Shaun Michael Morrison
- Listed as
- authorized agent-others, contractor
- Firm
- Camello Inc.
- Based in
- San Leandro
- On San Francisco permits
- Jun 2010 to May 2026
43 permits since 2000 (contractor on 43 permits, authorized agent-others on 1 permit): 39 completed, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Architects
- Ian Glidden (11), Jason Langkammerer (10), Liebes Architect (4), Beth Morris (2), Steve Kang (2), Bassel Edward Samaha, Gregory Iboshi, Heidi L Liebes, Robert Scott Sullivan, Wenda Wang
- Engineers
- Robert Shaffer, Steve Kang, Wenda Wang
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 12, 2026 | Completed final sign-off Aug 2026 | 4620 California St | Camello Inc. | revision to bpa: 202512151832 - (bldg b) sundry, minor mep updates.Details
revision to bpa: 202512151832 - (bldg b) sundry, minor mep updates. | |
| May 12, 2026 | Completed final sign-off Aug 2026 | 4614 California St | Camello Inc. | revision to pa 202512151833 bldg a minor plumbing upgradesDetails
revision to pa 202512151833 bldg a minor plumbing upgrades | |
| Dec 15, 2025 | Completed final sign-off Aug 2026 | 4614 California St | Camello Inc. | mep upgrades. building aDetails
mep upgrades. building a | $12,000 |
| Dec 15, 2025 | Completed final sign-off Aug 2026 | 4620 California St | Camello Inc. | mep upgrades. building bDetails
mep upgrades. building b | $20,000 |
| Dec 15, 2025 | Completed final sign-off Aug 2026 | 4630 California St | Camello Inc. | exterior lighting of church courtyard. building cDetails
exterior lighting of church courtyard. building c | $2,000 |
| Feb 27, 2025 | Completed final sign-off Mar 2025 | 201 Pine St | Camello Inc. | emergency evacuation sign in a restaurantDetails
emergency evacuation sign in a restaurant | $1,000 |
| Jun 28, 2024 | Completed final sign-off Mar 2025 | 201 Pine St | Camello Inc. | rev 202304045050- basement,1st, 2nd floor- includes mijor work on 3 floors : basement- structrually modify (e) steel beam, leave door @ fire control panel room, leave (e) elevator machine room walls. 1st flr- relocated access seating, (n) bathroom sink, leave stair wall. exterior work under separteDetails
rev 202304045050- basement,1st, 2nd floor- includes mijor work on 3 floors : basement- structrually modify (e) steel beam, leave door @ fire control panel room, leave (e) elevator machine room walls. 1st flr- relocated access seating, (n) bathroom sink, leave stair wall. exterior work under separte | |
| Dec 12, 2023 | Completed final sign-off Mar 2025 | 201 Pine St | Camello Inc. | soft demolition on basement, 1st and 2nd floors per ab-017. all remain vacant.Details
soft demolition on basement, 1st and 2nd floors per ab-017. all remain vacant. | $2,000 |
| Jul 28, 2023 | Completed final sign-off Mar 2025 | 201 Pine St | Camello Inc. | new exterior entry doors in (e) locations, new exhaust louvers for the restrnt in transom window area this permit application is for the exterior work only for a new restrnt. interior work under sep bpa#202304045050. minor pta approved #2023-001035pta.separte permit for sign will be obtained.Details
new exterior entry doors in (e) locations, new exhaust louvers for the restrnt in transom window area this permit application is for the exterior work only for a new restrnt. interior work under sep bpa#202304045050. minor pta approved #2023-001035pta.separte permit for sign will be obtained. | $45,000 |
| Apr 4, 2023 | Completed final sign-off Mar 2025 | 201 Pine St | Camello Inc. | remodel basement, 1st & 2nd fl. for (n) restaurant in an (e) 6 story bldg. 1st & 2nd fl. will be a change of use to an assembly occupancy. work includes (n) main stair, (n) kitchens at all 3 fls, (n) bathrooms, seating areas & bars. exterior work under sep permit. sprinklers under sep permit.Details
remodel basement, 1st & 2nd fl. for (n) restaurant in an (e) 6 story bldg. 1st & 2nd fl. will be a change of use to an assembly occupancy. work includes (n) main stair, (n) kitchens at all 3 fls, (n) bathrooms, seating areas & bars. exterior work under sep permit. sprinklers under sep permit. | $980,000 |
| Jun 19, 2018 | Completed final sign-off Nov 2020 | 285 South Van Ness Av | Camello Inc. | partial demo of interior portions of (e) blg. partial demo of ext facade. installation of exterior curtain wall and cladding system. new t.i. to (e) space includes: new and (e) office spaces, new restroom, new break area and new fire rated corridorDetails
partial demo of interior portions of (e) blg. partial demo of ext facade. installation of exterior curtain wall and cladding system. new t.i. to (e) space includes: new and (e) office spaces, new restroom, new break area and new fire rated corridor | $500,000 |
