Hillhouse Construction Company Inc
- Based in
- San Jose
- On San Francisco permits
- Dec 2003 to Sep 2026
- Last 24 months
- 24 permits filed
70 permits since 2000: 44 completed, 20 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 22, 2026 | In progress issued Oct 2026 | 2323 Sacramento St | revision to pa# 202401083567. technical infeasibility for garage entrance. new signage.Details
revision to pa# 202401083567. technical infeasibility for garage entrance. new signage. | $70 |
| Sep 16, 2026 | In progress issued Sep 2026 | 149 New Montgomery St | deferred mechancial + electrical for pa# 202606183556.Details
deferred mechancial + electrical for pa# 202606183556. | $339,411 |
| Aug 13, 2026 | In progress issued Aug 2026 | 149 New Montgomery St | deferred mep for 202512111568Details
deferred mep for 202512111568 | $160,000 |
| Aug 5, 2026 | In progress issued Aug 2026 | 149 New Montgomery St | revisoin 202512111568 and ref 202605111058 to docuemnt removal of all grade restrooms on 6th floorDetails
revisoin 202512111568 and ref 202605111058 to docuemnt removal of all grade restrooms on 6th floor | |
| Jul 24, 2026 | In progress filed Jul 2026, not yet issued | 145 New Montgomery St | ground floor: select demolition of one bay of storefront and semi-circular overhang above new replacement entry with pilaster details, header and crest, new entry door and door hardware. replocation of existing lights in the soffit.Details
ground floor: select demolition of one bay of storefront and semi-circular overhang above new replacement entry with pilaster details, header and crest, new entry door and door hardware. replocation of existing lights in the soffit. | $200,000 |
| Jul 24, 2026 | In progress issued Aug 2026 | 149 New Montgomery St | roof to 2nd/f: installation of new building vrf mechanical system and vertical pipe distribution, including rated floor patching and non-rated furring partitions from roof to 2nd/f.Details
roof to 2nd/f: installation of new building vrf mechanical system and vertical pipe distribution, including rated floor patching and non-rated furring partitions from roof to 2nd/f. | $1,193,158 |
| Jul 21, 2026 | Completed final sign-off Sep 2026 | 600 Montgomery St | revision to 202512111506, consist of 3 new interior doors. permit also establishes the employee breakroom use in lieu of a service kitchen.Details
revision to 202512111506, consist of 3 new interior doors. permit also establishes the employee breakroom use in lieu of a service kitchen. | |
| Jul 8, 2026 | Completed final sign-off Sep 2026 | 600 Montgomery St | mep revision for permit 202602256448. alterations in panel and smoke damper schedules & emergency door push botton and additional door security device.Details
mep revision for permit 202602256448. alterations in panel and smoke damper schedules & emergency door push botton and additional door security device. | $1,000 |
| Jun 18, 2026 | In progress issued Jun 2026 | 149 New Montgomery St | new partitions for mail room and securiety desk area on gr fl for common building lobby. new furring, floor and wall finishes for lobby, hallway and elevator lobby, new lighting basis of design in area of work. no changes to exterior or historic fabric- mep deferred.Details
new partitions for mail room and securiety desk area on gr fl for common building lobby. new furring, floor and wall finishes for lobby, hallway and elevator lobby, new lighting basis of design in area of work. no changes to exterior or historic fabric- mep deferred. | $350,000 |
| May 27, 2026 | In progress issued Jun 2026 | 600 Montgomery St | 18 floor: structural revison to bpa: 202512111506 and mep 202602256448 - upadate to the centralized ups system anchorage.Details
18 floor: structural revison to bpa: 202512111506 and mep 202602256448 - upadate to the centralized ups system anchorage. | |
| May 11, 2026 | In progress issued Jun 2026 | 149 New Montgomery St | relocate main building lobby for 149 new montogomery. select demo of partitions, millwork, and electrical for core and shell work. flooring level and layout adjustments revision to ground floor storefront including new lobby entry door and infill of previous cafe entry with insulated safety glassDetails
relocate main building lobby for 149 new montogomery. select demo of partitions, millwork, and electrical for core and shell work. flooring level and layout adjustments revision to ground floor storefront including new lobby entry door and infill of previous cafe entry with insulated safety glass | $250,000 |
