Block 5340, lot 009
1601 Lane St
- City’s use
- Commercial Misc
- Built
- 1949
- Stories
- 3
- Rooms
- 6 bathrooms
- Lot
- 30,004 sq ft
- Zoning
- RH1RH2
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
37 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 21, 2020 | Never finaled issued Jun 2020, no final | 1601 Lane St | San Francisco Fire Protection | add to (e) fire alarm: install (2) new fire-like smoke detectors, new multi-candela horn strobe in new child care room, install new multi-candela strobe in new bathroom, relocate (e) multi-candela horn strobeDetails
add to (e) fire alarm: install (2) new fire-like smoke detectors, new multi-candela horn strobe in new child care room, install new multi-candela strobe in new bathroom, relocate (e) multi-candela horn strobe | $3,000 |
| Jan 2, 2020 | Never finaled issued Jan 2020, no final | 1601 Lane St | street spaceDetails
street space | ||
| Nov 27, 2019 | Completed final sign-off Feb 2020 | 1601 Lane St | Nibbi Bros Assoc Inc. | revision to pa# 2019-0827-9991: revise bathroom design due to unforeseen structural condition & door access to it room. revise concrete landing outside of new door. revise signage locationDetails
revision to pa# 2019-0827-9991: revise bathroom design due to unforeseen structural condition & door access to it room. revise concrete landing outside of new door. revise signage location | |
| Nov 26, 2019 | Completed final sign-off Feb 2020 | 1601 Lane St | H & M Fire Protection, Inc. | relocate 3 fire sprinklers. reference pa# 2019-0827-9991Details
relocate 3 fire sprinklers. reference pa# 2019-0827-9991 | $600 |
| Aug 27, 2019 | Completed final sign-off Feb 2020 | 1601 Lane St | Nibbi Bros Assoc Inc. | remodel extg office to be a child watch 'e' occupancy in this room. add child's bathroom.Details
remodel extg office to be a child watch 'e' occupancy in this room. add child's bathroom. | $80,000 |
| Mar 7, 2014 | Completed final sign-off Apr 2014 | 1601 Lane St | Adanac Fire Protection Inc | add 1 sprinkler head to boiler rm, replace existing smoke damper with fie smoke damper in existing opening at boiler room. as built to show fsd and sprinkers 201307313274Details
add 1 sprinkler head to boiler rm, replace existing smoke damper with fie smoke damper in existing opening at boiler room. as built to show fsd and sprinkers 201307313274 | $1,000 |
| Oct 10, 2013 | Never finaled issued Oct 2013, no final | 1601 Lane St | establish occupant load signs for three rooms on 1 and 2 floors. sffd assembly permit required. construction was done under pa #2012.06.21.3101. no work to be done at this permit.Details
establish occupant load signs for three rooms on 1 and 2 floors. sffd assembly permit required. construction was done under pa #2012.06.21.3101. no work to be done at this permit. | ||
| Sep 18, 2013 | Completed final sign-off Nov 2013 | 1601 Lane St | Red Hawk Fire & Security Ca Llc | 2nd floor:t.i. adding 9 horn/strobes and 5 strobes total of 14 new devices. ref app#201306189860 and 201307313274Details
2nd floor:t.i. adding 9 horn/strobes and 5 strobes total of 14 new devices. ref app#201306189860 and 201307313274 | $5,000 |
| Aug 30, 2013 | Completed final sign-off Oct 2013 | 1601 Lane St | Adanac Fire Protection Inc | add 12 sprinkler heads at new t bar ceilingDetails
add 12 sprinkler heads at new t bar ceiling | $4,500 |
| Aug 30, 2013 | Never finaled issued Aug 2013, no final | 1601 Lane St | Adanac Fire Protection Inc | add 5 sprinkler heads at new stairsDetails
add 5 sprinkler heads at new stairs | $1,500 |
| Jul 31, 2013 | Completed final sign-off Nov 2013 | 1601 Lane St | Hillhouse Construction Company Inc | remodel (e) fitness rooms & change (e) storage room into new shower rooms & 09Details
remodel (e) fitness rooms & change (e) storage room into new shower rooms & 09 | $90,000 |
| Jun 18, 2013 | Completed final sign-off Nov 2013 | 1601 Lane St | Hillhouse Construction Company Inc | t.i. improvement of extg space to accommodate new child care center with/ stair down to street per fire requirement.Details
t.i. improvement of extg space to accommodate new child care center with/ stair down to street per fire requirement. | $75,000 |
