Jonathan Pearlman
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Elevation Architects
- Based in
- San Francisco
- On San Francisco permits
- Aug 2001 to Aug 2026
135 permits since 2000 (architect on 131 permits, authorized agent-others on 2 permits, designer on 1 permit, engineer on 1 permit): 74 completed, 5 in progress, 30 never finaled, 26 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 135.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 27, 2026 | In progress filed Aug 2026, not yet issued | 2600 16th Av | Amber - Tru Construction Inc. | revision to issued pa #202111303324: increase the skylight size & revise south property parapet at skylight.Details
revision to issued pa #202111303324: increase the skylight size & revise south property parapet at skylight. | $2,000 |
| Jul 23, 2026 | In progress filed Jul 2026, not yet issued | 649 28th St | Amber - Tru Construction Inc. | revision of demolition calcultaions for bpa: 202102013766 - in response to noe 2026005512 enf. issued on 07/17/2026Details
revision of demolition calcultaions for bpa: 202102013766 - in response to noe 2026005512 enf. issued on 07/17/2026 | |
| Oct 29, 2025 | In progress issued Feb 2026 | 541 Eureka St | Amber - Tru Construction Inc. | interior renovation of (e) 2 story buildling with 21sf addition in light well. demo (e) spiral stairs and build (n) wood framed stair. remove 2nd floor bathroom and remodel 2x bathrooms and remodel kitchen . remove and infill 3 windows and add (n) windows at breakfast room located at rear.Details
interior renovation of (e) 2 story buildling with 21sf addition in light well. demo (e) spiral stairs and build (n) wood framed stair. remove 2nd floor bathroom and remodel 2x bathrooms and remodel kitchen . remove and infill 3 windows and add (n) windows at breakfast room located at rear. | $110,000 |
| Jul 30, 2024 | In progress issued Dec 2024 | 1 Jones St | Landmark Construction Inc. | clarification of occupancy types and means of egress in existing building. no building changes, no constructionDetails
clarification of occupancy types and means of egress in existing building. no building changes, no construction | |
| Mar 14, 2024 | Completed final sign-off Jan 2026 | 25 Toledo Wy | Amber - Tru Construction Inc. | remodel 3598 sfd. 1st fl convert 771 sf of unconditioned space into conditioned area, 2nd fl addition of 17 sf by infilling lightwell, remodel kitchen and 2 baths. replace rear yard 2nd fl windows. add light monitor over shower at master bath and skylights at hallwayDetails
remodel 3598 sfd. 1st fl convert 771 sf of unconditioned space into conditioned area, 2nd fl addition of 17 sf by infilling lightwell, remodel kitchen and 2 baths. replace rear yard 2nd fl windows. add light monitor over shower at master bath and skylights at hallway | $400,000 |
| Jul 31, 2023 | Completed final sign-off Oct 2024 | 4043 19th St | Andrew Gallagher Construction | revision to pa202112285077. revise framing above garage to accommodate garage overhead door, vaulted ceiling @ 3/f master bedroom, revised window @ 3/f master bath, & revised skylights on roof.Details
revision to pa202112285077. revise framing above garage to accommodate garage overhead door, vaulted ceiling @ 3/f master bedroom, revised window @ 3/f master bath, & revised skylights on roof. | |
| Jun 2, 2023 | Completed final sign-off Sep 2023 | 2533 Balboa St | front facade modifications to ground floor level to category c- no historical resource present building. no structural work; demo existing entrance and window and new front door, windows and side hung doors.Details
front facade modifications to ground floor level to category c- no historical resource present building. no structural work; demo existing entrance and window and new front door, windows and side hung doors. | $7,500 | |
| Dec 8, 2022 | Completed final sign-off Jan 2025 | 492 45th Av | Tri Line Construction Co | rev to pa 201810223287 to respond to bid complaint 202290219 and notice of violation 2022001666 enfDetails
rev to pa 201810223287 to respond to bid complaint 202290219 and notice of violation 2022001666 enf | |
| Nov 30, 2022 | Completed final sign-off Apr 2023 | 132 Funston Av | Amber - Tru Construction Inc. | 3rd floor interior remodel. remodel kitchen and add one new bathroom new lighting and new 3rd bedroom. all work on 3rd floor.Details
3rd floor interior remodel. remodel kitchen and add one new bathroom new lighting and new 3rd bedroom. all work on 3rd floor. | $50,000 |
| Nov 30, 2022 | Never finaled filed Nov 2022, never issued | 2800 Geary Bl | to erect a 6-story, 1-basement, 42 dwelling units, type iii-a over 1-a, mixed-use building.Details
to erect a 6-story, 1-basement, 42 dwelling units, type iii-a over 1-a, mixed-use building. | $14,000,000 | |
| Nov 30, 2022 | Never finaled filed Nov 2022, never issued | 2800 Geary Bl | demolition of 1-story, type i, auto repair/service building.Details
