William Liang
- Listed as
- architect, authorized agent-others, designer, engineer
- Based in
- San Francisco
- On San Francisco permits
- Feb 2009 to Sep 2026
178 permits since 2000 (engineer on 159 permits, architect on 13 permits, designer on 6 permits, authorized agent-others on 3 permits): 133 completed, 16 in progress, 11 never finaled, 18 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 178.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 2921 Wawona St | to comply with nov. 202183704 - demolish unpermitted roof cover rear roof deck. remove and replace rear roof deck tile finishes. remove and replace rear wall siding above roof deck.Details
to comply with nov. 202183704 - demolish unpermitted roof cover rear roof deck. remove and replace rear roof deck tile finishes. remove and replace rear wall siding above roof deck. | $20,000 | |
| Sep 4, 2026 | In progress filed Sep 2026, not yet issued | 1523 22nd Av | Tri Line Construction Co | 2nd flr: replace 3 windows in e. frame, all non-street facing. ground flr: reconfigure existing living space to include family room, kitchenette with 2 burner cooktop (no oven), bedroom, & full bath. replace horizontal siding finish with stucco at walls facing backyard. replace furnace/water htrDetails
2nd flr: replace 3 windows in e. frame, all non-street facing. ground flr: reconfigure existing living space to include family room, kitchenette with 2 burner cooktop (no oven), bedroom, & full bath. replace horizontal siding finish with stucco at walls facing backyard. replace furnace/water htr | $150,000 |
| Aug 29, 2026 | In progress filed Aug 2026, not yet issued | 45 Saturn St | interior remodeling including the creation of new habitable, conditioned space,minor changes to exteriorDetails
interior remodeling including the creation of new habitable, conditioned space,minor changes to exterior | $175,000 | |
| Aug 28, 2026 | In progress filed Aug 2026, not yet issued | 135 Clearfield Dr | 2/f: reconfigure and remodel kitchen & master bath. g/f: add kitchenette with 2-burner cooktop (no oven) to (e) family room; convert bedroom to master bath.Details
2/f: reconfigure and remodel kitchen & master bath. g/f: add kitchenette with 2-burner cooktop (no oven) to (e) family room; convert bedroom to master bath. | $120,000 | |
| Jul 10, 2026 | In progress issued Jul 2026 | 611 40th Av | Jwl 888 Construction Inc | revision to 202511260478. reconfigure layout of family room, kitchenette, excercise area and full bath. relocate laundry set-up garage. relocate tankless water heater. at 2nd flr, replace (2) windoes and (1) sliding door, all facing backyard.Details
revision to 202511260478. reconfigure layout of family room, kitchenette, excercise area and full bath. relocate laundry set-up garage. relocate tankless water heater. at 2nd flr, replace (2) windoes and (1) sliding door, all facing backyard. | $6,000 |
| Jun 17, 2026 | Completed final sign-off Aug 2026 | 175 18th Av | Sequoia Bay Construction Inc | demolish unpermitted rear deck & stairs and rebuild 3rd floor deck and stairs to rear yard conforming to current codeDetails
demolish unpermitted rear deck & stairs and rebuild 3rd floor deck and stairs to rear yard conforming to current code | $20,000 |
| Jun 5, 2026 | In progress issued Jun 2026 | 8 Inverness Dr | New Cities Construction | g/f only: add laundry room. at (e) family room - add kitchenette with 2 burner cooktop and replace sliding door in (e) frame. at (e) exercise room - replace window in (e) frame, remodel full bathroom with addition of window and conversion of tub to shower.Details
g/f only: add laundry room. at (e) family room - add kitchenette with 2 burner cooktop and replace sliding door in (e) frame. at (e) exercise room - replace window in (e) frame, remodel full bathroom with addition of window and conversion of tub to shower. | $55,000 |
| Jan 30, 2026 | Completed final sign-off Sep 2026 | 221 Magellan Av | B W H Builder Inc. | kitchen relocation and remodeling. add 1 new bath. propose 1 new electrical fireplace like for like. replace all windows. replace furnace and water heater.Details
kitchen relocation and remodeling. add 1 new bath. propose 1 new electrical fireplace like for like. replace all windows. replace furnace and water heater. | $125,000 |
| Jan 27, 2026 | Completed final sign-off Aug 2026 | 1118 Geneva Av | Y L Construction | revision to pa# 2025-1107-9151: 2nd fl. convert living room to bed room; remove cement plaster ceiling and walls to facilliate installation of insulation then install gypsum board finish. replace front facing fixed window casement in (e) frame.Details
revision to pa# 2025-1107-9151: 2nd fl. convert living room to bed room; remove cement plaster ceiling and walls to facilliate installation of insulation then install gypsum board finish. replace front facing fixed window casement in (e) frame. | $12,000 |
| Jan 12, 2026 | In progress issued Jul 2026 | 250 Arleta Av | Thomas Le Construction Inc | new 1-story addition at rear with 2-bedrooms and roof deck to (e) sfr.Details
new 1-story addition at rear with 2-bedrooms and roof deck to (e) sfr. | $150,000 |
