Block 3722, lot 007
145 New Montgomery St
- City’s use
- Commercial Office
- Built
- 1907
- Stories
- 6
- Rooms
- 20 bathrooms
- Building
- 70,079 sq ft
- Lot
- 12,593 sq ft
- Zoning
- C3O
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
113 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 24, 2026 | In progress issued Sep 2026 | 145 New Montgomery St | Principal Builders Inc. | ground floor: revise pa #202607175229 to show addition of sink and removal of millwork at reception desk. deferred mep for pa 202607175229 is included on this permit.Details
ground floor: revise pa #202607175229 to show addition of sink and removal of millwork at reception desk. deferred mep for pa 202607175229 is included on this permit. | $842,811 |
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 149 New Montgomery St | non structural demolition of floors 2 and 3 per ab-17 no alteration s to structural components, dropped ceilings , rated partitions floor assemblies and historical fabric of feature or any extension walls under the permit.Details
non structural demolition of floors 2 and 3 per ab-17 no alteration s to structural components, dropped ceilings , rated partitions floor assemblies and historical fabric of feature or any extension walls under the permit. | $150,000 | |
| Sep 16, 2026 | In progress issued Sep 2026 | 149 New Montgomery St | Hillhouse Construction Company Inc | deferred mechancial + electrical for pa# 202606183556.Details
deferred mechancial + electrical for pa# 202606183556. | $339,411 |
| Aug 13, 2026 | In progress issued Aug 2026 | 149 New Montgomery St | Hillhouse Construction Company Inc | deferred mep for 202512111568Details
deferred mep for 202512111568 | $160,000 |
| Aug 7, 2026 | In progress issued Aug 2026 | 149 New Montgomery St | Principal Builders Inc. | 4th floor. revision to 202604209749. removal of (e) elevator lobby double door and adding new smoke curtain above (e) elevator cab doors. various partition layouts changes, rcp and lighting updates, and finish updates.Details
4th floor. revision to 202604209749. removal of (e) elevator lobby double door and adding new smoke curtain above (e) elevator cab doors. various partition layouts changes, rcp and lighting updates, and finish updates. | |
| Aug 5, 2026 | In progress issued Aug 2026 | 149 New Montgomery St | Hillhouse Construction Company Inc | revisoin 202512111568 and ref 202605111058 to docuemnt removal of all grade restrooms on 6th floorDetails
revisoin 202512111568 and ref 202605111058 to docuemnt removal of all grade restrooms on 6th floor | |
| Jul 24, 2026 | In progress filed Jul 2026, not yet issued | 145 New Montgomery St | Hillhouse Construction Company Inc | ground floor: select demolition of one bay of storefront and semi-circular overhang above new replacement entry with pilaster details, header and crest, new entry door and door hardware. replocation of existing lights in the soffit.Details
ground floor: select demolition of one bay of storefront and semi-circular overhang above new replacement entry with pilaster details, header and crest, new entry door and door hardware. replocation of existing lights in the soffit. | $200,000 |
| Jul 24, 2026 | In progress issued Aug 2026 | 149 New Montgomery St | Hillhouse Construction Company Inc | roof to 2nd/f: installation of new building vrf mechanical system and vertical pipe distribution, including rated floor patching and non-rated furring partitions from roof to 2nd/f.Details
roof to 2nd/f: installation of new building vrf mechanical system and vertical pipe distribution, including rated floor patching and non-rated furring partitions from roof to 2nd/f. | $1,193,158 |
| Jul 17, 2026 | In progress issued Aug 2026 | 145 New Montgomery St | Principal Builders Inc. | minor tenant improvements on ground floor, new non-structural partitions, finishes, and millwork.Details
minor tenant improvements on ground floor, new non-structural partitions, finishes, and millwork. | $750,000 |
| Jul 14, 2026 | In progress filed Jul 2026, not yet issued | 149 New Montgomery St | Principal Builders Inc. | stairs commercial tenant improvement between floors 4.5 &6. scope of work includes partial demolition of existing flooring. new interconnecting spiral staircases & associated structural improvements.Details
stairs commercial tenant improvement between floors 4.5 &6. scope of work includes partial demolition of existing flooring. new interconnecting spiral staircases & associated structural improvements. | $1,130,000 |
