J Z Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2001 to Sep 2022
- Last 24 months
- 0 permits filed
48 permits since 2000: 45 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2022 | Completed final sign-off May 2023 | 2587 21st Av | install washer/dryer, remodel kitchen, add full bath w/window and skylightsDetails
install washer/dryer, remodel kitchen, add full bath w/window and skylights | $60,000 |
| Jul 13, 2021 | Completed final sign-off Dec 2021 | 326 Victoria St | replace kitchen cabinets/countertops/all appliances w/new, new kitchen island, new lighting, electrical, ventilation work. remove woodburning fireplace from living room. replace upper level bathroom fixtures w/new, plumbing remains the same, upgrade electrical to code. provide 60 amp elec sub-panelDetails
replace kitchen cabinets/countertops/all appliances w/new, new kitchen island, new lighting, electrical, ventilation work. remove woodburning fireplace from living room. replace upper level bathroom fixtures w/new, plumbing remains the same, upgrade electrical to code. provide 60 amp elec sub-panel | $45,000 |
| Jul 9, 2020 | Completed final sign-off Nov 2020 | 109 Hancock St | revision to pa #202003056228. work to be performed repair damage stucco & dryrot on stairs side corner approx 200 sq ftDetails
revision to pa #202003056228. work to be performed repair damage stucco & dryrot on stairs side corner approx 200 sq ft | $6,000 |
| Mar 5, 2020 | Completed final sign-off Nov 2020 | 109 Hancock St | remodel one (e) kitchen & one (1) bath. (remove (2) load bearing walls) between 1. kitchen & living; 2. living & hallway. (relocate fixtures).Details
remodel one (e) kitchen & one (1) bath. (remove (2) load bearing walls) between 1. kitchen & living; 2. living & hallway. (relocate fixtures). | $19,500 |
| Jun 10, 2019 | Completed final sign-off Mar 2020 | 111 Hancock St | new opening wall in kitchen. new opening wall in living room. (e) bathroom to be remodeled. kitchen remodel.Details
new opening wall in kitchen. new opening wall in living room. (e) bathroom to be remodeled. kitchen remodel. | $14,950 |
| Oct 17, 2018 | Completed final sign-off Aug 2019 | 1210 22nd Av | revision to app#201801310037. 2nd flr:revise interior layout (no room added). add nw wood deck at rear nw patio dr. ground flr:revise interior layout (no rm added). exterior: revise 4 nw skylights to 3 nw at roof. replace front window with wood claded in kind. replace rear window with vinyl windowDetails
revision to app#201801310037. 2nd flr:revise interior layout (no room added). add nw wood deck at rear nw patio dr. ground flr:revise interior layout (no rm added). exterior: revise 4 nw skylights to 3 nw at roof. replace front window with wood claded in kind. replace rear window with vinyl window | $40,000 |
| Jul 26, 2018 | Completed final sign-off Oct 2019 | 1523 25th Av | construct 2 bedrooms, 2 full bathrooms & family room @ ground floor; replace wather heaterDetails
construct 2 bedrooms, 2 full bathrooms & family room @ ground floor; replace wather heater | $62,000 |
| Jul 6, 2018 | Completed final sign-off Oct 2018 | 83 Cityview Wy | revision to pa# 201806262934. work to be performed: repair dryrot on one wall approx 8ftx6ft. 48 sq ft total.Details
revision to pa# 201806262934. work to be performed: repair dryrot on one wall approx 8ftx6ft. 48 sq ft total. | $1,000 |
| Jun 26, 2018 | Completed final sign-off Oct 2018 | 83 Cityview Wy | remodel (2) existing bathrooms on main floor. no structure change. replace prexisting single pane windows to double pane windows. windows can not be seen from street. bathroom 50 s.f each.Details
remodel (2) existing bathrooms on main floor. no structure change. replace prexisting single pane windows to double pane windows. windows can not be seen from street. bathroom 50 s.f each. | $12,000 |
| Jun 12, 2018 | Completed final sign-off May 2021 | 1247 12th Av | remodel to legalize a master bedroom with full bath, one bedroom and one full bathroom on the ground fl. relocate existing water heater and furnace.Details
remodel to legalize a master bedroom with full bath, one bedroom and one full bathroom on the ground fl. relocate existing water heater and furnace. | $45,000 |