| Jun 22, 2016 | Completed final sign-off May 2022 | 569 Minna St | Camello Inc. | soft story retrofit to comply with mandatory seismic program.Details
soft story retrofit to comply with mandatory seismic program. | $100,000 |
| Oct 26, 2015 | Expired or cancelled withdrawn Jun 2016 | 407 Sansome St | Camello Inc. | revision to approved pa# 2015/03/31/2461 to include removal of non-historic 12 x 12 tile from 411 sansome street facade. clean, repair or replace historic brick behind. clean paint from brick on sacramento street facade. ** maher: compliance with ordinance no# 155-13 not required **Details
revision to approved pa# 2015/03/31/2461 to include removal of non-historic 12 x 12 tile from 411 sansome street facade. clean, repair or replace historic brick behind. clean paint from brick on sacramento street facade. ** maher: compliance with ordinance no# 155-13 not required ** | $4,000 |
| Apr 30, 2015 | Completed final sign-off Aug 2016 | 407 Sansome St | Camello Inc. | t.i. to extg office space on fourth floor. including construction of non-bearing partition walls. n/a for maherDetails
t.i. to extg office space on fourth floor. including construction of non-bearing partition walls. n/a for maher | $7,500 |
| Mar 31, 2015 | Completed final sign-off Aug 2016 | 407 Sansome St | Camello Inc. | replacement of non-historic storefront system @ the sansome street lobby entrance within (e) opening. removal of non-historic 12x12 tiles @ storefront area. historic brick behind to be cleaned, repaired or replaced. ** maher: compliance with ordinance no# 155-13 not required **Details
replacement of non-historic storefront system @ the sansome street lobby entrance within (e) opening. removal of non-historic 12x12 tiles @ storefront area. historic brick behind to be cleaned, repaired or replaced. ** maher: compliance with ordinance no# 155-13 not required ** | $10,000 |
| Mar 11, 2015 | Completed final sign-off Apr 2015 | 407 Sansome St | Camello Inc. | 2nd floor: t.i. to existing office space on second floor only. include construction of non-bearing partition walls. maher n/a.Details
2nd floor: t.i. to existing office space on second floor only. include construction of non-bearing partition walls. maher n/a. | $10,000 |
| Feb 12, 2015 | Completed final sign-off Mar 2015 | 407 Sansome St | Camello Inc. | 3rd floor: t.i. to extg office space on 3rd floor: including construction of non-bearing partition walls. n/a for the maherDetails
3rd floor: t.i. to extg office space on 3rd floor: including construction of non-bearing partition walls. n/a for the maher | $10,000 |
| Oct 31, 2014 | Completed final sign-off Mar 2015 | 407 Sansome St | Camello Inc. | 4th flr: tenant improvements for office space on 4th flr including construction of non bearing partition walls, replace finishes throughout. new mechanical equipment including ductwork and new electrical including lights & receptacles; maher n/aDetails
4th flr: tenant improvements for office space on 4th flr including construction of non bearing partition walls, replace finishes throughout. new mechanical equipment including ductwork and new electrical including lights & receptacles; maher n/a | $95,000 |
| Oct 3, 2014 | Completed final sign-off Apr 2015 | 407 Sansome St | Camello Inc. | replacement of non-historic aluminum windows, three windows, 3 windows total with new custom wood windows to match historic wood windows adjacent. n/a for the maherDetails
replacement of non-historic aluminum windows, three windows, 3 windows total with new custom wood windows to match historic wood windows adjacent. n/a for the maher | $12,000 |
| Sep 30, 2014 | Completed final sign-off Oct 2017 | 407 Sansome St | Camello Inc. | revision to 201407292433. revised electrical and lighting to comply with title 24 requirements. n/a ordinance #155-13.Details
revision to 201407292433. revised electrical and lighting to comply with title 24 requirements. n/a ordinance #155-13. | $4,000 |
| Sep 30, 2014 | Completed final sign-off Feb 2015 | 407 Sansome St | Camello Inc. | revision to 201408214392. revised electrical and lighting to comply with title 24 requirements on the 3/fDetails
revision to 201408214392. revised electrical and lighting to comply with title 24 requirements on the 3/f | $4,000 |
| Aug 21, 2014 | Completed final sign-off Feb 2015 | 407 Sansome St | Camello Inc. | 3rd flr: tenant improvements for office space including construction of non-bearing partition walls. replace finishes throughout; new mechanical equipment including ductwork & new electrical including lights & receptacles; maher n/aDetails