| Jun 18, 2026 | In progress issued Jun 2026 | 149 New Montgomery St | Hillhouse Construction Company Inc | new partitions for mail room and securiety desk area on gr fl for common building lobby. new furring, floor and wall finishes for lobby, hallway and elevator lobby, new lighting basis of design in area of work. no changes to exterior or historic fabric- mep deferred.Details
new partitions for mail room and securiety desk area on gr fl for common building lobby. new furring, floor and wall finishes for lobby, hallway and elevator lobby, new lighting basis of design in area of work. no changes to exterior or historic fabric- mep deferred. | $350,000 |
| May 11, 2026 | In progress issued Jun 2026 | 149 New Montgomery St | Hillhouse Construction Company Inc | relocate main building lobby for 149 new montogomery. select demo of partitions, millwork, and electrical for core and shell work. flooring level and layout adjustments revision to ground floor storefront including new lobby entry door and infill of previous cafe entry with insulated safety glassDetails
relocate main building lobby for 149 new montogomery. select demo of partitions, millwork, and electrical for core and shell work. flooring level and layout adjustments revision to ground floor storefront including new lobby entry door and infill of previous cafe entry with insulated safety glass | $250,000 |
| May 11, 2026 | In progress issued Jun 2026 | 149 New Montgomery St | Hillhouse Construction Company Inc | roof floor-revision 202512111568- replace roof membrane throughout roof drainage, cricketing and waterproofing to perform new work. roof framingstructural upgrade at area of work. upgrade and extend elevator at roofDetails
roof floor-revision 202512111568- replace roof membrane throughout roof drainage, cricketing and waterproofing to perform new work. roof framingstructural upgrade at area of work. upgrade and extend elevator at roof | |
| May 5, 2026 | Completed final sign-off Jul 2026 | 149 New Montgomery St | Hillhouse Construction Company Inc | deferred mep for 202603177710 for new cafe at ground flDetails
deferred mep for 202603177710 for new cafe at ground fl | $186,900 |
| Apr 20, 2026 | In progress issued Jun 2026 | 149 New Montgomery St | Principal Builders Inc. | 4/f: commercial ti of (e) 4th floor. scope of work includes partial demo of interior non-bearing walls, ceilings, light fixtures and (e) flooring. new construction of non-bearing walls, finishes, power (as required), and associated mep improvements.Details
4/f: commercial ti of (e) 4th floor. scope of work includes partial demo of interior non-bearing walls, ceilings, light fixtures and (e) flooring. new construction of non-bearing walls, finishes, power (as required), and associated mep improvements. | $3,270,000 |
| Apr 20, 2026 | In progress issued Jul 2026 | 149 New Montgomery St | Principal Builders Inc. | commercial tenant improvement of (e) floors 5 & 6.Details
commercial tenant improvement of (e) floors 5 & 6. | $5,670,000 |
| Mar 17, 2026 | Completed final sign-off Jul 2026 | 149 New Montgomery St | Hillhouse Construction Company Inc | select demo of non structural partition, doors, tile ceiling, relocation of existing cafe, new mill work, equpiment, finishes and gypsum board soffit, no exterior work, mep deferred. change of use from ground floor retail to cafe.Details
select demo of non structural partition, doors, tile ceiling, relocation of existing cafe, new mill work, equpiment, finishes and gypsum board soffit, no exterior work, mep deferred. change of use from ground floor retail to cafe. | $288,125 |
| Feb 25, 2026 | Completed final sign-off Apr 2026 | 149 New Montgomery St | Hillhouse Construction Company Inc | non-structural interior demolition on floors 4,5, and 6 per ab-017Details
non-structural interior demolition on floors 4,5, and 6 per ab-017 | $250,000 |
| Feb 9, 2026 | In progress issued Sep 2026 | 149 New Montgomery St | Bauman Landscape & Construction Inc. | replacing and modifying the sidewalk and abondoining an (e) subsidewalk basement. ref streetscape permit # 2025 exc- 024-3sDetails
replacing and modifying the sidewalk and abondoining an (e) subsidewalk basement. ref streetscape permit # 2025 exc- 024-3s | $110,000 |
| Dec 11, 2025 | In progress issued Apr 2026 | 149 New Montgomery St | Hillhouse Construction Company Inc | relocate (e) rooftop mechanical equipment in area of work , remove skylight in area of work, upgrade and extend (e) elevator to rooftop, reconfigure and extend (e) exit stair areas at 6th floor to roof, create (n) occupied roofdeck area, new counter area, exterior lighting, guard rails, roofDetails
