Block 0175, lot 029
755 Sansome St
- City’s use
- Commercial Office
- Built
- 1927
- Stories
- 6
- Units
- 1
- Building
- 57,057 sq ft
- Lot
- 9,452 sq ft
- Zoning
- C2
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
57 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 7, 2023 | Completed final sign-off Oct 2023 | 755 Sansome St | Sc Builders, Inc | ste 300: deferred submittal to altered lighting system. new power and data for workstations. new power for breakroom equipment. new lighting and controls. ref pa# 2023-0705-1473Details
ste 300: deferred submittal to altered lighting system. new power and data for workstations. new power for breakroom equipment. new lighting and controls. ref pa# 2023-0705-1473 | |
| Aug 21, 2023 | Completed final sign-off Apr 2024 | 755 Sansome St | Peacock Construction | existing restrooms barrier removal. replace drinking fountain with on e bottle filler. provide power door operators and actuators. mofify accessible toilet compartment doors and partitionsDetails
existing restrooms barrier removal. replace drinking fountain with on e bottle filler. provide power door operators and actuators. mofify accessible toilet compartment doors and partitions | $10,000 |
| Aug 15, 2023 | Completed final sign-off Sep 2023 | 755 Sansome St | Fire & Security & Alarm Co/ F.S.A.C. | due to interior remodel 3rd fl #300 1 existing notification device will be relocated to new location and fire new devices will be installed. new devices will be tie-in to (e) circuit and power supply. 202103297469, 202307051473Details
due to interior remodel 3rd fl #300 1 existing notification device will be relocated to new location and fire new devices will be installed. new devices will be tie-in to (e) circuit and power supply. 202103297469, 202307051473 | $2,500 |
| Jul 5, 2023 | Completed final sign-off Oct 2023 | 755 Sansome St | Sc Builders, Inc | ste 300 - interior tenant improvement: demolition of non structural partitions; new partitions, lighting, finishes and millwork. mep and fire sprinkler under separate permitDetails
ste 300 - interior tenant improvement: demolition of non structural partitions; new partitions, lighting, finishes and millwork. mep and fire sprinkler under separate permit | $206,650 |
| Jun 12, 2023 | Completed final sign-off Apr 2024 | 755 Sansome St | Peacock Construction | upgrade e restrooms for acessibility compliance. work incluse provision of drining fountains, reposition door. install powr door operator. modification of toilet compartment partitoins, relocate toilets and grab barsDetails
upgrade e restrooms for acessibility compliance. work incluse provision of drining fountains, reposition door. install powr door operator. modification of toilet compartment partitoins, relocate toilets and grab bars | $38,000 |
| Apr 7, 2022 | Never finaled issued Apr 2022, no final | 755 Sansome St | Golden Gate Fire Protection Inc | 5th fl: fire sprinklers. relocate 30 pendent sprinklers & relocate 9 uprights. ref ti pa# 202202097673.Details
5th fl: fire sprinklers. relocate 30 pendent sprinklers & relocate 9 uprights. ref ti pa# 202202097673. | $20,475 |
| Mar 9, 2022 | Completed final sign-off Mar 2024 | 755 Sansome St | Sc Builders, Inc | 5/f: deferred mep's to 202202097673Details
5/f: deferred mep's to 202202097673 | |
| Feb 16, 2022 | Completed final sign-off Jun 2022 | 755 Sansome St | Fire & Security & Alarm Co/ F.S.A.C. | due to interior remodeling on 5/f, 2 exist notification devices will be relocated to new location and 5 new will be install. new devices will be tie in to exist circuit and existing power supply panel on 6/f. pa# 202103297469Details
due to interior remodeling on 5/f, 2 exist notification devices will be relocated to new location and 5 new will be install. new devices will be tie in to exist circuit and existing power supply panel on 6/f. pa# 202103297469 | $2,000 |
