Block 0267, lot 001
201 Pine St
- City’s use
- Commercial Office
- Built
- 1908
- Stories
- 6
- Rooms
- 7 bathrooms
- Building
- 26,808 sq ft
- Lot
- 4,464 sq ft
- Zoning
- C3O
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
59 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 19, 2025 | Completed final sign-off Mar 2025 | 201 Pine St | Durkin Signs & Graphics Inc | installation of 4 non illuminated wood channel lettering wall sign on bldg facade for new retaurant. (wayfare tavern)Details
installation of 4 non illuminated wood channel lettering wall sign on bldg facade for new retaurant. (wayfare tavern) | $300 |
| Mar 19, 2025 | Completed final sign-off Mar 2025 | 201 Pine St | Durkin Signs & Graphics Inc | installation of 4 non illuminated wood channel lettering wall sign on bldg facade for new retaurant. "sequoia rooms"Details
installation of 4 non illuminated wood channel lettering wall sign on bldg facade for new retaurant. "sequoia rooms" | $350 |
| Mar 19, 2025 | Completed final sign-off Mar 2025 | 201 Pine St | Durkin Signs & Graphics Inc | installation of 4 non illuminated wood channel lettering wall sign on bldg facade for new retaurant. " wayfare tavern" sign wraps around battery & pine st cornerDetails
installation of 4 non illuminated wood channel lettering wall sign on bldg facade for new retaurant. " wayfare tavern" sign wraps around battery & pine st corner | $400 |
| Mar 19, 2025 | Completed final sign-off Mar 2025 | 201 Pine St | Durkin Signs & Graphics Inc | installation of 4 non illuminated wood channel lettering wall sign on bldg facade for new restaurant. ( wayfare tavern)Details
installation of 4 non illuminated wood channel lettering wall sign on bldg facade for new restaurant. ( wayfare tavern) | $400 |
| Mar 18, 2025 | Completed final sign-off Mar 2025 | 201 Pine St | Zebra Awning Co Inc | install 6 awnings 48" x 121" x 48" projection ref pa 202307283259 & 20304045050Details
install 6 awnings 48" x 121" x 48" projection ref pa 202307283259 & 20304045050 | $18,000 |
| Mar 5, 2025 | Completed final sign-off Mar 2025 | 201 Pine St | Security Engineers Inc | fire alarm as built submittal, revision to pa# 202405293210Details
fire alarm as built submittal, revision to pa# 202405293210 | $4,000 |
| Feb 27, 2025 | Completed final sign-off Mar 2025 | 201 Pine St | Camello Inc. | emergency evacuation sign in a restaurantDetails
emergency evacuation sign in a restaurant | $1,000 |
| Feb 25, 2025 | Completed final sign-off Mar 2025 | 201 Pine St | Aaa Restaurant Fire Control/Dba Aaa Fire | as built hood & duct fire systems for ref pa 202410012020Details
as built hood & duct fire systems for ref pa 202410012020 | $4,000 |
| Oct 1, 2024 | Completed final sign-off Mar 2025 | 201 Pine St | Aaa Restaurant Fire Control/Dba Aaa Fire | furnish and install 3 ansul r102 fire systems in the main kitchen area on the gr flDetails
furnish and install 3 ansul r102 fire systems in the main kitchen area on the gr fl | $10,000 |
| Jun 28, 2024 | Completed final sign-off Mar 2025 | 201 Pine St | Camello Inc. | rev 202304045050- basement,1st, 2nd floor- includes mijor work on 3 floors : basement- structrually modify (e) steel beam, leave door @ fire control panel room, leave (e) elevator machine room walls. 1st flr- relocated access seating, (n) bathroom sink, leave stair wall. exterior work under separteDetails
rev 202304045050- basement,1st, 2nd floor- includes mijor work on 3 floors : basement- structrually modify (e) steel beam, leave door @ fire control panel room, leave (e) elevator machine room walls. 1st flr- relocated access seating, (n) bathroom sink, leave stair wall. exterior work under separte | |
| May 29, 2024 | Completed final sign-off Mar 2025 | 201 Pine St | Security Engineers Inc | fire only: fire alarm system tenant improvement: basement, 1st, and 2nd floor: ti- 202304045050.Details
fire only: fire alarm system tenant improvement: basement, 1st, and 2nd floor: ti- 202304045050. | $65,000 |
| May 1, 2024 | In progress issued May 2024 | 201 Pine St | Three Alarm Fire Protection | t.i.: modifications to (e) wet pipe fire spirnkler system for the remodeled basement, 1/f & 2/f. ref pa 202304045050.Details
t.i.: modifications to (e) wet pipe fire spirnkler system for the remodeled basement, 1/f & 2/f. ref pa 202304045050. | $30,000 |
| Dec 12, 2023 | Completed final sign-off Mar 2025 | 201 Pine St | Camello Inc. | soft demolition on basement, 1st and 2nd floors per ab-017. all remain vacant.Details