relocate (e) rooftop mechanical equipment in area of work , remove skylight in area of work, upgrade and extend (e) elevator to rooftop, reconfigure and extend (e) exit stair areas at 6th floor to roof, create (n) occupied roofdeck area, new counter area, exterior lighting, guard rails, roof | $800,000 |
| Oct 4, 2023 | In progress issued Feb 2024 | 149 New Montgomery St | Martin Heagney | install plw3 formlock on top of existing brick wall as shown on plan and pour slabDetails
install plw3 formlock on top of existing brick wall as shown on plan and pour slab | $8,500 |
| Oct 21, 2019 | Never finaled issued Oct 2019, no final | 149 New Montgomery St | street spaceDetails
street space | ||
| Sep 10, 2019 | Completed final sign-off Feb 2020 | 149 New Montgomery St | All Guard Alarm Sys. Inc. | suite 201- relocating 4 fire notification devices. adding 1 fire notification device. ref 201907267027Details
suite 201- relocating 4 fire notification devices. adding 1 fire notification device. ref 201907267027 | $2,500 |
| Aug 27, 2019 | Completed final sign-off Apr 2020 | 149 New Montgomery St | Lifeguard Fire Protection Inc. | relocate 4 sprinkler heads for new office layoutDetails
relocate 4 sprinkler heads for new office layout | $3,200 |
| Jul 26, 2019 | Completed final sign-off Mar 2020 | 149 New Montgomery St | Whitney Commercial Construction | suite #201: minimal wall ceiling alteration, power and data adjusted as appropriate.Details
suite #201: minimal wall ceiling alteration, power and data adjusted as appropriate. | $100,000 |
| Jul 23, 2019 | Expired or cancelled cancelled Jan 2026 | 149 New Montgomery St | 2nd flr. minimal wall ceiling alteration, power and data adjusted as appropriateDetails
2nd flr. minimal wall ceiling alteration, power and data adjusted as appropriate | $120,000 | |
| Jul 2, 2019 | Never finaled issued Jul 2019, no final | 149 New Montgomery St | sign (b): to erect electrical wall sign at entrance.(werqwise)Details
sign (b): to erect electrical wall sign at entrance.(werqwise) | $4,000 | |
| Jul 2, 2019 | Completed final sign-off Sep 2019 | 149 New Montgomery St | sign (c): to erect non-electrical 2 banner projecting signs. (werqwise)Details
sign (c): to erect non-electrical 2 banner projecting signs. (werqwise) | $5,000 | |
| Jul 2, 2019 | Completed final sign-off Sep 2019 | 149 New Montgomery St | sign (a): to erect non-electrical blade sign at entrance.Details
sign (a): to erect non-electrical blade sign at entrance. | $1,000 | |
| Jun 5, 2018 | Never finaled issued Jun 2018, no final | 149 New Montgomery St | Pyro-Comm Systems, Inc. | 3rd fl: fire alarm pyro comm will provide 1 rps, 2 smoke detectors, 8 duct detectors,67 audio visual devices to be hood up to existing fa system ref 201801118386 and mechanical 201804035327Details
3rd fl: fire alarm pyro comm will provide 1 rps, 2 smoke detectors, 8 duct detectors,67 audio visual devices to be hood up to existing fa system ref 201801118386 and mechanical 201804035327 | $38,000 |
| Apr 11, 2018 | Completed final sign-off Jul 2018 | 149 New Montgomery St | Pyro-Comm Systems, Inc. | fifth floor fire alarm ti-provide 1 power supply, 11 smk det, 58 audio/visual devices, 2 monitor modules and 9 relay modules ref 201801057985- two way communication not required in locked lobby by building dept because low rise.Details
fifth floor fire alarm ti-provide 1 power supply, 11 smk det, 58 audio/visual devices, 2 monitor modules and 9 relay modules ref 201801057985- two way communication not required in locked lobby by building dept because low rise. | $39,699 |
| Apr 3, 2018 | Never finaled issued Apr 2018, no final | 149 New Montgomery St | Matrix Hg Inc | 5/f: relocate 3 existing heat pumps, replace 1 unit and duct out units for new layout. ref pa 2018-0105-7985Details
5/f: relocate 3 existing heat pumps, replace 1 unit and duct out units for new layout. ref pa 2018-0105-7985 | $150,000 |
| Apr 3, 2018 | Never finaled issued Apr 2018, no final | 149 New Montgomery St | Matrix Hg Inc | 3/f: relocate 4 units, replace 4 units, and duct for new layout. ref pa 2018-0111-8386Details
3/f: relocate 4 units, replace 4 units, and duct for new layout. ref pa 2018-0111-8386 | $158,000 |
| Mar 27, 2018 | Expired or cancelled cancelled Jan 2026 | 149 New Montgomery St | reviosn to 201801057985. 5th floor. restroom accessibilityDetails
reviosn to 201801057985. 5th floor. restroom accessibility | $2,800 | |
| Mar 27, 2018 | Expired or cancelled cancelled Jan 2026 | 149 New Montgomery St | Crane Construction Company Inc. | revision to 201801057987. 4th floor. restroom accessibilityDetails