| Nov 26, 2025 | In progress issued Mar 2026 | 611 40th Av | Jwl 888 Construction Inc | 2nd fl - shift interior stair toward the front of bldg; remove stairs in lightwell; reconstruct balcony in sunroom. ground fl - infill open space below (e) sunroom to create indoor plant add family room w/kitchenette (2 burner), full bath, exercise room & laundry area; add detached gazebo with ofuroDetails
2nd fl - shift interior stair toward the front of bldg; remove stairs in lightwell; reconstruct balcony in sunroom. ground fl - infill open space below (e) sunroom to create indoor plant add family room w/kitchenette (2 burner), full bath, exercise room & laundry area; add detached gazebo with ofuro | $150,000 |
| Nov 14, 2025 | Completed final sign-off Jan 2026 | 724 Avalon Av | to comply with nov 202545134 construct concrete retaining wall in backyard - max raise elevation 3 feet - no moreDetails
to comply with nov 202545134 construct concrete retaining wall in backyard - max raise elevation 3 feet - no more | $25,000 | |
| Nov 7, 2025 | Completed final sign-off Aug 2026 | 1118 Geneva Av | Y L Construction | 2nd fl - remove wall between kitchen & dining om, add (1) skylight in kitchen; ground fl - add media room with kitchenette (2 burner), (2) bedrooms & (1) full bath behind 1 car garageDetails
2nd fl - remove wall between kitchen & dining om, add (1) skylight in kitchen; ground fl - add media room with kitchenette (2 burner), (2) bedrooms & (1) full bath behind 1 car garage | $150,000 |
| Nov 4, 2025 | Completed final sign-off Jun 2026 | 480 Vienna St | Tri Line Construction Co | revision to 202509195676. roof, strenthen roof framing. 3rd fl: rebuild interior stud walls for bathroom and closets, replace window in bath, strenthen ceiling framing in bath. gr fl: perform voluntary plywood trengthening in garageDetails
revision to 202509195676. roof, strenthen roof framing. 3rd fl: rebuild interior stud walls for bathroom and closets, replace window in bath, strenthen ceiling framing in bath. gr fl: perform voluntary plywood trengthening in garage | $10,000 |
| Oct 14, 2025 | Completed final sign-off Jun 2026 | 1394 Alabama St | Bingo Builders | 2/f: kitchen remodel and relocate. bathroom remodel and add one bathroom. add a skylight.Details
2/f: kitchen remodel and relocate. bathroom remodel and add one bathroom. add a skylight. | $75,000 |
| Sep 30, 2025 | Completed final sign-off Mar 2026 | 386 Capistrano Av | Bingo Builders | add two skylights to the plan. revision to pa: 202503142264. to comply with 202537411Details
add two skylights to the plan. revision to pa: 202503142264. to comply with 202537411 | $6,000 |
| Sep 19, 2025 | Completed final sign-off Jun 2026 | 480 Vienna St | Tri Line Construction Co | demo deteriorated front exterior staircase & rebuild in same configuration; replace garage door in-kind; add header beam above garage door opening; infill (4) windows not visible from street; add operable skylight in kitchen; rebuild entry porch ceiling framingDetails
demo deteriorated front exterior staircase & rebuild in same configuration; replace garage door in-kind; add header beam above garage door opening; infill (4) windows not visible from street; add operable skylight in kitchen; rebuild entry porch ceiling framing | $40,000 |
| Aug 7, 2025 | Expired or cancelled expired Sep 2026 | 39 Lakewood Av | Y L Construction | revision to pa #202503212743. construct retaining wall along north property line. change proposed window in ground floor office to sliding door. add door in garage leading to side yard. perform dryrot repair at front stairs framing, not exceed 50%.Details
revision to pa #202503212743. construct retaining wall along north property line. change proposed window in ground floor office to sliding door. add door in garage leading to side yard. perform dryrot repair at front stairs framing, not exceed 50%. | $45,000 |
| Jun 27, 2025 | Completed final sign-off Aug 2025 | 21 Baltimore Wy | Y L Construction | revision to pa # 2023-0714-2156 2nd fl: replace bedroom 3 swing door leading to balcony. infill street facing bedroom 3 closet window. revise type & size of proposed windows. ground fl: infill garage window (visible from street) ; revise type of proposed windowsDetails
revision to pa # 2023-0714-2156 2nd fl: replace bedroom 3 swing door leading to balcony. infill street facing bedroom 3 closet window. revise type & size of proposed windows. ground fl: infill garage window (visible from street) ; revise type of proposed windows | $1,000 |
| Jun 20, 2025 | Completed final sign-off Aug 2025 | 850 Lombard St | Scott Lu's Construction Inc. | front building - demolish deteriorated deck and stairs at rear of front building and reconstruct in different configuration.Details
front building - demolish deteriorated deck and stairs at rear of front building and reconstruct in different configuration. | $25,000 |
| Jun 6, 2025 | In progress issued Jun 2025 | 706 Edinburgh St | P E Construction Co. | 2nd/fl:in response to the nov#202536904. swap living room and bedroom, remodel kitchen and full bath, laundry/storage area behind 1 car garage, replace 1 street facing window in existing frame. replace furnace and replace water heater with tankless type.Details
2nd/fl:in response to the nov#202536904. swap living room and bedroom, remodel kitchen and full bath, laundry/storage area behind 1 car garage, replace 1 street facing window in existing frame. replace furnace and replace water heater with tankless type. | $200,000 |