soft demolition on basement, 1st and 2nd floors per ab-017. all remain vacant. | $2,000 |
| Jul 28, 2023 | Completed final sign-off Mar 2025 | 201 Pine St | Camello Inc. | new exterior entry doors in (e) locations, new exhaust louvers for the restrnt in transom window area this permit application is for the exterior work only for a new restrnt. interior work under sep bpa#202304045050. minor pta approved #2023-001035pta.separte permit for sign will be obtained.Details
new exterior entry doors in (e) locations, new exhaust louvers for the restrnt in transom window area this permit application is for the exterior work only for a new restrnt. interior work under sep bpa#202304045050. minor pta approved #2023-001035pta.separte permit for sign will be obtained. | $45,000 |
| Apr 4, 2023 | Completed final sign-off Mar 2025 | 201 Pine St | Camello Inc. | remodel basement, 1st & 2nd fl. for (n) restaurant in an (e) 6 story bldg. 1st & 2nd fl. will be a change of use to an assembly occupancy. work includes (n) main stair, (n) kitchens at all 3 fls, (n) bathrooms, seating areas & bars. exterior work under sep permit. sprinklers under sep permit.Details
remodel basement, 1st & 2nd fl. for (n) restaurant in an (e) 6 story bldg. 1st & 2nd fl. will be a change of use to an assembly occupancy. work includes (n) main stair, (n) kitchens at all 3 fls, (n) bathrooms, seating areas & bars. exterior work under sep permit. sprinklers under sep permit. | $980,000 |
| Aug 22, 2018 | Never finaled issued Aug 2018, no final | 221 Pine St | San Francisco Fire Protection | add on to existing fire system due to elevator modernization. install radio comm nearest control panel in bsmt. install relay modules and smoke det for elev recall. tie in new devices to e control panel ew201807264541Details
add on to existing fire system due to elevator modernization. install radio comm nearest control panel in bsmt. install relay modules and smoke det for elev recall. tie in new devices to e control panel ew201807264541 | $2,800 |
| Nov 8, 2017 | Completed final sign-off Mar 2022 | 201 Pine St | Bay Area Lightworks Inc | re-construct sub-sidewalk basement to install ada compliant curb rampsDetails
re-construct sub-sidewalk basement to install ada compliant curb ramps | $400,000 |
| Feb 17, 2016 | Expired or cancelled cancelled Feb 2021 | 201 Pine St | to erect electric, projecting, double faced sign.Details
to erect electric, projecting, double faced sign. | $1,500 | |
| Sep 28, 2015 | Completed final sign-off Oct 2015 | 201 Pine St | San Francisco Fire Protection | automatic fire suppression system over new kitchen hood. ref app#201506199473. n/a for maherDetails
automatic fire suppression system over new kitchen hood. ref app#201506199473. n/a for maher | $4,000 |
| Sep 24, 2015 | Never finaled issued Sep 2015, no final | 201 Pine St | Nickell Fire Protection Inc. | install of ul300 hood and duct frf suppression system and connection to sprinkler system.ref pa 201506199473. maher naDetails
install of ul300 hood and duct frf suppression system and connection to sprinkler system.ref pa 201506199473. maher na | $4,000 |
| Sep 4, 2015 | Completed final sign-off Oct 2015 | 201 Pine St | San Francisco Fire Protection | add 3 point modules to monitor new ansul system.Details
add 3 point modules to monitor new ansul system. | $2,000 |
| Aug 12, 2015 | Expired or cancelled cancelled Feb 2021 | 201 Pine St | Quayle And Company | install 4 retractable awnings on the building maher naDetails
install 4 retractable awnings on the building maher na | $4,000 |
| Aug 12, 2015 | Expired or cancelled cancelled Feb 2021 | 201 Pine St | Quayle And Company | paint sign on (e)awningDetails
paint sign on (e)awning | $500 |
| Jun 19, 2015 | Never finaled issued Sep 2015, no final | 201 Pine St | Duley's Construction | replace existing type 1 hood maher not reqDetails
replace existing type 1 hood maher not req | $51,000 |
| Mar 20, 2014 | Expired or cancelled cancelled May 2014 | 221 Pine St | Camello Inc. | add card reader lock in elevator lobby of the 5th flr office, electrical, non-architectural work only. emempt from accessibility upgrades.Details
add card reader lock in elevator lobby of the 5th flr office, electrical, non-architectural work only. emempt from accessibility upgrades. | $2,800 |
| Jul 1, 2013 | Never finaled issued Jul 2013, no final | 221 Pine St | street space permitDetails
street space permit | ||