revision to 201801057987. 4th floor. restroom accessibility | $2,800 |
| Mar 27, 2018 | Expired or cancelled cancelled Jan 2026 | 149 New Montgomery St | Crane Construction Company Inc. | revision to 201801118383. removing acoustical tiles to be replaced with soffitsDetails
revision to 201801118383. removing acoustical tiles to be replaced with soffits | |
| Mar 27, 2018 | Expired or cancelled cancelled Jan 2026 | 149 New Montgomery St | Crane Construction Company Inc. | revision to 201801118386. removing acoustical tiles to be replaced with soffitsDetails
revision to 201801118386. removing acoustical tiles to be replaced with soffits | |
| Mar 21, 2018 | Completed final sign-off Apr 2018 | 149 New Montgomery St | Pyro-Comm Systems, Inc. | ti on 4th fl. pyro comm will provide 1 power supply, 10 relays, 8 duct detectors, 29 audible/visual devices, 1 pull station, 2 monitor modulesDetails
ti on 4th fl. pyro comm will provide 1 power supply, 10 relays, 8 duct detectors, 29 audible/visual devices, 1 pull station, 2 monitor modules | $12,500 |
| Mar 21, 2018 | Completed final sign-off Apr 2018 | 149 New Montgomery St | Pyro-Comm Systems, Inc. | pyro comm will provide 1 power supply, 10 relays, 8 duct detectors, 34 audible/visual devices, and 1 monitor modeDetails
pyro comm will provide 1 power supply, 10 relays, 8 duct detectors, 34 audible/visual devices, and 1 monitor mode | $12,500,000 |
| Mar 15, 2018 | Completed final sign-off Apr 2018 | 149 New Montgomery St | Westates Mechanical Corporation Inc | 3/f: remove, add & relocate existing fire sprinklers to new ti wall layout ref pa 2018-0111-8386 22 adds, 3 relocates.Details
3/f: remove, add & relocate existing fire sprinklers to new ti wall layout ref pa 2018-0111-8386 22 adds, 3 relocates. | $8,000 |
| Mar 5, 2018 | Never finaled issued Mar 2018, no final | 149 New Montgomery St | Matrix Hg Inc | 6th floor: reduct extg units to fit new layout. ref app#201802131201Details
6th floor: reduct extg units to fit new layout. ref app#201802131201 | $185,000 |
| Mar 5, 2018 | Never finaled issued Mar 2018, no final | 149 New Montgomery St | Matrix Hg Inc | 4th floor: reduct extg units to fit new layout. ref app#201802151466Details
4th floor: reduct extg units to fit new layout. ref app#201802151466 | $40,000 |
| Feb 28, 2018 | Completed final sign-off Mar 2018 | 149 New Montgomery St | Westates Mechanical Corporation Inc | 4th floor - remove, add and relocate existing fire sprinkler to new t.i. wall layout. reference t.i. #2018-0105-7987.Details
4th floor - remove, add and relocate existing fire sprinkler to new t.i. wall layout. reference t.i. #2018-0105-7987. | $6,700 |
| Feb 28, 2018 | Completed final sign-off Apr 2018 | 149 New Montgomery St | Westates Mechanical Corporation Inc | 5th floor - remove, add and relocate existing fire sprinkler to new t.i. wall layout. reference t.i. #2018-0105-7985.Details
5th floor - remove, add and relocate existing fire sprinkler to new t.i. wall layout. reference t.i. #2018-0105-7985. | $18,000 |
| Feb 28, 2018 | Completed final sign-off Mar 2018 | 149 New Montgomery St | Westates Mechanical Corporation Inc | 6th floor - remove, add and relocate existing fire sprinkler to new t.i. wall layout. reference t.i. #2018-0111-8383.Details
6th floor - remove, add and relocate existing fire sprinkler to new t.i. wall layout. reference t.i. #2018-0111-8383. | $9,000 |
| Feb 15, 2018 | Never finaled issued Mar 2018, no final | 149 New Montgomery St | Crane Construction Company Inc. | 4th floor: delete suspended ceiling, add gyp board veiling soffits. revision to 201801057987. fire protection and life safety under separate permitDetails
4th floor: delete suspended ceiling, add gyp board veiling soffits. revision to 201801057987. fire protection and life safety under separate permit | |
| Feb 13, 2018 | Never finaled issued Mar 2018, no final | 149 New Montgomery St | Crane Construction Company Inc. | 6th floor: delete suspended ceiling and add gyp. bd ceiling soffits. revision to app#201801118383. fire protection and life safety under separate permitDetails
6th floor: delete suspended ceiling and add gyp. bd ceiling soffits. revision to app#201801118383. fire protection and life safety under separate permit | |
| Jan 16, 2018 | Completed final sign-off Jan 2018 | 149 New Montgomery St | All Guard Alarm Sys. Inc. | 2nd floor: relocate two (2) fire alarm notification appliances thDetails
2nd floor: relocate two (2) fire alarm notification appliances th | $5,500 |