demolition of 1-story, type i, auto repair/service building. | $50,000 | |
| Nov 3, 2022 | Never finaled filed Nov 2022, never issued | 2976 Mission St | demolish entire building except retain mission street facade. construct 6-story building with commercial space and building lobby and services on 1st floor (type 1-a) with 5 stories above with 8 residential units (type 3-a) with common open space at 2nd and 5th floors.Details
demolish entire building except retain mission street facade. construct 6-story building with commercial space and building lobby and services on 1st floor (type 1-a) with 5 stories above with 8 residential units (type 3-a) with common open space at 2nd and 5th floors. | $3,750,000 | |
| Oct 5, 2022 | Completed final sign-off Oct 2022 | 4118 21st St | as-built revision to pa# 201802272279. to replace brick finish with stucco in street level of front facade and rear facade.Details
as-built revision to pa# 201802272279. to replace brick finish with stucco in street level of front facade and rear facade. | ||
| Aug 12, 2022 | Expired or cancelled expired Feb 2026 | 202 Fair Oaks St | Amber - Tru Construction Inc. | interior work at 202: add full bathroom at 3rd fl. add new skylight, replace pickets at rear stairsDetails
interior work at 202: add full bathroom at 3rd fl. add new skylight, replace pickets at rear stairs | $40,000 |
| Apr 4, 2022 | Never finaled filed Apr 2022, never issued | 445 Liberty St | renovation and 1431 sf net addition to an existing sfd. addition of 45 sf at 1st floor. net addition of 80 sf at 2nd floor. additon of 1310 sf 3rd floor with 3 bedrooms, 3 baths. new 610 sq ft adu within existing 1st floor level [local adu per sf planning code section 207(c)(4)]Details
renovation and 1431 sf net addition to an existing sfd. addition of 45 sf at 1st floor. net addition of 80 sf at 2nd floor. additon of 1310 sf 3rd floor with 3 bedrooms, 3 baths. new 610 sq ft adu within existing 1st floor level [local adu per sf planning code section 207(c)(4)] | $1,500,000 | |
| Jan 13, 2022 | Completed final sign-off Aug 2024 | 50 Fair Oaks St | Prospect Construction Inc | remodel 3/f: add exterior deck on east side. revision to 201712217056 and assoc addenda. comply with nov 202420974Details
remodel 3/f: add exterior deck on east side. revision to 201712217056 and assoc addenda. comply with nov 202420974 | $65,000 |
| Dec 28, 2021 | Completed final sign-off Oct 2024 | 4043 19th St | Andrew Gallagher Construction | excavate under bldg for new basement & garage. add 10'-0" curb cut at new garage entry. reconstruct front stair. renovate interior. add residential elevator.Details
excavate under bldg for new basement & garage. add 10'-0" curb cut at new garage entry. reconstruct front stair. renovate interior. add residential elevator. | $650,000 |
| Nov 30, 2021 | In progress issued Mar 2026 | 2600 16th Av | Amber - Tru Construction Inc. | addition and renovation of existing single-family residence. horizontal addition at rear of building (1st and 2nd floors) of 250 sf . infill addition at (e) 2nd floor lightwell of 50 sfDetails
addition and renovation of existing single-family residence. horizontal addition at rear of building (1st and 2nd floors) of 250 sf . infill addition at (e) 2nd floor lightwell of 50 sf | $600,000 |
| Jun 21, 2021 | Completed final sign-off Mar 2022 | 1250 Clay St | Amber - Tru Construction Inc. | revision to pa 202007089807. reduction of scope for east wall improvements: no change to bldg envelope. replace redwood siding. repair damaged framing as needed. add 5/8" plywood and hold downs for voluntary seismic improvement. install new windows in existing openings.Details
revision to pa 202007089807. reduction of scope for east wall improvements: no change to bldg envelope. replace redwood siding. repair damaged framing as needed. add 5/8" plywood and hold downs for voluntary seismic improvement. install new windows in existing openings. | |
| Feb 24, 2021 | Never finaled filed Feb 2021, never issued | 1196 Columbus Av | Centrix Builders Inc. | site & construct 28,865 gross sq ft res building w/ 56 group housing units w/o basement. no on-site parking w/ 20% rear yard. will request 122% density increase for 10 additional units on two additional floors under the state density bonus program plan code 206.6.Details
site & construct 28,865 gross sq ft res building w/ 56 group housing units w/o basement. no on-site parking w/ 20% rear yard. will request 122% density increase for 10 additional units on two additional floors under the state density bonus program plan code 206.6. | $8,500,000 |
| Feb 24, 2021 | Never finaled filed Feb 2021, never issued | 1196 Columbus Av | Centrix Builders Inc. | demolish an existing one-story buildingDetails
demolish an existing one-story building | $30,000 |
