Derrick Wu
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Derrick T. Wu Architect
- Based in
- Oakland
- On San Francisco permits
- Apr 2001 to Jul 2026
95 permits since 2000 (architect on 87 permits, engineer on 5 permits, authorized agent-others on 3 permits): 65 completed, 4 in progress, 6 never finaled, 20 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 24, 2026 | In progress filed Jul 2026, not yet issued | 17 Chula Ln | to comply with nov #202432205. legalize an enclosed patio constructed by previous owner without permit. enclosed patio is on the ground floor between living room of the house and rear yard, with an open deck above.Details
to comply with nov #202432205. legalize an enclosed patio constructed by previous owner without permit. enclosed patio is on the ground floor between living room of the house and rear yard, with an open deck above. | $10,000 | |
| Jul 7, 2026 | In progress filed Jul 2026, not yet issued | 2934 24th St | John Sutti & Associates, Inc. | interior t.i. to existing grocery market to install a commericial kitchen. modify existing restroom to meet accessiblity standards.Details
interior t.i. to existing grocery market to install a commericial kitchen. modify existing restroom to meet accessiblity standards. | $168,000 |
| Jun 4, 2026 | In progress issued Jun 2026 | 1515 Sunnydale Av | John Sutti & Associates, Inc. | 1st time, interior t.i. for grocery market vacant space of recently completed mixed bldg. construction work shall include minor demolition of existing partitions, new partitions, mechanical, electrical, plumbing improvement for sale floor, storage, cold storage, produce prep.Details
1st time, interior t.i. for grocery market vacant space of recently completed mixed bldg. construction work shall include minor demolition of existing partitions, new partitions, mechanical, electrical, plumbing improvement for sale floor, storage, cold storage, produce prep. | $1,200,000 |
| Dec 29, 2025 | Completed final sign-off Jul 2026 | 2001 Van Ness Av | Soundproofing Remodelers | suite 100: interior non structural, wall, floor and exposed ceiling finishes. mep & fire deferredDetails
suite 100: interior non structural, wall, floor and exposed ceiling finishes. mep & fire deferred | $75,000 |
| Jul 23, 2025 | In progress issued Jul 2026 | 442 Wilde Av | Jin's Construction Inc | converting (e) udu at lower lvl of bldg to adu. proposed adu consists of living/dining area, 1-bedroom, 1-bath and a kitchen that has been converted from a laundry. total adu area is 1,068 sqft.Details
converting (e) udu at lower lvl of bldg to adu. proposed adu consists of living/dining area, 1-bedroom, 1-bath and a kitchen that has been converted from a laundry. total adu area is 1,068 sqft. | $8,000 |
| Sep 5, 2024 | Completed final sign-off Mar 2025 | 2533 Noriega St | T S C Construction Co. | repair and restoration in-kind of a building exterior wall damaged by car impact. comply nov #202425884.Details
repair and restoration in-kind of a building exterior wall damaged by car impact. comply nov #202425884. | $18,000 |
| Nov 13, 2023 | Completed final sign-off Jun 2024 | 1300 Stockton St | Jin's Construction Inc | the project is the business entrance barrier remediation per compliance category two determination (abe 201910247386). request technical infeasibility to correct level change between sidewalk and entrance landing. request equivalent facilitation for non-compliant maneuvering space at entrance.Details
the project is the business entrance barrier remediation per compliance category two determination (abe 201910247386). request technical infeasibility to correct level change between sidewalk and entrance landing. request equivalent facilitation for non-compliant maneuvering space at entrance. | $5,800 |
| Jun 12, 2023 | Completed final sign-off Sep 2024 | 743 Washington St | T S C Construction Co. | business entrance barrier remdediation to comply with accessible business entrance program 51-16 abe 201901104135. request for technical infeasibilityDetails
business entrance barrier remdediation to comply with accessible business entrance program 51-16 abe 201901104135. request for technical infeasibility | $400 |
| Jun 12, 2023 | Completed final sign-off Apr 2024 | 755 Sansome St | Peacock Construction | upgrade e restrooms for acessibility compliance. work incluse provision of drining fountains, reposition door. install powr door operator. modification of toilet compartment partitoins, relocate toilets and grab barsDetails