| Feb 9, 2022 | Completed final sign-off Mar 2024 | 755 Sansome St | Sc Builders, Inc | install door actuators associated with 202202097673.Details
install door actuators associated with 202202097673. | $3,000 |
| Feb 9, 2022 | Completed final sign-off Mar 2024 | 755 Sansome St | Sc Builders, Inc | t.i new conference rooms, open office areas, demo feature stair including infill of slab. now work in restrooms, exit stairs and exiting breakroom. mep deferredDetails
t.i new conference rooms, open office areas, demo feature stair including infill of slab. now work in restrooms, exit stairs and exiting breakroom. mep deferred | $881,000 |
| Dec 23, 2021 | Expired or cancelled cancelled Jan 2026 | 755 Sansome St | suite 600: construction of non-load bearing partitions for 3 new offices and lobby vestible. maher n/a.Details
suite 600: construction of non-load bearing partitions for 3 new offices and lobby vestible. maher n/a. | $122,325 | |
| Nov 23, 2021 | Never finaled issued Nov 2021, no final | 755 Sansome St | Fire & Security & Alarm Co/ F.S.A.C. | due to interior remodeling on 6/f, 2 (e) notification devices will be relocated to new location & 2 new ones will be installed. new devices will be tied-in to (e) notification ckt. ref pa202103297469 & 201804126157. maher n/a.Details
due to interior remodeling on 6/f, 2 (e) notification devices will be relocated to new location & 2 new ones will be installed. new devices will be tied-in to (e) notification ckt. ref pa202103297469 & 201804126157. maher n/a. | $6,000 |
| Mar 29, 2021 | Never finaled issued Apr 2021, no final | 755 Sansome St | Fire & Security & Alarm Co/ F.S.A.C. | like for like fire system replacement w/new control panel, smoke detectors & pull stations install relay modules for primary recall only & fsd tie-in ex. floor & tamper switches to new panel. connect ex. notification devices to new panel as installed.Details
like for like fire system replacement w/new control panel, smoke detectors & pull stations install relay modules for primary recall only & fsd tie-in ex. floor & tamper switches to new panel. connect ex. notification devices to new panel as installed. | $22,000 |
| Jun 2, 2020 | Expired or cancelled withdrawn Mar 2021 | 755 Sansome St | new ti of (e) office spaces at 4th fl. of an (e) 6 story office building, no exterior work proposed, new wall, floor ceiling, millwork and fixture finishes, new electrical and lighting fixtures, demo of existing non- bearing partitions, and new non-bearing partitions,Details
new ti of (e) office spaces at 4th fl. of an (e) 6 story office building, no exterior work proposed, new wall, floor ceiling, millwork and fixture finishes, new electrical and lighting fixtures, demo of existing non- bearing partitions, and new non-bearing partitions, | $600,000 | |
| Mar 11, 2020 | Expired or cancelled withdrawn Mar 2021 | 755 Sansome St | 3rd fl - new ti of existing office space. no exterior work proposed. new floor, wall, ceiling, millwork & fixture finishes. new electrical & lighting. demo of (e) non bearing partitions w/limited ceiling construction. updated mep. no food/beverages or third party catering will be provided by theDetails
3rd fl - new ti of existing office space. no exterior work proposed. new floor, wall, ceiling, millwork & fixture finishes. new electrical & lighting. demo of (e) non bearing partitions w/limited ceiling construction. updated mep. no food/beverages or third party catering will be provided by the | $590,000 | |
| Jul 30, 2019 | Expired or cancelled withdrawn Jun 2021 | 755 Sansome St | ref pa 201812198763, & 201904168062; mechanical work for hvac systemDetails
ref pa 201812198763, & 201904168062; mechanical work for hvac system | $250,000 | |
| Jun 20, 2019 | Never finaled issued Jun 2019, no final | 755 Sansome St | Red Hawk Fire & Security Ca Llc | 1&2/f: add 15 horn/strobes, add 1 smoke detector, add 1 relay. ref pa 2018-1219-8763Details