| Apr 25, 2025 | In progress issued May 2025 | 1059 Montgomery St | Q & Qq Construction Inc | 3/f unit - revision to permit 202407126383. convert dining room to office. reconfigure living room by removing study and closets.Details
3/f unit - revision to permit 202407126383. convert dining room to office. reconfigure living room by removing study and closets. | $25,000 |
| Apr 25, 2025 | Completed final sign-off Mar 2026 | 2359 44th Av | Q & Qq Construction Inc | 2nd fl reconfigure and remodel kitchen, remodel full bath. gr fl add entertainment room, full bath, laundry area behind 1 car garageDetails
2nd fl reconfigure and remodel kitchen, remodel full bath. gr fl add entertainment room, full bath, laundry area behind 1 car garage | $88,000 |
| Apr 18, 2025 | Completed final sign-off Aug 2025 | 21 Baltimore Wy | revision to permit #202307142156. replace galvanized steel guardrail at front stairs and landing, demolish cracked concrete driveway and replace in kind. replace concrete walkway with pavers.Details
revision to permit #202307142156. replace galvanized steel guardrail at front stairs and landing, demolish cracked concrete driveway and replace in kind. replace concrete walkway with pavers. | $15,000 | |
| Apr 15, 2025 | Expired or cancelled withdrawn Nov 2025 | 791 26th Av | convert (e) udu into new jadu. new master bathroom on 3/f, rmeodel 1/2 bathroom on 2/f.Details
convert (e) udu into new jadu. new master bathroom on 3/f, rmeodel 1/2 bathroom on 2/f. | $200,000 | |
| Mar 31, 2025 | Completed final sign-off Mar 2026 | 386 Capistrano Av | Bingo Builders | 2/f: remodel (e) bath with larger shower, add 1 bedroom and 1 bath. in-fill lightwell (20sf). 1/f: turn 940sf into habitable space including adding 1 bathroom.Details
2/f: remodel (e) bath with larger shower, add 1 bedroom and 1 bath. in-fill lightwell (20sf). 1/f: turn 940sf into habitable space including adding 1 bathroom. | $60,000 |
| Feb 27, 2025 | Completed final sign-off Jul 2025 | 3953 Geary Bl | (e) unsafe wood-framed interior stair serving previously permitted 2nd floor. dwelling unit (pa# 202009023294). to be replaced with steel construction stair.Details
(e) unsafe wood-framed interior stair serving previously permitted 2nd floor. dwelling unit (pa# 202009023294). to be replaced with steel construction stair. | $25,000 | |
| Feb 18, 2025 | Completed final sign-off Jul 2025 | 2407 Judah St | Lin's Builder | revision to permit 202409130678. relocate mop sink, (2) hand sinks, grease trap, (1) floor sink, and water heater in commercial kitchen. provide minor changes to commercial kitchen ceiling framing. special inspections per pa 202409130678.Details
revision to permit 202409130678. relocate mop sink, (2) hand sinks, grease trap, (1) floor sink, and water heater in commercial kitchen. provide minor changes to commercial kitchen ceiling framing. special inspections per pa 202409130678. | |
| Dec 18, 2024 | Completed final sign-off Nov 2025 | 1570 32nd Av | Scott Lu's Construction Inc. | revision to pa 202407096020 2nd fl - revise configuration of master bath & wlk in closet; relocate master bedroom; ground fl - remove 2 posts & associated beams in garage. no change in fixture countDetails
revision to pa 202407096020 2nd fl - revise configuration of master bath & wlk in closet; relocate master bedroom; ground fl - remove 2 posts & associated beams in garage. no change in fixture count | $2,000 |
| Nov 21, 2024 | In progress filed Nov 2024, not yet issued | 750 Phelps St | proj-24-0608; sfpuc mou: partial building renovation of level 1 & 2. renovation to provide more office spaces. exterior stairs will be replaced & brought code standards. (e) freight elevator will be modernized to a passenger elevator. mechanical plumbing equipment to serve the renovated areas,Details
proj-24-0608; sfpuc mou: partial building renovation of level 1 & 2. renovation to provide more office spaces. exterior stairs will be replaced & brought code standards. (e) freight elevator will be modernized to a passenger elevator. mechanical plumbing equipment to serve the renovated areas, | $6,800,000 | |
| Sep 18, 2024 | In progress issued Oct 2024 | 2407 Judah St | Lin's Builder | reface (e) signature with new business name "lion kitchen"Details
reface (e) signature with new business name "lion kitchen" | $300 |
| Sep 13, 2024 | Completed final sign-off Jul 2025 | 2407 Judah St | Lin's Builder | ti on ground floor unit. enlarge and remodel kitchen for restaurant use. no proposed exterior changesDetails
ti on ground floor unit. enlarge and remodel kitchen for restaurant use. no proposed exterior changes | $70,000 |
| Aug 2, 2024 | Completed final sign-off Aug 2024 | 846 27th Av | revision to pa # 2022-0805-9989 demo exterior heavily corroded spiral staircase at rear deck & infill opening with wooden railing to matchDetails
revision to pa # 2022-0805-9989 demo exterior heavily corroded spiral staircase at rear deck & infill opening with wooden railing to match | $600 | |