| Feb 1, 2021 | Never finaled issued Aug 2022, no final | 649 28th St | Amber - Tru Construction Inc. | addition to rear of 1st and 2nd floors and addition of new 3rd floor. expand existing 2,105 gsf 2-bedroom, 1 bath house to a 4,227 gsf-5 bedroom 3.5-bath house.Details
addition to rear of 1st and 2nd floors and addition of new 3rd floor. expand existing 2,105 gsf 2-bedroom, 1 bath house to a 4,227 gsf-5 bedroom 3.5-bath house. | $1,200,000 |
| Nov 10, 2020 | Completed final sign-off Jul 2024 | 1212 Union St | Cranadore Construction Inc | interior remodel for floors 1/2/3 in 2-unit bldg. convert 1212a union st commercial space into residential and add to (e) 1212 union st (lower unit). modifications to front facade include the following: new alum clad casements in (e) openings, removal of door and storefront window at com maher n/aDetails
interior remodel for floors 1/2/3 in 2-unit bldg. convert 1212a union st commercial space into residential and add to (e) 1212 union st (lower unit). modifications to front facade include the following: new alum clad casements in (e) openings, removal of door and storefront window at com maher n/a | $145,000 |
| Jul 8, 2020 | Completed final sign-off Mar 2022 | 1250 Clay St | repair and alteration of existing east exterior wall: remove existing rustic siding & windows. repair existing wall framing as needed. existing studs and interior finishes to remain. new w-60 fire resistance rated p.l. windows. new insulation, bldg wrap and rustic sidng. no change to bldg envelope.Details
repair and alteration of existing east exterior wall: remove existing rustic siding & windows. repair existing wall framing as needed. existing studs and interior finishes to remain. new w-60 fire resistance rated p.l. windows. new insulation, bldg wrap and rustic sidng. no change to bldg envelope. | $30,000 | |
| Jun 29, 2020 | Completed final sign-off Apr 2023 | 4118 21st St | Amber - Tru Construction Inc. | revision to pa# 201802272279. expansion of sfh to 2 unit. add 3rd floor with living, dinning, kitchen for new 2nd unit per bid. new bpa can incorporate inspection & work under pa# 201802272279. plan abate dbi nov# 201919811 &nov# 201813931 / dcp2018-017368eng per dcp approval 2020-000215prj/cuaDetails
revision to pa# 201802272279. expansion of sfh to 2 unit. add 3rd floor with living, dinning, kitchen for new 2nd unit per bid. new bpa can incorporate inspection & work under pa# 201802272279. plan abate dbi nov# 201919811 &nov# 201813931 / dcp2018-017368eng per dcp approval 2020-000215prj/cua | $300,000 |
| Mar 4, 2020 | Completed final sign-off Jul 2020 | 339 18th Av | H T H Construction | add window to 2nd floor front stairs. add mechanical chase to 3rd floor hallway & remove closet. add access door to rear roof on top floor. add window fixed at top deck stairs. add railing on rear roof to bring up to 42".Details
add window to 2nd floor front stairs. add mechanical chase to 3rd floor hallway & remove closet. add access door to rear roof on top floor. add window fixed at top deck stairs. add railing on rear roof to bring up to 42". | $1,000 |
| Oct 1, 2019 | Expired or cancelled withdrawn Feb 2024 | 25 Toledo Wy | K. Brunner & Associates | vertical addition. renovation to an existing 2-story single family residential building. with an addition of 2 stories, which will include 3 new bedrooms and 3 new bathrooms. [to 2 dwelling units]. ** maher: n/a **Details
vertical addition. renovation to an existing 2-story single family residential building. with an addition of 2 stories, which will include 3 new bedrooms and 3 new bathrooms. [to 2 dwelling units]. ** maher: n/a ** | $720,000 |
| Jul 24, 2019 | Expired or cancelled withdrawn Sep 2024 | 1 Jones St | Landmark Construction Inc. | administrative permit to validate conditional use authorization 2018-012623cua, approved november 15, 2018 [motion no. 20339] permitting office use on gorund fl & basement of 1 jones street. no construction work to be performed - administrative only.Details
administrative permit to validate conditional use authorization 2018-012623cua, approved november 15, 2018 [motion no. 20339] permitting office use on gorund fl & basement of 1 jones street. no construction work to be performed - administrative only. | |
| Jun 4, 2019 | Expired or cancelled withdrawn Aug 2019 | 17 Osgood Pl | to erct a 3-story, type 5b, single family bldg w/ one basement at rear of the lot(aka 8 bartol st). main bldg remain.Details
to erct a 3-story, type 5b, single family bldg w/ one basement at rear of the lot(aka 8 bartol st). main bldg remain. | $350,000 | |
| May 7, 2019 | Expired or cancelled cancelled Sep 2023 | 3936 20th St | alter site. revision to pa# 2015/05/06/5527-s, issued on 12/27/2016. reduction of scope to eliminate construction of 3rd floor. project is: raise house 5'-0", new 1st floor, new stair from 1st to 3rd with new dormer on west side of roof.Details
