Block 0228, lot 003
407 Sansome St
- City’s use
- Commercial Office
- Built
- 1909
- Stories
- 4
- Units
- 5
- Rooms
- 5 bathrooms
- Building
- 17,854 sq ft
- Lot
- 3,963 sq ft
- Zoning
- C3O
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
25 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2016 | Never finaled issued Sep 2016, no final | 407 Sansome St | streetspace and mtaDetails
streetspace and mta | ||
| Oct 26, 2015 | Expired or cancelled withdrawn Jun 2016 | 407 Sansome St | Camello Inc. | revision to approved pa# 2015/03/31/2461 to include removal of non-historic 12 x 12 tile from 411 sansome street facade. clean, repair or replace historic brick behind. clean paint from brick on sacramento street facade. ** maher: compliance with ordinance no# 155-13 not required **Details
revision to approved pa# 2015/03/31/2461 to include removal of non-historic 12 x 12 tile from 411 sansome street facade. clean, repair or replace historic brick behind. clean paint from brick on sacramento street facade. ** maher: compliance with ordinance no# 155-13 not required ** | $4,000 |
| Sep 28, 2015 | Expired or cancelled withdrawn Jun 2016 | 407 Sansome St | awning signageDetails
awning signage | $500 | |
| Sep 28, 2015 | Expired or cancelled withdrawn Jun 2016 | 407 Sansome St | replace existing awnings with new. 3 awnings total. ** maher: compliance with ordinance no# 155-13 not required **Details
replace existing awnings with new. 3 awnings total. ** maher: compliance with ordinance no# 155-13 not required ** | $5,500 | |
| May 20, 2015 | Never finaled issued May 2015, no final | 407 Sansome St | street space (additional meters only).Details
street space (additional meters only). | ||
| May 20, 2015 | Never finaled issued May 2015, no final | 407 Sansome St | street spaceDetails
street space | ||
| Apr 30, 2015 | Completed final sign-off Aug 2016 | 407 Sansome St | Camello Inc. | t.i. to extg office space on fourth floor. including construction of non-bearing partition walls. n/a for maherDetails
t.i. to extg office space on fourth floor. including construction of non-bearing partition walls. n/a for maher | $7,500 |
| Mar 31, 2015 | Completed final sign-off Aug 2016 | 407 Sansome St | Camello Inc. | replacement of non-historic storefront system @ the sansome street lobby entrance within (e) opening. removal of non-historic 12x12 tiles @ storefront area. historic brick behind to be cleaned, repaired or replaced. ** maher: compliance with ordinance no# 155-13 not required **Details
replacement of non-historic storefront system @ the sansome street lobby entrance within (e) opening. removal of non-historic 12x12 tiles @ storefront area. historic brick behind to be cleaned, repaired or replaced. ** maher: compliance with ordinance no# 155-13 not required ** | $10,000 |
| Mar 11, 2015 | Completed final sign-off Apr 2015 | 407 Sansome St | Camello Inc. | 2nd floor: t.i. to existing office space on second floor only. include construction of non-bearing partition walls. maher n/a.Details
2nd floor: t.i. to existing office space on second floor only. include construction of non-bearing partition walls. maher n/a. | $10,000 |
| Feb 12, 2015 | Completed final sign-off Mar 2015 | 407 Sansome St | Camello Inc. | 3rd floor: t.i. to extg office space on 3rd floor: including construction of non-bearing partition walls. n/a for the maherDetails
3rd floor: t.i. to extg office space on 3rd floor: including construction of non-bearing partition walls. n/a for the maher | $10,000 |
| Nov 12, 2014 | Never finaled issued Nov 2014, no final | 407 Sansome St | street spaceDetails
street space | ||
| Oct 31, 2014 | Completed final sign-off Mar 2015 | 407 Sansome St | Camello Inc. | 4th flr: tenant improvements for office space on 4th flr including construction of non bearing partition walls, replace finishes throughout. new mechanical equipment including ductwork and new electrical including lights & receptacles; maher n/aDetails
4th flr: tenant improvements for office space on 4th flr including construction of non bearing partition walls, replace finishes throughout. new mechanical equipment including ductwork and new electrical including lights & receptacles; maher n/a | $95,000 |
| Oct 3, 2014 | Completed final sign-off Apr 2015 | 407 Sansome St | Camello Inc. | replacement of non-historic aluminum windows, three windows, 3 windows total with new custom wood windows to match historic wood windows adjacent. n/a for the maherDetails
replacement of non-historic aluminum windows, three windows, 3 windows total with new custom wood windows to match historic wood windows adjacent. n/a for the maher | $12,000 |
| Sep 30, 2014 | Completed final sign-off Oct 2017 | 407 Sansome St | Camello Inc. | revision to 201407292433. revised electrical and lighting to comply with title 24 requirements. n/a ordinance #155-13.Details
revision to 201407292433. revised electrical and lighting to comply with title 24 requirements. n/a ordinance #155-13. | $4,000 |
