign-off Nov 2023 | 1 Bush St | Richlen Construction | electrical and mechanical work for ti pa 2023-0322-4185 & 2022-1215-8405 | $125,000 |
| Jun 7, 2023 | Completed final sign-off Aug 2023 | 1 Bush St | Anderson, Rowe & Buckley, Inc. | 18/f: t.i. to (e) fire sprinkler system. relocate 116 heads; 20 heads added; 13 removed sprinklers & outlets plugged. ref pa# 202303214057 | $85,000 |
| May 9, 2023 | Never finaled issued May 2023, no final | 1 Bush St | Source Planning And Construction Inc | rev to pa# 202302091705, revised restroom scope to include previously approved restroom scope for pa# 202303214057 | |
| Mar 22, 2023 | Completed final sign-off Nov 2023 | 1 Bush St | Richlen Construction | 7/f: revision to p #202212158405, 7' wide double glass frameless door to large conf room in lieu of sliding glass, (n) conf rooms 717 & 718 not beng built, drywall & sliding dloors @ mtg & phone rm, keep rolling ladder & shelves @ nw corner, no wall coverings & kitchen millwork configuration | $300,000 |
| Mar 21, 2023 | Completed final sign-off Nov 2023 | 1 Bush St | Bcci Construction Company | 18th/f office t.i. demo (e) partition & ceiling. new partitions and finishes, mep included | $1,100,000 |
| Mar 16, 2023 | Completed final sign-off May 2023 | 1 Bush St | Anderson, Rowe & Buckley, Inc. | 17/f and 18/f: fire sprinkler only. ref permit 202302091705. add 2 uprights below new ceiling (stair infill) between 17/f and 18/f. | $1,000 |
| Feb 15, 2023 | Completed final sign-off Nov 2023 | 1 Bush St | Bcci Construction Company | 18th fl demo only for (e) office space | $75,000 |
| Feb 9, 2023 | Never finaled issued Feb 2023, no final | 1 Bush St | Source Planning And Construction Inc | 18/f: demo of (e) stair on 18th floor and structural infill at slab opening, no change to (e) eress and occupancy includes required path of travel upgrares mech, elec, life safety and sprinkler under seperate permit | $187,685 |
| Feb 9, 2023 | Never finaled issued Feb 2023, no final | 1 Bush St | Martin Sign Co Inc. | fabrication and installation of 6 evacuation maps for the 9th and 10th flrs. | $1,860 |
| Jan 31, 2023 | Completed final sign-off Mar 2023 | 1 Bush St | Bilcor Inc | 9th/10th flrs: install 75 simplex ceiling mount speaker strobes, 8 duct detectors, 11 control relays, 2 flush mount call stations, 2 signs and 1 smoke detector, ref pa# 202208150544 & 202208150546. | $65,340 |
| Dec 15, 2022 | Completed final sign-off Jan 2023 | 1 Bush St | Golden Gate Fire Protection Inc | fire sprinkler ti: relocate 49 pendents and 12 concealed pendents on the 9th floor. relocate 47 pendents and 23 concealed pendents on the 10th floor. ref t.i. #202208150544 (9th fl) and 202208150546 (10th fl). | $68,775 |
| Dec 15, 2022 | Completed final sign-off Nov 2023 | 1 Bush St | Richlen Construction | 7th/flr: minor demo of non-structural walls, ceiling and doors. new construction includes partitions and ceiling grid + tile, prl max system, light fixtures, millwork, power/ data and finishes throughout. restroom upgrades for accessibility. mep and life safety deferred. | $300,000 |
| Nov 4, 2022 | Completed final sign-off Feb 2023 | 1 Bush St | Source Planning And Construction Inc | bathroom accessibility upgrades on 6 fl restrooms. replacement of existing restroom partitions and faucets with new. existing toilets to remain. no mechanical, sprinkler and life safety work. path of travel previously approved 202106293447. | $75,000 |
| Aug 15, 2022 | Completed final sign-off Apr 2023 | 1 Bush St | Principal Builders Inc. | 9/f ti improvement. new partitions, ceiling, lighting, finishes and mep. upgrade to existing core restrooms for accessible compliance . new employee pantry and operable partition with associated structural support. | $2,400,000 |
| Aug 15, 2022 | Completed final sign-off Mar 2023 | 1 Bush St | Principal Builders Inc. | 10/f ti improvement. new partitions, ceiling, lighting, finishes and mep. upgrade to existing core restrooms for accessible compliance . new employee pantry | $2,200,000 |
| Jun 23, 2022 | Never finaled issued Jul 2022, no final | 1 Bush St | Anderson, Rowe & Buckley, Inc. | subbasement: replace (e) chiller and pumps with new. | $1,500,000 |
| Jun 1, 2022 | Completed final sign-off Aug 2022 | 1 Bush St | Bilcor Inc | suit #525: install 2 ceiling mount speaker strobes, relocate 3 ceiling mount speaker strobes, relocate 1 smoke detector. ref to t.i. 202204081879. | $1,320 |
| May 24, 2022 | Completed final sign-off Jan 2023 | 1 Bush St | Bcci Construction Company | 13th floor- revision to approved arch permit. m.e.p revision submittal included in set. ref: 202202047388. | $175,000 |
| May 24, 2022 | Completed final sign-off Jul 2022 | 1 Bush St | Bilcor Inc | 13th fl ste 1300: fire life safety. install 3 wall mount speaker strobes. 11 ceiling mount speaker strobes. 1 control relay. ref pa# 202202047388. | $9,900 |
