Alex Construction & Electric Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2007 to Oct 2025
- Last 24 months
- 1 permit filed
65 permits since 2000: 54 completed, 1 in progress, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 8, 2025 | In progress issued Dec 2025 | 2018 22nd Av | horizontal rear addition. add 2 bedrooms, 4 baths, home office, media, exercise room & infill front stairs.Details
horizontal rear addition. add 2 bedrooms, 4 baths, home office, media, exercise room & infill front stairs. | $350,000 |
| Sep 13, 2024 | Completed final sign-off Apr 2025 | 99 Robinhood Dr | remodel 2 (e) bathrooms. 1 on 2/f, 1 on 1/f. no removal of wallsDetails
remodel 2 (e) bathrooms. 1 on 2/f, 1 on 1/f. no removal of walls | $1,500 |
| Jun 21, 2024 | Completed final sign-off Apr 2025 | 99 Robinhood Dr | remodel (e) kitchen at 2md floor: replace counter top, cabinet & sink. no plumbing fixture increased. no work at front facade.Details
remodel (e) kitchen at 2md floor: replace counter top, cabinet & sink. no plumbing fixture increased. no work at front facade. | $20,000 |
| Mar 8, 2024 | Completed final sign-off Apr 2025 | 99 Robinhood Dr | convert (e) den into (n) bedroom & convert (e) hobby room into (n) office. all work at g/f.Details
convert (e) den into (n) bedroom & convert (e) hobby room into (n) office. all work at g/f. | |
| Oct 11, 2023 | Completed final sign-off Oct 2024 | 2271 35th Av | comply w/ nov #202312186: reduce fence height at sides and rear of backyard to be less than or equal to 6 ft height above grade.Details
comply w/ nov #202312186: reduce fence height at sides and rear of backyard to be less than or equal to 6 ft height above grade. | $5,000 |
| Sep 21, 2023 | Completed final sign-off Mar 2024 | 1288 Howard St | space # 5: convert vacant tenant space to office use. no previous use.Details
space # 5: convert vacant tenant space to office use. no previous use. | $50,000 |
| Jul 12, 2023 | Completed final sign-off Feb 2025 | 2271 35th Av | comply w/ complaint #202309751 for front landscapeDetails
comply w/ complaint #202309751 for front landscape | $3,000 |
| Oct 24, 2022 | Completed final sign-off Oct 2023 | 150 21st Av | rear cottage downstairs: remodel (e) kitchen, bathroom, bedroom & living room. construct (n) batroom and bedroom. replace (e) foundation. no work on 2nd floor of rear cottage. no work at front 3-story bldg.Details
rear cottage downstairs: remodel (e) kitchen, bathroom, bedroom & living room. construct (n) batroom and bedroom. replace (e) foundation. no work on 2nd floor of rear cottage. no work at front 3-story bldg. | $80,000 |
| Sep 30, 2022 | Completed final sign-off Jan 2023 | 2279 35th Av | replace the rear sidings: extg wood siding to hardy siding. replace downstair two 8' x 6' 8" siding to one 6' sliding door and one 6' single door with fixed glass.Details
replace the rear sidings: extg wood siding to hardy siding. replace downstair two 8' x 6' 8" siding to one 6' sliding door and one 6' single door with fixed glass. | $9,000 |
| Jul 29, 2022 | Completed final sign-off Oct 2024 | 2271 35th Av | replace the rear siding. (e) wood siding to hardi siding. replace (2) sliding windows in 2nd floor bedroom, same size. replacing (1) window in downstrairs bedroom 6'x7'. (3) windows total. approx 550sfDetails
replace the rear siding. (e) wood siding to hardi siding. replace (2) sliding windows in 2nd floor bedroom, same size. replacing (1) window in downstrairs bedroom 6'x7'. (3) windows total. approx 550sf | $6,000 |
| Apr 5, 2022 | Completed final sign-off Oct 2023 | 150 21st Av | unit b: fixing water damage in kitchen, bathroom, bedroom, livingroom, hallway, and storage room.Details