3rd flr: tenant improvements for office space including construction of non-bearing partition walls. replace finishes throughout; new mechanical equipment including ductwork & new electrical including lights & receptacles; maher n/a | $95,000 |
| Jul 29, 2014 | Completed final sign-off Feb 2015 | 407 Sansome St | Camello Inc. | t.i. for office space at 2nd floor including construction of non-bearing partition walls. replace finishes throughout. new mechanical equipment including ductwork and new electrical including lights and receptacles. n/a for the maher ordinance #155-13Details
t.i. for office space at 2nd floor including construction of non-bearing partition walls. replace finishes throughout. new mechanical equipment including ductwork and new electrical including lights and receptacles. n/a for the maher ordinance #155-13 | $95,000 |
| May 30, 2014 | Completed final sign-off Oct 2017 | 407 Sansome St | Camello Inc. | remodel of (e) lobby space, replace (e) wall & floor finishes, replace (e) lighting, no exterior work. compliance with maher ordinance no 155-13 not required.Details
remodel of (e) lobby space, replace (e) wall & floor finishes, replace (e) lighting, no exterior work. compliance with maher ordinance no 155-13 not required. | $15,000 |
| Apr 2, 2014 | Completed final sign-off Oct 2017 | 407 Sansome St | Camello Inc. | 2nd and 3rd floor only: provide cold shell office space. remove select interior walls and floor finishes, remove any mech. equipment and duct work. remove and safe off extg electrical. t.i. under separate permit.Details
2nd and 3rd floor only: provide cold shell office space. remove select interior walls and floor finishes, remove any mech. equipment and duct work. remove and safe off extg electrical. t.i. under separate permit. | $14,000 |
| Mar 20, 2014 | Expired or cancelled cancelled May 2014 | 221 Pine St | Camello Inc. | add card reader lock in elevator lobby of the 5th flr office, electrical, non-architectural work only. emempt from accessibility upgrades.Details
add card reader lock in elevator lobby of the 5th flr office, electrical, non-architectural work only. emempt from accessibility upgrades. | $2,800 |
| Jan 31, 2014 | Completed final sign-off Jun 2014 | 461 02nd St | Camello Inc. | minor renovation- remove kitchen island, reconfigure small bedroom, and closet, new partition at living roomDetails
minor renovation- remove kitchen island, reconfigure small bedroom, and closet, new partition at living room | $50,000 |
| Jan 10, 2014 | Completed final sign-off Oct 2017 | 407 Sansome St | Camello Inc. | demolition of interior finishes on the 4th fl only. provide cold shell office space. remvoe select interior walls and floor finishes. remove any mech equipment and ductwork. remove and safe off existing electricalDetails
demolition of interior finishes on the 4th fl only. provide cold shell office space. remvoe select interior walls and floor finishes. remove any mech equipment and ductwork. remove and safe off existing electrical | $7,500 |
| Oct 4, 2013 | Completed final sign-off Mar 2014 | 332 Pine St | Camello Inc. | the proposed revision to pa#201304245328 includes new non-bearing office partitions and a revised lighting plan.Details
the proposed revision to pa#201304245328 includes new non-bearing office partitions and a revised lighting plan. | $20,000 |
| Sep 11, 2013 | Completed final sign-off Apr 2014 | 19 Alta St | Camello Inc. | revision to pa 201302210618. interior work includes reconfiguration of laundry rm, closets at 2nd floor. renovation of powder rm on 1st flr, and revise lighting plansDetails
revision to pa 201302210618. interior work includes reconfiguration of laundry rm, closets at 2nd floor. renovation of powder rm on 1st flr, and revise lighting plans | $10,000 |
| Sep 6, 2013 | Never finaled issued Sep 2013, no final | 332 Pine St | Camello Inc. | demolish non-bearing partitions and bar celling to expo original plaster ceiling, per ab-017Details
demolish non-bearing partitions and bar celling to expo original plaster ceiling, per ab-017 | $22,000 |
| May 16, 2013 | Completed final sign-off Sep 2013 | 221 Pine St | Camello Inc. | 4th/5th/6th floor-create 2 hour rated mechanical shaft between floors 4, 5 & 6Details
4th/5th/6th floor-create 2 hour rated mechanical shaft between floors 4, 5 & 6 | $2,000 |
| Apr 24, 2013 | Completed final sign-off Mar 2014 | 332 Pine St | Camello Inc. | 5th floor:t.i. include demolition of extg acoustical ceilings and non bearing partitions, new light fixutes, new break area and renovation of extg men's and womens restrooms. sprinkler & hvac under seperate permitDetails