| May 13, 2022 | Completed final sign-off Oct 2022 | 1 Bush St | Premier Structures Inc | ste 510/525: mod of hvac system to including 1 new colling only vav, 1 new exhaust fan & duct distribution to accommodate new layout. modifty power distribution & lighting to accomoodate new layout - title 24 compliance. ref to pa202204081879. | $150,000 |
| May 10, 2022 | Completed final sign-off Jun 2022 | 1 Bush St | Anderson, Rowe & Buckley, Inc. | 13th fl: as built to pa# 202202107699. fire sprinkler only. | $1,000 |
| Apr 8, 2022 | Completed final sign-off Oct 2022 | 1 Bush St | Premier Structures Inc | ste 510 and 525: demo and construction of partitions, doors, and finishes. patching of extg ceiling tile and grid. mechanical, electrical lifesafety and sprinkler under seperate permit. path of travel previously approved #202110623447. | $180,000 |
| Feb 10, 2022 | Completed final sign-off Jun 2022 | 1 Bush St | Anderson, Rowe & Buckley, Inc. | 13/f: existing fire sprinkler system - ti, 4 added, 78 relocated, and 1 removed sprinklers. ref ti permit 202202047388. | $41,000 |
| Feb 4, 2022 | Completed final sign-off Jan 2023 | 1 Bush St | Bcci Construction Company | 13/f suite 1300: new construction of partitions, power and lighting, mep and finishes. sprinkler, emergency lighting, fire alarm all deferred. | $1,400,000 |
| Jan 26, 2022 | Completed final sign-off Dec 2022 | 1 Bush St | Gci, Inc | 13th fl restrooms: demo at (e) restroom plumbing fixtures, finishes, & accessories. new plumbing fixtures, finishes, & accessories. (e) ceilings & lighting to remain. new light fixture. no mechanical, sprinkler, life safety work. | $100,000 |
| Dec 15, 2021 | Completed final sign-off Feb 2022 | 1 Bush St | Bilcor Inc | 14/f: isntall 5 ceiling mount speaker strobes of fire life safety devices. ref pa 202106172714. | $3,300 |
| Dec 6, 2021 | Completed final sign-off Apr 2022 | 1 Bush St | Bcci Construction Company | 13th/ fl partial demo only of (e) non-structural partitions per ab-017. no exterior work. | $45,000 |
| Nov 1, 2021 | Completed final sign-off Nov 2021 | 1 Bush St | Bilcor Inc | fire life safety 14th fl install 10 ceiling mount speaker strobes. mech 202107214823 arch 202106293447 | $6,600 |
| Sep 28, 2021 | Completed final sign-off Nov 2021 | 1 Bush St | Pioneer Fire Inc. | relocate (4) pendent sprinkler heards, add (2) upright heads, add (3) pendent sprinklers, (6) uprights. remove (4) pendent sprinkler heads. ref gcti 202106293447 | |
| Jul 30, 2021 | Completed final sign-off Sep 2021 | 1 Bush St | Johnson Controls Fire | 4th fl.modify (e) fire alarm system, remove, relocate, replace devices(1) existing nac circuit new (10) s/-v and s-only devices, (4) existing zone smoke detectors and (1) existing add cable strobe detector add (3) new ducts ref pa# 201912139467 | $1,500 |
| Jul 21, 2021 | Completed final sign-off Aug 2022 | 1 Bush St | Gci, Inc | 1400 - ref pa 2021-0629-3447 mechanical: demo (e) ductwork, install 4 (n) cooling only vav's. install ductwork. electrical, power, lighting & signal | $240,000 |
| Jun 29, 2021 | Completed final sign-off Aug 2022 | 1 Bush St | Gci, Inc | ti non structural interior partitions and modi0fications to (e) ceiling, lighting, electrical and finishes. | $500,000 |
| Jun 29, 2021 | Never finaled issued Jun 2021, no final | 1 Bush St | Golden Gate Fire Protection Inc | 4/f suite 450: fire sprinklers; relocate 25 pendent sprinkler and 21 uprights. t.i ref pa 201912139467 | $24,150 |
| Jun 17, 2021 | Completed final sign-off Mar 2022 | 1 Bush St | Gci, Inc | 14th fl restroom remodel. remodel all finishes except floors and install new finishes, plumbing fixtures and partitions. | $100,000 |
| Jun 15, 2021 | Completed final sign-off Oct 2021 | 1 Bush St | Clune Construction Company L P | mechanical, electrical, plumbing (mep) for approved permit #201912139467. full mech, electrical, plumbing for office improvement. | |
| Nov 19, 2020 | Completed final sign-off Jan 2021 | 1 Bush St | Bilcor Inc | fls - two-way comm. installation. install (1) command center base station, (1) sub-base station, (1) distribution board, (1) command center system supervisor, (1) power supply/ups back up, (2) back up batteries, (1) relay control card, (2) fire alarm monitor modules. | $6,600 |
| Jan 8, 2020 | Completed final sign-off Feb 2020 | 1 Bush St | Golden Gate Fire Protection Inc | 5th floor:fire sprinklers, relocate 12 pendent. ref app#201912048669 | $6,000 |
| Dec 13, 2019 | Completed final sign-off Oct 2021 | 1 Bush St | Clune Construction Company L P | 4th fl: partial ti consisting of new non-load bearing partitions, glazing, doors, millwork, lighting, electrical, a/v, telecom, plumbing, and mechanical. no structural. mep, fire life safety deferred. | $1,200,000 |