| Jan 11, 2018 | Never finaled issued Jan 2018, no final | 149 New Montgomery St | Crane Construction Company Inc. | 6th fl ti - new non load bearing partitions, suspended, ceiling, lighting, electrical. restroom accessibility. elec/mech under separate permit. maher naDetails
6th fl ti - new non load bearing partitions, suspended, ceiling, lighting, electrical. restroom accessibility. elec/mech under separate permit. maher na | $550,000 |
| Jan 11, 2018 | Never finaled issued Jan 2018, no final | 149 New Montgomery St | Crane Construction Company Inc. | 3rd fl ti - new non-load bearing partitions, suspended ceiling, lighting, electrical. restroom accessibility elec/mech under separate permit. maher naDetails
3rd fl ti - new non-load bearing partitions, suspended ceiling, lighting, electrical. restroom accessibility elec/mech under separate permit. maher na | $550,000 |
| Jan 5, 2018 | Never finaled issued Jan 2018, no final | 149 New Montgomery St | Crane Construction Company Inc. | 4th fl - ti new non-load bearing partitions, suspended ceiling, lighting, electrical. restroom accessibility elec/mech under separate permit. maher naDetails
4th fl - ti new non-load bearing partitions, suspended ceiling, lighting, electrical. restroom accessibility elec/mech under separate permit. maher na | $498,000 |
| Jan 5, 2018 | Never finaled issued Jan 2018, no final | 149 New Montgomery St | Crane Construction Company Inc. | 5th fl ti - new non load bearing partitions, suspended, ceiling, lighting, electrical. restroom accessibility. elec/mech under separate permit. maher naDetails
5th fl ti - new non load bearing partitions, suspended, ceiling, lighting, electrical. restroom accessibility. elec/mech under separate permit. maher na | $523,000 |
| Jan 4, 2018 | Completed final sign-off Mar 2018 | 149 New Montgomery St | Tom Hammer Construction Llc | revision to 201711093690: response to inspectio correction notice hardship for accessible stall, fully accessible drinking fountain and updated egress pathDetails
revision to 201711093690: response to inspectio correction notice hardship for accessible stall, fully accessible drinking fountain and updated egress path | $2,500 |
| Dec 20, 2017 | Never finaled issued Dec 2017, no final | 149 New Montgomery St | Crane Construction Company Inc. | demo existing tenant improvment spaceDetails
demo existing tenant improvment space | $40,000 |
| Dec 13, 2017 | Never finaled issued Dec 2017, no final | 149 New Montgomery St | Crane Construction Company Inc. | 3,5,6 floors - interior demo of (e) tenant spaceDetails
3,5,6 floors - interior demo of (e) tenant space | $140,000 |
| Nov 20, 2017 | Never finaled issued Nov 2017, no final | 149 New Montgomery St | street spaceDetails
street space | ||
| Nov 9, 2017 | Never finaled issued Nov 2017, no final | 149 New Montgomery St | street spaceDetails
street space | ||
| Nov 9, 2017 | Completed final sign-off Feb 2018 | 149 New Montgomery St | Tom Hammer Construction Llc | 2/f- t.i. including demolition, new walls, ceilings, millwork, and finishes.Details
2/f- t.i. including demolition, new walls, ceilings, millwork, and finishes. | $140,000 |
| Oct 25, 2017 | Never finaled issued Oct 2017, no final | 149 New Montgomery St | street space w/mtaDetails
street space w/mta | ||
| Sep 20, 2017 | Never finaled issued Sep 2017, no final | 149 New Montgomery St | street spaceDetails
street space | ||
| Dec 18, 2014 | Completed final sign-off Mar 2015 | 149 New Montgomery St | Centric Construction Inc | tenant improvement of exisisting office interior. scope includes adding doors, new built-in furniture, new fire exist signs and power for av equipment. electrical and under separate permit.Details
tenant improvement of exisisting office interior. scope includes adding doors, new built-in furniture, new fire exist signs and power for av equipment. electrical and under separate permit. | $95,000 |
| Jun 18, 2014 | Completed final sign-off Jun 2014 | 149 New Montgomery St | Ayoob & Peery Plumbing Co Inc | 6th floor relocate fire sprinklers per tenant improvements - 7 relocate. ref pa #2014.0610.7912Details
6th floor relocate fire sprinklers per tenant improvements - 7 relocate. ref pa #2014.0610.7912 | $3,598 |
| Jun 12, 2014 | Completed final sign-off Jul 2014 | 149 New Montgomery St | C B 2 Builders Incorporated | 6th floor: new duct branches and diffusers added to extg duct and extg equipment, single zone heat pump. per arch app#201406107912Details
6th floor: new duct branches and diffusers added to extg duct and extg equipment, single zone heat pump. per arch app#201406107912 | $5,000 |