unit b: fixing water damage in kitchen, bathroom, bedroom, livingroom, hallway, and storage room. | $900 |
| Mar 11, 2022 | Never finaled issued Apr 2022, no final | 1601 11th Av | remodel (e) 2 bedroom & bathroom, construct (n) bathroom & laundry room at g/f. remodel (e) kitchen & bathroom at 1st flr. remove (e) bedroom & bathroom at dormer floor. remove (e) rear staircase & rear exterior staircase. repair dry rot at (e) garage. install 2 (n) skylights at dormer flr.Details
remodel (e) 2 bedroom & bathroom, construct (n) bathroom & laundry room at g/f. remodel (e) kitchen & bathroom at 1st flr. remove (e) bedroom & bathroom at dormer floor. remove (e) rear staircase & rear exterior staircase. repair dry rot at (e) garage. install 2 (n) skylights at dormer flr. | $130,000 |
| Jul 29, 2021 | Completed final sign-off Feb 2025 | 2271 35th Av | construct (n) bedroom, (n) full & half bathroom at g/f. remodel (e) staircase, remove walls between living rooms, kitchen, & dining room. remodel (e) kitchen & bath, construct (n) bath at 2nd floor.Details
construct (n) bedroom, (n) full & half bathroom at g/f. remodel (e) staircase, remove walls between living rooms, kitchen, & dining room. remodel (e) kitchen & bath, construct (n) bath at 2nd floor. | $130,000 |
| Nov 10, 2020 | Never finaled issued Nov 2020, no final | 838 Santiago St | revision to pa #2019-1113-7130 & 2019-1212-9456: update interior layouts.Details
revision to pa #2019-1113-7130 & 2019-1212-9456: update interior layouts. | |
| Nov 9, 2020 | Completed final sign-off Apr 2022 | 33 Capra Wy | rev to pa201806010822-s1: revision to shear wall at front facade, lower floor elevatoin at rear, relocate egress gate at r.o.w., infill recesed garage 7 entray at 2/f.Details
rev to pa201806010822-s1: revision to shear wall at front facade, lower floor elevatoin at rear, relocate egress gate at r.o.w., infill recesed garage 7 entray at 2/f. | $25,000 |
| Nov 13, 2019 | Completed final sign-off Apr 2023 | 838 Santiago St | 1)construct exercise room, den, & 3 full bathroom at 1st floor. 2)remodel kitchen, 2 new full bathroom at 2nd floor. 3) construct new deck at rear of bldg.Details
1)construct exercise room, den, & 3 full bathroom at 1st floor. 2)remodel kitchen, 2 new full bathroom at 2nd floor. 3) construct new deck at rear of bldg. | $90,000 |
| Jul 18, 2019 | Completed final sign-off Jan 2020 | 135 Lincoln Wy | unit #2, 3 ,4 bathroom & kitchen remodeling, bathroom retiling. replace new toilet & vanity. kitchen replace new cabinets. no remove walls.Details
unit #2, 3 ,4 bathroom & kitchen remodeling, bathroom retiling. replace new toilet & vanity. kitchen replace new cabinets. no remove walls. | $75,000 |
| Mar 25, 2019 | Expired or cancelled expired Mar 2026 | 817 Lyon St | underpinning of (e) foundation to match future foundation depth at 815 lyon pa# 201701268022Details
underpinning of (e) foundation to match future foundation depth at 815 lyon pa# 201701268022 | $15,000 |
| Feb 6, 2019 | Completed final sign-off Sep 2020 | 815 Lyon St | temporary shoring. ref pa201701268022.Details
temporary shoring. ref pa201701268022. | |
| Jun 15, 2018 | Completed final sign-off Jun 2018 | 439 23rd Av | renew for final 201403191190. all work is completeDetails
renew for final 201403191190. all work is complete | |
| Jun 1, 2018 | Completed final sign-off Apr 2022 | 33 Capra Wy | remodel & addition to convert (e) sfd to (n) 3 unit residence. horizontal addition @ rear yard. vertical addition of (n) 3rd & 4th flrs.new interior stairs. new nfpa 13-r fire sprinklers throughout,under separate permit.**maher n/a**Details