| Mar 16, 2018 | Completed final sign-off Oct 2018 | 1254 12th Av | foundation repair. underpinning of adjacent property provided under permit #2016-11-18-3069Details
foundation repair. underpinning of adjacent property provided under permit #2016-11-18-3069 | $10,000 |
| Jan 31, 2018 | Completed final sign-off Aug 2019 | 1210 22nd Av | 2/f: add 2(m) bathrooms, remodel (e) bathroom & kitchen, dining & living room. g/f:add 1(n) bathroom, 1(n) office, sheetrock garage. exterior: replace rear patio doors @ window opening, add 4(n) skylights.Details
2/f: add 2(m) bathrooms, remodel (e) bathroom & kitchen, dining & living room. g/f:add 1(n) bathroom, 1(n) office, sheetrock garage. exterior: replace rear patio doors @ window opening, add 4(n) skylights. | $75,000 |
| Sep 27, 2017 | Completed final sign-off Sep 2017 | 1254 12th Av | revision to app no. 201509015755 to change description of scope of work to include horizontal addition by remove sun room, laundry room and add basement, laundry, den, deck, electrical - lights, receptacles; plumbing - washing machine, bath, sinkDetails
revision to app no. 201509015755 to change description of scope of work to include horizontal addition by remove sun room, laundry room and add basement, laundry, den, deck, electrical - lights, receptacles; plumbing - washing machine, bath, sink | |
| Sep 11, 2017 | Completed final sign-off Jan 2019 | 1848 29th Av | construct 1 bedroom, 1 full bath, laundry area and relocate 1 e bath at gr fl. convert 1 e bath to 2 full bathrm and remodel e kitchen, replace counter, cabinets, fixtures at 2nd flDetails
construct 1 bedroom, 1 full bath, laundry area and relocate 1 e bath at gr fl. convert 1 e bath to 2 full bathrm and remodel e kitchen, replace counter, cabinets, fixtures at 2nd fl | $68,000 |
| Apr 21, 2017 | Completed final sign-off Sep 2017 | 1254 12th Av | revision to pa 2015-0901-5755 - add heater, hose bib, lights, skylights. create home office at ground floor. no exterior work.Details
revision to pa 2015-0901-5755 - add heater, hose bib, lights, skylights. create home office at ground floor. no exterior work. | $2,000 |
| Oct 6, 2015 | Completed final sign-off Apr 2016 | 2386 47th Av | bathroom remodel because of water damage.Details
bathroom remodel because of water damage. | $6,000 |
| Sep 1, 2015 | Completed final sign-off Sep 2017 | 1254 12th Av | remove sun room, laudry room. add basement, bathroom, laundry,den, deck electrical: lights, receptacles, plumbing: washing machine, bath fixtures, sink.Details
remove sun room, laudry room. add basement, bathroom, laundry,den, deck electrical: lights, receptacles, plumbing: washing machine, bath fixtures, sink. | $89,100 |
| Mar 26, 2015 | Completed final sign-off Dec 2018 | 40 Delano Av | demo old addition & porch, add rear addition w/ roof deck, add (n) bath, relocate kitchen & baths, remodel.Details
demo old addition & porch, add rear addition w/ roof deck, add (n) bath, relocate kitchen & baths, remodel. | $180,000 |
| Feb 27, 2015 | Never finaled issued Mar 2015, no final | 1145 Green St | remodel kitchen, no walls being altered.Details
remodel kitchen, no walls being altered. | $12,500 |
| Aug 18, 2014 | Completed final sign-off Dec 2014 | 1159 Green St | unit #4: remodel kitchen including new cabinets, remodel bath including new fixtures and w/d. upgrade electrical, eplace bath window in kind only apt 4Details
unit #4: remodel kitchen including new cabinets, remodel bath including new fixtures and w/d. upgrade electrical, eplace bath window in kind only apt 4 | $26,000 |
| Feb 24, 2014 | Completed final sign-off Feb 2015 | 1250 12th Av | inject soils with epoxy grout along south proerty line to be associated with pa# 201208177701Details
inject soils with epoxy grout along south proerty line to be associated with pa# 201208177701 | $7,500 |
| Feb 24, 2014 | Completed final sign-off Feb 2015 | 1242 12th Av | inject soils with epoxy grout along north proerty line to be associated with pa# 201208177701Details
inject soils with epoxy grout along north proerty line to be associated with pa# 201208177701 | $7,500 |
| Jan 13, 2014 | Completed final sign-off Jan 2014 | 715 Lincoln Wy | replace 4 aluminum singel pane windows to double pane vinyl windows at unit b. not visible from street. window replacement is at the rear of bldg only. comply with rescue window requirements for sleeping roomsDetails