1&2/f: add 15 horn/strobes, add 1 smoke detector, add 1 relay. ref pa 2018-1219-8763 | $9,000 |
| May 9, 2019 | Completed final sign-off May 2019 | 755 Sansome St | R L H Fire Protection Inc | fire sprinkler, relocate 97, add 12, delete 25 on the 1st and 2nd fl. ref 201812198763Details
fire sprinkler, relocate 97, add 12, delete 25 on the 1st and 2nd fl. ref 201812198763 | $26,000 |
| Apr 16, 2019 | Completed final sign-off Jun 2021 | 755 Sansome St | Wework Construction Llc Dba Wework Const | revision to 201812198763 new ventilation fan removed from scope. the (e) air handler will provide ventilation in compliance with t-24 part 6Details
revision to 201812198763 new ventilation fan removed from scope. the (e) air handler will provide ventilation in compliance with t-24 part 6 | |
| Feb 8, 2019 | Completed final sign-off Jun 2021 | 755 Sansome St | Wework Construction Llc Dba Wework Const | ref pa# 201812198763; mep only for office t.i.Details
ref pa# 201812198763; mep only for office t.i. | $1,245,000 |
| Dec 19, 2018 | Completed final sign-off Jun 2021 | 755 Sansome St | Wework Construction Llc Dba Wework Const | 1/f & 2/f: interior ti to existing office floors. non-structural remodel to include partitions, flooring, ceilings, furnishes & finishes.Details
1/f & 2/f: interior ti to existing office floors. non-structural remodel to include partitions, flooring, ceilings, furnishes & finishes. | $1,245,000 |
| Jun 21, 2018 | Expired or cancelled withdrawn Jan 2022 | 755 Sansome St | in basement: 1) remove non-load bearing walls. 2)add handicap accessible bathroom. 3)add kitchenette. 4)upgrade materials.Details
in basement: 1) remove non-load bearing walls. 2)add handicap accessible bathroom. 3)add kitchenette. 4)upgrade materials. | $350,000 | |
| Jun 5, 2018 | Expired or cancelled withdrawn Jan 2022 | 755 Sansome St | 4th floor - minor tenant improvement of (e) office suite, non-structural demo, new finishes.Details
4th floor - minor tenant improvement of (e) office suite, non-structural demo, new finishes. | $160,000 | |
| Apr 12, 2018 | Never finaled issued Apr 2018, no final | 755 Sansome St | Battery Street Construction | partitions to surround (e) stairs at 5rh flr,. extend railing to block entry to (e) stairs at 6th flr. enclose (e) meeting area with glazing, add door, frames to restrooms & shower door at showersDetails
partitions to surround (e) stairs at 5rh flr,. extend railing to block entry to (e) stairs at 6th flr. enclose (e) meeting area with glazing, add door, frames to restrooms & shower door at showers | $50,000 |
| Oct 3, 2017 | Never finaled issued Oct 2017, no final | 755 Sansome St | Principal Builders Inc. | title 24 electrical to install new lighting, power & wiring. ref pa 2017-0817-5165 for ti workDetails
title 24 electrical to install new lighting, power & wiring. ref pa 2017-0817-5165 for ti work | $132,150 |
| Sep 29, 2017 | Completed final sign-off Oct 2017 | 755 Sansome St | Red Hawk Fire & Security Ca Llc | f/a: add (6) new strobes on 6th fl. & 8 new horn/strobes on the 5th fl. relocate (1) existing strobe and one horn strobe on the 5th fl. ref ti #201708175165. maher naDetails
f/a: add (6) new strobes on 6th fl. & 8 new horn/strobes on the 5th fl. relocate (1) existing strobe and one horn strobe on the 5th fl. ref ti #201708175165. maher na | $2,500 |
| Aug 31, 2017 | Completed final sign-off Sep 2017 | 755 Sansome St | Pribuss Engineering Inc | 5/f, 6/f- fire sprinkler t.i. relocate 32 heads & add 16 heads. total 48 heads. n/a ordinance #155-13Details
5/f, 6/f- fire sprinkler t.i. relocate 32 heads & add 16 heads. total 48 heads. n/a ordinance #155-13 | $24,672 |
| Aug 17, 2017 | Completed final sign-off Nov 2017 | 755 Sansome St | Principal Builders Inc. | 5th and 6th floor: construction of new partition framing, doors, millwork, ceiling and finishes. mep, life safty and sprinklers on seperate permit. n/a for maherDetails