upgrade e restrooms for acessibility compliance. work incluse provision of drining fountains, reposition door. install powr door operator. modification of toilet compartment partitoins, relocate toilets and grab bars | $38,000 |
| May 25, 2023 | Expired or cancelled cancelled Jan 2026 | 925 Kearny St | business entrance barrier remediation to comply with accessible business entrance program 51-16 abe201901154352. provide door bell and signage to offer acdess assistanceDetails
business entrance barrier remediation to comply with accessible business entrance program 51-16 abe201901154352. provide door bell and signage to offer acdess assistance | $300 | |
| May 25, 2023 | Expired or cancelled cancelled Jan 2026 | 852 Washington St | business entrance barrier remediation to comply with accessible busines entrance program 51-16 & abe201901244663. provide door bell and signate to offer access assistance. provide handrails at stairs.Details
business entrance barrier remediation to comply with accessible busines entrance program 51-16 & abe201901244663. provide door bell and signate to offer access assistance. provide handrails at stairs. | $3,000 | |
| Mar 31, 2023 | Expired or cancelled cancelled Jan 2026 | 915 Kearny St | business entrance barrier remediation to comply with acessible business entrance program. abe 201901154347. provide power door operatorDetails
business entrance barrier remediation to comply with acessible business entrance program. abe 201901154347. provide power door operator | $4,000 | |
| Feb 1, 2023 | Completed final sign-off Oct 2023 | 723 Clay St | accessible business entrance program per ordinance 51-16 business entrance barrier remediation to comply with accessible business entrance program 51-16 abe# 202001311570, request for technical infeasibility approvalDetails
accessible business entrance program per ordinance 51-16 business entrance barrier remediation to comply with accessible business entrance program 51-16 abe# 202001311570, request for technical infeasibility approval | $1,000 | |
| Jan 31, 2023 | Completed final sign-off Feb 2024 | 944 Irving St | business entrance barrier remediation to comply with accessible business entrance program 51-16, abe # 201910096903, request for technical infeasibility approval.Details
business entrance barrier remediation to comply with accessible business entrance program 51-16, abe # 201910096903, request for technical infeasibility approval. | $2,500 | |
| Jan 25, 2023 | Expired or cancelled cancelled Jan 2026 | 1174 Bryant St | business entrance barrier remediation to comply with accessible business entrance program 51-16. abe 201910257439, request for technical infeasibility approvalDetails
business entrance barrier remediation to comply with accessible business entrance program 51-16. abe 201910257439, request for technical infeasibility approval | $800 | |
| Jan 25, 2023 | Expired or cancelled cancelled Jan 2026 | 478 Jackson St | to comply with accessible business entrance program 51-16, abe 201910257400, request for technical infeasibility business entrance barrier remediationDetails
to comply with accessible business entrance program 51-16, abe 201910257400, request for technical infeasibility business entrance barrier remediation | $400 | |
| Jan 23, 2023 | Expired or cancelled cancelled Jan 2026 | 412 Jackson St | to comply with accessible business entrance program 51-16, abe 201910257429, business entrance barrier remediation provide power door operatorDetails
to comply with accessible business entrance program 51-16, abe 201910257429, business entrance barrier remediation provide power door operator | $4,800 | |
| Jan 23, 2023 | Expired or cancelled cancelled Jan 2026 | 1301 Harrison St | business entrance barrier remediation to comply with accessible business entrance program 51-16 abe 201910257437. provide handrails and warning stridesat stairsDetails
business entrance barrier remediation to comply with accessible business entrance program 51-16 abe 201910257437. provide handrails and warning stridesat stairs | $2,800 | |
| Dec 21, 2022 | Expired or cancelled cancelled Jan 2026 | 2157 Polk St | front bldg-accessible business entrance program per ordinance 51-16. abe #201901144233: powell door operator & actuatorsDetails
front bldg-accessible business entrance program per ordinance 51-16. abe #201901144233: powell door operator & actuators | $4,800 | |
| Dec 21, 2022 | Expired or cancelled cancelled Jan 2026 | 2157 Polk St | front bldg-accessible business entrance program per ordinance 51-16. abe #201901144231: powell door operator & actuatorsDetails
front bldg-accessible business entrance program per ordinance 51-16. abe #201901144231: powell door operator & actuators | $4,800 | |
