Markus Williams
- Listed as
- engineer
- Firm
- Bureau Of Enginnering
- Based in
- Sf
- On San Francisco permits
- Oct 2024 to May 2026
8 permits since 2000 (engineer on 8 permits): 8 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 13, 2026 | In progress issued Sep 2026 | 147 Natoma St | replacing and modifying the sidewalk, as well as modifying the sub-sidewalk basement to accommodate the new sidewalk gradesDetails
replacing and modifying the sidewalk, as well as modifying the sub-sidewalk basement to accommodate the new sidewalk grades | $15,000 | |
| Feb 9, 2026 | In progress issued Sep 2026 | 149 New Montgomery St | Bauman Landscape & Construction Inc. | replacing and modifying the sidewalk and abondoining an (e) subsidewalk basement. ref streetscape permit # 2025 exc- 024-3sDetails
replacing and modifying the sidewalk and abondoining an (e) subsidewalk basement. ref streetscape permit # 2025 exc- 024-3s | $110,000 |
| Dec 2, 2025 | In progress issued Jan 2026 | 124 02nd St | Bauman Landscape & Construction Inc. | replacing and modifying the sidewalk topping slab and the sub-sidewalk basement to accommodete a new street light foundationDetails
replacing and modifying the sidewalk topping slab and the sub-sidewalk basement to accommodete a new street light foundation | $54,000 |
| Nov 12, 2024 | In progress issued Jul 2025 | 301 Geary St | Bay Area Lightworks Inc | selective demo and replacement on basement roof slab, concrete sidewalk toping slab and curb ramp replacment. installation of traffic signal and street liight pol with corbel like support on basement wall. no work to facade of building.Details
selective demo and replacement on basement roof slab, concrete sidewalk toping slab and curb ramp replacment. installation of traffic signal and street liight pol with corbel like support on basement wall. no work to facade of building. | $45,000 |
| Oct 28, 2024 | In progress issued Jul 2025 | 201 Powell St | Bay Area Lightworks Inc | demolition and reconfiguration of basement roof salb and curb ramps, installation of a traffic signal over basement area and stl column support. no work done to facade or building itself.Details
demolition and reconfiguration of basement roof salb and curb ramps, installation of a traffic signal over basement area and stl column support. no work done to facade or building itself. | $387,750 |
| Oct 28, 2024 | In progress issued Jul 2025 | 200 Powell St | Bay Area Lightworks Inc | replacement of concrete sidewalk topping & regrading of curbramps, installation of steel st light & traffic signal pole w/ steel column support in basement. no work to the building nor facadeDetails
replacement of concrete sidewalk topping & regrading of curbramps, installation of steel st light & traffic signal pole w/ steel column support in basement. no work to the building nor facade | $90,000 |
| Oct 9, 2024 | In progress issued Jul 2025 | 111 Ellis St | Bay Area Lightworks Inc | replacement of brick pavers & curbramp, installation of steel streetlight and steel pole support in basement.Details
replacement of brick pavers & curbramp, installation of steel streetlight and steel pole support in basement. | $50,000 |
| Oct 9, 2024 | In progress issued Jul 2025 | 101 Powell St | Bay Area Lightworks Inc | topping sidewalk replacement. installation of traffic signals and support in basement area. installation of traffic signal pedestal and cabinet at sidewalk level.Details
topping sidewalk replacement. installation of traffic signals and support in basement area. installation of traffic signal pedestal and cabinet at sidewalk level. | $80,000 |