Back to kitchen remodel contractors
Alex Construction & Electric Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2007 to Oct 2025
- Last 24 months
- 1 permit filed
65 permits since 2000: 54 completed, 1 in progress, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 16 completed, 2 never finaled, 1 expired or cancelled. Typically 5 days from filing to permit and 196 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 21, 2024 | Completed final sign-off Apr 2025 | 99 Robinhood Dr | remodel (e) kitchen at 2md floor: replace counter top, cabinet & sink. no plumbing fixture increased. no work at front facade.Details
remodel (e) kitchen at 2md floor: replace counter top, cabinet & sink. no plumbing fixture increased. no work at front facade. | $20,000 |
| Oct 24, 2022 | Completed final sign-off Oct 2023 | 150 21st Av | rear cottage downstairs: remodel (e) kitchen, bathroom, bedroom & living room. construct (n) batroom and bedroom. replace (e) foundation. no work on 2nd floor of rear cottage. no work at front 3-story bldg.Details
rear cottage downstairs: remodel (e) kitchen, bathroom, bedroom & living room. construct (n) batroom and bedroom. replace (e) foundation. no work on 2nd floor of rear cottage. no work at front 3-story bldg. | $80,000 |
| Apr 5, 2022 | Completed final sign-off Oct 2023 | 150 21st Av | unit b: fixing water damage in kitchen, bathroom, bedroom, livingroom, hallway, and storage room.Details
unit b: fixing water damage in kitchen, bathroom, bedroom, livingroom, hallway, and storage room. | $900 |
| Mar 11, 2022 | Never finaled issued Apr 2022, no final | 1601 11th Av | remodel (e) 2 bedroom & bathroom, construct (n) bathroom & laundry room at g/f. remodel (e) kitchen & bathroom at 1st flr. remove (e) bedroom & bathroom at dormer floor. remove (e) rear staircase & rear exterior staircase. repair dry rot at (e) garage. install 2 (n) skylights at dormer flr.Details
remodel (e) 2 bedroom & bathroom, construct (n) bathroom & laundry room at g/f. remodel (e) kitchen & bathroom at 1st flr. remove (e) bedroom & bathroom at dormer floor. remove (e) rear staircase & rear exterior staircase. repair dry rot at (e) garage. install 2 (n) skylights at dormer flr. | $130,000 |
| Jul 29, 2021 | Completed final sign-off Feb 2025 | 2271 35th Av | construct (n) bedroom, (n) full & half bathroom at g/f. remodel (e) staircase, remove walls between living rooms, kitchen, & dining room. remodel (e) kitchen & bath, construct (n) bath at 2nd floor.Details
construct (n) bedroom, (n) full & half bathroom at g/f. remodel (e) staircase, remove walls between living rooms, kitchen, & dining room. remodel (e) kitchen & bath, construct (n) bath at 2nd floor. | $130,000 |
| Nov 13, 2019 | Completed final sign-off Apr 2023 | 838 Santiago St | 1)construct exercise room, den, & 3 full bathroom at 1st floor. 2)remodel kitchen, 2 new full bathroom at 2nd floor. 3) construct new deck at rear of bldg.Details
1)construct exercise room, den, & 3 full bathroom at 1st floor. 2)remodel kitchen, 2 new full bathroom at 2nd floor. 3) construct new deck at rear of bldg. | $90,000 |
| Jul 18, 2019 | Completed final sign-off Jan 2020 | 135 Lincoln Wy | unit #2, 3 ,4 bathroom & kitchen remodeling, bathroom retiling. replace new toilet & vanity. kitchen replace new cabinets. no remove walls.Details
unit #2, 3 ,4 bathroom & kitchen remodeling, bathroom retiling. replace new toilet & vanity. kitchen replace new cabinets. no remove walls. | $75,000 |
| May 26, 2017 | Completed final sign-off Nov 2017 | 740 Haight St | kitchen and bath remodel. open up center line wall between kitchen and liv rm. new laundry hookupDetails
kitchen and bath remodel. open up center line wall between kitchen and liv rm. new laundry hookup | $50,000 |
| Sep 12, 2016 | Completed final sign-off Jul 2019 | 1753 Noe St | horizontal rear addition. widen building by 3'-3" and garage space. 1st floor: add 1 den, 1 playroom, 1 bath, 1 bedroom, 1 office & laundry. 2nd floor: remodel kitchen, add 1/2 bath & rear deck. 3rd floor: add 2 bedrooms, 2 baths & roof deck.Details
horizontal rear addition. widen building by 3'-3" and garage space. 1st floor: add 1 den, 1 playroom, 1 bath, 1 bedroom, 1 office & laundry. 2nd floor: remodel kitchen, add 1/2 bath & rear deck. 3rd floor: add 2 bedrooms, 2 baths & roof deck. | $200,000 |