| May 11, 2026 | In progress issued Jun 2026 | 149 New Montgomery St | roof floor-revision 202512111568- replace roof membrane throughout roof drainage, cricketing and waterproofing to perform new work. roof framingstructural upgrade at area of work. upgrade and extend elevator at roofDetails
roof floor-revision 202512111568- replace roof membrane throughout roof drainage, cricketing and waterproofing to perform new work. roof framingstructural upgrade at area of work. upgrade and extend elevator at roof | |
| May 5, 2026 | Completed final sign-off Jul 2026 | 149 New Montgomery St | deferred mep for 202603177710 for new cafe at ground flDetails
deferred mep for 202603177710 for new cafe at ground fl | $186,900 |
| Mar 17, 2026 | Completed final sign-off Jul 2026 | 149 New Montgomery St | select demo of non structural partition, doors, tile ceiling, relocation of existing cafe, new mill work, equpiment, finishes and gypsum board soffit, no exterior work, mep deferred. change of use from ground floor retail to cafe.Details
select demo of non structural partition, doors, tile ceiling, relocation of existing cafe, new mill work, equpiment, finishes and gypsum board soffit, no exterior work, mep deferred. change of use from ground floor retail to cafe. | $288,125 |
| Feb 25, 2026 | Completed final sign-off Apr 2026 | 149 New Montgomery St | non-structural interior demolition on floors 4,5, and 6 per ab-017Details
non-structural interior demolition on floors 4,5, and 6 per ab-017 | $250,000 |
| Feb 25, 2026 | In progress issued Apr 2026 | 600 Montgomery St | 18/fl- ref 202512111506- deffered engineering scope for ti mepsDetails
18/fl- ref 202512111506- deffered engineering scope for ti meps | $450,000 |
| Feb 3, 2026 | In progress issued Feb 2026 | 2311 Taraval St | revision 202311301659 and ref 202506209135- basement layout reconfiguration to include wall reconfiguration at 1st floor due to drinking fountain. door 124 changed to 3 sectional sliding door, door 125 changed to sliding door, exposed mechanical duct at room 202Details
revision 202311301659 and ref 202506209135- basement layout reconfiguration to include wall reconfiguration at 1st floor due to drinking fountain. door 124 changed to 3 sectional sliding door, door 125 changed to sliding door, exposed mechanical duct at room 202 | $1,500 |
| Dec 18, 2025 | In progress issued Mar 2026 | 2311 Taraval St | proposed roof screen to be raised additional 3' (change the top elevation of the roof screen from 21'-7" to 24'-7"). revision to 2023-1130-1659Details
proposed roof screen to be raised additional 3' (change the top elevation of the roof screen from 21'-7" to 24'-7"). revision to 2023-1130-1659 | $160,123 |
| Dec 11, 2025 | In progress issued Apr 2026 | 149 New Montgomery St | relocate (e) rooftop mechanical equipment in area of work , remove skylight in area of work, upgrade and extend (e) elevator to rooftop, reconfigure and extend (e) exit stair areas at 6th floor to roof, create (n) occupied roofdeck area, new counter area, exterior lighting, guard rails, roofDetails
relocate (e) rooftop mechanical equipment in area of work , remove skylight in area of work, upgrade and extend (e) elevator to rooftop, reconfigure and extend (e) exit stair areas at 6th floor to roof, create (n) occupied roofdeck area, new counter area, exterior lighting, guard rails, roof | $800,000 |
| Dec 11, 2025 | In progress issued Feb 2026 | 600 Montgomery St | interior demolition and construction of interior partitions. mep deferred to separate permit.pantry and coffee point to be defered permit. 18th fl. no food scope in this permit. deferred submisison for health scope will be sent for review at a later date.Details
interior demolition and construction of interior partitions. mep deferred to separate permit.pantry and coffee point to be defered permit. 18th fl. no food scope in this permit. deferred submisison for health scope will be sent for review at a later date. | $2,095,830 |
| Nov 19, 2025 | Expired or cancelled withdrawn Sep 2026 | 2323 Sacramento St | revision to permit 202401083567. remove existing cement plaster and install new gypsum sheathing and cement plaster. install new wood siding.Details
revision to permit 202401083567. remove existing cement plaster and install new gypsum sheathing and cement plaster. install new wood siding. | $15,000 |
