Permit GraphShortlistSan Francisco building permits since 2000

Block 2353, lot 011

1430 Taraval St

City’s use
Commercial Office
Built
1968
Stories
2
Units
3
Rooms
4 bathrooms
Building
7,900 sq ft
Lot
4,996 sq ft
Zoning
NC2
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

7 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 7, 2023Completed
final sign-off Sep 2024
1430 Taraval StHillhouse Construction Company Increvision to pa# 202211176713 (phase 1) & 202212148342 (phase 2). structural only. revisons on elevator rail support (hss column) location.
Details
Permit
202308073891
Status
complete
Filed
Aug 7, 2023
Permit issued
Aug 8, 2023
Final sign-off
Sep 25, 2024
Address
1430 Taraval St

revision to pa# 202211176713 (phase 1) & 202212148342 (phase 2). structural only. revisons on elevator rail support (hss column) location.

Open the permit page

Jul 26, 2023Completed
final sign-off Feb 2025
1430 Taraval StPyro-Comm Systems, Inc.a new fire alarm panel will be installed with 18 smoke detectors, 2 duct detectors, 11 horn strobes, 16 strobes, 6 relay modules, 1 monitor module,3 pull station, 2 remote test switch for duct detectors, 1 cellular telguard.
Details
Permit
202307263038
Status
complete
Filed
Jul 26, 2023
Permit issued
Aug 24, 2023
Final sign-off
Feb 19, 2025
Declared cost
$16,000
Address
1430 Taraval St

a new fire alarm panel will be installed with 18 smoke detectors, 2 duct detectors, 11 horn strobes, 16 strobes, 6 relay modules, 1 monitor module,3 pull station, 2 remote test switch for duct detectors, 1 cellular telguard.

Open the permit page

$16,000
May 12, 2023Completed
final sign-off Sep 2024
1430 Taraval StHillhouse Construction Company Incpermit revision to #202211176713, no change of scope of work; revision includes floor plan layout changed at room #108, 109, 102. updated exit diagram and egress calculations; minor changes include partition and millwork details, and associated mep changes.
Details
Permit
202305127695
Status
complete
Filed
May 12, 2023
Permit issued
May 31, 2023
Final sign-off
Sep 25, 2024
Address
1430 Taraval St

permit revision to #202211176713, no change of scope of work; revision includes floor plan layout changed at room #108, 109, 102. updated exit diagram and egress calculations; minor changes include partition and millwork details, and associated mep changes.

Open the permit page

Dec 14, 2022Completed
final sign-off Apr 2025
1430 Taraval Stpartial floor t.i. on 2nd floor. selective demo, new elevator and shaft, partitions ceiling, lighting, mechanical, electrical, and plumbing. structural work limited to 2nd floor elevator shaft and control room floor. equipment anchorage. phase 2 of pa 202211176713
Details
Permit
202212148342
Status
complete
Filed
Dec 14, 2022
Permit issued
May 2, 2023
Final sign-off
Apr 14, 2025
Declared cost
$600,000
Address
1430 Taraval St

partial floor t.i. on 2nd floor. selective demo, new elevator and shaft, partitions ceiling, lighting, mechanical, electrical, and plumbing. structural work limited to 2nd floor elevator shaft and control room floor. equipment anchorage. phase 2 of pa 202211176713

Open the permit page

$600,000
Nov 17, 2022Completed
final sign-off Apr 2025
1430 Taraval StHillhouse Construction Company Incdemo interior, new partitions, ceiling, mechanical, electrical, plumbing, new elevator pit, new entry door. new elevator to be under seperate permit.
Details
Permit
202211176713
Status
complete
Filed
Nov 17, 2022
Permit issued
Mar 30, 2023
Final sign-off
Apr 14, 2025
Declared cost
$625,000
Address
1430 Taraval St

demo interior, new partitions, ceiling, mechanical, electrical, plumbing, new elevator pit, new entry door. new elevator to be under seperate permit.

Open the permit page

$625,000
Aug 13, 2019Completed
final sign-off Aug 2019
1430 Taraval StB Y C Construction Inc.re-roofing
Details
Permit
201908138658
Status
complete
Filed
Aug 13, 2019
Permit issued
Aug 13, 2019
Final sign-off
Aug 27, 2019
Declared cost
$30,000
Address
1430 Taraval St

re-roofing

Open the permit page

$30,000
Dec 30, 2014Expired or cancelled
cancelled Jan 2026
1430 Taraval StCalifornia Signs And Graphicschange copy on existing sign
Details
Permit
201412304683
Status
cancelled
Filed
Dec 30, 2014
Declared cost
$2,000
Address
1430 Taraval St

change copy on existing sign

Open the permit page

$2,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Hillhouse Construction Company Inc (3), B Y C Construction Inc., California Signs And Graphics, Pyro-Comm Systems, Inc.
Architects
Donnie Lam (2), Victoria Salgado (2)
Engineers
Chan Siong Loh (2), Keith Huen (2), Maria Wahond (2)

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.