| Dec 4, 2019 | Never finaled issued Dec 2019, no final | 1 Bush St | Skyline Construction | 5th fl - revision to 2019-0219-3200 removal of partitions, finishes, doors | |
| Oct 15, 2019 | Completed final sign-off Dec 2019 | 1 Bush St | Johnson Controls Fire | adding 3 speaker strobes on 5th fl in fire alarm system. ref #201908279919 | $1,901 |
| Sep 5, 2019 | Never finaled issued Sep 2019, no final | 1 Bush St | Johnson Controls Fire | fire alarm provide and install 4 strobes, 5 speaker strobes to cover the ti area. ref 201908057855 | $5,281 |
| Sep 5, 2019 | Never finaled issued Sep 2019, no final | 1 Bush St | Golden Gate Fire Protection Inc | 5th floor: fire sprinklers relocate 7 pendent sprinkler heads. relocate/replace 17 uprights. add 2 uprights and one pendent. ref app#201908057855. (phase 2) | $13,500 |
| Aug 27, 2019 | Never finaled issued Aug 2019, no final | 1 Bush St | Skyline Construction | demolition and construction of new partitions, doors, finishes, portion of e ceiling tile and grid to remain. new millwork and sink. mep, ls, sprinker under sep permit | $235,000 |
| Aug 5, 2019 | Completed final sign-off Mar 2021 | 1 Bush St | Skyline Construction | phase 2- 5th floor: demo of non-bearing interior partitions, plumbing, mech, equipment/ducts and electrical work. new non-bearing interior partitions, doors, glass partitions, finishes, electrical, plumbing and mechanical work. | $552,500 |
| May 23, 2019 | Completed final sign-off May 2019 | 1 Bush St | Pioneer Fire Inc. | ste. 600: relocate 1 pendent ref 201901089858 | $500 |
| May 22, 2019 | Completed final sign-off Jul 2019 | 1 Bush St | Johnson Controls Fire | 6th fl: fire alarm system remove and replaced two speaker strobe and add one speaker strobe in the vestibule room. t.i. ref. 201901089858 | $1,901 |
| May 15, 2019 | Never finaled issued May 2019, no final | 1 Bush St | Skyline Construction | ref pa# 201901089858; title 24 for mechanical and electrical for t.i. for suite 600. maher n/a. | $18,000 |
| May 8, 2019 | Expired or cancelled cancelled Nov 2022 | 1 Bush St | to erect 1 story, no basement, type v-b, beverage kiosk. | $63,000 | |
| Apr 8, 2019 | Completed final sign-off Mar 2020 | 1 Bush St | Johnson Controls Fire | installing 19 speaker/strobes and 5 strobes on 5th flr and connecting them to (e) fire alarm system ref 201901241193 | $14,680 |
| Feb 21, 2019 | Completed final sign-off Mar 2019 | 1 Bush St | Golden Gate Fire Protection Inc | 5th flr. fire sprinklers only. 61 pendents & 61 uprights to be relocated, 2 each pendents and uprights added for tishman speyer. ref pa 201901241193 | $63,000 |
| Feb 19, 2019 | Completed final sign-off Mar 2021 | 1 Bush St | Skyline Construction | 5th fl - revision to ti 2019-0124-1193 slight wall layout shifts, lighting changes, mechanical ducts. reorganize slightly, lighting and power plan changed to match new wall layout | |
| Jan 24, 2019 | Completed final sign-off Mar 2021 | 1 Bush St | Skyline Construction | 5th fl ti includes demo of non bearing interior paritiions, plumbing fixtures, mech equipment (ducts, elec wor, improvements include new non bearing interior partitions, doors, glass partitons, finishes, lighting, mech work. fire alarm deferred. structural deferred. maher n/a. | $2,500,000 |
| Jan 8, 2019 | Completed final sign-off Jul 2019 | 1 Bush St | Skyline Construction | project is converting portion of file rm into private offices, including minor demo and construction of new partitions, doors & finishes. (e) ceiling tile and grid to remain, no plumbing work, mech, elec,life safety and sprinkler system modification is under sep permit. 6th fl | $55,000 |
| Nov 13, 2018 | Never finaled issued Nov 2018, no final | 1 Bush St | Golden Gate Fire Protection Inc | fire sprinkler - relocate 4 sprinkler pendents for gic on the 11th flor | $2,000 |
| Oct 10, 2018 | Never finaled issued Oct 2018, no final | 1 Bush St | Ken Wolz | set 5 bike bases with docks and connect to (e) ele nearby j-box at ground floor outside of building. not visible from street. | $300 |
| Sep 24, 2018 | Never finaled issued Sep 2018, no final | 1 Bush St | Gci, Inc | 11th flr. relocate grilles and thermostats, demo ductwork, re-balance vav to values per plans | $55,000 |
| Aug 8, 2018 | Completed final sign-off Aug 2019 | 1 Bush St | #1100 -select demo of partitions, doors, ceiling, lighting, and finishes, construction of new parttions, doors, ceilings, and finishes. safety mep and sprinkler system under seperate permit | $80,000 | |
| May 3, 2018 | Never finaled filed May 2018, never issued | 1 Bush St | to comply with nov 201845434 and nov 201845373 to permit a temporary structure that has an approved temporary use authorization from planning 2017-013303gen | $10,000 | |
| Mar 1, 2018 | Completed final sign-off Mar 2018 | 1 Bush St | Johnson Controls Fire | 9 & 10 flr - ti - add 2 speaker/strobes, 1 duct detector as shown on dwgs. relocate (e) 1 speaker/strobe to new location. demo 1 speaker/strobe. ref pa # 201712156588. | $2,500 |