| Oct 10, 2025 | In progress issued Oct 2025 | 2323 Sacramento St | revision to 202401083567: swapping out e) concrete column for a steel column for feasibility of constructionDetails
revision to 202401083567: swapping out e) concrete column for a steel column for feasibility of construction | $40,000 |
| Jul 14, 2025 | In progress issued Jan 2026 | 2311 Taraval St | revision pa#:20231131659 &202506209135 is upgrading the facility to oshpd3 with new architect of record with the following change:(1)additional staff restroom doors at patient restrooms to be swinging outword to meet oshpd 3 requirement resulting relocation of the proposed drinking fountain,Details
revision pa#:20231131659 &202506209135 is upgrading the facility to oshpd3 with new architect of record with the following change:(1)additional staff restroom doors at patient restrooms to be swinging outword to meet oshpd 3 requirement resulting relocation of the proposed drinking fountain, | $10,000 |
| Jul 1, 2025 | In progress issued Jul 2025 | 2323 Sacramento St | revision to 202401083567. voluntary strengthening to (e) concrete columns in basement via steel jacketing, 10 columns in totalDetails
revision to 202401083567. voluntary strengthening to (e) concrete columns in basement via steel jacketing, 10 columns in total | $48,000 |
| Jan 8, 2024 | In progress issued Oct 2024 | 2323 Sacramento St | change of use and occupancy: prov. a senior res. care facility. basement:1 ada parking and renovate existing kitchen, laundry room and admin areas.1/f: provide 12 sleeping units,medical office, dining room,reception. 2/f:provide 17 sleeping units,activity/nursing room. total capacity 29 units/39 bedDetails
change of use and occupancy: prov. a senior res. care facility. basement:1 ada parking and renovate existing kitchen, laundry room and admin areas.1/f: provide 12 sleeping units,medical office, dining room,reception. 2/f:provide 17 sleeping units,activity/nursing room. total capacity 29 units/39 bed | $5,000,000 |
| Nov 30, 2023 | In progress issued Dec 2024 | 2311 Taraval St | ti: basement, ground & mezz. selective demo of non-bearing partitions, doors, and ceilings. new scope incl: partitions; ceiling, lighting, finishes; reduction of (e)mezz; new basement electrical room; mep and civil. struc. scope: shear walls. ext scope: new storefront sys, infill of (e) openings,Details
ti: basement, ground & mezz. selective demo of non-bearing partitions, doors, and ceilings. new scope incl: partitions; ceiling, lighting, finishes; reduction of (e)mezz; new basement electrical room; mep and civil. struc. scope: shear walls. ext scope: new storefront sys, infill of (e) openings, | $1,149,608 |
| Aug 7, 2023 | Completed final sign-off Sep 2024 | 1430 Taraval St | revision to pa# 202211176713 (phase 1) & 202212148342 (phase 2). structural only. revisons on elevator rail support (hss column) location.Details
revision to pa# 202211176713 (phase 1) & 202212148342 (phase 2). structural only. revisons on elevator rail support (hss column) location. | |
| May 12, 2023 | Completed final sign-off Sep 2024 | 1430 Taraval St | permit revision to #202211176713, no change of scope of work; revision includes floor plan layout changed at room #108, 109, 102. updated exit diagram and egress calculations; minor changes include partition and millwork details, and associated mep changes.Details
permit revision to #202211176713, no change of scope of work; revision includes floor plan layout changed at room #108, 109, 102. updated exit diagram and egress calculations; minor changes include partition and millwork details, and associated mep changes. | |
| Nov 17, 2022 | Completed final sign-off Apr 2025 | 1430 Taraval St | demo interior, new partitions, ceiling, mechanical, electrical, plumbing, new elevator pit, new entry door. new elevator to be under seperate permit.Details
demo interior, new partitions, ceiling, mechanical, electrical, plumbing, new elevator pit, new entry door. new elevator to be under seperate permit. | $625,000 |
| Jun 29, 2021 | Completed final sign-off Sep 2021 | 600 Battery St | revision to bpa 202009023304. minor adjustment to roof deck area, guardrail location changed and minor structural modifications.Details
revision to bpa 202009023304. minor adjustment to roof deck area, guardrail location changed and minor structural modifications. | $10,000 |
| Mar 1, 2021 | Completed final sign-off Sep 2021 | 600 Battery St | renovate lighting & power & lighting for new roof deck renovation permit #2020-0902-3304.Details