| May 20, 2013 | Completed final sign-off May 2013 | 1601 Lane St | Fire & Security & Alarm Co/ F.S.A.C. | as builts to permit #201303051503. add one horn strobe,and one duct detector(installed by others) in the kitchen. relocate one horn/strobe in community room. tie in new devices to extg control panel.Details
as builts to permit #201303051503. add one horn strobe,and one duct detector(installed by others) in the kitchen. relocate one horn/strobe in community room. tie in new devices to extg control panel. | $1,000 |
| Apr 3, 2013 | Completed final sign-off May 2013 | 1601 Lane St | Ok Fire System | install a ul-300 fire system in a kitchen hoodDetails
install a ul-300 fire system in a kitchen hood | $4,200 |
| Mar 5, 2013 | Completed final sign-off May 2013 | 1601 Lane St | Fire & Security & Alarm Co/ F.S.A.C. | due to the t.i. of extg space on 1st floor to accomodate new kitchen, community room. conference room and women restroom, 2 new horn/strobes and strobe will bbe add. 1 extg horn/strobe will be relocate. new extg devices will be tie in to extg circuits. new ansul will be tie in to extg control.Details
due to the t.i. of extg space on 1st floor to accomodate new kitchen, community room. conference room and women restroom, 2 new horn/strobes and strobe will bbe add. 1 extg horn/strobe will be relocate. new extg devices will be tie in to extg circuits. new ansul will be tie in to extg control. | $2,000 |
| Feb 26, 2013 | Completed final sign-off May 2013 | 1601 Lane St | Yum's Mechanical Co Inc | 1 kitchen exhaust fan and duct (1) make up air unit and duct. 1 fan coil unit and duct. 1 fan coil/heat pump system and duct. 1 bathroom exhaust fan and duct. 1 aoutside air fan and ductDetails
1 kitchen exhaust fan and duct (1) make up air unit and duct. 1 fan coil unit and duct. 1 fan coil/heat pump system and duct. 1 bathroom exhaust fan and duct. 1 aoutside air fan and duct | $62,100 |
| Jan 31, 2013 | Completed final sign-off Apr 2013 | 1601 Lane St | D & S Leong Associates | ground floor:relocate 12 extg heads and add 7 new head due to new t-bar ceiling on ground floor only. ref app#201206213101Details
ground floor:relocate 12 extg heads and add 7 new head due to new t-bar ceiling on ground floor only. ref app#201206213101 | $4,500 |
| Jul 27, 2012 | Never finaled issued Jul 2012, no final | 1601 Lane St | San Francisco Fire Protection | remove & re-install 1 horn/strobe & 1 strobeDetails
remove & re-install 1 horn/strobe & 1 strobe | $500 |
| Jun 26, 2012 | Never finaled issued Jul 2012, no final | 1601 Lane St | International Fire Equip | relocate existing sprinklers in teen center (ymca) due to new ceiling construction work on 2nd floor.Details
relocate existing sprinklers in teen center (ymca) due to new ceiling construction work on 2nd floor. | $3,500 |
| Jun 21, 2012 | Completed final sign-off Jun 2013 | 1601 Lane St | Thompson Builders Corp | tenant improvement of existing space to accommodate new kitche, community room, conference room, offices, womens restroomDetails
tenant improvement of existing space to accommodate new kitche, community room, conference room, offices, womens restroom | $181,000 |
| Jul 18, 2011 | Completed final sign-off Sep 2013 | 1601 Lane St | River View Construction Inc | remove (e) offices & refinish (e) restroom for teen center, remove (e) entry, fill in wall & add new windows, add new exit. occupant load calculations added to plans. must field verify 3 exits for occupant load calculated for gym. review 2nd floor for proper occupant load signage, egress.Details
remove (e) offices & refinish (e) restroom for teen center, remove (e) entry, fill in wall & add new windows, add new exit. occupant load calculations added to plans. must field verify 3 exits for occupant load calculated for gym. review 2nd floor for proper occupant load signage, egress. | $120,000 |
| May 3, 2010 | Never finaled issued May 2010, no final | 1601 Lane St | street space and sidewalkDetails
street space and sidewalk | ||
| Apr 21, 2010 | Completed final sign-off Jun 2010 | 1601 Lane St | Aeco Systems, Inc | as built revisio to ap #200812087992 consisting of (1) added strobe, (2) outdoor horn/strobe, day care center being complete under separate permit. elimination of remote annunciator.Details