replace 4 aluminum singel pane windows to double pane vinyl windows at unit b. not visible from street. window replacement is at the rear of bldg only. comply with rescue window requirements for sleeping rooms | $2,500 |
| Aug 29, 2013 | Completed final sign-off Jan 2014 | 52 Beaver St | renovate kitchen & (e) bathroom, add (n) bathroom, upgrade electrical & plumbing in area of work.Details
renovate kitchen & (e) bathroom, add (n) bathroom, upgrade electrical & plumbing in area of work. | $40,000 |
| May 29, 2013 | Never finaled issued May 2013, no final | 109 Hancock St | replace broken/old windows (visible from street) 4 windowsDetails
replace broken/old windows (visible from street) 4 windows | $6,000 |
| Feb 27, 2013 | Completed final sign-off Jul 2013 | 1159 Green St | #6- remodel of kitchen including new cabinets, remodel of bath including new fixtures, w/d, upgrade electrical for new appliances. bathroom window in kind only.Details
#6- remodel of kitchen including new cabinets, remodel of bath including new fixtures, w/d, upgrade electrical for new appliances. bathroom window in kind only. | $25,000 |
| Jan 22, 2013 | Completed final sign-off Mar 2013 | 1638 44th Av | remodel (e) kitchen & bathroom. no changing walls & doorsDetails
remodel (e) kitchen & bathroom. no changing walls & doors | $18,300 |
| Oct 3, 2012 | Never finaled issued Oct 2012, no final | 1155 Howard St | remodel kitchen bathroom #9 & #11 replace cabinets, bathtub, vanity, floor tile in kind (same location) no structual changeDetails
remodel kitchen bathroom #9 & #11 replace cabinets, bathtub, vanity, floor tile in kind (same location) no structual change | $11,000 |
| Aug 17, 2012 | Completed final sign-off Jan 2016 | 1246 12th Av | add 3 story addition to rear of house, 1335 s.f total. move kitchen to rear, add bath, remodel existing space. covert 290 s.f of basement area to habitable.Details
add 3 story addition to rear of house, 1335 s.f total. move kitchen to rear, add bath, remodel existing space. covert 290 s.f of basement area to habitable. | $285,000 |
| Jun 6, 2011 | Completed final sign-off Mar 2012 | 1235 24th Av | extend 4' at rear yard. enlarge bedroom & laundry rm. add new deck at rear yard. under appln #201105055476.Details
extend 4' at rear yard. enlarge bedroom & laundry rm. add new deck at rear yard. under appln #201105055476. | $20,000 |
| May 5, 2011 | Completed final sign-off Mar 2012 | 1235 24th Av | add guest room, office room, exercise room & two full bath on ground floor. rearrange 2nd floor & add one bath. add bath at attic. replace (e) unsound wall & ceiling gyp bd (less than 2/3 of hole bldg). new stair from 2nd floor to ground floor.Details
add guest room, office room, exercise room & two full bath on ground floor. rearrange 2nd floor & add one bath. add bath at attic. replace (e) unsound wall & ceiling gyp bd (less than 2/3 of hole bldg). new stair from 2nd floor to ground floor. | $53,000 |
| Feb 17, 2011 | Completed final sign-off Apr 2011 | 2386 47th Av | replace existing aluminum signle pane windows to double-pnae windows, total 9. repair water damage & stucco for the front south corner of the house, replace in kind, u-factor =0.40, no structural work.Details
replace existing aluminum signle pane windows to double-pnae windows, total 9. repair water damage & stucco for the front south corner of the house, replace in kind, u-factor =0.40, no structural work. | $2,000 |
| Feb 1, 2011 | Completed final sign-off Apr 2011 | 2386 47th Av | remodel kitchen & 1 bathroom at existing upper floor, downstair tile flooring. lighting to comply with cec 150(k). no change to walls, doors & windows.Details
remodel kitchen & 1 bathroom at existing upper floor, downstair tile flooring. lighting to comply with cec 150(k). no change to walls, doors & windows. | $20,000 |
| Oct 13, 2010 | Completed final sign-off Oct 2010 | 1665 Plymouth Av | repair damage on existing roof. repair damage on floor. tear down non-structure room on ground level. upgrade electrical service. replace existing furnace system. no structural work. in garage.Details
repair damage on existing roof. repair damage on floor. tear down non-structure room on ground level. upgrade electrical service. replace existing furnace system. no structural work. in garage. | $6,500 |