| Jan 19, 2018 | Completed final sign-off Feb 2018 | 1 Bush St | Ayoob & Peery Plumbing Co Inc | 9th & 10th flr; fire sprinkler ti 9th flr - add 1 10th flr - relocate 4, remove 2 ref 201712156588 | $1,425 |
| Jan 3, 2018 | Completed final sign-off Feb 2018 | 1 Bush St | Johnson Controls Fire | revision to 201711033041 per inspector. relocate required s/d, 1 only | $500 |
| Dec 18, 2017 | Completed final sign-off Aug 2018 | 1 Bush St | Principal Builders Inc. | 8th flr: ti- r&r 1 ceiling height partition and add new door with minor patch paint & glazing. no new hvac or electrical work. sprinklers and life safety will not be impacted | $366 |
| Dec 15, 2017 | Completed final sign-off Aug 2018 | 1 Bush St | Bcci Construction Company | 9th & 10th floors - non-structural demo & build back of partitions, doors & finishes. mep included | $525,000 |
| Dec 14, 2017 | Completed final sign-off Oct 2018 | 1 Bush St | Tulley Mechanical, Inc | 2nd fl: installtion of (1) new mechanical unit to act as redundant of back up to the (e) unit in server room. associated electrical work and mechanical fastening of mechanical unit to (e) slab. no architectural work to be performed. | $25,000 |
| Nov 3, 2017 | Completed final sign-off Feb 2018 | 1 Bush St | Johnson Controls Fire | 4th fl - f/a ti: consist of adding new (3) speaker/stroes & (7) strobes. relocate existing (2) strobes to new location. demo existing devices as shown. ref ti #201709087329. | $8,000 |
| Oct 25, 2017 | Completed final sign-off Dec 2018 | 1 Bush St | Gci, Inc | new mechanical & electrical including demo (3) new vav boxes, (1) new heat pump, (1) transfer fan. new plumbing. new lighting/power signal. ref pa 2017-0908-7329 | |
| Oct 13, 2017 | Completed final sign-off Nov 2017 | 1 Bush St | Anderson, Rowe & Buckley, Inc. | fire sprinkler ti relocate heads 25, add heads 2, total heads: 27 | $14,175 |
| Sep 8, 2017 | Completed final sign-off Dec 2018 | 1 Bush St | Gci, Inc | #400- minor demolition of non structural partitions, construct new conference rooms, offices, ceiling and new finishes throughout. mep. life safety and sprinkler modification are under seperate permit. | $600,000 |
| Aug 21, 2017 | Completed final sign-off Dec 2018 | 1 Bush St | Gci, Inc | demolition of interior partitions, glazing, millwork, finishes, doors. e ceiling and lighting to remain. e mep and sprinkler modification sep permit. path of travel not req per ab-107 | $10,000 |
| May 12, 2017 | Completed final sign-off Jun 2017 | 1 Bush St | Johnson Controls Fire | 6th floor:consist of adding new 1 speaker/strobe and 1 duct detector as shown on drawings. t.i. #201701127025 | $1,500 |
| Jan 12, 2017 | Completed final sign-off May 2017 | 1 Bush St | Skyline Construction | 6th flr: demolition and construction of new partitions, doors and finishes. (e) ceiling tile and grid to remain. no plumbing work. mechanical, electrical life safety and sprinklers system modification is under sep permit | $180,000 |
| Nov 21, 2016 | Completed final sign-off Mar 2017 | 1 Bush St | Skyline Construction | suite 1500: mechanical and electrical work for tenant improvement, relocate (e) fire smoke dampers, replace (e) heat pump ref pa# 201609228519. | $20,000 |
| Nov 7, 2016 | Completed final sign-off Nov 2016 | 1 Bush St | Golden Gate Fire Protection Inc | 15th flr: fire sprinkler only, relocate 51 pendents & add 2 (53 total) for newmark cornish carey suite 1500 ref 201609228519 | $15,900 |
| Oct 17, 2016 | Completed final sign-off Dec 2016 | 1 Bush St | Johnson Controls Fire | 15th floor t.i. consists of adding (3) speakers.strobes. demo existing (1) speaker.strobe, (4) smoke detectors & (4) door holers. reff #201609228519. | $2,000 |
| Sep 22, 2016 | Completed final sign-off Mar 2017 | 1 Bush St | Skyline Construction | 15th fl: minor demo of partitions, doors, millwork, light/ceiling & finishes. construction of a new offices break room & conference room. new finishes, partitions, doors, ceiling, light fixtures, & millwork. flr is currently unoccupied. mep, sprnk, & l/s upgrade to be under seperate permits. | $867,000 |
| Sep 21, 2016 | Completed final sign-off Oct 2016 | 1 Bush St | Golden Gate Fire Protection Inc | fire sprinkler only - relocate 3 pendents, add 1 (4 total) for rock point group llc (suite # 1450) 14th floor | $2,625 |
| Aug 23, 2016 | Completed final sign-off Sep 2016 | 1 Bush St | Anderson, Rowe & Buckley, Inc. | 13th floor - existing fire sprinkler system - ti 26 relocated sprinklers, 6 added sprinklers. ref pa 2016-0629-1185. | $16,000 |
| Aug 19, 2016 | Completed final sign-off Sep 2016 | 1 Bush St | Johnson Controls Fire | 13th floor: ti - consists of adding 6 speaker/strobes, 2 duct detectors & 1 smoke detector. relocate (e) speaker/storbes to new locations as shown. ti 201606291185 | $6,000 |