| Sep 29, 2022 | Expired or cancelled cancelled Jan 2026 | 6908 Geary Bl | demolition of existing non structural partiions new non structural partitions, new millwork, finishes, electrical and plumbing work, new kitchen equipment for future limited restaurantDetails
demolition of existing non structural partiions new non structural partitions, new millwork, finishes, electrical and plumbing work, new kitchen equipment for future limited restaurant | $38,000 | |
| Mar 25, 2022 | Completed final sign-off Jan 2023 | 1353 48th Av | interior remodel to include removal of metal circular stairs, structural, mechanical, plumbing & electrical upgrade. new interior finishes, replacement of windows in kind. and full seismic upgrade. as follow up to bpa 202110080152.full new bath on upper flrDetails
interior remodel to include removal of metal circular stairs, structural, mechanical, plumbing & electrical upgrade. new interior finishes, replacement of windows in kind. and full seismic upgrade. as follow up to bpa 202110080152.full new bath on upper flr | $128,000 | |
| Feb 21, 2020 | Completed final sign-off Apr 2023 | 1101 Grant Av | to comply with abe ord 51-16 remediation for 1101 grant aveDetails
to comply with abe ord 51-16 remediation for 1101 grant ave | $3,800 | |
| Feb 21, 2020 | Completed final sign-off Apr 2023 | 1105 Grant Av | to comply with abe ord 51-16 remediation for 1105 grant aveDetails
to comply with abe ord 51-16 remediation for 1105 grant ave | $3,800 | |
| Feb 6, 2020 | Completed final sign-off Jun 2024 | 3401 Judah St | Jin's Construction Inc | to comply with abe ord 51-16 abe 201910257421.business entrance barrier remdieation, replace entry door, install power door push button.Details
to comply with abe ord 51-16 abe 201910257421.business entrance barrier remdieation, replace entry door, install power door push button. | $3,000 |
| Dec 4, 2019 | Completed final sign-off Apr 2023 | 714 Pacific Av | comply w/ accessible business entrance program 51-16: business entrance barrier remediation for 714a pacificDetails
comply w/ accessible business entrance program 51-16: business entrance barrier remediation for 714a pacific | $3,800 | |
| Oct 1, 2019 | Completed final sign-off Jan 2020 | 646 Clement St | 8 Plus Inc. | accessible business entrace program per oridinace 51-16. barrier removel and to provide power door operator on both sides of (e) entrance.Details
accessible business entrace program per oridinace 51-16. barrier removel and to provide power door operator on both sides of (e) entrance. | $3,000 |
| May 21, 2018 | Expired or cancelled expired Aug 2023 | 3006 26th St | American Precision Bldrs | revision to app#201802282477 for additional structural upgrade. repair exterior siding, replace windows in kind, add mechanical room in basement, comply with complaint 200455245 item #2.Details
revision to app#201802282477 for additional structural upgrade. repair exterior siding, replace windows in kind, add mechanical room in basement, comply with complaint 200455245 item #2. | $50,000 |
| Feb 28, 2018 | Expired or cancelled expired Aug 2023 | 3006 26th St | American Precision Bldrs | interior improvement and structural work. no change to unit count, sq ft, & no change to bldg exterior. mech,plmg, & elect. work to be under separate permit/application. comply with complaint #200455245 item #2Details
interior improvement and structural work. no change to unit count, sq ft, & no change to bldg exterior. mech,plmg, & elect. work to be under separate permit/application. comply with complaint #200455245 item #2 | $38,000 |
| Dec 20, 2017 | Completed final sign-off May 2018 | 555 Montgomery St | Rudolph Commercial Interiors Inc, Rci | 1st floor - interior renovation of existing storage to provide for a computer equipment room for bank operation. n/a maher ordinanceDetails
1st floor - interior renovation of existing storage to provide for a computer equipment room for bank operation. n/a maher ordinance | $28,000 |
| Sep 29, 2017 | Never finaled issued Jun 2018, no final | 499 33rd Av | L F George Construction Corp | #310- revise drawing to show as-built condition to pa#201411262652. n/a ordinance #155-13; n/a maherDetails
#310- revise drawing to show as-built condition to pa#201411262652. n/a ordinance #155-13; n/a maher | |
| Jun 22, 2017 | Completed final sign-off Sep 2017 | 1620 Diamond St | High Ground Construction | structural revision to #201705257653 for kitchen/bath work. kitchen header to tv room & shearwall change at door to dining room.Details