remodel & addition to convert (e) sfd to (n) 3 unit residence. horizontal addition @ rear yard. vertical addition of (n) 3rd & 4th flrs.new interior stairs. new nfpa 13-r fire sprinklers throughout,under separate permit.**maher n/a** | $881,437 |
| May 24, 2018 | Expired or cancelled withdrawn Jun 2018 | 924 Noe St | revision to 201612144945. reconfigure decks at rearDetails
revision to 201612144945. reconfigure decks at rear | |
| Jan 18, 2018 | Completed final sign-off Jun 2018 | 812 Lyon St | unit a: bathroom remodeling: replace door and install heater for the room.Details
unit a: bathroom remodeling: replace door and install heater for the room. | $15,000 |
| Dec 13, 2017 | Completed final sign-off May 2018 | 3339 21st St | repair extg stairs deck guardrail. no change in layout or overall dimentions. repairs in kind.Details
repair extg stairs deck guardrail. no change in layout or overall dimentions. repairs in kind. | $20,000 |
| Nov 8, 2017 | Completed final sign-off Jun 2018 | 924 Noe St | revision to 201612144945. reconfigure rooms on 1st and 2nd flDetails
revision to 201612144945. reconfigure rooms on 1st and 2nd fl | |
| Jun 15, 2017 | Completed final sign-off Jun 2018 | 924 Noe St | revision to pa #201611172979 - structural revisionDetails
revision to pa #201611172979 - structural revision | $2,000 |
| Jun 7, 2017 | Completed final sign-off Nov 2017 | 740 Haight St | revision to 2017-0526-7732, modify support detail for basement beamDetails
revision to 2017-0526-7732, modify support detail for basement beam | |
| May 26, 2017 | Completed final sign-off Nov 2017 | 740 Haight St | kitchen and bath remodel. open up center line wall between kitchen and liv rm. new laundry hookupDetails
kitchen and bath remodel. open up center line wall between kitchen and liv rm. new laundry hookup | $50,000 |
| Jan 26, 2017 | Completed final sign-off Sep 2020 | 815 Lyon St | vertical & horizontal addition. addition & renovte (e) residential unit. addition new residential unit. total addition of 2,532 sf.Details
vertical & horizontal addition. addition & renovte (e) residential unit. addition new residential unit. total addition of 2,532 sf. | $900,000 |
| Dec 14, 2016 | Completed final sign-off Jun 2018 | 924 Noe St | revision to appln #201611172979: rear addition. 1st fl: add (1) bedroom, (1) full bath & study room. 2nd fl: add family room & enclarge roof deck. 3rd fl: enlarge roof deck.Details
revision to appln #201611172979: rear addition. 1st fl: add (1) bedroom, (1) full bath & study room. 2nd fl: add family room & enclarge roof deck. 3rd fl: enlarge roof deck. | $80,000 |
| Sep 12, 2016 | Completed final sign-off Jul 2019 | 1753 Noe St | horizontal rear addition. widen building by 3'-3" and garage space. 1st floor: add 1 den, 1 playroom, 1 bath, 1 bedroom, 1 office & laundry. 2nd floor: remodel kitchen, add 1/2 bath & rear deck. 3rd floor: add 2 bedrooms, 2 baths & roof deck.Details
horizontal rear addition. widen building by 3'-3" and garage space. 1st floor: add 1 den, 1 playroom, 1 bath, 1 bedroom, 1 office & laundry. 2nd floor: remodel kitchen, add 1/2 bath & rear deck. 3rd floor: add 2 bedrooms, 2 baths & roof deck. | $200,000 |
| Sep 1, 2016 | Completed final sign-off Apr 2017 | 763 Page St | revision to app#201603031066. reconfigure laundry room, den, and 2 bathrooms. comply with complaint #201632991 and 201633982. all work on ground floor.Details
revision to app#201603031066. reconfigure laundry room, den, and 2 bathrooms. comply with complaint #201632991 and 201633982. all work on ground floor. | |