| Jul 28, 2016 | Completed final sign-off Dec 2016 | 1 Bush St | Peacock Construction | ste 1450 - 14th flr: demolition and construction of new partitions, glazing, doors and minimal lighting. (e) ceiling tile and grid to remain. no plumbing work. mep, life safety and sprinkler under a separate permit | $80,000 |
| Jun 29, 2016 | Completed final sign-off Sep 2017 | 1 Bush St | Gci, Inc | ste 1350, minor demolition of partitions and doors; construction of new offices, break room, and conference room. new finishes, ceiling and light fixtures. | $200,000 |
| Apr 24, 2015 | Completed final sign-off Jul 2015 | 1 Bush St | Johnson Controls Fire | fire alarm t.i. for 12/f consist of relocating (11) existing speaker/strobes to new location, provide new (5) speaker/strobes & (5) speakers only. t.i. pa#201502208884 | $8,000 |
| Apr 7, 2015 | Completed final sign-off Jul 2015 | 1 Bush St | Ayoob & Peery Plumbing Co Inc | 12th floor fire sprinklers per tenant improvements. add 9, relocate 121. ref pa #2015.0220.8884. | $66,820 |
| Feb 27, 2015 | Completed final sign-off May 2015 | 1 Bush St | Johnson Controls Fire | ti of 13th flr - consist of adding 26-speakers/strobes, 1-duct detector ti 2015 0126 6672 | $11,000 |
| Feb 23, 2015 | Completed final sign-off Jul 2016 | 1 Bush St | Ayoob & Peery Plumbing Co Inc | 13th floor fire sprinklers per tenant improvements - add 12, relcoate 58, plugged 10. ref pa #2015.0126.6672. | $35,980 |
| Feb 20, 2015 | Completed final sign-off Aug 2015 | 1 Bush St | Bcci Construction Company | 12th floor: full floor interior construction of new, non-load bearing partitions, glazing, doors, millwork, lighting and associated electrical and mechanical. life safety under separate permit. | $1,450,000 |
| Jan 26, 2015 | Completed final sign-off Apr 2015 | 1 Bush St | Novo Construction Inc | suite 1300 t.i. to a 7500 sqft suite on the 13th floor to include new interior partitions millwork and finishes. mep included. | $817,500 |
| Jan 26, 2015 | Completed final sign-off Mar 2015 | 1 Bush St | Cannon Constructors North Inc | addition of lighting fixures in offices on the 17th and 18th fl. 52 offices total. no other work | $3,000 |
| Dec 2, 2014 | Completed final sign-off Feb 2015 | 1 Bush St | Novo Construction Inc | interior non structural demo | $9,500 |
| Dec 1, 2014 | Expired or cancelled cancelled Mar 2020 | 1 Bush St | installation of a verizon wireless idas system consisting of 1-dc power plant, 1-radio equipment rack, 1-donor antenna, 1-gps antenna | $35,000 | |
| Aug 25, 2014 | Completed final sign-off Dec 2014 | 1 Bush St | Ayoob & Peery Plumbing Co Inc | 19m - remove fire sprinkler heads & pipe, cap outlet at existing riser at elevator mech. room. no ref permit, only sprinkler work. will get sep permit for fa if necessary. | $3,500 |
| Jul 25, 2014 | Completed final sign-off Aug 2014 | 1 Bush St | Johnson Controls Fire | 14th floor. adding 4 speakler/strobes, 2 smoke detectors & 2 duct detectors. relocate existing devices to new location. demo (e) devisces shwon on dwg. ref. t.i. appl. #201406239128. | $9,000 |
| Jul 16, 2014 | Completed final sign-off Aug 2014 | 1 Bush St | R L H Fire Protection Inc | fire sprinkler permit. relocate 53, add 6 and delete 4 pendents, relocate 22 and add 38 uprights on the 14th floor, t.i. pa#201405236646 | $61,166 |
| Jun 23, 2014 | Completed final sign-off Dec 2014 | 1 Bush St | Gci, Inc | 14th flr: ti to provide new equipment for partial floor space pa #201405236646. | $503,293 |
| Jun 2, 2014 | Completed final sign-off May 2016 | 1 Bush St | Access Systems & Solutions Inc | install window washing equipment and guardrails at the mian roof level. | $350,000 |
| May 23, 2014 | Completed final sign-off Sep 2014 | 1 Bush St | Gci, Inc | 14th floor: t.i. to construct new partition doors, millwork and finishes. mep sprinklers and life safety on seperate permit. | $1,115,000 |
| May 9, 2014 | Completed final sign-off Jun 2014 | 1 Bush St | Gci, Inc | soft demo of non-structural partitions, doors, finishes on 12th floor. space will remain vacant per ab-017 and ada will be addressed under separate t.i. permit. | $40,000 |
| May 9, 2014 | Completed final sign-off Jun 2014 | 1 Bush St | Gci, Inc | soft demo of non structural partitions, doors & finishes on 13th floor, space remain vacant under ab-017 and ada will be addressed under separate permit. | $40,000 |
| May 2, 2014 | Completed final sign-off Jun 2014 | 1 Bush St | Johnson Controls Fire | fire alarm 17th and 18th fl: demo existing fire alarm devices. provide new 60 speaker strobes. 9 strobes, 5 speakers as shown ref 2014022279442 | $27,000 |