alter site. revision to pa# 2015/05/06/5527-s, issued on 12/27/2016. reduction of scope to eliminate construction of 3rd floor. project is: raise house 5'-0", new 1st floor, new stair from 1st to 3rd with new dormer on west side of roof. | ||
| Apr 10, 2019 | Never finaled filed Apr 2019, never issued | 3330 Geary Bl | demolish 3-story officeDetails
demolish 3-story office | $100,000 | |
| Apr 10, 2019 | Never finaled issued Mar 2022, no final | 166 Parker Av | erect (n) 4-story 2-unit residentialDetails
erect (n) 4-story 2-unit residential | $1,350,000 | |
| Apr 9, 2019 | Completed final sign-off Jul 2024 | 1212 Union St | Cranadore Construction Inc | voluntary foundation seismic upgrade, infill, new bathroom. relocating and adding closet.Details
voluntary foundation seismic upgrade, infill, new bathroom. relocating and adding closet. | $50,000 |
| Mar 28, 2019 | Expired or cancelled withdrawn Apr 2025 | 3330 Geary Bl | to erect a type 2-a over 3-a, 6-story mixed use bldg with 41 dwelling units and commercial over 1 basement.Details
to erect a type 2-a over 3-a, 6-story mixed use bldg with 41 dwelling units and commercial over 1 basement. | $17,500,000 | |
| Mar 21, 2019 | Completed final sign-off Feb 2020 | 32 Ord St | revision to pa 2014-1017-9274 - minor interior changes & creating new pg&e gas meter cabinet outside per pg&e requirementsDetails
revision to pa 2014-1017-9274 - minor interior changes & creating new pg&e gas meter cabinet outside per pg&e requirements | $500 | |
| Oct 26, 2018 | Completed final sign-off Feb 2019 | 369 18th Av | rev to pa# 200806275522s3; update bathroom plans to show compliance with ada requirementsDetails
rev to pa# 200806275522s3; update bathroom plans to show compliance with ada requirements | ||
| Oct 11, 2018 | Completed final sign-off Feb 2019 | 369 18th Av | revision to approved bpa #200806275522/s3. architectural addendum to clarify location of (n) errc equipment room on p1, revised location of facu, and 2-hr rated chase for errc wiring/conduit.Details
revision to approved bpa #200806275522/s3. architectural addendum to clarify location of (n) errc equipment room on p1, revised location of facu, and 2-hr rated chase for errc wiring/conduit. | $1,000 | |
| Mar 13, 2018 | Expired or cancelled cancelled Jul 2021 | 1126 Irving St | revision to issued site permit #2016-0307-1309 issued: 07/20/17. removing commercial. retain (e) garage at basement.Details
revision to issued site permit #2016-0307-1309 issued: 07/20/17. removing commercial. retain (e) garage at basement. | ||
| Dec 21, 2017 | Never finaled issued Dec 2021, no final | 50 Fair Oaks St | Prospect Construction Inc | to demolish 1 story garage building.Details
to demolish 1 story garage building. | $5,000 |
| Dec 21, 2017 | Never finaled issued Dec 2021, no final | 50 Fair Oaks St | Prospect Construction Inc | to erect 1 story, no basement, type v-b, garage building.Details
to erect 1 story, no basement, type v-b, garage building. | $75,000 |
| Dec 21, 2017 | Completed final sign-off Aug 2024 | 50 Fair Oaks St | Finbarr Collins Construction Inc. | horizontal & vertical addition & renovation of (e) 2 units residence. new foundation work. horizontal addition of rear of 1st floor & vertical addition of new 3rd floor (net add of 644 sf). add 2.5 bathrooms to upper unit.Details
horizontal & vertical addition & renovation of (e) 2 units residence. new foundation work. horizontal addition of rear of 1st floor & vertical addition of new 3rd floor (net add of 644 sf). add 2.5 bathrooms to upper unit. | $510,000 |
| Dec 6, 2017 | Expired or cancelled withdrawn May 2024 | 50 Fair Oaks St | addition and renovation of existing 2-unit residence. new foundation work, horizontal addition at rear of 1st fl and vertical addition of new 3rd fl (net add of 644 sf).Details
addition and renovation of existing 2-unit residence. new foundation work, horizontal addition at rear of 1st fl and vertical addition of new 3rd fl (net add of 644 sf). | $600,000 | |
| Nov 8, 2017 | Never finaled issued Nov 2017, no final | 5400 Geary Bl | repair neon letter patch sheet metal & repaint @ existing projecting sign.Details
repair neon letter patch sheet metal & repaint @ existing projecting sign. | $10,000 | |
| Nov 8, 2017 | Never finaled issued Nov 2017, no final | 5400 Geary Bl | repair neon letter, patch sheet metal & repaint @ existing marquee.Details
repair neon letter, patch sheet metal & repaint @ existing marquee. | $25,000 | |
| Nov 8, 2017 | Never finaled issued Nov 2017, no final | 5400 Geary Bl | repair neon letter, patch sheet metal & repaint @ existing wall signDetails
repair neon letter, patch sheet metal & repaint @ existing wall sign | $15,000 | |
| Oct 20, 2017 | Expired or cancelled withdrawn Sep 2019 | 2976 Mission St | vertical addition. one (e) residential unit is renovated & 7 new residential units are added. creating a 6 story building on ground. type of construciton from v-b to ii-a / iii-a.Details