5th floor:t.i. include demolition of extg acoustical ceilings and non bearing partitions, new light fixutes, new break area and renovation of extg men's and womens restrooms. sprinkler & hvac under seperate permit | $150,000 |
| Apr 3, 2013 | Completed final sign-off Aug 2013 | 221 Pine St | Camello Inc. | 6th floor tenant improvements include demolitoin & construction of non-bearing partition walls to create private offices & enclose (e) break room, replace (e) sink & cabinets in break room, ada upgrades to restrooms.Details
6th floor tenant improvements include demolitoin & construction of non-bearing partition walls to create private offices & enclose (e) break room, replace (e) sink & cabinets in break room, ada upgrades to restrooms. | $90,000 |
| Mar 22, 2013 | Completed final sign-off Jul 2013 | 221 Pine St | Camello Inc. | 4th floor-tenant improvement includes demolition & construction of non bearing partition wall to create private offices, enclose (e) breakroom. replace (e) sink & cabinets in breakroom. ada upgrades to restroomsDetails
4th floor-tenant improvement includes demolition & construction of non bearing partition wall to create private offices, enclose (e) breakroom. replace (e) sink & cabinets in breakroom. ada upgrades to restrooms | $90,000 |
| Mar 15, 2013 | Never finaled issued Mar 2013, no final | 332 Pine St | Camello Inc. | revision to pa# 201208086881 to create new elevator lobby.Details
revision to pa# 201208086881 to create new elevator lobby. | |
| Mar 15, 2013 | Completed final sign-off Sep 2013 | 221 Pine St | Camello Inc. | 5th floor t.i include demo & constuction of non-bearing partition walls to create private offices. conference room & enclose (e) break room; replace (e) sink & cabinets in break room, ada upgrade to restrooms.Details
5th floor t.i include demo & constuction of non-bearing partition walls to create private offices. conference room & enclose (e) break room; replace (e) sink & cabinets in break room, ada upgrade to restrooms. | $50,000 |
| Aug 8, 2012 | Completed final sign-off Mar 2013 | 332 Pine St | Camello Inc. | tenant improvement: demo of existing acoustic ceilings & some non bearing partitions: new lighting & renovation of existing women's restroom & brreak area.Details
tenant improvement: demo of existing acoustic ceilings & some non bearing partitions: new lighting & renovation of existing women's restroom & brreak area. | $65,000 |
| Jul 18, 2012 | Completed final sign-off Nov 2012 | 461 02nd St | Camello Inc. | interior renovation of (e) unit to create new bathroom & bedroom within same footprint.Details
interior renovation of (e) unit to create new bathroom & bedroom within same footprint. | $65,000 |
| May 13, 2011 | Completed final sign-off Jul 2011 | 221 Pine St | Camello Inc. | 2nd floor tenant improvements iclude removing 24 linear ft of non-bearing partition walls; replacing break room cabinet & fixtures; replacing less than 50% of light fixtures.Details
2nd floor tenant improvements iclude removing 24 linear ft of non-bearing partition walls; replacing break room cabinet & fixtures; replacing less than 50% of light fixtures. | $15,000 |
| Apr 18, 2011 | Completed final sign-off Aug 2011 | 2509 Bush St | Camello Inc. | coversion of extg 2 unit (r) occupancy to (e) ocupancy day-care(pre-school). remodel (e) bathrooms, partition walls, rated walls at basement, re-build the rear stair way partial and sprinkler the entire bldg.Details
coversion of extg 2 unit (r) occupancy to (e) ocupancy day-care(pre-school). remodel (e) bathrooms, partition walls, rated walls at basement, re-build the rear stair way partial and sprinkler the entire bldg. | $50,000 |
| Mar 2, 2011 | Completed final sign-off Jun 2011 | 221 Pine St | Camello Inc. | 3rd floor, tenant improvement: adding partition walls for vestibule, conf. rm., 2-offices & enclose (e) breakroom area; replace (e) break room sink; ada upgrades to restrooms. hvac under separate permit.Details
3rd floor, tenant improvement: adding partition walls for vestibule, conf. rm., 2-offices & enclose (e) breakroom area; replace (e) break room sink; ada upgrades to restrooms. hvac under separate permit. | $48,000 |
| Jun 24, 2010 | Completed final sign-off Sep 2010 | 221 Pine St | Camello Inc. | 3rd floor - remove existing sheetrock, electrical/data, non-structural partition walls, existing lighting fixtures, carpet, ceiling panels, existing millwork per ab-017.Details
3rd floor - remove existing sheetrock, electrical/data, non-structural partition walls, existing lighting fixtures, carpet, ceiling panels, existing millwork per ab-017. | $55,000 |