| Jul 12, 2024 | In progress issued Dec 2024 | 144 Encline Ct | New Cities Construction | 2nd floor - infill to enlarge kitche; reconfigure and remodel kitchen; remodel full bath; 1st fl - add family room kitchenette, master bedroom and bath; 2nd full bath, media room, laundry room and deck with stairs to backyard; replace furnace and water heater with tankless typeDetails
2nd floor - infill to enlarge kitche; reconfigure and remodel kitchen; remodel full bath; 1st fl - add family room kitchenette, master bedroom and bath; 2nd full bath, media room, laundry room and deck with stairs to backyard; replace furnace and water heater with tankless type | $220,000 |
| Jul 12, 2024 | In progress issued Feb 2025 | 1059 Montgomery St | Q & Qq Construction Inc | 3rd fl unit - reconfigure and remodel kitchen & full bath; replace windows and swing door in kitchen with same size in existing frameDetails
3rd fl unit - reconfigure and remodel kitchen & full bath; replace windows and swing door in kitchen with same size in existing frame | $35,000 |
| Jul 9, 2024 | Completed final sign-off Nov 2025 | 1570 32nd Av | Scott Lu's Construction Inc. | 2nd fl, reconfigure and remodel kitchen and 1/2 bath, infill light well adjacent to half bath, reconfigure interior stairs. gr fl infill open space below existing sunroom to create playroom, add family room with kitchenette, full bath and laundry closet. replace furnace and water heater.Details
2nd fl, reconfigure and remodel kitchen and 1/2 bath, infill light well adjacent to half bath, reconfigure interior stairs. gr fl infill open space below existing sunroom to create playroom, add family room with kitchenette, full bath and laundry closet. replace furnace and water heater. | $225,000 |
| Jun 26, 2024 | Completed final sign-off Dec 2024 | 576 Liberty St | Jpg Home Improvement Inc | demolish two level rear deck with stairs and reconstruct in kind. demolish windows and door at 1st fl porch & replace with 3 panel sliding doors at rear and 2 panel sliding doors at east side.Details
demolish two level rear deck with stairs and reconstruct in kind. demolish windows and door at 1st fl porch & replace with 3 panel sliding doors at rear and 2 panel sliding doors at east side. | $85,000 |
| Jun 25, 2024 | Completed final sign-off Sep 2024 | 618 33rd Av | Xing Construction Inc. | 3rd fl - reconfigure and remodel half bath with replacement of (e) windows in existing frame. windows not visible from streetDetails
3rd fl - reconfigure and remodel half bath with replacement of (e) windows in existing frame. windows not visible from street | $20,000 |
| Apr 12, 2024 | Completed final sign-off Jun 2024 | 807 41st Av | g/f: add shearwall & replace concrete retaining wall at rear below existing sunroom. replace rear patio stair in kind.Details
g/f: add shearwall & replace concrete retaining wall at rear below existing sunroom. replace rear patio stair in kind. | $30,000 | |
| Mar 22, 2024 | Completed final sign-off May 2024 | 2438 41st Av | Lema Construction | ground floor demolish (2) windows at rear wall and replace with french doors and (2) side light windowsDetails
ground floor demolish (2) windows at rear wall and replace with french doors and (2) side light windows | $15,000 |
| Feb 20, 2024 | Completed final sign-off Jul 2024 | 370 10th Av | Great Ocean Construction Inc. | 2/f: remodel kitchen, replace rear sliding door leading to (e) deck. ground floor: replace rear sliding door leading to backyard.Details
2/f: remodel kitchen, replace rear sliding door leading to (e) deck. ground floor: replace rear sliding door leading to backyard. | $40,000 |
| Jan 26, 2024 | Completed final sign-off Oct 2024 | 4265 24th St | Teutonic Construction Inc | 1st fl above basement, remodel kitchenDetails
1st fl above basement, remodel kitchen | $60,000 |
| Jan 19, 2024 | Completed final sign-off Jan 2024 | 567 Wildwood Wy | On Tung Inc | revision to permit# 202209303514: remove original scope of work to replace (2) street facing windows for final building inspection.Details
revision to permit# 202209303514: remove original scope of work to replace (2) street facing windows for final building inspection. | |
| Dec 8, 2023 | Completed final sign-off Aug 2025 | 2135 34th Av | Y L Construction | revision to 202307212659. 2nd fl add 1 more skylight in kitchen. change heating source from gas furnace to radiant heat flooringDetails
revision to 202307212659. 2nd fl add 1 more skylight in kitchen. change heating source from gas furnace to radiant heat flooring | $1,000 |
| Oct 20, 2023 | Completed final sign-off Jun 2025 | 33 Rio Ct | revision to 202305268669. roof: reconfigure skylights. 2nd fl eleminated frosted tempered glass floor panels. relocate electric fireplace. 1st fl: reconfigure bath 3. basement fl: swap toilet and vanity sink in bath 4. demolish deteriorated rear wall footing and replace with new.Details
revision to 202305268669. roof: reconfigure skylights. 2nd fl eleminated frosted tempered glass floor panels. relocate electric fireplace. 1st fl: reconfigure bath 3. basement fl: swap toilet and vanity sink in bath 4. demolish deteriorated rear wall footing and replace with new. | ||
| Sep 15, 2023 | Completed final sign-off Jun 2024 | 1658 25th Av | Scott Lu's Construction Inc. | convert existing living area on ground floor to family room with kitchenette, 2-bedrooms, and 1-full bath behind 1-car garage.Details