| Jun 10, 2014 | Completed final sign-off Jul 2014 | 149 New Montgomery St | C B 2 Builders Incorporated | 6th floor: t.i. of an extg office interior, scope includes reorganization of conference and storage rooms with supporting electrical upgrade.Details
6th floor: t.i. of an extg office interior, scope includes reorganization of conference and storage rooms with supporting electrical upgrade. | $94,000 |
| Mar 24, 2014 | Never finaled issued Jul 2014, no final | 149 New Montgomery St | Golden Gate Sign Company Inc. | painted sign. copy change only to 3 existing signs.Details
painted sign. copy change only to 3 existing signs. | $3,000 |
| Feb 26, 2010 | Completed final sign-off Mar 2010 | 149 New Montgomery St | Tri-Signal Integration Inc. | 1st & 2nd floor as built for fire alarm systyem, ref pa #20091016913.Details
1st & 2nd floor as built for fire alarm systyem, ref pa #20091016913. | |
| Oct 27, 2009 | Completed final sign-off Feb 2010 | 149 New Montgomery St | Golden Gate Sign Company Inc. | erect an electric single faced direct illuminated new wall sign.Details
erect an electric single faced direct illuminated new wall sign. | $5,000 |
| Oct 27, 2009 | Never finaled issued Dec 2009, no final | 149 New Montgomery St | Golden Gate Sign Company Inc. | erect a non-electric single faced door/window non illuminated, non-structural sign.Details
erect a non-electric single faced door/window non illuminated, non-structural sign. | $1,000 |
| Oct 22, 2009 | Completed final sign-off May 2010 | 149 New Montgomery St | Ayoob & Peery Plumbing Co Inc | 1st & 2nd floor relocate & remove fire sprinkler heads per tenant improvements, 1st floor: 38 relcoate, 4 remove. 2nd floor: 51 relocate, 6 remove.Details
1st & 2nd floor relocate & remove fire sprinkler heads per tenant improvements, 1st floor: 38 relcoate, 4 remove. 2nd floor: 51 relocate, 6 remove. | $13,350 |
| Oct 16, 2009 | Completed final sign-off Mar 2010 | 149 New Montgomery St | Tri-Signal Integration Inc. | 1st & 2nd floors-add 2 control modules, 33 honr/strobes, 6 strobes to (e) fire alarm systemDetails
1st & 2nd floors-add 2 control modules, 33 honr/strobes, 6 strobes to (e) fire alarm system | $8,900 |
| Sep 11, 2009 | Completed final sign-off Mar 2010 | 149 New Montgomery St | Novo Construction Inc | new partition walls, new break room, electrrical, mechanical & plumbing work. no exterior work. no structural removal.Details
new partition walls, new break room, electrrical, mechanical & plumbing work. no exterior work. no structural removal. | $775,000 |
| Aug 26, 2009 | Expired or cancelled cancelled Jan 2026 | 149 New Montgomery St | removal of walls, doors, ceiling, hvac ducting and electrical on 1st and 2nd floors per ab.017. no structural wall removal. no exterior work.Details
removal of walls, doors, ceiling, hvac ducting and electrical on 1st and 2nd floors per ab.017. no structural wall removal. no exterior work. | $25,000 | |
| Mar 2, 2009 | Expired or cancelled expired Nov 2013 | 149 New Montgomery St | M B Development | at 5th fl: remove some existing interior walls, acoustic ceilings. built new partition walls, paint, relocate existing electrical outles & switches. life safety separate permit. existing mechanical to remainDetails
at 5th fl: remove some existing interior walls, acoustic ceilings. built new partition walls, paint, relocate existing electrical outles & switches. life safety separate permit. existing mechanical to remain | $56,500 |
| May 15, 2008 | Never finaled issued May 2008, no final | 149 New Montgomery St | ti on the 4th floor. demolition of non structural partition walls, construction of new offices and work room. mechanical, lighting, plumbing and fire suppression system to be done under separate permit.Details
ti on the 4th floor. demolition of non structural partition walls, construction of new offices and work room. mechanical, lighting, plumbing and fire suppression system to be done under separate permit. | $8,000 | |
| Nov 29, 2004 | Expired or cancelled expired Oct 2007 | 149 New Montgomery St | Bcci Construction Company | structural work on the ground floor to support oven pad. revision to#200408161618 (oven permittedDetails
structural work on the ground floor to support oven pad. revision to#200408161618 (oven permitted | $6,000 |
| Nov 22, 2004 | Completed final sign-off Mar 2005 | 149 New Montgomery St | Zebra Awning Co Inc | fabricate & install 1 curved style awning. store logo applied to front panel.Details
fabricate & install 1 curved style awning. store logo applied to front panel. | $1,200 |
| Nov 22, 2004 | Completed final sign-off Mar 2005 | 149 New Montgomery St | Zebra Awning Co Inc | to erect single faced non-electric signDetails