| May 16, 2013 | Completed final sign-off Sep 2013 | 221 Pine St | Camello Inc. | 4th/5th/6th floor-create 2 hour rated mechanical shaft between floors 4, 5 & 6Details
4th/5th/6th floor-create 2 hour rated mechanical shaft between floors 4, 5 & 6 | $2,000 |
| May 7, 2013 | Completed final sign-off Sep 2013 | 221 Pine St | Lovazzano Hvac Inc | 4th,5th, 6th floor - 3 new gas furnaces & ductwork. ref t.i. #2013.0322.2836, #2013.0315.2311, & #2013.04.03.3686.Details
4th,5th, 6th floor - 3 new gas furnaces & ductwork. ref t.i. #2013.0322.2836, #2013.0315.2311, & #2013.04.03.3686. | $50,000 |
| Apr 24, 2013 | Completed final sign-off Aug 2013 | 221 Pine St | Todd Morris Fire Protection Inc. | 6th floor-commercial t.i fire sprinkler work-64 total sprinkler heads. hydraulically calculated per nfpa 13.Details
6th floor-commercial t.i fire sprinkler work-64 total sprinkler heads. hydraulically calculated per nfpa 13. | $8,000 |
| Apr 24, 2013 | Completed final sign-off Aug 2013 | 221 Pine St | Todd Morris Fire Protection Inc. | 4th floor-commercial t.i fire sprinkler work-36 total sprinkler headsDetails
4th floor-commercial t.i fire sprinkler work-36 total sprinkler heads | $8,000 |
| Apr 24, 2013 | Completed final sign-off Aug 2013 | 221 Pine St | Todd Morris Fire Protection Inc. | 5th floor-commercial t.i fire sprinkler work-37 total sprinkler headsDetails
5th floor-commercial t.i fire sprinkler work-37 total sprinkler heads | $8,000 |
| Apr 3, 2013 | Completed final sign-off Aug 2013 | 221 Pine St | Camello Inc. | 6th floor tenant improvements include demolitoin & construction of non-bearing partition walls to create private offices & enclose (e) break room, replace (e) sink & cabinets in break room, ada upgrades to restrooms.Details
6th floor tenant improvements include demolitoin & construction of non-bearing partition walls to create private offices & enclose (e) break room, replace (e) sink & cabinets in break room, ada upgrades to restrooms. | $90,000 |
| Mar 22, 2013 | Completed final sign-off Jul 2013 | 221 Pine St | Camello Inc. | 4th floor-tenant improvement includes demolition & construction of non bearing partition wall to create private offices, enclose (e) breakroom. replace (e) sink & cabinets in breakroom. ada upgrades to restroomsDetails
4th floor-tenant improvement includes demolition & construction of non bearing partition wall to create private offices, enclose (e) breakroom. replace (e) sink & cabinets in breakroom. ada upgrades to restrooms | $90,000 |
| Mar 15, 2013 | Completed final sign-off Sep 2013 | 221 Pine St | Camello Inc. | 5th floor t.i include demo & constuction of non-bearing partition walls to create private offices. conference room & enclose (e) break room; replace (e) sink & cabinets in break room, ada upgrade to restrooms.Details
5th floor t.i include demo & constuction of non-bearing partition walls to create private offices. conference room & enclose (e) break room; replace (e) sink & cabinets in break room, ada upgrade to restrooms. | $50,000 |
| May 27, 2011 | Never finaled issued May 2011, no final | 221 Pine St | street space permitDetails
street space permit | ||
| May 13, 2011 | Completed final sign-off Jul 2011 | 221 Pine St | Camello Inc. | 2nd floor tenant improvements iclude removing 24 linear ft of non-bearing partition walls; replacing break room cabinet & fixtures; replacing less than 50% of light fixtures.Details
2nd floor tenant improvements iclude removing 24 linear ft of non-bearing partition walls; replacing break room cabinet & fixtures; replacing less than 50% of light fixtures. | $15,000 |
| Apr 21, 2011 | Completed final sign-off Jun 2011 | 221 Pine St | Lovazzano Hvac Inc | install new furnace and ductwork in shell office space. ti 201103021218Details
install new furnace and ductwork in shell office space. ti 201103021218 | $20,000 |
| Apr 8, 2011 | Expired or cancelled cancelled Jan 2026 | 221 Pine St | Lovazzano Hvac Inc | 3rd floor-t.i. pa# 2011-0302-1218-removal of (e) gas furnace, install new furnace & duct work.Details
3rd floor-t.i. pa# 2011-0302-1218-removal of (e) gas furnace, install new furnace & duct work. | $10,000 |
| Mar 11, 2011 | Never finaled issued Mar 2011, no final | 221 Pine St | street spaceDetails
street space | ||
| Mar 2, 2011 | Completed final sign-off Jun 2011 | 221 Pine St | Camello Inc. | 3rd floor, tenant improvement: adding partition walls for vestibule, conf. rm., 2-offices & enclose (e) breakroom area; replace (e) break room sink; ada upgrades to restrooms. hvac under separate permit.Details