| Dec 11, 2015 | Completed final sign-off Jun 2016 | 1634 Dolores St | 1st floor - legalize room to master bedroom, legalize bathroom, add closet, french doors to rear yard, new wider stair connecting to 2nd floor. new hallway & door to rear yard. 2nd floor - remodel kitchen & bathroom, new skylight over stair to 1st floorDetails
1st floor - legalize room to master bedroom, legalize bathroom, add closet, french doors to rear yard, new wider stair connecting to 2nd floor. new hallway & door to rear yard. 2nd floor - remodel kitchen & bathroom, new skylight over stair to 1st floor | $50,000 |
| Sep 29, 2015 | Completed final sign-off Apr 2016 | 2029 Wawona St | interior kitchen remodel. enlarge door opening from kitchen to living room.Details
interior kitchen remodel. enlarge door opening from kitchen to living room. | $15,000 |
| Nov 3, 2011 | Never finaled issued Aug 2012, no final | 780 Ashbury St | legalize (e) 4th fl attic space & remodel it. remodel 3rd fl kitchen. (n) dormers @ roo,(n) skylights. convert portion of (e) roof to (n) 4th fl roof deck. enclose (e) opening in 1st fl wall (northside). add (n) roof overhead. sprinkler under sep permit. entire bldg must be sprinklered to nfpa 13.Details
legalize (e) 4th fl attic space & remodel it. remodel 3rd fl kitchen. (n) dormers @ roo,(n) skylights. convert portion of (e) roof to (n) 4th fl roof deck. enclose (e) opening in 1st fl wall (northside). add (n) roof overhead. sprinkler under sep permit. entire bldg must be sprinklered to nfpa 13. | $91,000 |
| Sep 26, 2011 | Completed final sign-off Jan 2012 | 71 Cumberland St | remove and replace kitchen cabinets, lighting, appliances. replace bath vanity, add fan and heat lamp upper unitDetails
remove and replace kitchen cabinets, lighting, appliances. replace bath vanity, add fan and heat lamp upper unit | $7,800 |
| Jun 10, 2011 | Expired or cancelled expired Sep 2017 | 796 34th Av | remove and replace kitchen cabinets and sinks. lighting to comply with cec 150(k). no change to walls, windows and doors.Details
remove and replace kitchen cabinets and sinks. lighting to comply with cec 150(k). no change to walls, windows and doors. | $4,500 |
| Dec 14, 2010 | Completed final sign-off May 2011 | 73 Cumberland St | (front bldg.) remove and replace kitchen cabinets and appliances. (lower unit)Details
(front bldg.) remove and replace kitchen cabinets and appliances. (lower unit) | $9,750 |
| Aug 4, 2009 | Completed final sign-off Oct 2009 | 48 Loyola Tr | kitchen remodel and new garage doors (wood). min. 50% of kitchen light wattage must be in flourescent (high efficacy lights)Details
kitchen remodel and new garage doors (wood). min. 50% of kitchen light wattage must be in flourescent (high efficacy lights) | $15,000 |
| Oct 23, 2008 | Completed final sign-off May 2009 | 1319 32nd Av | revision to pa# 2007/05/08/0700, minor wall change between dining room & living room, kitchen entry and window to light well.Details
revision to pa# 2007/05/08/0700, minor wall change between dining room & living room, kitchen entry and window to light well. | $2,000 |
| Oct 8, 2008 | Completed final sign-off Mar 2009 | 28 Sears St | kitchen remodling, new electric, cabinets, tiles, sink at second floor. remove (e) and apply new stuuco finish at exterior, street front facade, approx 600 sf. finishes to match existing. r-13 insulation wall. r-30 insulation ceiling.Details
kitchen remodling, new electric, cabinets, tiles, sink at second floor. remove (e) and apply new stuuco finish at exterior, street front facade, approx 600 sf. finishes to match existing. r-13 insulation wall. r-30 insulation ceiling. | $15,000 |
| May 19, 2008 | Completed final sign-off May 2010 | 1255 43rd Av | rear horizontal addition and interior renovation. legalize ex family rm on the ground floor. add 1 guest rm, 1 storage rm and 1 full bath on the ground flr. on the 2nd floor, add 1 master suite and relocate kitchen and dinning rmDetails
rear horizontal addition and interior renovation. legalize ex family rm on the ground floor. add 1 guest rm, 1 storage rm and 1 full bath on the ground flr. on the 2nd floor, add 1 master suite and relocate kitchen and dinning rm | $150,000 |