convert existing living area on ground floor to family room with kitchenette, 2-bedrooms, and 1-full bath behind 1-car garage. | $90,000 |
| Aug 29, 2023 | Expired or cancelled withdrawn Sep 2023 | 1658 25th Av | convert existing living area on ground floor to adu which includes living room with kitchen, (2) bedrooms, and full bath behind 1-car garage. per ordinance 95-17Details
convert existing living area on ground floor to adu which includes living room with kitchen, (2) bedrooms, and full bath behind 1-car garage. per ordinance 95-17 | $100,000 | |
| Jul 14, 2023 | Completed final sign-off Aug 2025 | 21 Baltimore Wy | Y L Construction | 2nd fl. convert kitchen and nook to master bedroom and bath, convert dining room to combined kitchen/dining reconfigure and remodel full bath, relocate interior stairs. ground fl. add family room with kitchenette, entertainment room, excercise room, bedroom (2) full bathrs, and 1/4 bath. replaceDetails
2nd fl. convert kitchen and nook to master bedroom and bath, convert dining room to combined kitchen/dining reconfigure and remodel full bath, relocate interior stairs. ground fl. add family room with kitchenette, entertainment room, excercise room, bedroom (2) full bathrs, and 1/4 bath. replace | $200,000 |
| Jun 30, 2023 | Completed final sign-off Mar 2024 | 60 Clairview Ct | B W H Builder Inc. | ground flr: add family room with kitchenette, 2 bedrooms, laundry closet, and full bathroom behind 2-car garage. replace furnace and water heater. remain a single-family.Details
ground flr: add family room with kitchenette, 2 bedrooms, laundry closet, and full bathroom behind 2-car garage. replace furnace and water heater. remain a single-family. | $100,000 |
| Jun 23, 2023 | Completed final sign-off May 2024 | 72 Westgate Dr | Jpg Home Improvement Inc | revision to permit 202303203963. reconfigure 1/f bedroom and bath.Details
revision to permit 202303203963. reconfigure 1/f bedroom and bath. | |
| Jun 20, 2023 | Completed final sign-off Aug 2024 | 846 27th Av | revision to bpa#202208059989, 2/f change bath #2 layout, change size of skylights in master bath #1 & kitchen, add skylight over staircase; ground/f change bedroom #3 sliding door to window, increase width of french door in family room, add laungry sink in garageDetails
revision to bpa#202208059989, 2/f change bath #2 layout, change size of skylights in master bath #1 & kitchen, add skylight over staircase; ground/f change bedroom #3 sliding door to window, increase width of french door in family room, add laungry sink in garage | ||
| May 26, 2023 | Completed final sign-off Jun 2025 | 33 Rio Ct | to comply with bid nov #202304724 dated 3/13/2023. basement: add entertainment rm/office/full bath; 1/f: reconfig family rm, add master br/bathrm, add br/full bath behind garage, new cantilevered deck @ rear; 2/f: reconfig to open living/dining rm, kitchen, master br/bathrm/half bath, interiorDetails
to comply with bid nov #202304724 dated 3/13/2023. basement: add entertainment rm/office/full bath; 1/f: reconfig family rm, add master br/bathrm, add br/full bath behind garage, new cantilevered deck @ rear; 2/f: reconfig to open living/dining rm, kitchen, master br/bathrm/half bath, interior | $230,000 | |
| May 1, 2023 | Completed final sign-off May 2023 | 2082 33rd Av | Jian Lou Construction Co. | revision to pa 2020-0626-9207 ground floor - relocate entry door to family room; reconfigure mechanical closet to house only the water heater and move furnace to 2nd floor hallway closetDetails
revision to pa 2020-0626-9207 ground floor - relocate entry door to family room; reconfigure mechanical closet to house only the water heater and move furnace to 2nd floor hallway closet | |
| Apr 14, 2023 | Completed final sign-off May 2023 | 401 Ramsell St | in repsonse to nov 202305704, construct guardrail 9in yard in front of e retaining wallDetails
in repsonse to nov 202305704, construct guardrail 9in yard in front of e retaining wall | $1,500 | |
| Dec 16, 2022 | In progress issued Mar 2024 | 39 Morningside Dr | Grand View Construction Inc | upper/f: reconfigure/remodel full bath; main/f: reconfigure/remodel ktichen, reconstruct stairs to upper floor; g/f: add french doors in family room; add lights/switches/outlets throughout houseDetails
upper/f: reconfigure/remodel full bath; main/f: reconfigure/remodel ktichen, reconstruct stairs to upper floor; g/f: add french doors in family room; add lights/switches/outlets throughout house | $60,000 |
| Dec 8, 2022 | Completed final sign-off Jan 2025 | 492 45th Av | Tri Line Construction Co | rev to pa 201810223287 to respond to bid complaint 202290219 and notice of violation 2022001666 enfDetails
rev to pa 201810223287 to respond to bid complaint 202290219 and notice of violation 2022001666 enf | |
| Dec 2, 2022 | Completed final sign-off Nov 2023 | 1177 California St | Tri Line Construction Co | unit 301: add stacked washer dryerDetails
unit 301: add stacked washer dryer | $5,000 |
| Nov 18, 2022 | Completed final sign-off Sep 2023 | 765 39th Av | Realty Builders Inc | demolish leaky front exterior staircase and rebuild in-kind, replace siding rear of house approx 150 sq. ft.Details
demolish leaky front exterior staircase and rebuild in-kind, replace siding rear of house approx 150 sq. ft. | $22,000 |