5th and 6th floor: construction of new partition framing, doors, millwork, ceiling and finishes. mep, life safty and sprinklers on seperate permit. n/a for maher | $800,000 |
| Aug 16, 2017 | Never finaled issued Sep 2017, no final | 755 Sansome St | Principal Builders Inc. | 5/f, 6/f- accessibility upgrade for men's and women's restrooms n/a ordinance #155-13Details
5/f, 6/f- accessibility upgrade for men's and women's restrooms n/a ordinance #155-13 | $100,000 |
| Jul 28, 2017 | Never finaled issued Jul 2017, no final | 755 Sansome St | Principal Builders Inc. | 5th & 6th: interior demo of partitions, millwork, doors, and finishes: spaceto remain vacant under ab-017 and all ada to be provide with future ti permit. n/a maher ordinanceDetails
5th & 6th: interior demo of partitions, millwork, doors, and finishes: spaceto remain vacant under ab-017 and all ada to be provide with future ti permit. n/a maher ordinance | $17,000 |
| Oct 13, 2015 | Completed final sign-off Jul 2017 | 755 Sansome St | Bay Area Lightworks Inc | barrier removal work for installation of curb ramps at sw corner of pacific and asansome. maher naDetails
barrier removal work for installation of curb ramps at sw corner of pacific and asansome. maher na | $20,000 |
| Aug 28, 2015 | Never finaled issued Aug 2015, no final | 755 Sansome St | P 3 Construction & Remodeling Inc | floors 1 & 3: per ab-017 partial, non structural demolition. no new proposed under this application. all new work under separate application.Details
floors 1 & 3: per ab-017 partial, non structural demolition. no new proposed under this application. all new work under separate application. | $10,000 |
| Mar 11, 2015 | Never finaled issued Mar 2015, no final | 755 Sansome St | street spaceDetails
street space | ||
| Oct 30, 2014 | Completed final sign-off Apr 2015 | 755 Sansome St | Gci, Inc | 4th floor ste 450 - interior t.i. : minor demo & construction of non-structural partition, electrical & plumbing. mep, life safety, sprinklers are separate design, build submitteds. n/a maher ordinanceDetails
4th floor ste 450 - interior t.i. : minor demo & construction of non-structural partition, electrical & plumbing. mep, life safety, sprinklers are separate design, build submitteds. n/a maher ordinance | $22,750 |
| Sep 12, 2012 | Never finaled issued Sep 2012, no final | 755 Sansome St | Ayoob & Peery Plumbing Co Inc | add & relocate fire sprinkler heads for t.i. 2 add, 5 relocate. t.i pa# 201208167583Details
add & relocate fire sprinkler heads for t.i. 2 add, 5 relocate. t.i pa# 201208167583 | $3,500 |
| Aug 24, 2012 | Completed final sign-off Sep 2012 | 755 Sansome St | C B F Inc | tenant improvement of cleanwell at 755 sansome st. ste 300. install 5 ceiling mount horn-strobes install 1 ceiling mount strobe instll 1 booster panel connect new horn-strobe circuit to new booster panel. sequence operation reamin unchanged.Details
tenant improvement of cleanwell at 755 sansome st. ste 300. install 5 ceiling mount horn-strobes install 1 ceiling mount strobe instll 1 booster panel connect new horn-strobe circuit to new booster panel. sequence operation reamin unchanged. | $4,000 |
| Aug 16, 2012 | Completed final sign-off Sep 2012 | 755 Sansome St | Daryl Lassen Construction Inc | tenant improvements to existing office suite. alteration include dmolition of existing partitions and construct new partitions, replace some lightsDetails
tenant improvements to existing office suite. alteration include dmolition of existing partitions and construct new partitions, replace some lights | $40,000 |
| Feb 1, 2011 | Completed final sign-off Jan 2012 | 755 Sansome St | Cci Com'l Constr & Improv**See 985808*** | revision to 201010052338. revise downward the roof deck occupancy load and add exit sign width requirement. requested by fire dept.Details