vertical addition. one (e) residential unit is renovated & 7 new residential units are added. creating a 6 story building on ground. type of construciton from v-b to ii-a / iii-a. | $1,750,000 | |
| Sep 28, 2017 | Never finaled issued Nov 2017, no final | 5400 Geary Bl | repair marquee and sign elements: replace soffit and lighting, reair & repaint marquee, replace neon, repair blade sign, replace neon, repair "parking" sign, replace neon. signage under separate permit.Details
repair marquee and sign elements: replace soffit and lighting, reair & repaint marquee, replace neon, repair blade sign, replace neon, repair "parking" sign, replace neon. signage under separate permit. | $47,402 | |
| Jul 24, 2017 | Never finaled filed Jul 2017, never issued | 820 Post St | demolish 2-story dry cleanerDetails
demolish 2-story dry cleaner | $12,000 | |
| Jul 24, 2017 | Never finaled filed Jul 2017, never issued | 820 Post St | to erect 7 stories, no basement, type iii-a, 11 units residential with commercial on 1st floor. (r-2, b); applicant submitted revised drawings to show 11 units and 7-story building, no basement, dmj 12/15/2020; originally, bldg was proposed to be 8-story and 12-units. mgwDetails
to erect 7 stories, no basement, type iii-a, 11 units residential with commercial on 1st floor. (r-2, b); applicant submitted revised drawings to show 11 units and 7-story building, no basement, dmj 12/15/2020; originally, bldg was proposed to be 8-story and 12-units. mgw | $3,500,000 | |
| Jun 29, 2017 | Completed final sign-off Feb 2022 | 858 Stanyan St | Amber - Tru Construction Inc. | vertical addition & renovation of (e) commercial / retail building. add 4 floors with 3 residential units. renovation of retail space. add garage on frederick. total of 7500 sq.ft.Details
vertical addition & renovation of (e) commercial / retail building. add 4 floors with 3 residential units. renovation of retail space. add garage on frederick. total of 7500 sq.ft. | $1,500,000 |
| Jun 27, 2017 | Never finaled filed Jun 2017, never issued | 5400 Geary Bl | change of use from movie theater to swim center. (e) theater will be remodeled to include: (n) basement lockers, showers & bldg equipment rooms; (n) swimming pools, remodeled lobby, remodeled retail; (n) class rooms, (n) office floor, (n) stairs, elevators, toiletsthis is designed as at iia buildingDetails
change of use from movie theater to swim center. (e) theater will be remodeled to include: (n) basement lockers, showers & bldg equipment rooms; (n) swimming pools, remodeled lobby, remodeled retail; (n) class rooms, (n) office floor, (n) stairs, elevators, toiletsthis is designed as at iia building | $3,500,000 | |
| May 23, 2017 | Expired or cancelled cancelled Nov 2024 | 905 Folsom St | demolish 1-story gas station & retail buildingDetails
demolish 1-story gas station & retail building | $15,000 | |
| Apr 14, 2017 | Completed final sign-off Sep 2021 | 3747 Jackson St | Stronghold Builders Inc, R Lowy Fire Protection Inc | renovation of (e) 3 story residential building with basement, and addition on 4th floor.Details
renovation of (e) 3 story residential building with basement, and addition on 4th floor. | $1,800,000 |
| Mar 30, 2017 | Completed final sign-off May 2022 | 42 Otis St | Achill Beg Construction Inc | demo 2 stories bldg for hvac fabrication building.Details
demo 2 stories bldg for hvac fabrication building. | $20,000 |
| Mar 30, 2017 | Completed final sign-off May 2022 | 42 Otis St | Achill Beg Construction Inc | to erect 5 stories, no basement, 24 units residential with commercial on 1st floor. mix use with type 5 constructiom.Details
to erect 5 stories, no basement, 24 units residential with commercial on 1st floor. mix use with type 5 constructiom. | $3,600,000 |
| Feb 14, 2017 | Expired or cancelled cancelled Nov 2024 | 40 Cleveland St | demolish 1-story industrial building. maher n/a.Details
demolish 1-story industrial building. maher n/a. | $35,000 | |
| Feb 14, 2017 | Expired or cancelled cancelled Nov 2024 | 40 Cleveland St | Sean Cafferkey Construction | construct (n) 4-story, no basement, 5 family dwelling units.Details
construct (n) 4-story, no basement, 5 family dwelling units. | $900,000 |
| Feb 14, 2017 | Never finaled issued Dec 2019, no final | 1089 Folsom St | to erect 6 stories, no basement, type i-a & iii-b, 48 residential units with retail, mix use building.Details
to erect 6 stories, no basement, type i-a & iii-b, 48 residential units with retail, mix use building. | $4,900,000 | |
| Feb 14, 2017 | Never finaled issued Jun 2020, no final | 1089 Folsom St | Granite Excavation & Demolition Inc | to demolish 1 story of a industrial building. n/a for maher ordinance no. 155-13Details
to demolish 1 story of a industrial building. n/a for maher ordinance no. 155-13 | $20,000 |
| Feb 14, 2017 | Never finaled issued Jun 2020, no final | 1075 Folsom St | Granite Excavation & Demolition Inc | to demolish 1 story of a industrial building. n/a for maher ordinance no. 155-13Details