| Oct 21, 2022 | Completed final sign-off Mar 2023 | 2118 34th Av | B W H Builder Inc. | ground fl - remodel full bath; add kitchenette; replace 10 windows, 2 of which are street facing & 1 sliding door; replace furnace w/packaged furnace/air conditioning unit. add plywood to g/f walls.Details
ground fl - remodel full bath; add kitchenette; replace 10 windows, 2 of which are street facing & 1 sliding door; replace furnace w/packaged furnace/air conditioning unit. add plywood to g/f walls. | $60,000 |
| Oct 21, 2022 | Completed final sign-off Feb 2023 | 2224 Clay St | Jpg Home Improvement Inc | add full bathroom. work to be performed at ground floor only.Details
add full bathroom. work to be performed at ground floor only. | $15,000 |
| Sep 30, 2022 | Completed final sign-off Jan 2024 | 567 Wildwood Wy | On Tung Inc | 2/f: create open floor plan for living/dining room/kitchen, reconfigure interior staircase, add primary bath, reconfigure/remodel full bath; ground f: shift rear wall to line w/(e) 2/f wall, reconfigure fmily room, ad (2) bedrooms & full bathroom behind garage; replace furnace & water heaterDetails
2/f: create open floor plan for living/dining room/kitchen, reconfigure interior staircase, add primary bath, reconfigure/remodel full bath; ground f: shift rear wall to line w/(e) 2/f wall, reconfigure fmily room, ad (2) bedrooms & full bathroom behind garage; replace furnace & water heater | $150,000 |
| Aug 24, 2022 | Completed final sign-off May 2024 | 834 25th Av | New Cities Construction | ground floor: add media room & replace garage door; 2/f: reconfigure & remodel ktichen, convert full bath to half bath, add deck & stairs are rear; 3/f: add primary bath & walk-in closet, reconfigure & remodel bath 2Details
ground floor: add media room & replace garage door; 2/f: reconfigure & remodel ktichen, convert full bath to half bath, add deck & stairs are rear; 3/f: add primary bath & walk-in closet, reconfigure & remodel bath 2 | $150,000 |
| Aug 5, 2022 | Completed final sign-off Aug 2024 | 846 27th Av | Dbf Construction Co Inc | 2nd/f: infill center patio to create living/dining rm & kitchen, relocate interior stairs, add master bath, reconfigure & remodel full bath. groud/f: relocate family rm & bath, add bedroom & office. replace windows @ front and rear. replace furnace and water heater.Details
2nd/f: infill center patio to create living/dining rm & kitchen, relocate interior stairs, add master bath, reconfigure & remodel full bath. groud/f: relocate family rm & bath, add bedroom & office. replace windows @ front and rear. replace furnace and water heater. | $240,000 |
| Feb 23, 2022 | Never finaled issued Feb 2022, no final | 2425 Rivera St | Tri Line Construction Co | revision to permit application 202201206273. along east perimeter wall, perform foundation improvements by underpinning with reinforcement concrete. along rear perimeter wall, replace portion of existing foundation with reinforced concrete.Details
revision to permit application 202201206273. along east perimeter wall, perform foundation improvements by underpinning with reinforcement concrete. along rear perimeter wall, replace portion of existing foundation with reinforced concrete. | $15,000 |
| Feb 2, 2022 | Never finaled filed Feb 2022, never issued | 1679 48th Av | 3/f: convert bookroom into kitchenette with 2-burner stove. 2/f: all hallway walls. g/f: rotate washer and dryer so they are accessible from the main hallway.Details
3/f: convert bookroom into kitchenette with 2-burner stove. 2/f: all hallway walls. g/f: rotate washer and dryer so they are accessible from the main hallway. | $18,000 | |
| Jan 20, 2022 | Never finaled issued Jan 2022, no final | 2425 Rivera St | Tri Line Construction Co | 2/f: reconfigure and remodel kitchen and full bathroom. g/f: add family room, bedroom, and full bathroom behind 1 car garage.Details
2/f: reconfigure and remodel kitchen and full bathroom. g/f: add family room, bedroom, and full bathroom behind 1 car garage. | $90,000 |
| Dec 27, 2021 | Completed final sign-off Jul 2022 | 606 Noe St | New Cities Construction | add interior steel spiral staircase to connect 2nd and 3rd flDetails
add interior steel spiral staircase to connect 2nd and 3rd fl | $20,000 |
| Oct 28, 2021 | Completed final sign-off Jul 2022 | 606 Noe St | New Cities Construction | work on 2nd floor only. reconfigure & remodel kitchen. remodel full bath.Details
work on 2nd floor only. reconfigure & remodel kitchen. remodel full bath. | $32,000 |
| Sep 24, 2021 | Completed final sign-off Dec 2022 | 182 Morningside Dr | New Cities Construction | top fl: reconfig & remodel (e) master bath; 2/f: reconfig & remodel 2 full bath; main fl: config & remodel kitchen, relocate stairs to g/f; g/f: add family room, laundry room & full bath behind garage. replace all windows with double pane (u-factor 0.30 or better); replace w/h & furnace.Details
top fl: reconfig & remodel (e) master bath; 2/f: reconfig & remodel 2 full bath; main fl: config & remodel kitchen, relocate stairs to g/f; g/f: add family room, laundry room & full bath behind garage. replace all windows with double pane (u-factor 0.30 or better); replace w/h & furnace. | $200,000 |