as built revisio to ap #200812087992 consisting of (1) added strobe, (2) outdoor horn/strobe, day care center being complete under separate permit. elimination of remote annunciator. | $2,000 |
| Feb 9, 2010 | Completed final sign-off Jun 2010 | 1601 Lane St | River View Construction Inc | revision to appl #200809121467: roll-up grilles, concrete curbs, stucco column 7 plaster, courtyard concrete slab, lighting & drainage.Details
revision to appl #200809121467: roll-up grilles, concrete curbs, stucco column 7 plaster, courtyard concrete slab, lighting & drainage. | $50,000 |
| Jul 31, 2009 | Completed final sign-off Jun 2010 | 1601 Lane St | River View Construction Inc | voluntary structural strengthening, 3-levels.Details
voluntary structural strengthening, 3-levels. | $300,000 |
| Jun 23, 2009 | Completed final sign-off Jun 2010 | 1601 Lane St | Precision Fire Protection Systems Co | install 236 new sprinkler heads -retrofit 3 floors of existing ymca building.Details
install 236 new sprinkler heads -retrofit 3 floors of existing ymca building. | $75,000 |
| Apr 20, 2009 | Never finaled issued Apr 2009, no final | 1601 Lane St | street space permitDetails
street space permit | ||
| Apr 6, 2009 | Never finaled issued Apr 2009, no final | 1601 Lane St | streetspaceDetails
streetspace | ||
| Dec 8, 2008 | Never finaled issued Dec 2008, no final | 1601 Lane St | Aeco Systems, Inc | expansion of existing fire alarm consisting of horn/strobes, strobes, water flow monitoring.Details
expansion of existing fire alarm consisting of horn/strobes, strobes, water flow monitoring. | $25,000 |
| Sep 12, 2008 | Completed final sign-off Jun 2010 | 1601 Lane St | Schikore Construction, River View Construction Inc | demo work-1st, 2nd & 3rd floors. tenant alteration-1st, 2nd & 3rd floor. new stairs, elevator structure. new ada restrooms, ada lift. m.e.p, life safety under seperate permitDetails
demo work-1st, 2nd & 3rd floors. tenant alteration-1st, 2nd & 3rd floor. new stairs, elevator structure. new ada restrooms, ada lift. m.e.p, life safety under seperate permit | $993,000 |
| Jun 26, 2008 | Expired or cancelled expired Jun 2010 | 1601 Lane St | demolition work-ground floor (wall & door), tenant alteration-ground floor (new partitions & door), non-structural work.Details
demolition work-ground floor (wall & door), tenant alteration-ground floor (new partitions & door), non-structural work. | $4,000 | |
| Jun 9, 2008 | Never finaled issued Jul 2010, no final | 1601 Lane St | River View Construction Inc | remodel existing office/activity space on 1st floor, to new child care & uni-sex restroom plus, remodel (e) boiler room. tenant improvement, repalce windows with hm doors, (perimeter wall). mep, life safety, sprinklers under separate permit.Details
remodel existing office/activity space on 1st floor, to new child care & uni-sex restroom plus, remodel (e) boiler room. tenant improvement, repalce windows with hm doors, (perimeter wall). mep, life safety, sprinklers under separate permit. | $300,000 |
| Aug 4, 2006 | Completed final sign-off Mar 2007 | 1601 Lane St | San Francisco Fire Protection | phase 1 of installation of new fire system at groundfloor gym areaDetails
phase 1 of installation of new fire system at groundfloor gym area | $3,000 |
| Mar 23, 2006 | Never finaled issued Mar 2006, no final | 1601 Lane St | street spaceDetails
street space | ||
| Apr 19, 2005 | Completed final sign-off Mar 2007 | 1601 Lane St | James Lim Plumbing | new fire sprinkler system (97 sprinkler heads) and fire water servicesprinkler revision to grd fl/Details
new fire sprinkler system (97 sprinkler heads) and fire water servicesprinkler revision to grd fl/ | $26,000 |
| Mar 3, 2005 | Completed final sign-off Mar 2007 | 1601 Lane St | add in missing sheets from r-3 & r-4 submittals- not included in permit set. r-3 - dated 8/16/04 t-iDetails
add in missing sheets from r-3 & r-4 submittals- not included in permit set. r-3 - dated 8/16/04 t-i | ||
| Apr 7, 2004 | Completed final sign-off Mar 2007 | 1601 Lane St | renovation of gymnasium (including new roof & voluntary structural strenghthening of roof structure,Details
renovation of gymnasium (including new roof & voluntary structural strenghthening of roof structure, | $750,000 |