Block 0315, lot 001
301 Geary St
- City’s use
- Commercial Office
- Built
- 1908
- Stories
- 8
- Rooms
- 14 bathrooms
- Lot
- 7,862 sq ft
- Zoning
- C3R
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
30 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 10, 2025 | Completed final sign-off Dec 2025 | 301 Geary St | Tdi Signs | illuminated hanging sign: shoe palaceDetails
illuminated hanging sign: shoe palace | $9,000 |
| Jul 10, 2025 | Completed final sign-off Dec 2025 | 301 Geary St | Tdi Signs | reface existing projecting signDetails
reface existing projecting sign | $4,000 |
| Nov 12, 2024 | In progress issued Jul 2025 | 301 Geary St | Bay Area Lightworks Inc | selective demo and replacement on basement roof slab, concrete sidewalk toping slab and curb ramp replacment. installation of traffic signal and street liight pol with corbel like support on basement wall. no work to facade of building.Details
selective demo and replacement on basement roof slab, concrete sidewalk toping slab and curb ramp replacment. installation of traffic signal and street liight pol with corbel like support on basement wall. no work to facade of building. | $45,000 |
| Oct 16, 2024 | Completed final sign-off Feb 2025 | 323 Geary St | Baba Builders Co | minor repair of floor covering, clean up touch up paint. install floor store fixtures, replace toilet w/ new fix electrical wall plugs.Details
minor repair of floor covering, clean up touch up paint. install floor store fixtures, replace toilet w/ new fix electrical wall plugs. | $2,500 |
| Aug 9, 2017 | Completed final sign-off Dec 2017 | 323 Geary St | Johnson Controls Fire | basement - replace (5) existing smoke detectors with (5) heat detectors as shown on plans.Details
basement - replace (5) existing smoke detectors with (5) heat detectors as shown on plans. | $3,000 |
| May 15, 2014 | Never finaled issued May 2014, no final | 323 Geary St | street spaceDetails
street space | ||
| Sep 18, 2013 | Completed final sign-off Oct 2013 | 301 Geary St | Shawmut Woodworking & Supply Inc | erect electric, wall, single-faced, direct, new sign.Details
erect electric, wall, single-faced, direct, new sign. | $1,500 |
| Sep 10, 2013 | Never finaled issued Sep 2013, no final | 301 Geary St | street space permitDetails
street space permit | ||
| Sep 9, 2013 | Completed final sign-off Oct 2013 | 301 Geary St | Pribuss Engineering Inc | fire sprinkler t.i. basement- 61 heads, g/f- 32 heads, mezz- 74 heads. total 167 heads.Details
fire sprinkler t.i. basement- 61 heads, g/f- 32 heads, mezz- 74 heads. total 167 heads. | $89,544 |
| Aug 26, 2013 | Completed final sign-off Oct 2013 | 301 Geary St | Simplexgrinnell Lp. | fire alarm adding(1) duct (1) nac panel (1) annunciator (58) smoke detetors (28) conttrol delay (13) monitor modutes (2) duct detetors (32) horn/strobes (11) strobes. basement, first and 2 mezz.,Details
fire alarm adding(1) duct (1) nac panel (1) annunciator (58) smoke detetors (28) conttrol delay (13) monitor modutes (2) duct detetors (32) horn/strobes (11) strobes. basement, first and 2 mezz., | $34,000 |
| Aug 6, 2013 | Never finaled issued Aug 2013, no final | 301 Geary St | Shawmut Woodworking & Supply Inc | shelving work only for retail store. ti approved under application # 2012-1211-5948Details
shelving work only for retail store. ti approved under application # 2012-1211-5948 | $50,000 |
| Jul 30, 2013 | Never finaled issued Jul 2013, no final | 323 Geary St | street space permitDetails
street space permit | ||
| Jun 26, 2013 | Never finaled issued Jun 2013, no final | 323 Geary St | street spaceDetails
street space | ||
| May 22, 2013 | Never finaled issued May 2013, no final | 301 Geary St | street spaceDetails
street space | ||
| May 7, 2013 | Completed final sign-off May 2013 | 301 Geary St | Simplexgrinnell Lp. | basement/1st/2nd floors-4 new monitor modules, 1 new duct smoke with relayDetails
basement/1st/2nd floors-4 new monitor modules, 1 new duct smoke with relay | $3,000 |
| Apr 4, 2013 | Never finaled issued Apr 2013, no final | 323 Geary St | street sapce permitDetails
street sapce permit | ||