| Sep 24, 2021 | Never finaled issued Sep 2021, no final | 206 Justin Dr | D S Management Inc Dba Metrocon Builders | rev to pa201907165947: at rear elevation - change propsed bi-fold doors to fixed windows & double slding doors and propsed french door to swing door.not visible from street.Details
rev to pa201907165947: at rear elevation - change propsed bi-fold doors to fixed windows & double slding doors and propsed french door to swing door.not visible from street. | |
| Aug 13, 2021 | Completed final sign-off Mar 2022 | 2224 Clay St | Jpg Home Improvement Inc | work to be performed on 3rd fl only. reconfigure and remodel master bathroom.Details
work to be performed on 3rd fl only. reconfigure and remodel master bathroom. | $16,000 |
| Jun 28, 2021 | In progress issued Oct 2023 | 428 Otsego Av | construct 2-story horizontal rear addition to existing 2-story single family dwelling. on 2nd floor, add bedroom, full bathroom, ground floor add workshop and storage space.Details
construct 2-story horizontal rear addition to existing 2-story single family dwelling. on 2nd floor, add bedroom, full bathroom, ground floor add workshop and storage space. | $150,000 | |
| Jun 8, 2021 | Completed final sign-off Jun 2022 | 71 Molimo Dr | Ibs Usa Inc. | replace damaged concrete retaining wall in kind at rear of property, approximately 26' in total length.Details
replace damaged concrete retaining wall in kind at rear of property, approximately 26' in total length. | $30,000 |
| Apr 19, 2021 | Never finaled issued Aug 2021, no final | 2054 Wawona St | revision to pa 2020 0113 1783 & 2019 0329 6586. at front portion of house, perform foundation improvement to accommodate increased ceiling height on ground flr for future development space. add (6) 3'-0" wide glass door panels at rear of house, leading to back yardDetails
revision to pa 2020 0113 1783 & 2019 0329 6586. at front portion of house, perform foundation improvement to accommodate increased ceiling height on ground flr for future development space. add (6) 3'-0" wide glass door panels at rear of house, leading to back yard | $5,000 | |
| Apr 16, 2021 | Never finaled filed Apr 2021, never issued | 240 Benton Av | Tri Line Construction Co | demolish rotten and leaky front exterior brick staircase and rebuild with slight change in configuration.Details
demolish rotten and leaky front exterior brick staircase and rebuild with slight change in configuration. | $6,000 |
| Jan 22, 2021 | Completed final sign-off Apr 2023 | 71 Molimo Dr | Ibs Usa Inc., Barahona Brothers Construction Inc. | demolish exterior staircase at rear of property and construct (2) wooden decks, one at the street level and one at the 2nd floor, and (1) staircase from street level deck to backyard. please note that the proposed 2nd floor deck will be more than 10'-0" above finish grade at backyard.Details
demolish exterior staircase at rear of property and construct (2) wooden decks, one at the street level and one at the 2nd floor, and (1) staircase from street level deck to backyard. please note that the proposed 2nd floor deck will be more than 10'-0" above finish grade at backyard. | $25,000 |
| Jan 13, 2021 | Completed final sign-off Nov 2021 | 2224 Clay St | Jpg Home Improvement Inc | 3/f - convert 3/4 bath to full bath and remodel 1/4 bathDetails
3/f - convert 3/4 bath to full bath and remodel 1/4 bath | $13,000 |
| Nov 19, 2020 | Completed final sign-off Jan 2022 | 29 Rausch St | Lin's Builder | work to be performed at 3rd (#29) fl only. reconfigure and relocate kitchen, remodel (2) full baths, convert living room and family room into bedrooms. replace and relocate tank type water heater with tankless type. install lighting, switches, and receptacles.Details
work to be performed at 3rd (#29) fl only. reconfigure and relocate kitchen, remodel (2) full baths, convert living room and family room into bedrooms. replace and relocate tank type water heater with tankless type. install lighting, switches, and receptacles. | $50,000 |
| Nov 19, 2020 | Completed final sign-off Apr 2023 | 465 Brussels St | main floor: remodel kitchen and master bath; add full bath; add wooden deck and staircase at rear of property. lower floor: add family room, 3 bedrooms and 2 full baths.Details
main floor: remodel kitchen and master bath; add full bath; add wooden deck and staircase at rear of property. lower floor: add family room, 3 bedrooms and 2 full baths. | $135,000 | |
| Nov 17, 2020 | Completed final sign-off Apr 2023 | 465 Brussels St | aconvert existing 3rd floor to new adu to include living room, dining room, kitchen, (3) bedrooms, and (2) full baths. no proposed change to building exterior elevations.Details
aconvert existing 3rd floor to new adu to include living room, dining room, kitchen, (3) bedrooms, and (2) full baths. no proposed change to building exterior elevations. | $55,000 | |
| Oct 17, 2020 | Completed final sign-off Apr 2021 | 689 Spruce St | comply w/ nov #202045613: work on 3rd floor unit. reconfigure & remodel kitchen & bath. remove all cement plaster interior walls and replae with gypsum board. reconstruct load-bearing wall between kitchen and hallway.Details