| Apr 28, 2014 | Completed final sign-off May 2014 | 1 Bush St | R L H Fire Protection Inc | 17 & 18th floors:fire sprinkler:relocate 78, add 12 and delete 13 pendents on the 17th floor. relocate 82, add 13 and delete 7 pendents on the 18th floor. t. i. app#201402279442. | $95,090 |
| Mar 26, 2014 | Completed final sign-off Nov 2014 | 1 Bush St | Bcci Construction Company | revision to pa# 201402118254 modify layout of pantry & storage, add sink at wellness room, change lock furnitures at #1710 & #1810 | $18,000 |
| Mar 25, 2014 | Expired or cancelled cancelled Jan 2026 | 1 Bush St | install guardrails & window washing equipment on the roof. | $350,000 | |
| Feb 27, 2014 | Completed final sign-off Jul 2014 | 1 Bush St | Bcci Construction Company | 17/f & 18/f t.i. include new non load bearing partitions, ceilings and finishes and associated mechanical and electrical. ls and sprinklers under seperate perit. | $1,935,000 |
| Feb 11, 2014 | Completed final sign-off Nov 2014 | 1 Bush St | Bcci Construction Company | structural, pre construction demolition per sfab-017 floors to remain unoccupied. | $38,250 |
| Jan 10, 2014 | Completed final sign-off Jan 2014 | 1 Bush St | Johnson Controls Fire | renovation existing fa to 16/f tenant improvement for add (1) smoke sensor, (2) duct sensor, (23) speaker/strobes, (3) strobes, (5) speakers. t.i. pa#201311202404 | $9,000 |
| Dec 17, 2013 | Completed final sign-off Jan 2014 | 1 Bush St | R L H Fire Protection Inc | 16th fl. fire sprinkler relocate 8, add 10 & delete 1 pendent sprinklers. ti pa#2013-11-20-2404. | $9,252 |
| Nov 20, 2013 | Completed final sign-off Jan 2014 | 1 Bush St | Dome Construction Corp | full floor interior construction of new non load bearing partitions, glasing, door,s millwork, lighting with associated elec, audio visual, tlecommunications, plumb,mech, fire/l/s, sep permits. no structural work to be performed | $787,000 |
| Oct 25, 2013 | Completed final sign-off Nov 2013 | 1 Bush St | Johnson Controls Fire | revision to pa# 2013-0628-0704-as builts drawings-add magnetic door holders in the sequence of operation | |
| Oct 18, 2013 | Completed final sign-off Nov 2013 | 1 Bush St | Johnson Controls Fire | additional new (1) nac panel, (1) smoke detector, (2) pull stations, (10) duct detectors, (1) strobe, (3) speakers, (54) speaker/strobes to 9/f & 10/f fire alarm improvement. t.i.# 201308013346 (9/f) & 201308013349 (10/f) | $30,000 |
| Sep 27, 2013 | Completed final sign-off Nov 2013 | 1 Bush St | R L H Fire Protection Inc | 9th and 10th floor. add, removed and relocate fire sprinkler heads per t.i.: 9th floor: 27 add, 116 relocate, 6 remove, 10 floor:19 add 105 relocate, 7 remove | $137,238 |
| Sep 3, 2013 | Never finaled issued Oct 2013, no final | 1 Bush St | Gci, Inc | structural work to remove slab between 9th and 10th fl. install inter connecting stairs to servie tenant space. ref 201308013346 and 201308013349 for ti work | $120,000 |
| Aug 1, 2013 | Completed final sign-off Dec 2013 | 1 Bush St | Gci, Inc | 10th floor-full floor t.i-build new non structural partitions, doors, millwork with m.e.p to relocate & install equipment & fixtures. sprinklers, life safety, card readers & a structural stair will be submitted under seperate permit. | $1,374,300 |
| Aug 1, 2013 | Completed final sign-off Dec 2013 | 1 Bush St | Gci, Inc | 9th floor-full floor t.i-build new non structural partitions, doors, millwork with m.e.p to relocate & install equipment & fixtures. sprinklers, life safety & a structural stair will be submitted under seperate permit | $1,374,300 |
| Jul 31, 2013 | Completed final sign-off Aug 2013 | 1 Bush St | Simplexgrinnell Lp. | 7th floor:revision to app#201307172005. removing non existant devices shown on plans. | |
| Jul 24, 2013 | Never finaled issued Jul 2013, no final | 1 Bush St | Gci, Inc | 9th and 10th floors - interior demo on 9th and 10th floors to remove non structrual partitions, doors, and finishes to create space for future ti. floors will remain vacant under ab017 and all ada requirements will be under future tis | $100,000 |
| Jul 19, 2013 | Completed final sign-off Jul 2013 | 1 Bush St | Golden Gate Fire Protection Inc | 11th floor-relocate 21 pendent sprinkler heads ti 201306129324 | $10,815 |
| Jul 17, 2013 | Completed final sign-off Sep 2013 | 1 Bush St | Simplexgrinnell Lp. | 7th floor fire alarm - add 2 new strobes wall-mount, 9 speaker/strobes, 17 strobes ceiling-mount, 3 speakers, remove & cover 4 existing speaker/strobes, 3 existing strobes, 6 (e) smoke sensors, 4 existing door holders, relcoate 4 (e) speakers & 2 (e) strobes to new location. ref #2013.05.17.7212. | $9,000 |
| Jul 16, 2013 | Never finaled issued Jul 2013, no final | 1 Bush St | Gci, Inc | ste #1100 and basement :mechanical and electrical for t.i. 11th floor ti under 201306129324- basement work mep only, no construction plans required for basement- sprinklers and fire alarm separate permit | $230,000 |