| Sep 30, 2014 | Completed final sign-off Feb 2015 | 407 Sansome St | Camello Inc. | revision to 201408214392. revised electrical and lighting to comply with title 24 requirements on the 3/fDetails
revision to 201408214392. revised electrical and lighting to comply with title 24 requirements on the 3/f | $4,000 |
| Aug 21, 2014 | Completed final sign-off Feb 2015 | 407 Sansome St | Camello Inc. | 3rd flr: tenant improvements for office space including construction of non-bearing partition walls. replace finishes throughout; new mechanical equipment including ductwork & new electrical including lights & receptacles; maher n/aDetails
3rd flr: tenant improvements for office space including construction of non-bearing partition walls. replace finishes throughout; new mechanical equipment including ductwork & new electrical including lights & receptacles; maher n/a | $95,000 |
| Jul 29, 2014 | Completed final sign-off Feb 2015 | 407 Sansome St | Camello Inc. | t.i. for office space at 2nd floor including construction of non-bearing partition walls. replace finishes throughout. new mechanical equipment including ductwork and new electrical including lights and receptacles. n/a for the maher ordinance #155-13Details
t.i. for office space at 2nd floor including construction of non-bearing partition walls. replace finishes throughout. new mechanical equipment including ductwork and new electrical including lights and receptacles. n/a for the maher ordinance #155-13 | $95,000 |
| May 30, 2014 | Completed final sign-off Oct 2017 | 407 Sansome St | Camello Inc. | remodel of (e) lobby space, replace (e) wall & floor finishes, replace (e) lighting, no exterior work. compliance with maher ordinance no 155-13 not required.Details
remodel of (e) lobby space, replace (e) wall & floor finishes, replace (e) lighting, no exterior work. compliance with maher ordinance no 155-13 not required. | $15,000 |
| Apr 2, 2014 | Completed final sign-off Oct 2017 | 407 Sansome St | Camello Inc. | 2nd and 3rd floor only: provide cold shell office space. remove select interior walls and floor finishes, remove any mech. equipment and duct work. remove and safe off extg electrical. t.i. under separate permit.Details
2nd and 3rd floor only: provide cold shell office space. remove select interior walls and floor finishes, remove any mech. equipment and duct work. remove and safe off extg electrical. t.i. under separate permit. | $14,000 |
| Jan 13, 2014 | Completed final sign-off Mar 2014 | 407 Sansome St | State Roofing Systems Inc | reroofing (compliance with ordinance no. 155-13 not required. excavation <50 cu.yd.Details
reroofing (compliance with ordinance no. 155-13 not required. excavation <50 cu.yd. | $55,000 |
| Jan 10, 2014 | Completed final sign-off Oct 2017 | 407 Sansome St | Camello Inc. | demolition of interior finishes on the 4th fl only. provide cold shell office space. remvoe select interior walls and floor finishes. remove any mech equipment and ductwork. remove and safe off existing electricalDetails
demolition of interior finishes on the 4th fl only. provide cold shell office space. remvoe select interior walls and floor finishes. remove any mech equipment and ductwork. remove and safe off existing electrical | $7,500 |
| Mar 8, 2012 | Completed final sign-off May 2012 | 407 Sansome St | Otis Elevator Co | minor renovation to elevator interior car for "barrier removal" scope of work includes replacing existing with new: car operating panel, car position indicator, handrail, hall lantern, call button and car fan. change of elevator door at basement landing. ada upgrades to elevator controlsDetails
minor renovation to elevator interior car for "barrier removal" scope of work includes replacing existing with new: car operating panel, car position indicator, handrail, hall lantern, call button and car fan. change of elevator door at basement landing. ada upgrades to elevator controls | $40,000 |
| Jan 8, 2008 | Expired or cancelled expired Jun 2009 | 407 Sansome St | revision to permit (bpa#2007/08/15/9876) to add a (n) elevator pit and support during servicing only for new elevator per plan.Details
revision to permit (bpa#2007/08/15/9876) to add a (n) elevator pit and support during servicing only for new elevator per plan. | $8,000 | |
| Aug 15, 2007 | Never finaled issued Aug 2007, no final | 407 Sansome St | retrofit existing elavator with new accessible elevator new shaft walls as required and new i-hour vestibule walls and doors at elevator lobbies.Details
retrofit existing elavator with new accessible elevator new shaft walls as required and new i-hour vestibule walls and doors at elevator lobbies. | $126,000 | |
| Jul 8, 2005 | Never finaled issued Jul 2005, no final | 407 Sansome St | street space & sidewalk permit only.Details
street space & sidewalk permit only. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Camello Inc. (14), Otis Elevator Co, State Roofing Systems Inc
- Architects
- Ian Glidden (13), Jonathan Rearlman