structural revision to #201705257653 for kitchen/bath work. kitchen header to tv room & shearwall change at door to dining room. | $900 |
| Mar 1, 2017 | Completed final sign-off May 2017 | 1409 Sutter St | Advanced Design General Contractor | to bid complaint #201759894 and eid complaint #201759892, pid complaints #201759896. install bath on 4th floor office.Details
to bid complaint #201759894 and eid complaint #201759892, pid complaints #201759896. install bath on 4th floor office. | $9,000 |
| Jun 2, 2016 | Expired or cancelled cancelled Jan 2026 | 555 Montgomery St | barrier removal. provide 60" clearance at accessible toilets. n/a for maherDetails
barrier removal. provide 60" clearance at accessible toilets. n/a for maher | $108,000 | |
| May 3, 2016 | Completed final sign-off Oct 2019 | 523 Munich St | interior renovation & horizontal addition to (e) 2 story, 2 unit residential building. additional 1 bedroom & 1 bath on each floor.Details
interior renovation & horizontal addition to (e) 2 story, 2 unit residential building. additional 1 bedroom & 1 bath on each floor. | $125,000 | |
| Feb 25, 2016 | Completed final sign-off Jul 2016 | 555 Montgomery St | Commercial Interior Builders Inc | office ti on 15th floor only, interior renovation to remove ceiling height partition and install interior windows. no electrical, lighting, mechanical work. maher naDetails
office ti on 15th floor only, interior renovation to remove ceiling height partition and install interior windows. no electrical, lighting, mechanical work. maher na | $8,800 |
| Jul 8, 2015 | Completed final sign-off Jan 2017 | 555 Montgomery St | Commercial Interior Builders Inc | 1st floor: remodel existing lobby control console and provide accessible counter. maher n/a.Details
1st floor: remodel existing lobby control console and provide accessible counter. maher n/a. | $8,000 |
| Nov 26, 2014 | Completed final sign-off May 2015 | 499 33rd Av | L F George Construction Corp | residential units only, interior improvement including: painting, new flooring, millwork; maher n/aDetails
residential units only, interior improvement including: painting, new flooring, millwork; maher n/a | $68,000 |
| Oct 31, 2014 | Completed final sign-off Dec 2014 | 555 Montgomery St | Commercial Interior Builders Inc | 15th floor - office interior improvement to sub-divide an existing tenant suite. no mechanical, plumbing or life safety work. n/a maher ord # 155-13Details
15th floor - office interior improvement to sub-divide an existing tenant suite. no mechanical, plumbing or life safety work. n/a maher ord # 155-13 | $12,000 |
| Oct 30, 2014 | Never finaled issued Oct 2014, no final | 555 Montgomery St | Kone Inc. | barrier removal. destination based elevator dispatching upgrade. comply with ab-090. maher n/a. fire inspection shall be required at the end of destination work on the complete group 4- system.Details
barrier removal. destination based elevator dispatching upgrade. comply with ab-090. maher n/a. fire inspection shall be required at the end of destination work on the complete group 4- system. | $41,600 |
| Oct 22, 2014 | Completed final sign-off Jan 2015 | 555 Montgomery St | Dome Construction Corp | office tenant improvement to rearrange and add offices. provide new lunch room and equipment room. elec, mech, l/s under sep permitDetails
office tenant improvement to rearrange and add offices. provide new lunch room and equipment room. elec, mech, l/s under sep permit | $125,000 |
| Aug 7, 2014 | Completed final sign-off Jan 2015 | 555 Montgomery St | Commercial Interior Builders Inc | office tenant improvement, interior renovation of lobby area and work room. mech, elec, fire safety sep permitDetails
office tenant improvement, interior renovation of lobby area and work room. mech, elec, fire safety sep permit | $88,000 |
| Jul 9, 2014 | Completed final sign-off Apr 2016 | 833 Greenwich St | S F Garage Company Inc. | convert existing storage room @ basement to a parking garage, construct a new driveway ramp down to new garage and standard curb cut at sidewalk curbDetails
convert existing storage room @ basement to a parking garage, construct a new driveway ramp down to new garage and standard curb cut at sidewalk curb | $48,000 |
| Jun 24, 2014 | Completed final sign-off Jan 2015 | 555 Montgomery St | Commercial Interior Builders Inc | 7th floor:office t.i. rearrange office and conffrence room. provide new work room and equipment room electrical, mechanical, fire safety under seperate permits. n/a for the maher ordinance #155-13Details