to demolish 1 story of a industrial building. n/a for maher ordinance no. 155-13 | $35,000 |
| Feb 7, 2017 | Expired or cancelled cancelled Nov 2022 | 1 Jones St | Landmark Construction Inc. | add sidewalk hc lift to exterior rotunda.Details
add sidewalk hc lift to exterior rotunda. | $40,000 |
| Jan 26, 2017 | Never finaled issued Sep 2020, no final | 17 Osgood Pl | addition & renovation of (e) mixed-use commercial/residential building: renovation & addition of (2) (e) residential units. total addition of 522 sfDetails
addition & renovation of (e) mixed-use commercial/residential building: renovation & addition of (2) (e) residential units. total addition of 522 sf | $775,000 | |
| Jan 26, 2017 | Completed final sign-off Dec 2020 | 478 Collingwood St | front lot. construct 4-story, no basement, type va, single family residential. ** maher: n/a **Details
front lot. construct 4-story, no basement, type va, single family residential. ** maher: n/a ** | $900,000 | |
| Jan 26, 2017 | Completed final sign-off Sep 2020 | 815 Lyon St | Alex Construction & Electric Inc | vertical & horizontal addition. addition & renovte (e) residential unit. addition new residential unit. total addition of 2,532 sf.Details
vertical & horizontal addition. addition & renovte (e) residential unit. addition new residential unit. total addition of 2,532 sf. | $900,000 |
| Nov 22, 2016 | Never finaled issued Jun 2019, no final | 135 Hyde St | Landmark Construction Inc. | to demolish 1 story, auto repair shop. ** maher: distrubance of at least 50 cu.yd. of soil; route to dph **Details
to demolish 1 story, auto repair shop. ** maher: distrubance of at least 50 cu.yd. of soil; route to dph ** | $50,000 |
| Nov 7, 2016 | Never finaled issued Jun 2019, no final | 135 Hyde St | Landmark Construction Inc. | to erect 8 stories, 1 basement, type i-b, 69 dwelling units residential with retail & parking building. (r-2,b,s-2)Details
to erect 8 stories, 1 basement, type i-b, 69 dwelling units residential with retail & parking building. (r-2,b,s-2) | $10,000,000 |
| Oct 25, 2016 | Completed final sign-off Apr 2021 | 2146 Union St | Dliu Construction | addition and renovation of mixed use retail/residential bldg. renovation of (e) ground flr retail & 2 (e) residential units. addition of (4) residential units at rear of building. total addition of 4,191 sf. ** maher: n/a **Details
addition and renovation of mixed use retail/residential bldg. renovation of (e) ground flr retail & 2 (e) residential units. addition of (4) residential units at rear of building. total addition of 4,191 sf. ** maher: n/a ** | $1,500,000 |
| Sep 12, 2016 | Completed final sign-off Jul 2019 | 1753 Noe St | Alex Construction & Electric Inc | horizontal rear addition. widen building by 3'-3" and garage space. 1st floor: add 1 den, 1 playroom, 1 bath, 1 bedroom, 1 office & laundry. 2nd floor: remodel kitchen, add 1/2 bath & rear deck. 3rd floor: add 2 bedrooms, 2 baths & roof deck.Details
horizontal rear addition. widen building by 3'-3" and garage space. 1st floor: add 1 den, 1 playroom, 1 bath, 1 bedroom, 1 office & laundry. 2nd floor: remodel kitchen, add 1/2 bath & rear deck. 3rd floor: add 2 bedrooms, 2 baths & roof deck. | $200,000 |
| Jul 5, 2016 | Completed final sign-off Jul 2017 | 2850 Divisadero St | Paniagua Construction Inc | structural revision to app#201503181194. add two windows at 4th fl facing the streetDetails
structural revision to app#201503181194. add two windows at 4th fl facing the street | |
| Jun 2, 2016 | Expired or cancelled expired Mar 2026 | 39 Jones St | Nueva Catilla Iron Works Inc | modifications to fire escape. removing bottom landing & accordian ladder, re-installing bottom landing five feet higher & provide new ladder down to the new steel grate walkway in north alley of 1 jones st (under sep. permit)Details
modifications to fire escape. removing bottom landing & accordian ladder, re-installing bottom landing five feet higher & provide new ladder down to the new steel grate walkway in north alley of 1 jones st (under sep. permit) | $6,000 |
| Mar 23, 2016 | Completed final sign-off Aug 2016 | 1805 Fillmore St | minor interior to ground floor commercial space. change of work desk layout. relocate door from tenant space to common restroom area to provide accessibility clearance. n/a for maher.Details
minor interior to ground floor commercial space. change of work desk layout. relocate door from tenant space to common restroom area to provide accessibility clearance. n/a for maher. | $25,000 | |
| Mar 7, 2016 | Expired or cancelled cancelled Jul 2021 | 1126 Irving St | vertical & horizontal addition. renovation & addition to (e) 3 story bldg. raise (e) 1st & 2nd floors +1-16'-6" as 3rd & 4th floor. add 1st floor commercial space & 2nd floor residential. add to rear of building. fire sprinkler under separated permit.Details