| Apr 12, 2016 | Completed final sign-off Jun 2016 | 977 Duncan St | to comply with physical inspection report # cc-7966Details
to comply with physical inspection report # cc-7966 | $1,000 |
| Dec 11, 2015 | Completed final sign-off Jun 2016 | 1634 Dolores St | 1st floor - legalize room to master bedroom, legalize bathroom, add closet, french doors to rear yard, new wider stair connecting to 2nd floor. new hallway & door to rear yard. 2nd floor - remodel kitchen & bathroom, new skylight over stair to 1st floorDetails
1st floor - legalize room to master bedroom, legalize bathroom, add closet, french doors to rear yard, new wider stair connecting to 2nd floor. new hallway & door to rear yard. 2nd floor - remodel kitchen & bathroom, new skylight over stair to 1st floor | $50,000 |
| Oct 13, 2015 | Completed final sign-off Jun 2016 | 125 Cole St | replce back outside sidings, back of house.Details
replce back outside sidings, back of house. | $3,000 |
| Sep 29, 2015 | Completed final sign-off Apr 2016 | 2029 Wawona St | interior kitchen remodel. enlarge door opening from kitchen to living room.Details
interior kitchen remodel. enlarge door opening from kitchen to living room. | $15,000 |
| Sep 8, 2014 | Never finaled issued Sep 2014, no final | 1685 Union St | install a garage doorDetails
install a garage door | $1,500 |
| Jul 1, 2014 | Completed final sign-off Aug 2014 | 780 Ashbury St | to obtain final inspection for work approved under pa# 201111038198. all work is complete.Details
to obtain final inspection for work approved under pa# 201111038198. all work is complete. | |
| Jul 1, 2014 | Completed final sign-off Aug 2014 | 780 Ashbury St | to obtain final inspection for work approved under pa# 201207164971. all work is complete.Details
to obtain final inspection for work approved under pa# 201207164971. all work is complete. | |
| Mar 19, 2014 | Expired or cancelled expired Jun 2018 | 439 23rd Av | two story horizontal addition at rear, addition of one residential unit on ground floor behind garage.Details
two story horizontal addition at rear, addition of one residential unit on ground floor behind garage. | $80,000 |
| Aug 1, 2013 | Never finaled issued Aug 2013, no final | 2171 Mission St | bathroom remodeling in unit 203, replacing existing sink, vanity, ceiling fan,& light,replace exisitng tub shower with a combination shower & steam, replacing existing tile on walls & floor .Details
bathroom remodeling in unit 203, replacing existing sink, vanity, ceiling fan,& light,replace exisitng tub shower with a combination shower & steam, replacing existing tile on walls & floor . | $7,000 |
| Feb 1, 2013 | Completed final sign-off May 2015 | 780 Ashbury St | change single panel windows to double panels same window are street facing & some are not, 48 total windows, no change to size or location, max u-facotr 040Details
change single panel windows to double panels same window are street facing & some are not, 48 total windows, no change to size or location, max u-facotr 040 | $10,000 |
| Nov 30, 2012 | Completed final sign-off Aug 2014 | 780 Ashbury St | revision to approved permit set #201111038198; add in foundation at north property line wallDetails
revision to approved permit set #201111038198; add in foundation at north property line wall | $5,000 |
| Jul 16, 2012 | Completed final sign-off Aug 2014 | 780 Ashbury St | revision to appl #2011.0929.5779 - south wall existing foundation remains with new sistered foundation.Details
revision to appl #2011.0929.5779 - south wall existing foundation remains with new sistered foundation. | |
| Feb 17, 2012 | Completed final sign-off Sep 2012 | 1627 08th Av | master bathroom remodeling, high efficacy lightingDetails