| Mar 21, 2013 | Completed final sign-off May 2013 | 301 Geary St | Pribuss Engineering Inc | basement, 1 plug ground floor. relocate 88 plugs at the ground fl. add 105 sprinkler at basement. total 193 sprinkler heads. t.i ref # 201301288873Details
basement, 1 plug ground floor. relocate 88 plugs at the ground fl. add 105 sprinkler at basement. total 193 sprinkler heads. t.i ref # 201301288873 | $98,807 |
| Mar 13, 2013 | Completed final sign-off Oct 2013 | 301 Geary St | Shawmut Woodworking & Supply Inc | erect non-electric, single-faced, door/windowDetails
erect non-electric, single-faced, door/window | $85 |
| Mar 13, 2013 | Completed final sign-off Oct 2013 | 301 Geary St | Shawmut Woodworking & Supply Inc | erect electric, wall, single-faced, direct, new sign.Details
erect electric, wall, single-faced, direct, new sign. | $3,500 |
| Mar 13, 2013 | Completed final sign-off Oct 2013 | 301 Geary St | Shawmut Woodworking & Supply Inc | erect electric, wall, single-faced, direct, new sign.Details
erect electric, wall, single-faced, direct, new sign. | $8,000 |
| Mar 4, 2013 | Completed final sign-off Oct 2013 | 301 Geary St | Cci Com'l Constr & Improv**See 985808*** | revision to pa# 2013-0128-8873-replace (e) wood mezzanine & wood stairs with non combustible constructionDetails
revision to pa# 2013-0128-8873-replace (e) wood mezzanine & wood stairs with non combustible construction | $70,000 |
| Jan 28, 2013 | Completed final sign-off Oct 2013 | 301 Geary St | Cci Com'l Constr & Improv**See 985808*** | floor leveling in basement and ground floor. reinforce mezzanine floor at ground floor. modify mezzanine in basement. add/reconfigure corridor at ground floor. misc shell and core mep work.Details
floor leveling in basement and ground floor. reinforce mezzanine floor at ground floor. modify mezzanine in basement. add/reconfigure corridor at ground floor. misc shell and core mep work. | $400,000 |
| Dec 18, 2012 | Never finaled issued Sep 2013, no final | 301 Geary St | Shawmut Woodworking & Supply Inc | install a new storefront on two street frontages. ref to pa#201212115948 for ti application. signage under separate permitDetails
install a new storefront on two street frontages. ref to pa#201212115948 for ti application. signage under separate permit | $65,000 |
| Dec 11, 2012 | Completed final sign-off Oct 2013 | 301 Geary St | Shawmut Woodworking & Supply Inc | interior ti for new retail store. work includes new partitions, new flooring, new finishes, new casework. fire protection , mep and shelving under separate permitDetails
interior ti for new retail store. work includes new partitions, new flooring, new finishes, new casework. fire protection , mep and shelving under separate permit | $1,375,000 |
| Dec 11, 2012 | Completed final sign-off Oct 2013 | 301 Geary St | Shawmut Woodworking & Supply Inc | mep for new retail store ti under separate permit 201212126948Details
mep for new retail store ti under separate permit 201212126948 | $275,000 |
| Aug 23, 2012 | Completed final sign-off Dec 2012 | 301 Geary St | Plant Construction Company Lp | basement, mezzanine, 1st, 2nd floors. interior demolition of partitions, removal of carpet, tile ceiling tile. no structural or life safety demo. space to remain vacant per ab-017. comply with cfc chapter 14. demo on basement, first fl & mezzanine only. note: accessible access deferred per ab-017.Details
basement, mezzanine, 1st, 2nd floors. interior demolition of partitions, removal of carpet, tile ceiling tile. no structural or life safety demo. space to remain vacant per ab-017. comply with cfc chapter 14. demo on basement, first fl & mezzanine only. note: accessible access deferred per ab-017. | $30,000 |
| Oct 9, 2007 | Completed final sign-off Dec 2007 | 323 Geary St | State Roofing Systems Inc | reroofingDetails
reroofing | $120,000 |
| Jul 24, 2001 | Completed final sign-off Jan 2003 | 323 Geary St | Mcclure Electric Inc | new fire alarm systemDetails
new fire alarm system | $70,000 |
| Jan 22, 2001 | Expired or cancelled cancelled Oct 2024 | 301 Geary St | erect signsDetails
erect signs | ||
| Jan 22, 2001 | Expired or cancelled expired Aug 2001 | 301 Geary St | Oliveira Sign Service | to erect new sign indirect,single faced door/window electricDetails
to erect new sign indirect,single faced door/window electric |