vertical & horizontal addition. renovation & addition to (e) 3 story bldg. raise (e) 1st & 2nd floors +1-16'-6" as 3rd & 4th floor. add 1st floor commercial space & 2nd floor residential. add to rear of building. fire sprinkler under separated permit. | $850,000 | |
| Dec 17, 2015 | Completed final sign-off Jun 2020 | 1010 Stanyan St | erect 4 stories of 4 dwelling unit multi family res'd. type 5 construction.Details
erect 4 stories of 4 dwelling unit multi family res'd. type 5 construction. | $1,250,000 | |
| Dec 4, 2015 | Completed final sign-off Jan 2017 | 1 Jones St | Landmark Construction Inc. | fire evacuation maps for building (renovated under a separate permit #201210101737.)Details
fire evacuation maps for building (renovated under a separate permit #201210101737.) | $5,000 |
| Oct 22, 2015 | Never finaled issued Jan 2017, no final | 2725 Filbert St | O'shaughnessy Construction | renovate 3rd floor & add 289 sf, add full bath at 3rd floor, add new staircase form 2nd to 3rd floor, add half bath at garage level, add residential elevator.Details
renovate 3rd floor & add 289 sf, add full bath at 3rd floor, add new staircase form 2nd to 3rd floor, add half bath at garage level, add residential elevator. | $350,000 |
| Oct 8, 2015 | Completed final sign-off Dec 2016 | 480 Collingwood St | The Banner Development Company | remodel and voluntray structural upgrade. new windows and doors on the exterior. repair portion of roof. compliance with maher ordinance no 155-13 not required.Details
remodel and voluntray structural upgrade. new windows and doors on the exterior. repair portion of roof. compliance with maher ordinance no 155-13 not required. | $175,000 |
| Aug 27, 2015 | Never finaled issued Feb 2017, no final | 274 Duncan St | Jhy Construction Inc | vertical addition. remodel (e) 2 flr o/crawl space, add 3rd, 4th flrs, 2 new kitchens, 4 new full baths, 2 (n) 1/2 baths.Details
vertical addition. remodel (e) 2 flr o/crawl space, add 3rd, 4th flrs, 2 new kitchens, 4 new full baths, 2 (n) 1/2 baths. | $550,000 |
| Aug 7, 2015 | Completed final sign-off Oct 2019 | 10 Romain St | Royal Lyon Construction | 3rd floor addition & renovation of (e) 2nd floor, (n) kitchen, (1)(n) bathroom.Details
3rd floor addition & renovation of (e) 2nd floor, (n) kitchen, (1)(n) bathroom. | $250,000 |
| Jun 3, 2015 | Never finaled issued Jun 2015, no final | 4200 17th St | Curran & Associates General Contractors | voluntary seismic improvements, expansion of mezzanine by 142 sf. 20% ada improvements - entry, unisex bathroom & stair. new exterior doors on douglass side.Details
voluntary seismic improvements, expansion of mezzanine by 142 sf. 20% ada improvements - entry, unisex bathroom & stair. new exterior doors on douglass side. | $130,000 |
| May 6, 2015 | Expired or cancelled cancelled Sep 2023 | 3936 20th St | vertical addition. raise house 5'-0", add 1-car garage, add living space at 1st fl. add bedroom & bath on 3rd flDetails
vertical addition. raise house 5'-0", add 1-car garage, add living space at 1st fl. add bedroom & bath on 3rd fl | $375,000 | |
| Mar 18, 2015 | Completed final sign-off Jun 2017 | 2850 Divisadero St | Paniagua Construction Inc | addition of basement & 3 floor rear yard living space. renovate kitchen & bathrooms. facade remodel with new windows. total 5 bedrooms (reduce 2). add 1 full, 3 1/2 baths.Details
addition of basement & 3 floor rear yard living space. renovate kitchen & bathrooms. facade remodel with new windows. total 5 bedrooms (reduce 2). add 1 full, 3 1/2 baths. | $950,000 |
| Feb 4, 2015 | Expired or cancelled cancelled Dec 2021 | 2018 19th St | construct (n) 4-story single family residential.Details
construct (n) 4-story single family residential. | $625,000 | |
| Nov 19, 2014 | Completed final sign-off May 2019 | 547 Missouri St | Ampex Engineering & Co, R & D Construction Co Inc | horizontal & vertical side yard & rear yard addition. remodel (e) single family home to be 4 bedrooms & 3.5 baths.Details
horizontal & vertical side yard & rear yard addition. remodel (e) single family home to be 4 bedrooms & 3.5 baths. | $300,000 |
| Oct 28, 2014 | Completed final sign-off Dec 2016 | 51 Bernard St | remodel existing 1st story/basement residence, horizontal/vertical addition to 5 story residential, living, bedrooms, kitchen and bathrooms.Details
remodel existing 1st story/basement residence, horizontal/vertical addition to 5 story residential, living, bedrooms, kitchen and bathrooms. | $600,000 | |
| Oct 17, 2014 | Completed final sign-off Jan 2020 | 32 Ord St | renovate (e) 1st & 2nd fl. add (n) 3rd fl w/ kitchen & powder rm. expand basement & 1st fl.Details
renovate (e) 1st & 2nd fl. add (n) 3rd fl w/ kitchen & powder rm. expand basement & 1st fl. | $625,000 | |