renovate lighting & power & lighting for new roof deck renovation permit #2020-0902-3304. | $65,000 |
| Mar 1, 2021 | Completed final sign-off Sep 2021 | 600 Battery St | add a few accent light fixtures to new lobby finishesDetails
add a few accent light fixtures to new lobby finishes | $20,000 |
| Feb 5, 2021 | Completed final sign-off Jul 2021 | 600 Battery St | rooftop exhaust fan relocation (for restrooms). ref t.i. pa202009023304. maher n/aDetails
rooftop exhaust fan relocation (for restrooms). ref t.i. pa202009023304. maher n/a | $15,000 |
| Nov 20, 2020 | Completed final sign-off Aug 2021 | 600 Battery St | 1,2,3 flrs: demo of non-structural & non load bearing interior partitions including walls, glazing, doors & finishes on flr 1, 2 & 3. no structural demo. seperate permit issued for ti work. not to be occupied until completion of ti work per ab 017.Details
1,2,3 flrs: demo of non-structural & non load bearing interior partitions including walls, glazing, doors & finishes on flr 1, 2 & 3. no structural demo. seperate permit issued for ti work. not to be occupied until completion of ti work per ab 017. | $239,455 |
| Oct 21, 2020 | Completed final sign-off Jun 2021 | 301 De Montfort Av | remove temporary stairs installed under pa 2015 1006 8907Details
remove temporary stairs installed under pa 2015 1006 8907 | $4,500 |
| Sep 2, 2020 | Completed final sign-off Nov 2021 | 600 Battery St | partial renovations & non-structural demo of roof deck and new lobby doors on ground floor.Details
partial renovations & non-structural demo of roof deck and new lobby doors on ground floor. | $1,875,000 |
| Aug 31, 2020 | Completed final sign-off Aug 2021 | 600 Battery St | demo extg non-structural lobby finishes and construct new lobby finishes.Details
demo extg non-structural lobby finishes and construct new lobby finishes. | $750,000 |
| Aug 31, 2020 | Completed final sign-off Oct 2021 | 600 Battery St | ada upgrade and path of travel upgrade for primary entrance.Details
ada upgrade and path of travel upgrade for primary entrance. | $170,466 |
| Jan 2, 2019 | Completed final sign-off Feb 2019 | 635 14th Av | interior evacuation signage only. ref app#201710312729 (rev 2)Details
interior evacuation signage only. ref app#201710312729 (rev 2) | $3,500 |
| Oct 22, 2018 | Completed final sign-off Mar 2019 | 635 14th Av | new ada parking stall, curb and ramp to replace existing, located in private parking lot. ref pa 2017-1031-2729 rev 2Details
new ada parking stall, curb and ramp to replace existing, located in private parking lot. ref pa 2017-1031-2729 rev 2 | $4,500 |
| Jun 29, 2018 | Completed final sign-off Mar 2019 | 635 14th Av | mechanical & plumbing for pa 2017-1031-2729 - new rooftop units serving gym & new fan coil units throuhgout 1st and 2nd floorsDetails
mechanical & plumbing for pa 2017-1031-2729 - new rooftop units serving gym & new fan coil units throuhgout 1st and 2nd floors | $750,000 |
| Jun 26, 2018 | Completed final sign-off Mar 2019 | 635 14th Av | revision to 201710312729 structural - shearwall, load bearing wall and footings. no mep or life safetyDetails
revision to 201710312729 structural - shearwall, load bearing wall and footings. no mep or life safety | $65,000 |
| Apr 19, 2018 | Expired or cancelled cancelled Jan 2026 | 635 14th Av | mech equipment replacement (fan coil units exhauset fans) plumbing work to support revised toilet rooms. ref# 201710312729Details
mech equipment replacement (fan coil units exhauset fans) plumbing work to support revised toilet rooms. ref# 201710312729 | $800,000 |
| Mar 14, 2018 | Completed final sign-off Mar 2019 | 635 14th Av | demo only permit including removal of interior non-load bearing partitions. electrical plmg, casework, finishes and restroom fixtures. this permit filed under ab-017 for unoccupied bldg. arch permit on seperate permit app#201710312729Details
demo only permit including removal of interior non-load bearing partitions. electrical plmg, casework, finishes and restroom fixtures. this permit filed under ab-017 for unoccupied bldg. arch permit on seperate permit app#201710312729 | |
| Oct 31, 2017 | Completed final sign-off Mar 2019 | 635 14th Av | improvements to (e) school bldg & property. scope incl interior improvements, (n) exterior exit balcony&ada access upgrades. (n)automatic sprinkler sys,voice fire alarm &mep under separate permit.Details