to erect single faced non-electric sign | $200 |
| Nov 3, 2004 | Completed final sign-off Dec 2004 | 149 New Montgomery St | Gci, Inc | interior demo approx 50 l.f.walls,patch demo scars.no new wallsDetails
interior demo approx 50 l.f.walls,patch demo scars.no new walls | $4,000 |
| Nov 1, 2004 | Expired or cancelled expired Oct 2007 | 149 New Montgomery St | Bcci Construction Company | install new door to street for entrance.new door & system to match (e),scope of work limited to abovDetails
install new door to street for entrance.new door & system to match (e),scope of work limited to abov | $5,000 |
| Oct 15, 2004 | Never finaled issued Oct 2004, no final | 149 New Montgomery St | Martinelli Environmental Graph | erect double faced non electric projecting wall signDetails
erect double faced non electric projecting wall sign | |
| Oct 15, 2004 | Never finaled issued Oct 2004, no final | 149 New Montgomery St | Martinelli Environmental Graph | to erect new non electric projecting wall signDetails
to erect new non electric projecting wall sign | |
| Oct 4, 2004 | Completed final sign-off Feb 2005 | 149 New Montgomery St | Bcci Construction Company | electrical, mechanical & fire sprinkler work associated with 3200408161618. 1st flDetails
electrical, mechanical & fire sprinkler work associated with 3200408161618. 1st fl | $75,000 |
| Sep 30, 2004 | Completed final sign-off Feb 2005 | 149 New Montgomery St | Bcci Construction Company | fire alarm work on ground floor, scope of work includes 1 strobe, 1 notifier moduleDetails
fire alarm work on ground floor, scope of work includes 1 strobe, 1 notifier module | $3,000 |
| Sep 30, 2004 | Completed final sign-off Dec 2004 | 149 New Montgomery St | Paganini Electric Corp(See Signatories) | addition of 9 strobes, 3 horn/strobes & 1 smoke detector for the floor 1 "red envelope" tenant remodDetails
addition of 9 strobes, 3 horn/strobes & 1 smoke detector for the floor 1 "red envelope" tenant remod | $3,500 |
| Sep 28, 2004 | Completed final sign-off Feb 2005 | 149 New Montgomery St | Aaa Restaurant Fire Control/Dba Aaa Fire | installation of 1 automatic hood & duct fire protection system.Details
installation of 1 automatic hood & duct fire protection system. | $2,275 |
| Sep 24, 2004 | Completed final sign-off Dec 2004 | 149 New Montgomery St | Gci, Inc | oti-2, 1st floor, el, me, sp.Details
oti-2, 1st floor, el, me, sp. | $85,000 |
| Aug 30, 2004 | Completed final sign-off May 2005 | 149 New Montgomery St | Gci, Inc | oti-2 2nd floor el me sp lsDetails
oti-2 2nd floor el me sp ls | $55,000 |
| Aug 30, 2004 | Completed final sign-off May 2005 | 149 New Montgomery St | Gci, Inc | oti-2 3rd floor el me ls spDetails
oti-2 3rd floor el me ls sp | $55,000 |
| Aug 19, 2004 | Completed final sign-off May 2005 | 149 New Montgomery St | Gci, Inc | oti-1 1/f el me spDetails
oti-1 1/f el me sp | $145,000 |
| Aug 16, 2004 | Expired or cancelled expired Oct 2007 | 149 New Montgomery St | Bcci Construction Company | cnfig exist 1st fl space to be a bakery&cafe from an office. elec,mech,fire sp,ls,hood sep permit.Details
cnfig exist 1st fl space to be a bakery&cafe from an office. elec,mech,fire sp,ls,hood sep permit. | $150,000 |
| Jul 16, 2004 | Completed final sign-off May 2005 | 149 New Montgomery St | Gci, Inc | oti-1 3rd lfoo el me ls spDetails
oti-1 3rd lfoo el me ls sp | $115,000 |
| Jul 14, 2004 | Completed final sign-off May 2005 | 149 New Montgomery St | Gci, Inc | oti-1, 2nd floor, el,ls,me,spDetails
oti-1, 2nd floor, el,ls,me,sp | $115,000 |
| Sep 9, 2003 | Expired or cancelled expired Dec 2004 | 149 New Montgomery St | oti-1 4th floor, el, me, ls, spDetails
oti-1 4th floor, el, me, ls, sp | $18,500 | |
| Oct 24, 2002 | Completed final sign-off Dec 2002 | 149 New Montgomery St | ti work consisting of addition of offices and associated elec p hvac workDetails
ti work consisting of addition of offices and associated elec p hvac work | $48,000 | |
| Aug 28, 2002 | Expired or cancelled cancelled Aug 2002 | 149 New Montgomery St | erect signDetails
erect sign | $3,750 | |
| Jun 20, 2002 | Expired or cancelled expired Oct 2003 | 149 New Montgomery St | Intellisec | addition of two fire alarm devicesDetails
addition of two fire alarm devices | $2,000 |
| May 15, 2002 | Completed final sign-off Jun 2002 | 149 New Montgomery St | Alert Fire Protection | add 3 sprnkler heads on 4th floorDetails
add 3 sprnkler heads on 4th floor | $2,000 |
| Apr 19, 2002 | Completed final sign-off Jun 2002 | 149 New Montgomery St | new non-bearing partitionsDetails
new non-bearing partitions | $22,000 | |