master bathroom remodeling, high efficacy lighting | $5,000 |
| Nov 16, 2011 | Completed final sign-off Jan 2012 | 71 Cumberland St | revision to appl #201109265476 - change toilet room to laundry room & replace the (e) furnace.Details
revision to appl #201109265476 - change toilet room to laundry room & replace the (e) furnace. | $5,000 |
| Nov 3, 2011 | Never finaled issued Aug 2012, no final | 780 Ashbury St | legalize (e) 4th fl attic space & remodel it. remodel 3rd fl kitchen. (n) dormers @ roo,(n) skylights. convert portion of (e) roof to (n) 4th fl roof deck. enclose (e) opening in 1st fl wall (northside). add (n) roof overhead. sprinkler under sep permit. entire bldg must be sprinklered to nfpa 13.Details
legalize (e) 4th fl attic space & remodel it. remodel 3rd fl kitchen. (n) dormers @ roo,(n) skylights. convert portion of (e) roof to (n) 4th fl roof deck. enclose (e) opening in 1st fl wall (northside). add (n) roof overhead. sprinkler under sep permit. entire bldg must be sprinklered to nfpa 13. | $91,000 |
| Sep 26, 2011 | Completed final sign-off Dec 2011 | 200 Virginia Av | remove and replace cabinets, lighting, refrigerator, stove. remove and replace vanity, add fan, heat lamp. provide high eff lights per cec 180 kDetails
remove and replace cabinets, lighting, refrigerator, stove. remove and replace vanity, add fan, heat lamp. provide high eff lights per cec 180 k | $4,500 |
| Sep 26, 2011 | Completed final sign-off Jan 2012 | 71 Cumberland St | remove and replace kitchen cabinets, lighting, appliances. replace bath vanity, add fan and heat lamp upper unitDetails
remove and replace kitchen cabinets, lighting, appliances. replace bath vanity, add fan and heat lamp upper unit | $7,800 |
| Aug 30, 2011 | Completed final sign-off Sep 2011 | 202 Virginia Av | install the washer and dryer on the third floor of building. comply with co alarm requirement per cbc 2010 sec 420.1.Details
install the washer and dryer on the third floor of building. comply with co alarm requirement per cbc 2010 sec 420.1. | $1,000 |
| Jun 10, 2011 | Expired or cancelled expired Sep 2017 | 796 34th Av | remove and replace kitchen cabinets and sinks. lighting to comply with cec 150(k). no change to walls, windows and doors.Details
remove and replace kitchen cabinets and sinks. lighting to comply with cec 150(k). no change to walls, windows and doors. | $4,500 |
| Jan 5, 2011 | Completed final sign-off May 2012 | 73 Cumberland St | bathroom replace fixtures & electrical. bedroom update electrical. additional work to pa#201010122667Details
bathroom replace fixtures & electrical. bedroom update electrical. additional work to pa#201010122667 | $2,750 |
| Jan 5, 2011 | Completed final sign-off May 2011 | 71 Cumberland St | #73 only - bathroom upgrade fixtures, electric & plumbing and hall lighting. additional work to pa# 201012146664Details
#73 only - bathroom upgrade fixtures, electric & plumbing and hall lighting. additional work to pa# 201012146664 | $7,000 |
| Dec 14, 2010 | Completed final sign-off May 2011 | 73 Cumberland St | (front bldg.) remove and replace kitchen cabinets and appliances. (lower unit)Details
(front bldg.) remove and replace kitchen cabinets and appliances. (lower unit) | $9,750 |
| Jan 28, 2010 | Completed final sign-off Aug 2010 | 22 Museum Wy | remodel bath and closet. replace plumbing fixtures, new lighting. no structural changes. igh efficacy lighting or occupancy sendsor controlDetails
remodel bath and closet. replace plumbing fixtures, new lighting. no structural changes. igh efficacy lighting or occupancy sendsor control | $10,000 |