3rd floor, tenant improvement: adding partition walls for vestibule, conf. rm., 2-offices & enclose (e) breakroom area; replace (e) break room sink; ada upgrades to restrooms. hvac under separate permit. | $48,000 |
| Aug 9, 2010 | Never finaled issued Aug 2010, no final | 221 Pine St | streetspaceDetails
streetspace | ||
| Jun 24, 2010 | Completed final sign-off Sep 2010 | 221 Pine St | Camello Inc. | 3rd floor - remove existing sheetrock, electrical/data, non-structural partition walls, existing lighting fixtures, carpet, ceiling panels, existing millwork per ab-017.Details
3rd floor - remove existing sheetrock, electrical/data, non-structural partition walls, existing lighting fixtures, carpet, ceiling panels, existing millwork per ab-017. | $55,000 |
| Dec 8, 2009 | Never finaled issued Dec 2009, no final | 201 Pine St | street spaceDetails
street space | ||
| Oct 15, 2009 | Never finaled issued Oct 2009, no final | 201 Pine St | street space & mta permit.Details
street space & mta permit. | ||
| Mar 10, 2009 | Completed final sign-off Mar 2009 | 201 Pine St | to obtain final inspection for work approved under pa 200601253053; all work has been completedDetails
to obtain final inspection for work approved under pa 200601253053; all work has been completed | ||
| May 16, 2007 | Never finaled issued May 2007, no final | 201 Pine St | Zebra Awning Co Inc | to erect electrical signDetails
to erect electrical sign | $200 |
| May 16, 2007 | Never finaled issued May 2007, no final | 201 Pine St | Zebra Awning Co Inc | fabricate and install 1 awningDetails
fabricate and install 1 awning | $1,000 |
| Sep 12, 2006 | Never finaled filed Sep 2006, never issued | 201 Pine St | renew for final 200512301342 soup/salad bistroDetails
renew for final 200512301342 soup/salad bistro | ||
| Sep 12, 2006 | Completed final sign-off Sep 2006 | 201 Pine St | for final inspection. renew expired permit 200512301342, soup/salad bistroDetails
for final inspection. renew expired permit 200512301342, soup/salad bistro | ||
| Apr 25, 2006 | Never finaled issued Apr 2006, no final | 221 Pine St | street space permit only.Details
street space permit only. | ||
| Apr 7, 2006 | Never finaled issued Apr 2006, no final | 201 Pine St | San Francisco Fire Protection | connect (e) ansul system to (e) fire control panelDetails
connect (e) ansul system to (e) fire control panel | $500 |
| Jan 25, 2006 | Expired or cancelled expired Feb 2009 | 201 Pine St | H K Fire Protection Inc.* Check I.D. *** | isntalled automatic fire suppression system to the cooking hood using range guard ul 300 systemDetails
isntalled automatic fire suppression system to the cooking hood using range guard ul 300 system | $1,500 |
| Dec 30, 2005 | Expired or cancelled expired Sep 2006 | 201 Pine St | replace e cookline equip n grn flr: equip at cntr. upgrade non ada compliant sales counter with new compliant counter, n automatic door opener for e restroom, type 1 hood and duct requ under seperate permitDetails
replace e cookline equip n grn flr: equip at cntr. upgrade non ada compliant sales counter with new compliant counter, n automatic door opener for e restroom, type 1 hood and duct requ under seperate permit | $22,000 | |
| Dec 2, 2005 | Completed final sign-off Mar 2006 | 221 Pine St | Zebra Awning Co Inc | fabricate and install 5 box awningsDetails
fabricate and install 5 box awnings | $2,475 |
| Dec 2, 2005 | Completed final sign-off Mar 2006 | 221 Pine St | Zebra Awning Co Inc | paint graphics on awnings, see attachedDetails
paint graphics on awnings, see attached | |
| Sep 20, 2005 | Completed final sign-off Oct 2006 | 221 Pine St | Lewis M Merlo Inc | remove & replace sidewalk.no plumbing & no electrical.Details
remove & replace sidewalk.no plumbing & no electrical. | $70,000 |
| Sep 6, 2005 | Never finaled issued Sep 2005, no final | 221 Pine St | streetspaceDetails
streetspace | ||
| May 16, 2005 | Completed final sign-off Mar 2006 | 201 Pine St | Oceanside Sheet Metal | type i ul hood 16 ga. solid weld duct 3000 cfm exhaust blower make up air blower ansul system byDetails
type i ul hood 16 ga. solid weld duct 3000 cfm exhaust blower make up air blower ansul system by | $10,000 |
| May 15, 2002 | Completed final sign-off Jun 2002 | 221 Pine St | Vip Roofing And Construction Co. | reroofingDetails
reroofing | $18,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.