7th floor:office t.i. rearrange office and conffrence room. provide new work room and equipment room electrical, mechanical, fire safety under seperate permits. n/a for the maher ordinance #155-13 | $48,000 |
| May 14, 2014 | Completed final sign-off Nov 2014 | 555 Montgomery St | Commercial Interior Builders Inc | 12th fl office interior improvement to provide 3 additional offices, new floor, ceiling & wall finishes. hvac, lighting & life safety under seperate permit.Details
12th fl office interior improvement to provide 3 additional offices, new floor, ceiling & wall finishes. hvac, lighting & life safety under seperate permit. | $88,000 |
| Apr 3, 2014 | Never finaled issued Apr 2014, no final | 565 04th St | Bing Wu Construction Co., Egoodat Inc | revision to pa#201308063629 commercial tenant improvement, change internal stairs & restroom layouts. fire sprinkler, mechanical & electrical work under seperate permit.n/a for the maher ordinance #155-13 and n/a for the interim control #428-13Details
revision to pa#201308063629 commercial tenant improvement, change internal stairs & restroom layouts. fire sprinkler, mechanical & electrical work under seperate permit.n/a for the maher ordinance #155-13 and n/a for the interim control #428-13 | $68,000 |
| Feb 27, 2014 | Completed final sign-off Aug 2014 | 555 Montgomery St | Commercial Interior Builders Inc | barrier removal, provide 60" clearance at toilet stall and remodel restrooms. mep. and fire safety under seperate permit. compliance with ordinance #155-13 not required.Details
barrier removal, provide 60" clearance at toilet stall and remodel restrooms. mep. and fire safety under seperate permit. compliance with ordinance #155-13 not required. | $210,000 |
| Nov 22, 2013 | Completed final sign-off Nov 2014 | 555 Montgomery St | Commercial Interior Builders Inc | 16th floor: office t.i. :new carpet, new finishes, remodel employee's break room. no mechanical, no new lighting. life safety under seperate permit.Details
16th floor: office t.i. :new carpet, new finishes, remodel employee's break room. no mechanical, no new lighting. life safety under seperate permit. | $30,000 |
| Nov 22, 2013 | Completed final sign-off Nov 2014 | 555 Montgomery St | Commercial Interior Builders Inc | 12th floor: office t.i. new carpet, new finishes, remodel employee's break room. no mechanical, no new lighting. life safety under seperate permit. new non-structural partitions, new ceiling.Details
12th floor: office t.i. new carpet, new finishes, remodel employee's break room. no mechanical, no new lighting. life safety under seperate permit. new non-structural partitions, new ceiling. | $38,000 |
| Oct 1, 2013 | Completed final sign-off Mar 2015 | 62 Vicksburg St | revision to appl #2012.0719.5235 during construction - clarifies gravity load framing on 2nd floor & interior stair winder @ 1st floor.Details
revision to appl #2012.0719.5235 during construction - clarifies gravity load framing on 2nd floor & interior stair winder @ 1st floor. | ||
| Sep 25, 2013 | Completed final sign-off Nov 2014 | 555 Montgomery St | Commercial Interior Builders Inc | barrier removal and restroom remodel.Details
barrier removal and restroom remodel. | $18,800 |
| Sep 19, 2013 | Completed final sign-off Apr 2014 | 1066 Grant Av | T S C Construction Co. | barrier removal to add accessible service counter and wheelchair platform liftDetails
barrier removal to add accessible service counter and wheelchair platform lift | $128,000 |
| Aug 29, 2013 | Completed final sign-off Sep 2013 | 555 Montgomery St | Commercial Interior Builders Inc | replace ceiling system. related lighting, fire sprinkler work to be under separate permit.Details
replace ceiling system. related lighting, fire sprinkler work to be under separate permit. | $35,000 |
| Aug 6, 2013 | Expired or cancelled expired Nov 2017 | 555 04th St | Star Plumbing & Fire Const Co., Egoodat Inc | unit b: interior improvement to divide space into 2, construct new mezzanine, 3 restrooms, and one breakroom.fire sprinkler mechanical and electrical work to be under seperate permit.Details
unit b: interior improvement to divide space into 2, construct new mezzanine, 3 restrooms, and one breakroom.fire sprinkler mechanical and electrical work to be under seperate permit. | $68,000 |
| Jun 14, 2013 | Completed final sign-off Jul 2013 | 555 Montgomery St | Commercial Interior Builders Inc | enclose existing convenience stairs between two floors.Details
enclose existing convenience stairs between two floors. | $8,000 |
| May 17, 2013 | Completed final sign-off Apr 2015 | 417 Grant Av | Shek Chung Ma | corrections to comply with notice of violation. improvent of extg office space, renovate extg restroom, staff's lounge and kitchen, close hightwell.Details