| Jul 2, 2013 | Completed final sign-off Sep 2013 | 1 Bush St | Pioneer Fire Inc. | remodel 51 relocated pendants, add 4 pendants, relocate 30 uprights. t.i. pa#201305177212 | $30,448 |
| Jun 28, 2013 | Completed final sign-off Nov 2013 | 1 Bush St | Simplexgrinnell Lp. | t.i. on 11th floor:add 3 smoke sensor, 4 door holders, 5 duct detector, 1 relay iam, 6 speakers, 3 speakers, 1 storbes, 10 strobes. relocate (1)door holder. ref app#201306129324 | $15,000 |
| Jun 12, 2013 | Completed final sign-off Nov 2013 | 1 Bush St | Gci, Inc | suite 1100: full floor interior construction of new non-load bearing partitions, glazing doors & millwork. mep deferred. life safety & fire sprinkler under separate permit. | $1,143,513 |
| Jun 7, 2013 | Completed final sign-off Jun 2013 | 1 Bush St | Simplexgrinnell Lp. | 2nd & 3rd floors-fire alarm t.i-install 9 speaker/strobes, 2 speaker, 4 smoke detectors, 4 door holders, demo/remove 8 speaker/strobes & relocate 2 speaker/strobes ti pa 201303121984 | $8,000 |
| May 17, 2013 | Completed final sign-off Sep 2013 | 1 Bush St | Gci, Inc | tenant improvement on 7th flr to construct new non-load bearing partitions, doors, millwork and finishes and new mep equipment | $1,400,000 |
| May 9, 2013 | Completed final sign-off May 2013 | 1 Bush St | Ayoob & Peery Plumbing Co Inc | add, remove and relocate fire sprinkler heads per tenant improvements :2nd floor: 2 add, 12 relocate. 3rd floor:2 add, 8 relocate and 2 remove. ref app#201303121984 | $12,300 |
| May 8, 2013 | Completed final sign-off Jan 2014 | 1 Bush St | Gci, Inc | 7th floor soft demo of tenant interior space to remove non-structural partitions, doors,frames, finishes & mep equipment. space will remain vacant per ab-017. new construction will happen until future t.i. permit with ada requirement. | $35,000 |
| Apr 15, 2013 | Completed final sign-off May 2013 | 1 Bush St | Cannon Constructors North Inc | 14th floor-demolition of only (e) non structural partitions, associated power & telecom outlets, plumbing & finishes. (e) ceiling finshes to remain. approx. 2300 sq.ft. of office area. exiting & occupancy to be addressed under seperate permit per ab-017 | $5,000 |
| Mar 29, 2013 | Expired or cancelled cancelled Jan 2026 | 1 Bush St | 12th floor-change (e) office into conference room, no electrical & no plumbing work. life safety under seperate permit | ||
| Mar 12, 2013 | Completed final sign-off Oct 2013 | 1 Bush St | Dome Construction Corp | 2nd & 3rd floors-interior tenant improvement including demolition, new partitions, new electrical, plumbing, mechanical. new ceiling & lighting. related finishes. no structural worked to be performed. sprinkler and ls on sep permit. no access control devices into tennant space are approved. | $730,000 |
| Mar 5, 2013 | Completed final sign-off Apr 2013 | 1 Bush St | Golden Gate Fire Protection Inc | fire spirnkler system upgrade, relocate 119 pendent sprinkler heads on the 8th floor. add 1 sidewall sprinkler. ref app#201212286961 | $61,800 |
| Mar 4, 2013 | Completed final sign-off Mar 2013 | 1 Bush St | Simplexgrinnell Lp. | 12th floor-fire alarm ti-5 new speaker/strobes, remove 5 smokes, remove 4 door holders & remove 1 strobe | $5,000 |
| Feb 15, 2013 | Completed final sign-off Mar 2013 | 1 Bush St | Acco Engineered Systems Inc. Dba Acco En | relocating existing diffuser to new location. re-use existing wshp. | $40,000 |
| Feb 11, 2013 | Completed final sign-off Apr 2013 | 1 Bush St | Simplexgrinnell Lp. | fire alarm system t.i. to 8th floor. relocate 26 existing speakers/strobes, relocate 2 smoke, relocate 2 door holders, demo 3 smokes & 2 door holders. add 9 new devices. t.i ref pa#201212286961 | $8,000 |
| Feb 6, 2013 | Completed final sign-off Mar 2013 | 1 Bush St | R L H Fire Protection Inc | fire sprinkler permit. ti ref pa# 201212146250. relocate 8, add 3 and delete 2 pendent sprinklers. | $5,500 |
| Dec 28, 2012 | Completed final sign-off Apr 2013 | 1 Bush St | Principal Builders Inc. | t.i on the 8th floor to build new non-structural partitions in existing vacant space, mech, electrical & plumbing included. | $850,273 |
| Dec 14, 2012 | Completed final sign-off Mar 2013 | 1 Bush St | Charles Pankow Builders Ltd | interior tenant improvement, to add offices & open offices. mech, electrical & life safety/sprinkler modifications shall be under separate permit | $128,000 |
| Nov 14, 2012 | Completed final sign-off Feb 2013 | 1 Bush St | Principal Builders Inc. | includes demo of non structral partitions in vacant space. future work to be submitted udner separate permit | $5,000 |
| Jul 10, 2012 | Never finaled issued Jul 2012, no final | 1 Bush St | Simplexgrinnell Lp. | 6th floor life safety - addition of (2) multi-candela ceiling mount speaker/strobes. | $4,000 |
| Jun 7, 2012 | Completed final sign-off Aug 2012 | 1 Bush St | 6th floor-(e) fire sprinkler system t.i.-relocate 1 sprinkler & add 5 sprinklers. ti pa# 201204138238 | $2,500 | |