| Mar 29, 2002 | Completed final sign-off Jun 2002 | 149 New Montgomery St | 4/fl- new 1 hr. rated partitions & ceiling @ server room, non structural demoDetails
4/fl- new 1 hr. rated partitions & ceiling @ server room, non structural demo | $11,000 | |
| Mar 15, 2002 | Completed final sign-off Apr 2002 | 149 New Montgomery St | Skyline Construction | oti-3: (5th fl) elDetails
oti-3: (5th fl) el | $20,000 |
| Feb 22, 2002 | Completed final sign-off Apr 2002 | 149 New Montgomery St | Skyline Construction | oti-2, 5th flr, me,spDetails
oti-2, 5th flr, me,sp | $40,000 |
| Feb 7, 2002 | Completed final sign-off Apr 2002 | 149 New Montgomery St | Skyline Construction | oti-1 5th floor ltg,mech,lsDetails
oti-1 5th floor ltg,mech,ls | $75,000 |
| Aug 2, 2001 | Expired or cancelled expired Jun 2003 | 149 New Montgomery St | new non structural partition and demo at 1st floor retail spacesDetails
new non structural partition and demo at 1st floor retail spaces | $3,500 | |
| Jan 18, 2001 | Expired or cancelled cancelled Oct 2024 | 149 New Montgomery St | Signs America Inc Dba Sign A Rama | to erect sign non illuminated double faced projectingDetails
to erect sign non illuminated double faced projecting | $1,755 |
| Sep 11, 2000 | Completed final sign-off Nov 2000 | 149 New Montgomery St | Rosendin Electric, Inc. | fire alarm installation off of (e)system(basmnt & 1st flr)Details
fire alarm installation off of (e)system(basmnt & 1st flr) | $40,000 |
| Aug 9, 2000 | Completed final sign-off Nov 2000 | 149 New Montgomery St | tenant improvement/demo shell space minimal ceiling partitions new coffee station new power voice daDetails
tenant improvement/demo shell space minimal ceiling partitions new coffee station new power voice da | $120,000 | |
| Aug 9, 2000 | Expired or cancelled withdrawn Oct 2001 | 149 New Montgomery St | replace (n) store front doors with(n) glazing panel to match existingDetails
replace (n) store front doors with(n) glazing panel to match existing | $15,000 | |
| Aug 3, 2000 | Completed final sign-off Nov 2000 | 149 New Montgomery St | new acoustical ceiling @one office-4th flr(relocate (e)lightingDetails
new acoustical ceiling @one office-4th flr(relocate (e)lighting | $3,500 | |
| Jun 27, 2000 | Completed final sign-off Nov 2000 | 149 New Montgomery St | new non structural partitions for storage areasDetails
new non structural partitions for storage areas | $5,000 | |
| Jun 27, 2000 | Expired or cancelled withdrawn Aug 2000 | 149 New Montgomery St | oti-1 el me ls sp ground floorDetails
oti-1 el me ls sp ground floor | $160,000 | |
| May 22, 2000 | Completed final sign-off Nov 2000 | 149 New Montgomery St | add & relocate fire sprinklers for new wall & ceilingsDetails
add & relocate fire sprinklers for new wall & ceilings | $4,500 | |
| Apr 12, 2000 | Completed final sign-off Jan 2001 | 149 New Montgomery St | to erect nonelectrical signDetails
to erect nonelectrical sign | ||
| Jan 5, 2000 | Completed final sign-off Jan 2001 | 149 New Montgomery St | Arrow Sign Company | erect a single faced electrical wall signDetails
erect a single faced electrical wall sign | $5,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Hillhouse Construction Company Inc (12), Crane Construction Company Inc. (11), Gci, Inc (7), Principal Builders Inc. (6), Bcci Construction Company (5), Matrix Hg Inc (4), Pyro-Comm Systems, Inc. (4), Westates Mechanical Corporation Inc (4), Golden Gate Sign Company Inc. (3), Skyline Construction (3), All Guard Alarm Sys. Inc. (2), Ayoob & Peery Plumbing Co Inc (2), C B 2 Builders Incorporated (2), Martinelli Environmental Graph (2), Tom Hammer Construction Llc (2), Tri-Signal Integration Inc. (2), Zebra Awning Co Inc (2), Aaa Restaurant Fire Control/Dba Aaa Fire, Alert Fire Protection, Arrow Sign Company, Bauman Landscape & Construction Inc., Centric Construction Inc, Intellisec, Lifeguard Fire Protection Inc., M B Development, Martin Heagney, Novo Construction Inc, Paganini Electric Corp(See Signatories), Rosendin Electric, Inc., Signs America Inc Dba Sign A Rama, Whitney Commercial Construction
- Architects
- Eric James Mersmann (10), Nicholas Detorres (3), Victoria Salgado (3), Timothy Murphy (2), Ashley Miller, John C Sprinkle, Nash Hurley, Refael Vinoly Arch, Ryan Lee, Ware Malcomb
- Engineers
- Stephen Shaffer (5), Ivano Russo (3), Carlo Biscocho (2), Pablo Orozco (2), Charles French, Kevin M. Sotto, Markus Williams, Paul Littler, Thomas Podesta
- Authorized agent-otherss
- Hooksasd Hooks Asd
- Subcontractors
- Eric James Mersmann
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.