Bay Area Lightworks Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Mar 2026
- Last 24 months
- 6 permits filed
8 permits since 2000: 2 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 17, 2026 | In progress filed Mar 2026, not yet issued | 201 Powell St | revision 202410283844 to include removing (n) column from design and framing to (e) columnDetails
revision 202410283844 to include removing (n) column from design and framing to (e) column | $50,000 |
| Nov 12, 2024 | In progress issued Jul 2025 | 301 Geary St | selective demo and replacement on basement roof slab, concrete sidewalk toping slab and curb ramp replacment. installation of traffic signal and street liight pol with corbel like support on basement wall. no work to facade of building.Details
selective demo and replacement on basement roof slab, concrete sidewalk toping slab and curb ramp replacment. installation of traffic signal and street liight pol with corbel like support on basement wall. no work to facade of building. | $45,000 |
| Oct 28, 2024 | In progress issued Jul 2025 | 200 Powell St | replacement of concrete sidewalk topping & regrading of curbramps, installation of steel st light & traffic signal pole w/ steel column support in basement. no work to the building nor facadeDetails
replacement of concrete sidewalk topping & regrading of curbramps, installation of steel st light & traffic signal pole w/ steel column support in basement. no work to the building nor facade | $90,000 |
| Oct 28, 2024 | In progress issued Jul 2025 | 201 Powell St | demolition and reconfiguration of basement roof salb and curb ramps, installation of a traffic signal over basement area and stl column support. no work done to facade or building itself.Details
demolition and reconfiguration of basement roof salb and curb ramps, installation of a traffic signal over basement area and stl column support. no work done to facade or building itself. | $387,750 |
| Oct 9, 2024 | In progress issued Jul 2025 | 111 Ellis St | replacement of brick pavers & curbramp, installation of steel streetlight and steel pole support in basement.Details
replacement of brick pavers & curbramp, installation of steel streetlight and steel pole support in basement. | $50,000 |
| Oct 9, 2024 | In progress issued Jul 2025 | 101 Powell St | topping sidewalk replacement. installation of traffic signals and support in basement area. installation of traffic signal pedestal and cabinet at sidewalk level.Details
topping sidewalk replacement. installation of traffic signals and support in basement area. installation of traffic signal pedestal and cabinet at sidewalk level. | $80,000 |
| Nov 8, 2017 | Completed final sign-off Mar 2022 | 201 Pine St | re-construct sub-sidewalk basement to install ada compliant curb rampsDetails
re-construct sub-sidewalk basement to install ada compliant curb ramps | $400,000 |
| Oct 13, 2015 | Completed final sign-off Jul 2017 | 755 Sansome St | barrier removal work for installation of curb ramps at sw corner of pacific and asansome. maher naDetails
barrier removal work for installation of curb ramps at sw corner of pacific and asansome. maher na | $20,000 |