corrections to comply with notice of violation. improvent of extg office space, renovate extg restroom, staff's lounge and kitchen, close hightwell. | $15,000 |
| Mar 29, 2013 | Expired or cancelled cancelled Jan 2026 | 1 Bush St | 12th floor-change (e) office into conference room, no electrical & no plumbing work. life safety under seperate permitDetails
12th floor-change (e) office into conference room, no electrical & no plumbing work. life safety under seperate permit | ||
| Feb 6, 2013 | Completed final sign-off Mar 2013 | 555 Montgomery St | Commercial Interior Builders Inc | 3rd floor:interior improvement to remove partition between 2 small conference room to combine into one large conference room. electrical, mech, and life safety under seperate permit.Details
3rd floor:interior improvement to remove partition between 2 small conference room to combine into one large conference room. electrical, mech, and life safety under seperate permit. | $30,000 |
| Dec 14, 2012 | Completed final sign-off Mar 2013 | 1 Bush St | Charles Pankow Builders Ltd | interior tenant improvement, to add offices & open offices. mech, electrical & life safety/sprinkler modifications shall be under separate permitDetails
interior tenant improvement, to add offices & open offices. mech, electrical & life safety/sprinkler modifications shall be under separate permit | $128,000 |
| Nov 16, 2012 | Completed final sign-off Feb 2013 | 1682 33rd Av | Alan Zhu Construction | convert existing space ground floor to a living area (game room) and full bathDetails
convert existing space ground floor to a living area (game room) and full bath | $18,000 |
| Oct 26, 2012 | Completed final sign-off Dec 2012 | 555 Montgomery St | Commercial Interior Builders Inc | 8th floor:interior tenant improvement to consist of minor demolition and construction of a new meeting room. mep, life safety sep. permitsDetails
8th floor:interior tenant improvement to consist of minor demolition and construction of a new meeting room. mep, life safety sep. permits | $98,000 |
| Sep 24, 2012 | Completed final sign-off Jan 2013 | 555 Montgomery St | Commercial Interior Builders Inc | barrier removal, provide 60" clearnace at accessible toilet stalls, replace existing fixtures & finishes in restrooms on the 4,8,12,16 floors.Details
barrier removal, provide 60" clearnace at accessible toilet stalls, replace existing fixtures & finishes in restrooms on the 4,8,12,16 floors. | $240,000 |
| Sep 14, 2012 | Completed final sign-off Aug 2013 | 1471 17th Av | Cal Am Construction Inc. | interior work only-remodel 3rd floor (unit #2), remodel (e) kitchen, bathroom & master bedroom on 3rd floor. structural lateral strengthening of third floor only.Details
interior work only-remodel 3rd floor (unit #2), remodel (e) kitchen, bathroom & master bedroom on 3rd floor. structural lateral strengthening of third floor only. | $35,000 |
| Jun 11, 2012 | Completed final sign-off Sep 2012 | 555 Montgomery St | Commercial Interior Builders Inc | 12th floor interior tenant improvement ot construct two additional offices & connect suite 1210 with suite 1206.Details
12th floor interior tenant improvement ot construct two additional offices & connect suite 1210 with suite 1206. | $45,000 |
| Mar 26, 2012 | Completed final sign-off Jun 2013 | 1370 35th Av | enclose existing space below upper floor sun-room. convert single family house to two legal units.Details
enclose existing space below upper floor sun-room. convert single family house to two legal units. | $20,000 | |
| Feb 22, 2012 | Completed final sign-off Aug 2012 | 58 Woodward St | comply with his nov 201114381: install a code compliant dryer vent connector and remove illegal service unit in garage with plansDetails
comply with his nov 201114381: install a code compliant dryer vent connector and remove illegal service unit in garage with plans | $4,000 | |
| Jan 26, 2012 | Completed final sign-off Jun 2013 | 1370 35th Av | expand kitchen on 2nd floor approx 30 sq ft into extg lightwell. no new plmg fixtures added. no glazing areas added. no lighting change. lighting with 50% high efficacy in kitchen.Details
expand kitchen on 2nd floor approx 30 sq ft into extg lightwell. no new plmg fixtures added. no glazing areas added. no lighting change. lighting with 50% high efficacy in kitchen. | $8,800 | |
| Dec 9, 2011 | Completed final sign-off Jun 2013 | 1370 35th Av | renovate garage level to add study, game room, half bath, wet bar, family room. renovate main level, 2nd floor to add full bathDetails