revision to 201010052338. revise downward the roof deck occupancy load and add exit sign width requirement. requested by fire dept. | |
| Oct 22, 2010 | Never finaled issued Oct 2010, no final | 755 Sansome St | Carter Brothers Fire & Life Safety | add new fire alarm devices to existing fa system in new ti space on 2nd, 5th, and 6th flrs. includes 30 horn strobes, 9 strobes, 2 bps panels. ti 201007237289, 201007237372, 201008058211Details
add new fire alarm devices to existing fa system in new ti space on 2nd, 5th, and 6th flrs. includes 30 horn strobes, 9 strobes, 2 bps panels. ti 201007237289, 201007237372, 201008058211 | $6,400 |
| Oct 21, 2010 | Completed final sign-off Feb 2011 | 755 Sansome St | Marina Mechanical Services | hvac remodel, reuse extg zones and systems. reference pa # 201007237372, 201007237289, & 201008058211.Details
hvac remodel, reuse extg zones and systems. reference pa # 201007237372, 201007237289, & 201008058211. | $43,000 |
| Oct 14, 2010 | Completed final sign-off Feb 2011 | 755 Sansome St | Gci, Inc | 2nd, 5th & 6th floors for electrical work (permit). 2nd floor ref pa #2010072377372, 5th floor ref pa #201007237289, 6th floor ref pa #201008058211.Details
2nd, 5th & 6th floors for electrical work (permit). 2nd floor ref pa #2010072377372, 5th floor ref pa #201007237289, 6th floor ref pa #201008058211. | $254,000 |
| Oct 12, 2010 | Completed final sign-off Feb 2011 | 755 Sansome St | Incom Mechanical Inc | remove and add fire sprinkler as needed for 2,5, 6thDetails
remove and add fire sprinkler as needed for 2,5, 6th | $13,000 |
| Oct 5, 2010 | Completed final sign-off Jan 2012 | 755 Sansome St | Cci Com'l Constr & Improv**See 985808*** | roof-new roof deck on (e) roof, concrete deck, handrails, guardrails, stair vestibile, screen. new waterproofing & roofing for use of building tenant (s) only; change of use from b to b, a & occupant load verification.Details
roof-new roof deck on (e) roof, concrete deck, handrails, guardrails, stair vestibile, screen. new waterproofing & roofing for use of building tenant (s) only; change of use from b to b, a & occupant load verification. | $144,157 |
| Aug 5, 2010 | Completed final sign-off Feb 2011 | 755 Sansome St | Johnstone - Mc Auliffe Const. Inc. | interior tenant improvement for office uswe. no increase in area, change of occupancy,use. demo non struct partitions, lighting, elec, mech,, plumb, millwork, interior glazing,doors, hardware,finishes. non struc partitions, millwork,int glazing, doors,hardware,finishes. new non struc partitions,Details
interior tenant improvement for office uswe. no increase in area, change of occupancy,use. demo non struct partitions, lighting, elec, mech,, plumb, millwork, interior glazing,doors, hardware,finishes. non struc partitions, millwork,int glazing, doors,hardware,finishes. new non struc partitions, | $320,000 |
| Aug 3, 2010 | Never finaled filed Aug 2010, never issued | 755 Sansome St | Johnstone - Mc Auliffe Const. Inc. | interior tenant improvment for office use. no increase in area. no change in occupancy or use. demo e non struct partitions, lighting, elec, mech, plumb, millwork, interior glazing, doors, hardware, finishes. n non struc partitions, lightijng, elec, millmwork, int glazing, doors, hardware, finishes.Details
interior tenant improvment for office use. no increase in area. no change in occupancy or use. demo e non struct partitions, lighting, elec, mech, plumb, millwork, interior glazing, doors, hardware, finishes. n non struc partitions, lightijng, elec, millmwork, int glazing, doors, hardware, finishes. | $320,000 |
| Jul 23, 2010 | Completed final sign-off Feb 2011 | 755 Sansome St | Gci, Inc | interior tenant improvement for office use. scope: demolition of (e) non-structural partitions, lighting, electrical, plumbing, millwork, interior glazing, doors & hardware, and finishes. (n) non-structural partitions, lighting,l electrical, millwork, interior glazing, doors & hardware & finishesDetails