improvements to (e) school bldg & property. scope incl interior improvements, (n) exterior exit balcony&ada access upgrades. (n)automatic sprinkler sys,voice fire alarm &mep under separate permit. | $1,250,000 |
| Oct 30, 2017 | Completed final sign-off Jan 2018 | 1837 Union St | scope is to add (n) furred walls @ perimeter and prep location for wall of tv monitors. revision to pa 2017-0911-7528 & 2017-1003-0211Details
scope is to add (n) furred walls @ perimeter and prep location for wall of tv monitors. revision to pa 2017-0911-7528 & 2017-1003-0211 | $5,000 |
| Oct 3, 2017 | Completed final sign-off Jan 2018 | 1837 Union St | revision to pa#201709117528 to remove bearing wall and adjust restroom.Details
revision to pa#201709117528 to remove bearing wall and adjust restroom. | |
| Sep 11, 2017 | Completed final sign-off Jan 2018 | 1837 Union St | removal of non stuctural prtitions and doors, includes elec/plumbing. update finishe and lighting. update restroom for ada accessibility. change of use from retail to health services. (invisaligh)Details
removal of non stuctural prtitions and doors, includes elec/plumbing. update finishe and lighting. update restroom for ada accessibility. change of use from retail to health services. (invisaligh) | $136,976 |
| Mar 27, 2017 | Completed final sign-off Feb 2020 | 1520 Stockton St | voluntary seismic upgrade in 6 story commercial building. work limited to front facing facadeDetails
voluntary seismic upgrade in 6 story commercial building. work limited to front facing facade | $1,300,000 |
| Aug 18, 2016 | Completed final sign-off Oct 2016 | 301 De Montfort Av | revision to app#201510068907. revision to number of wall anchors on temporary stair.Details
revision to app#201510068907. revision to number of wall anchors on temporary stair. | |
| Jun 24, 2016 | Completed final sign-off Apr 2017 | 333 Eucalyptus Dr | revision to (e) pa#201512044176, provide lockers, lighting, flooring @ existing locker rooms.Details
revision to (e) pa#201512044176, provide lockers, lighting, flooring @ existing locker rooms. | $165,000 |
| Mar 29, 2016 | Completed final sign-off Dec 2016 | 919 Clement St | waterproofing of existing building, plaster finish over existing brick to be removed.Details
waterproofing of existing building, plaster finish over existing brick to be removed. | $35,000 |
| Feb 29, 2016 | Never finaled issued Feb 2016, no final | 919 Clement St | structural repair of concrete columnDetails
structural repair of concrete column | $9,000 |
| Dec 4, 2015 | Never finaled issued Dec 2015, no final | 919 Clement St | revision to pa #201505055431: structural strengthenibg to existing roof framing of approx. 38'x20' area.Details
revision to pa #201505055431: structural strengthenibg to existing roof framing of approx. 38'x20' area. | $8,000 |
| Oct 6, 2015 | Completed final sign-off Oct 2016 | 301 De Montfort Av | replace (e) window with an exit door and add new temporary stair from 2nd floor to play area for emergency egress.Details
replace (e) window with an exit door and add new temporary stair from 2nd floor to play area for emergency egress. | $25,000 |
| May 5, 2015 | Completed final sign-off Dec 2016 | 919 Clement St | demo interior finishes, light fixture, millwork, plumbing fixture, walls, doors, electrical. (n) glass conference room, office system, finishes, light fixtures, doors, millwork, plumbing fixtures. (e) restroom altered to be accessible.Details
demo interior finishes, light fixture, millwork, plumbing fixture, walls, doors, electrical. (n) glass conference room, office system, finishes, light fixtures, doors, millwork, plumbing fixtures. (e) restroom altered to be accessible. | $455,000 |
| Feb 19, 2015 | Never finaled issued Mar 2015, no final | 150 Greenwich St | suite 120: revision to app#201310179488 to change toilet 128 to storage 128. ref app#201310179488. n/a for the maher.Details
suite 120: revision to app#201310179488 to change toilet 128 to storage 128. ref app#201310179488. n/a for the maher. | $65,000 |
| Dec 16, 2014 | Never finaled issued Mar 2015, no final | 150 Greenwich St | ti for lobby of e athletic club on gr fl and mezz. includes new partitions staircase, glass guards, flooring. mep & fire sep permit. no exterior work maher not requiredDetails
ti for lobby of e athletic club on gr fl and mezz. includes new partitions staircase, glass guards, flooring. mep & fire sep permit. no exterior work maher not required | $325,000 |