renovate garage level to add study, game room, half bath, wet bar, family room. renovate main level, 2nd floor to add full bath | $12,800 | |
| Nov 16, 2011 | Completed final sign-off Feb 2012 | 555 Montgomery St | Hathaway Dinwiddie Co. | 14th floor-interior improvement to improve offices, conference room, open office. work area, electrical, mechanical & life safety on seperate permit. ref to pa#201111169053Details
14th floor-interior improvement to improve offices, conference room, open office. work area, electrical, mechanical & life safety on seperate permit. ref to pa#201111169053 | $105,000 |
| Nov 16, 2011 | Completed final sign-off Feb 2012 | 555 Montgomery St | Hathaway Dinwiddie Co. | 14th floor-barrier removal to provide 60" clearenace at accessible toilet stall. ref. pa#201111169055Details
14th floor-barrier removal to provide 60" clearenace at accessible toilet stall. ref. pa#201111169055 | $75,000 |
| Sep 29, 2011 | Completed final sign-off Jul 2012 | 503 Connecticut St | Advanced Design General Contractor | comply w/nov #201152687 - correct nov & document reduced scope (no 3rd floor) of work under bpa# 2006-0314-6604. new roof hatch to access non occupied roof for maintenance onlyDetails
comply w/nov #201152687 - correct nov & document reduced scope (no 3rd floor) of work under bpa# 2006-0314-6604. new roof hatch to access non occupied roof for maintenance only | $5,000 |
| Aug 15, 2011 | Never finaled issued Aug 2011, no final | 555 Montgomery St | Source Planning And Construction Inc | office ti on the 12th floor. interior improvement to provide for additional office. no new lighting fixtures, relocate (e) onlyDetails
office ti on the 12th floor. interior improvement to provide for additional office. no new lighting fixtures, relocate (e) only | $19,000 |
| Jun 3, 2011 | Completed final sign-off Mar 2016 | 18 Valley St | Wall Construction, Salgo Constructions | remodel both units. repair (e) deck. new kitchen cabinets 2nd floor. new kitchen upper cabinets 3rd floor.Details
remodel both units. repair (e) deck. new kitchen cabinets 2nd floor. new kitchen upper cabinets 3rd floor. | $27,500 |
| Mar 2, 2011 | Completed final sign-off May 2011 | 555 Montgomery St | Hathaway Dinwiddie Co. | unit 1206:interior tenant improvement to provide for 4 offices,1 conference room.work areas,other work includes mechanical, electrical and life safety.Details
unit 1206:interior tenant improvement to provide for 4 offices,1 conference room.work areas,other work includes mechanical, electrical and life safety. | $10,500 |
| Jan 19, 2011 | Completed final sign-off Mar 2011 | 39 Albion St | S A Baxter Inc. | replace headers @ existing staircase to create more headeroom @ main entrance on the interior staircase landing. no exterior work.Details
replace headers @ existing staircase to create more headeroom @ main entrance on the interior staircase landing. no exterior work. | $10,000 |
| Nov 18, 2010 | Never finaled issued Nov 2010, no final | 555 Montgomery St | Hathaway Dinwiddie Co. | office ti on 3rd fl. construct non struc partitions for two officesDetails
office ti on 3rd fl. construct non struc partitions for two offices | $9,000 |
| Oct 19, 2010 | Completed final sign-off Dec 2010 | 555 Montgomery St | Hathaway Dinwiddie Co. | barrier removal- provide 60" clearance at accessible toilet stalls on 13th floorDetails
barrier removal- provide 60" clearance at accessible toilet stalls on 13th floor | $75,000 |
| Aug 24, 2010 | Completed final sign-off Sep 2010 | 1 Bush St | Turner Construction Co | remove 14' of wall. relocate 1 elec receptacle. relocate 1 data receptacle. relocate 1 switch all to adjacent wall existing. remove 2 doors and frame. paint. install 3'x9' glass. install small strip of carpetDetails
remove 14' of wall. relocate 1 elec receptacle. relocate 1 data receptacle. relocate 1 switch all to adjacent wall existing. remove 2 doors and frame. paint. install 3'x9' glass. install small strip of carpet | $12,000 |
| Apr 23, 2010 | Completed final sign-off Jul 2010 | 135 Tioga Av | to comply w/his nov #201033821 dated 3/24/2010 to legalize bathroom including bedroom & family room on ground floor.Details
to comply w/his nov #201033821 dated 3/24/2010 to legalize bathroom including bedroom & family room on ground floor. | $10,000 | |
| Mar 16, 2010 | Completed final sign-off Mar 2010 | 1 Bush St | Turner Construction Co | office ti on 12th floor. remove partiton wall to create large conference roomDetails
office ti on 12th floor. remove partiton wall to create large conference room | $5,000 |