interior tenant improvement for office use. scope: demolition of (e) non-structural partitions, lighting, electrical, plumbing, millwork, interior glazing, doors & hardware, and finishes. (n) non-structural partitions, lighting,l electrical, millwork, interior glazing, doors & hardware & finishes | $488,000 |
| Jul 23, 2010 | Completed final sign-off Feb 2011 | 755 Sansome St | Gci, Inc | office ti on the 2nd fl. demo of (e)non struc. partitions, lighting,elec,plbg, millwork, int.glazing,dootrs, hrdware and finishes. construction/ reworking of (e) non struc partitions, lighting, elec, mech,millwork, interior glazing, doors , hardware , and finishes. upgrade restrooms.Details
office ti on the 2nd fl. demo of (e)non struc. partitions, lighting,elec,plbg, millwork, int.glazing,dootrs, hrdware and finishes. construction/ reworking of (e) non struc partitions, lighting, elec, mech,millwork, interior glazing, doors , hardware , and finishes. upgrade restrooms. | $275,000 |
| Jun 30, 2008 | Never finaled issued Jun 2008, no final | 755 Sansome St | street space permitDetails
street space permit | ||
| Nov 5, 2007 | Never finaled issued Apr 2008, no final | 755 Sansome St | Sign & Sign Again | erect a non-electric, wall, single faced, non-illuminated sign on entryway opening.Details
erect a non-electric, wall, single faced, non-illuminated sign on entryway opening. | $2,500 |
| May 15, 2006 | Never finaled issued May 2006, no final | 755 Sansome St | street spaceDetails
street space | ||
| Jan 26, 2005 | Never finaled issued Feb 2005, no final | 755 Sansome St | Anderson, Rowe & Buckley, Inc. | it new preaction 10 hos 12 removedDetails
it new preaction 10 hos 12 removed | $7,500 |
| Jan 13, 2005 | Never finaled issued Feb 2005, no final | 755 Sansome St | Intelligent Technologies & Services Inc | install new hfc-227ea/pre-action fire suppression sysstem for the 2nd fl server room.Details
install new hfc-227ea/pre-action fire suppression sysstem for the 2nd fl server room. | $5,300 |
| Apr 17, 2002 | Completed final sign-off Jan 2003 | 755 Sansome St | penetration thru extg concrete floor slab between 5th and 6th floors for new stairway/steel strngrDetails
penetration thru extg concrete floor slab between 5th and 6th floors for new stairway/steel strngr | $45,000 | |
| Apr 8, 2002 | Expired or cancelled expired Aug 2002 | 755 Sansome St | street spaceDetails
street space | ||
| Dec 7, 2001 | Expired or cancelled expired Apr 2002 | 755 Sansome St | street space permit.Details
street space permit. | ||
| Jul 31, 2001 | Expired or cancelled expired Nov 2001 | 755 Sansome St | street spaceDetails
street space | ||
| Mar 30, 2001 | Expired or cancelled expired Jul 2001 | 755 Sansome St | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Sc Builders, Inc (5), Fire & Security & Alarm Co/ F.S.A.C. (4), Gci, Inc (4), Principal Builders Inc. (4), Wework Construction Llc Dba Wework Const (3), Cci Com'l Constr & Improv**See 985808*** (2), Johnstone - Mc Auliffe Const. Inc. (2), Peacock Construction (2), Red Hawk Fire & Security Ca Llc (2), Anderson, Rowe & Buckley, Inc., Ayoob & Peery Plumbing Co Inc, Battery Street Construction, Bay Area Lightworks Inc, C B F Inc, Carter Brothers Fire & Life Safety, Daryl Lassen Construction Inc, Golden Gate Fire Protection Inc, Incom Mechanical Inc, Intelligent Technologies & Services Inc, Marina Mechanical Services, P 3 Construction & Remodeling Inc, Pribuss Engineering Inc, R L H Fire Protection Inc, Sign & Sign Again
- Architects
- Daniel Huntsman (2), Randall Dowler (2), David Hecht, Dennis Heath, Derrick Wu, George S Soskin, James Stefanski, John A. Chipman, Sophia Tyra, Stanley Lew
- Engineers
- Donald Dammen, James Passaglia, Shawn Mclean, Wesley S. Lau
- Authorized agent-otherss
- Anthony Lorenzo
- Designers
- Ben Terani, Joseph Tarantino, Leanne Goff
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.