| Jun 11, 2010 | Completed final sign-off Aug 2010 | 115 Lomita Av | remodel (e) kitchen with new cabinets, countertop, sink, ranges, microwave, dishwashers, floor cover.Details
remodel (e) kitchen with new cabinets, countertop, sink, ranges, microwave, dishwashers, floor cover. | $12,000 |
| May 28, 2010 | Completed final sign-off Sep 2010 | 2470 24th Av | no structural work-replace (e) single pane four rear windows, update electrical outlets, add insulation, replace cabinetry.Details
no structural work-replace (e) single pane four rear windows, update electrical outlets, add insulation, replace cabinetry. | $25,000 |
| Mar 12, 2010 | Completed final sign-off May 2010 | 88 Mangels Av | remodeling existing one bathroom on 2nd flr, remove tub and replace with shower, replace toilet , sink, vanity , floor tiles and wall tiles, no structural changes on wall relocation & exhaustDetails
remodeling existing one bathroom on 2nd flr, remove tub and replace with shower, replace toilet , sink, vanity , floor tiles and wall tiles, no structural changes on wall relocation & exhaust | $8,000 |
| Feb 27, 2008 | Completed final sign-off Apr 2008 | 106 Amber Dr | remodel bathroom of extg master bathroom. no structural work. no exterior work.Details
remodel bathroom of extg master bathroom. no structural work. no exterior work. | $9,500 |
| Sep 5, 2007 | Completed final sign-off Jan 2008 | 2463 24th Av | kitchen renovationDetails
kitchen renovation | $25,000 |
| Aug 17, 2007 | Completed final sign-off Nov 2007 | 1226 Bowdoin St | remodeling kitchen-relocate stove. remodeling bathroom. replace window w/ larger @ rear window. living room create small opening at wall. mechanical & electrical under seperate permits.Details
remodeling kitchen-relocate stove. remodeling bathroom. replace window w/ larger @ rear window. living room create small opening at wall. mechanical & electrical under seperate permits. | $10,000 |
| Dec 20, 2006 | Completed final sign-off May 2007 | 2470 24th Av | remodel e kitchen with new cabinets, countertop, sink, etc. replace window same size and location. remodel 2 existing baths with new fixtures. replace windows in upstairs bath.no struc work. upgrade existing elec in liv rm,dining rm,hallway,masterbedroomDetails
remodel e kitchen with new cabinets, countertop, sink, etc. replace window same size and location. remodel 2 existing baths with new fixtures. replace windows in upstairs bath.no struc work. upgrade existing elec in liv rm,dining rm,hallway,masterbedroom | $45,000 |
| Oct 12, 2004 | Completed final sign-off Nov 2004 | 1778 26th Av | repair damaged wood & stucco in the front exterior of the house (bottom of the window. left side staDetails
repair damaged wood & stucco in the front exterior of the house (bottom of the window. left side sta | $4,500 |
| Aug 18, 2003 | Completed final sign-off Dec 2003 | 882 25th Av | remodel kitchen, remodel/rearrange bathrooms, replace front windows and doorsDetails
remodel kitchen, remodel/rearrange bathrooms, replace front windows and doors | $30,000 |
| Apr 10, 2003 | Completed final sign-off Jun 2003 | 1665 Plymouth Av | remodel kitchen & bath tub, basin, bathroom, toilet, cabinets, tile, flooringDetails
remodel kitchen & bath tub, basin, bathroom, toilet, cabinets, tile, flooring | $16,000 |
| Feb 11, 2003 | Completed final sign-off May 2003 | 2438 36th Av | remodel kitchen cabinets, counter, tile floor & dry wall in kitchenDetails
remodel kitchen cabinets, counter, tile floor & dry wall in kitchen | $12,000 |
| Dec 23, 2002 | Completed final sign-off Jan 2003 | 389 Crestlake Dr | remodel kitchen cabinet, counter, hardwood floor, add 8 recess lightDetails
remodel kitchen cabinet, counter, hardwood floor, add 8 recess light | $15,000 |
| Jan 28, 2002 | Completed final sign-off Apr 2002 | 142 Geneva Av | remodel tiles plumbing & electrical in existing bathroom on 2nd floor.Details
remodel tiles plumbing & electrical in existing bathroom on 2nd floor. | $3,200 |
| Nov 19, 2001 | Completed final sign-off Apr 2002 | 142 Geneva Av | remodel kitchen cabinets, ocunter top add 9 resesed lightsDetails
remodel kitchen cabinets, ocunter top add 9 resesed lights | $10,000 |