| Apr 13, 2012 | Completed final sign-off Oct 2012 | 1 Bush St | Turner Construction Co | 6th fl: ti of office space including minor interior. demo of power and data outlets, new partitions, patch ceiling grid and tile,, new and relocated lights, new elec., patch and repair finishes, no structural work. mep to design build. | $55,000 |
| Jan 26, 2012 | Completed final sign-off Feb 2012 | 1 Bush St | Anderson, Rowe & Buckley, Inc. | existing fire sprinkler system. raise and center one sprinkler. 11th floor. | $500 |
| Jan 24, 2012 | Completed final sign-off Feb 2012 | 1 Bush St | Simplexgrinnell Lp. | remove and cover 4 extg strobes. remove and replace 2 extg strobe with new. install 3 new strobes and 1 ceiling mount speaker for 11th flr t.i. | $5,000 |
| Dec 13, 2011 | Completed final sign-off Feb 2012 | 1 Bush St | Jones Lang La Salle Construction Company | t.i. of office space including minor interior demolition on non structural partitions and portions of ceiling grid and tile. new partitions patching of ceiling grid and tile new and relocate lights, new electrical and patch and repiar finishes. no structural work/mep design bldg under seperate prmt | $50,000 |
| Apr 1, 2011 | Completed final sign-off Jul 2011 | 1 Bush St | Siemens Industry, Inc. | basement level-addition of a control panel, 5 zone modules, 4 relay modules, 6 duct detectors for the "battery plant upgrade" project at the basement level. the new control panel will connect to (e) smoke detectors & pull stations for the telco equipment rm fire suppression system (e) | $11,000 |
| Feb 22, 2011 | Completed final sign-off Mar 2011 | 1 Bush St | Simplex Grinnell | 5th floor-fire alarm t.i-relocating 4 (e) speaker/strobes | $5,000 |
| Feb 4, 2011 | Completed final sign-off Mar 2011 | 1 Bush St | R L H Fire Protection Inc | 5th floor-fire sprinkler system upgrade-relocate 4 pendent heads & delete 1 head | $2,500 |
| Jan 26, 2011 | Completed final sign-off Mar 2011 | 1 Bush St | Dome Construction Corp | office renovation, minor work, add 2 offices, relocation of sink | $140,000 |
| Nov 29, 2010 | Never finaled issued Nov 2010, no final | 1 Bush St | Simplex Grinnell | 5th floor - add (1) new multi-candela strobe to break room, (1) new multi-candela speaker/strobe to conference room. | $3,000 |
| Nov 23, 2010 | Completed final sign-off Feb 2011 | 1 Bush St | Dome Construction Corp | 5th: mep drawings corresponding to minor office space renovation. ref 201010153075 | |
| Oct 15, 2010 | Completed final sign-off Feb 2011 | 1 Bush St | Dome Construction Corp | minor demolition. construct new offices and breakroom. provide new interior finishes. mep & life safety under separate permit. | $75,000 |
| Aug 25, 2010 | Completed final sign-off Jun 2011 | 1 Bush St | Roebbelen Contracting Inc | install battery stands at basement | $50,000 |
| Aug 24, 2010 | Completed final sign-off Sep 2010 | 1 Bush St | Turner Construction Co | remove 14' of wall. relocate 1 elec receptacle. relocate 1 data receptacle. relocate 1 switch all to adjacent wall existing. remove 2 doors and frame. paint. install 3'x9' glass. install small strip of carpet | $12,000 |
| Jun 15, 2010 | Never finaled issued Jun 2010, no final | 1 Bush St | street space | ||
| Jun 11, 2010 | Completed final sign-off Jul 2010 | 1 Bush St | Simplex Grinnell | as built fire alarm pland for pa# 2009-0813-4791 no work under this permit. | |
| Mar 16, 2010 | Completed final sign-off Mar 2010 | 1 Bush St | Turner Construction Co | office ti on 12th floor. remove partiton wall to create large conference room | $5,000 |
| Feb 8, 2010 | Completed final sign-off May 2010 | 1 Bush St | Dome Construction Corp | 2nd fl - remodel of existing conference room to become a video conference room. scope of work includes acoustical wall furring, new lighting, power, data outlets and rework of existing hvac | $79,000 |
| Jan 22, 2010 | Expired or cancelled cancelled Jan 2026 | 1 Bush St | remove and replace (e) battery supports only on basement level. old battery removal and new battery installation is under a different permit application and scope of work. | $27,000 | |
| Nov 12, 2009 | Completed final sign-off Feb 2010 | 1 Bush St | Skyline Construction | 9th & 10th floors-new interior non-structural partition to create private offices, electrical work included. fire alarm, sprinkler & mechical under seperate permit if necessary | $21,000 |
| Nov 10, 2009 | Completed final sign-off Feb 2010 | 1 Bush St | Simplex Grinnell | revision to pa# 2009-0810-4425-re-routing of circuit place end of line resistor on ckt "v6", no additional devices | |
| Oct 26, 2009 | Completed final sign-off Dec 2009 | 1 Bush St | Simplex Grinnell | add 3 new speaker/strobes and relocate 1 existing speaker/strobe | $1,000 |