| Dec 31, 2009 | Expired or cancelled cancelled Feb 2013 | 428 22nd Av | horizontal extension at rear ground floor of building. r section 136 (c) (25) (a) includes renovation to provide for additional living space and full bath.Details
horizontal extension at rear ground floor of building. r section 136 (c) (25) (a) includes renovation to provide for additional living space and full bath. | $20,000 | |
| Apr 6, 2009 | Completed final sign-off Apr 2009 | 2565 Judah St | interior improvement of an existing commercial retail space. constructu new non sructural partitions, new paint, and floor finish. change of use to beauty/facial salon.Details
interior improvement of an existing commercial retail space. constructu new non sructural partitions, new paint, and floor finish. change of use to beauty/facial salon. | $7,500 | |
| Jan 26, 2009 | Completed final sign-off Jun 2010 | 903 Minnesota St | in correction for violation no.200877679 to amend original permit for 100% repiar/replace of exterior stairs to original appearance. dryrot repiar behind exterior siding and plywood. ref. app #200809292871Details
in correction for violation no.200877679 to amend original permit for 100% repiar/replace of exterior stairs to original appearance. dryrot repiar behind exterior siding and plywood. ref. app #200809292871 | $3,500 | |
| Nov 10, 2008 | Completed final sign-off Nov 2008 | 727 Clay St | T S C Construction Co. | correct error in disabled checklist of appl# 2008.01.30.3538. no new work, no plans. 2 sets of disabled checklistDetails
correct error in disabled checklist of appl# 2008.01.30.3538. no new work, no plans. 2 sets of disabled checklist | $100 |
| Sep 29, 2008 | Expired or cancelled suspend Dec 2008 | 903 Minnesota St | repair and refinish exterior wood stairs & guardrail in kind less than 50%.Details
repair and refinish exterior wood stairs & guardrail in kind less than 50%. | $3,500 | |
| Sep 10, 2008 | Expired or cancelled expired Feb 2010 | 1966 Donner Av | repair and refinish exterior stairs and new handrail in kind.Details
repair and refinish exterior stairs and new handrail in kind. | $3,500 | |
| Sep 3, 2008 | Never finaled issued Sep 2008, no final | 539 Sutter St | barrier removal-provide accessible entry to retail on ground levelDetails
barrier removal-provide accessible entry to retail on ground level | $5,500 | |
| Nov 26, 2007 | Completed final sign-off Oct 2008 | 555 Montgomery St | interior tenant improvement to partial 12th floor of an existing office building. no change in use or occupancy. mep under separate permit. sprinkler & fire alarm seperate permit.Details
interior tenant improvement to partial 12th floor of an existing office building. no change in use or occupancy. mep under separate permit. sprinkler & fire alarm seperate permit. | $57,000 | |
| Nov 5, 2007 | Completed final sign-off Aug 2009 | 555 Montgomery St | correct address for application # 200710226090 from 16th to 15th floorDetails
correct address for application # 200710226090 from 16th to 15th floor | ||
| Oct 22, 2007 | Completed final sign-off Aug 2009 | 555 Montgomery St | interior tenant improvement to partial 16th floor of an existing office bldg. remove ex. non-structural partitions, create 2 new offices, 1 pantry and a conference room. lighting, mechanical and life safety under a separate permit.Details
interior tenant improvement to partial 16th floor of an existing office bldg. remove ex. non-structural partitions, create 2 new offices, 1 pantry and a conference room. lighting, mechanical and life safety under a separate permit. | $95,000 | |
| Aug 31, 2007 | Completed final sign-off Jul 2008 | 2533 Noriega St | Shek Chung Ma | remove and replace teller counter construct new offices upgrade restroom for diabled accessDetails
remove and replace teller counter construct new offices upgrade restroom for diabled access | $65,000 |
| Mar 27, 2007 | Completed final sign-off Nov 2007 | 555 Montgomery St | Hathaway Dinwiddie Co. | united commercial bank: oti-1 6th floor ls.Details
united commercial bank: oti-1 6th floor ls. | $50,000 |
| Jul 27, 2006 | Completed final sign-off Jan 2007 | 333 Sutter St | re-construction of existing 2nd exit at ground floor.Details
re-construction of existing 2nd exit at ground floor. | $13,000 | |
| Apr 15, 2005 | Expired or cancelled expired Jul 2007 | 555 Montgomery St | Hathaway Dinwiddie Co. | oti-1 9/f el,me,ls,spDetails
oti-1 9/f el,me,ls,sp | $244,000 |
| Apr 5, 2001 | Expired or cancelled expired Oct 2001 | 100 Van Ness Av | remove walls in mezzanine-construct office in lobbyDetails
remove walls in mezzanine-construct office in lobby | $16,500 |