| Sep 26, 2014 | Completed final sign-off Feb 2016 | 776 Wisconsin St | Ace Drilling & Excavation, Brennan Strong Hold Construction Inc | excavate basement reconfigure front entry & add one additoinal vehicle parking space, add family room, wine cellar and bathroom. add roof deck reconfigure rear deck & interior stairway.Details
excavate basement reconfigure front entry & add one additoinal vehicle parking space, add family room, wine cellar and bathroom. add roof deck reconfigure rear deck & interior stairway. | $350,000 |
| Sep 12, 2014 | Completed final sign-off Apr 2015 | 2850 Divisadero St | dwelling unit merger. combine 2 units into 1 unit. remove existing kitchen. remove doors and partition walls.Details
dwelling unit merger. combine 2 units into 1 unit. remove existing kitchen. remove doors and partition walls. | $1,500 | |
| Aug 21, 2014 | Expired or cancelled withdrawn Nov 2015 | 1126 Irving St | to demolish 2 stories, 2 units residential building.Details
to demolish 2 stories, 2 units residential building. | $18,000 | |
| Aug 21, 2014 | Expired or cancelled withdrawn Nov 2015 | 1126 Irving St | to erect 4 stories, 3 units residential with retail building.Details
to erect 4 stories, 3 units residential with retail building. | $900,000 | |
| Aug 18, 2014 | Completed final sign-off Dec 2014 | 1159 Green St | J Z Construction | unit #4: remodel kitchen including new cabinets, remodel bath including new fixtures and w/d. upgrade electrical, eplace bath window in kind only apt 4Details
unit #4: remodel kitchen including new cabinets, remodel bath including new fixtures and w/d. upgrade electrical, eplace bath window in kind only apt 4 | $26,000 |
| Jun 24, 2014 | Completed final sign-off Dec 2019 | 6635 03rd St | Trim Fit Constr. - O'reilly Engineering, Ace Drilling & Excavation | to erect 3 stories, no basement, 3 units residential building. ** maher: disturbance of at least 50 cu.yd. of soil; route to dph **Details
to erect 3 stories, no basement, 3 units residential building. ** maher: disturbance of at least 50 cu.yd. of soil; route to dph ** | $500,000 |
| Apr 18, 2014 | Completed final sign-off Aug 2016 | 752 Cayuga Av | addition at the rear yard on 1st, 2nd floors. add bedroom & master suite on bottom. remodel, expand kitchen and remodel 2nd floor.Details
addition at the rear yard on 1st, 2nd floors. add bedroom & master suite on bottom. remodel, expand kitchen and remodel 2nd floor. | $150,000 | |
| Apr 17, 2014 | Completed final sign-off Mar 2019 | 2621 Harrison St | Ace Drilling & Excavation | covert 2 story, 2 bedroom, 1 bath residence to 4 story triplex with garage and living space at first floor and 3 flats at upper stories.Details
covert 2 story, 2 bedroom, 1 bath residence to 4 story triplex with garage and living space at first floor and 3 flats at upper stories. | $820,000 |
| Mar 14, 2014 | Completed final sign-off Oct 2016 | 45 Prosper St | H T H Construction | horizontal & vertical addition. 920 sf addition. family room expansion at 1st floor. remodel kitchen & bath at 2nd floor. new bedroom & 2 baths at 3rd floor.Details
horizontal & vertical addition. 920 sf addition. family room expansion at 1st floor. remodel kitchen & bath at 2nd floor. new bedroom & 2 baths at 3rd floor. | $350,000 |
| Feb 21, 2014 | Completed final sign-off Aug 2016 | 930 Esmeralda Av | Lokman Construction | rear yard addition:l 372 sf. at g/f: 1 bedroom; 220 sf at 2/f: expand living roomDetails
rear yard addition:l 372 sf. at g/f: 1 bedroom; 220 sf at 2/f: expand living room | $125,000 |
| Feb 19, 2014 | Expired or cancelled withdrawn Oct 2014 | 51 Bernard St | demolish 1 story, 1 basement, type 5, single family building.Details
demolish 1 story, 1 basement, type 5, single family building. | $10,000 | |
| Feb 19, 2014 | Expired or cancelled withdrawn Oct 2014 | 51 Bernard St | erect 4-story, 1 basement, type 5, single family building.Details
erect 4-story, 1 basement, type 5, single family building. | $650,000 | |
| Jan 21, 2014 | Expired or cancelled withdrawn Aug 2014 | 1126 Irving St | add new 4th fl, remodel existing bldg, add retail space at ground floor.Details
add new 4th fl, remodel existing bldg, add retail space at ground floor. | $900,000 | |
| Jan 14, 2014 | Completed final sign-off Apr 2018 | 4469 23rd St | remodel (e) basement and first floor add 620 sf 2nd floor master bedroom. vertical addition only.Details
remodel (e) basement and first floor add 620 sf 2nd floor master bedroom. vertical addition only. | $250,000 | |
| Oct 17, 2013 | Completed final sign-off Jul 2014 | 115 Ashbury St | revision 201308083888: interior renovation of 4th fl. new winows at 4th fl. addition of washer dryer closet at 2nd and 3rd fl. windows not visible from street. open kitchen wall to dining room on 2nd and 3rd floorDetails
revision 201308083888: interior renovation of 4th fl. new winows at 4th fl. addition of washer dryer closet at 2nd and 3rd fl. windows not visible from street. open kitchen wall to dining room on 2nd and 3rd floor | $15,000 |