| Nov 13, 2009 | Completed final sign-off Apr 2010 | 331 Lawton St | bathroom remodeling at 2nd floor. provide hight efficency lights or o sDetails
bathroom remodeling at 2nd floor. provide hight efficency lights or o s | $11,700 |
| Sep 28, 2009 | Completed final sign-off Feb 2010 | 660 27th Av | remodel (e) bathroom on 1st floor, relocate (e) bathroom door, remodel (e) bedroom on 1st floor, change (e) window to sliding door, add one (e) bedroom on 1st floor. add new deck at rear (3 ft above ground), to comply with nov# 200920883Details
remodel (e) bathroom on 1st floor, relocate (e) bathroom door, remodel (e) bedroom on 1st floor, change (e) window to sliding door, add one (e) bedroom on 1st floor. add new deck at rear (3 ft above ground), to comply with nov# 200920883 | $10,000 |
| Sep 22, 2009 | Completed final sign-off Jan 2010 | 1371 33rd Av | convert e storage room to new bedroom, add new bath, paint on 1st floorDetails
convert e storage room to new bedroom, add new bath, paint on 1st floor | $12,000 |
| Aug 4, 2009 | Completed final sign-off Oct 2009 | 48 Loyola Tr | kitchen remodel and new garage doors (wood). min. 50% of kitchen light wattage must be in flourescent (high efficacy lights)Details
kitchen remodel and new garage doors (wood). min. 50% of kitchen light wattage must be in flourescent (high efficacy lights) | $15,000 |
| Feb 27, 2009 | Completed final sign-off Mar 2009 | 28 Sears St | to obtain final inspection for work approved under pa #200702224698s. all work complete.Details
to obtain final inspection for work approved under pa #200702224698s. all work complete. | |
| Dec 9, 2008 | Completed final sign-off Dec 2008 | 999 Green St | units 1201 & 1203 - to finalize work approved under 200705312679. all work is complete.Details
units 1201 & 1203 - to finalize work approved under 200705312679. all work is complete. | |
| Oct 23, 2008 | Completed final sign-off May 2009 | 1319 32nd Av | revision to pa# 2007/05/08/0700, minor wall change between dining room & living room, kitchen entry and window to light well.Details
revision to pa# 2007/05/08/0700, minor wall change between dining room & living room, kitchen entry and window to light well. | $2,000 |
| Oct 8, 2008 | Completed final sign-off Mar 2009 | 28 Sears St | kitchen remodling, new electric, cabinets, tiles, sink at second floor. remove (e) and apply new stuuco finish at exterior, street front facade, approx 600 sf. finishes to match existing. r-13 insulation wall. r-30 insulation ceiling.Details
kitchen remodling, new electric, cabinets, tiles, sink at second floor. remove (e) and apply new stuuco finish at exterior, street front facade, approx 600 sf. finishes to match existing. r-13 insulation wall. r-30 insulation ceiling. | $15,000 |
| May 19, 2008 | Completed final sign-off May 2010 | 1255 43rd Av | rear horizontal addition and interior renovation. legalize ex family rm on the ground floor. add 1 guest rm, 1 storage rm and 1 full bath on the ground flr. on the 2nd floor, add 1 master suite and relocate kitchen and dinning rmDetails
rear horizontal addition and interior renovation. legalize ex family rm on the ground floor. add 1 guest rm, 1 storage rm and 1 full bath on the ground flr. on the 2nd floor, add 1 master suite and relocate kitchen and dinning rm | $150,000 |
| May 8, 2007 | Never finaled issued Jan 2008, no final | 1319 32nd Av | rear addition and interior renovation for two bedrooms, a den, a guest room, a family room, and three baths.Details
rear addition and interior renovation for two bedrooms, a den, a guest room, a family room, and three baths. | $100,000 |