| Sep 23, 2013 | Completed final sign-off Dec 2014 | 2055 Union St | interior tenant improvement to the fitness club. installation of juice bar and retail sales on ground floor. fire alarm & sprinklers on separate permit. ** maher: compliance with ordinance no# 155-13 not required **Details
interior tenant improvement to the fitness club. installation of juice bar and retail sales on ground floor. fire alarm & sprinklers on separate permit. ** maher: compliance with ordinance no# 155-13 not required ** | $165,000 |
| Aug 16, 2013 | Completed final sign-off Oct 2013 | 2030 Union St | 1st floor-remodel restroom for accessibility compliance. revision to pa# 2013-0522-7675Details
1st floor-remodel restroom for accessibility compliance. revision to pa# 2013-0522-7675 | $40,000 |
| Jul 31, 2013 | Completed final sign-off Nov 2013 | 1601 Lane St | remodel (e) fitness rooms & change (e) storage room into new shower rooms & 09Details
remodel (e) fitness rooms & change (e) storage room into new shower rooms & 09 | $90,000 |
| Jun 18, 2013 | Completed final sign-off Nov 2013 | 1601 Lane St | t.i. improvement of extg space to accommodate new child care center with/ stair down to street per fire requirement.Details
t.i. improvement of extg space to accommodate new child care center with/ stair down to street per fire requirement. | $75,000 |
| May 22, 2013 | Completed final sign-off Oct 2013 | 2030 Union St | change a retail space to a temparoy office space to sale personal membership for one year. non strutrual partition, minor demo of shelving, flooring and finishes.Details
change a retail space to a temparoy office space to sale personal membership for one year. non strutrual partition, minor demo of shelving, flooring and finishes. | $40,000 |
| May 20, 2013 | Completed final sign-off Feb 2014 | 1550 Bryant St | remove 2 ladders at 12th floor deck. install patio heater. revision to application #201302120041; compliance with ord 155-13 not requiredDetails
remove 2 ladders at 12th floor deck. install patio heater. revision to application #201302120041; compliance with ord 155-13 not required | |
| May 7, 2013 | Completed final sign-off Oct 2013 | 1550 Bryant St | construct cafe and food prep area at ground floor lobby.Details
construct cafe and food prep area at ground floor lobby. | $30,000 |
| Mar 21, 2013 | Completed final sign-off Jun 2014 | 2055 Union St | interior t.i. to fitness club. work to include new offices, laundry room, lounge, locker rooms, spa, steam room & mep on floors 1 through 4. core & shell, change of use & historic preservation approved under pa# 2012/08/01/6283.Details
interior t.i. to fitness club. work to include new offices, laundry room, lounge, locker rooms, spa, steam room & mep on floors 1 through 4. core & shell, change of use & historic preservation approved under pa# 2012/08/01/6283. | $2,000,000 |
| Aug 26, 2009 | Completed final sign-off Mar 2010 | 300 Montgomery St | 3rd fl. minor demolition & construction of 3rd floor elevator lobbies & partial corridor. mep & fire sprinkler under separate permit.Details
3rd fl. minor demolition & construction of 3rd floor elevator lobbies & partial corridor. mep & fire sprinkler under separate permit. | $87,687 |
| Aug 20, 2009 | Completed final sign-off Mar 2010 | 300 Montgomery St | 3rd floor t.i. revision to appl #200904146220 - add second exit door at back of space. build 1-hr exit corridor at main entry. delete plan check comment to install smoke guard at passenger elevator doors.Details
3rd floor t.i. revision to appl #200904146220 - add second exit door at back of space. build 1-hr exit corridor at main entry. delete plan check comment to install smoke guard at passenger elevator doors. | $16,500 |
| Apr 14, 2009 | Completed final sign-off Mar 2010 | 300 Montgomery St | t.i. at 3rd fl: remodel existing vacant office space, const new offices, confer rm, reception/exhibit area, staff rm, upgrade toilets to comply w/ ada, demo at pa 200808229899, mech, elect sprinkler, life safety under separate permits.Details
t.i. at 3rd fl: remodel existing vacant office space, const new offices, confer rm, reception/exhibit area, staff rm, upgrade toilets to comply w/ ada, demo at pa 200808229899, mech, elect sprinkler, life safety under separate permits. | $476,000 |
| Dec 15, 2003 | Completed final sign-off Aug 2004 | 3951 Alemany Bl | this permit incl arch floor plans missing under 200308111751 and for temp occupancy on 10/20/03.Details
this permit incl arch floor plans missing under 200308111751 and for temp occupancy on 10/20/03. |