comply w/ nov #202045613: work on 3rd floor unit. reconfigure & remodel kitchen & bath. remove all cement plaster interior walls and replae with gypsum board. reconstruct load-bearing wall between kitchen and hallway. | $50,000 | |
| Oct 17, 2020 | Completed final sign-off Mar 2022 | 254 Harvard St | B A Builders Inc | 2nd floor construct interior staircase. ground floor add 2 storage rooms and full bathDetails
2nd floor construct interior staircase. ground floor add 2 storage rooms and full bath | $40,000 |
| Aug 22, 2020 | Completed final sign-off Dec 2020 | 2450 Taraval St | Scott Lu's Construction Inc. | revision to pa #2019-0503-9724: all existing windows to remain in place. no change to entire building windows.Details
revision to pa #2019-0503-9724: all existing windows to remain in place. no change to entire building windows. | |
| Jun 26, 2020 | Completed final sign-off Sep 2021 | 39 Clearfield Dr | 2nd floor: rebuild interior staircase to make it more walkable. g/f: add family room, bedroom & full bath behind 2 car garage. remove cracked stucco around house perimeter and apply new stucco with min 3 coats.Details
2nd floor: rebuild interior staircase to make it more walkable. g/f: add family room, bedroom & full bath behind 2 car garage. remove cracked stucco around house perimeter and apply new stucco with min 3 coats. | $90,000 | |
| Jun 26, 2020 | Completed final sign-off May 2023 | 2082 33rd Av | Jian Lou Construction Co. | 2nd fl: reconfigure & remodel kitchen & full bath, add master bath, demolish interior staircase; add exterior staricase at rear. ground fl: add family room, (2) bedroom & full bath. reference complaint #202021447.Details
2nd fl: reconfigure & remodel kitchen & full bath, add master bath, demolish interior staircase; add exterior staricase at rear. ground fl: add family room, (2) bedroom & full bath. reference complaint #202021447. | $110,000 |
| Feb 18, 2020 | Never finaled issued Feb 2020, no final | 762 19th Av | Tri Line Construction Co | 3rd fl add master bath, reconfig and remodel bath 2. 2nd fl relocate and remodel kitchen, convert 1/4 1/2 bath, add deck at rear. gr fl enlarge garage door opening and replace garage doorDetails
3rd fl add master bath, reconfig and remodel bath 2. 2nd fl relocate and remodel kitchen, convert 1/4 1/2 bath, add deck at rear. gr fl enlarge garage door opening and replace garage door | $50,000 |
| Dec 6, 2019 | Completed final sign-off Jul 2025 | 477 Oak St | Lin's Builder | 3rd fl, unit 477 - reconfig fl plan to create combined living,dining & kitchen, 5 bedrms, 2 baths; 2nd fl, unit 479 - reconfig fl plan to create living, dining & kitchen, 3 bedrms, play rm, 1 full bath & half bath; ground fl part of unit 479 - add 2 bedrms, office & 2 full baths.Details
3rd fl, unit 477 - reconfig fl plan to create combined living,dining & kitchen, 5 bedrms, 2 baths; 2nd fl, unit 479 - reconfig fl plan to create living, dining & kitchen, 3 bedrms, play rm, 1 full bath & half bath; ground fl part of unit 479 - add 2 bedrms, office & 2 full baths. | $250,000 |
| Oct 18, 2019 | Completed final sign-off May 2022 | 838 Darien Wy | New Cities Construction | unit legalizaiton ord 43-14. work at street & lower levels. legalize existing unit including living room, kitchen, nook, 3 bedrooms, playroom, & 2 full baths.Details
unit legalizaiton ord 43-14. work at street & lower levels. legalize existing unit including living room, kitchen, nook, 3 bedrooms, playroom, & 2 full baths. | $85,000 |
| Oct 11, 2019 | Completed final sign-off May 2022 | 838 Darien Wy | New Cities Construction | work at 2nd level: reconfigure & remodel kitchen, convert bedrooms to master bath & walk in closet, convert half bath to laundry closet, remodel guest bathDetails
work at 2nd level: reconfigure & remodel kitchen, convert bedrooms to master bath & walk in closet, convert half bath to laundry closet, remodel guest bath | $50,000 |
| Jul 24, 2019 | Completed final sign-off Aug 2019 | 1030 Baker St | to comply with nov #201930994. legalize cmu wall at backyard along north property line.Details
to comply with nov #201930994. legalize cmu wall at backyard along north property line. | ||
| Jun 17, 2019 | Expired or cancelled withdrawn Feb 2024 | 3542 24th St | interior remodel at existing 2nd floor dwelling. creation of 3rd unit at 1st floor garage/shell space. n ew wood window system to replace garage door, no work at occupied 3rd flDetails
interior remodel at existing 2nd floor dwelling. creation of 3rd unit at 1st floor garage/shell space. n ew wood window system to replace garage door, no work at occupied 3rd fl | $150,000 | |
| May 3, 2019 | Completed final sign-off Dec 2020 | 2450 Taraval St | Scott Lu's Construction Inc. | to comply w/ n.o.v's 201931781 & 201940961. remove water-damaged & dryrot partition walls at ground floor commercial unit. replace all 55 windows in building including storefront.Details
to comply w/ n.o.v's 201931781 & 201940961. remove water-damaged & dryrot partition walls at ground floor commercial unit. replace all 55 windows in building including storefront. | $45,000 |
| Mar 29, 2019 | Expired or cancelled cancelled Jan 2026 | 2186 21st Av | 2nd fl - reconfigure & remodel kitchenk; remodel full bath; replace (8) non street facing windowsDetails
2nd fl - reconfigure & remodel kitchenk; remodel full bath; replace (8) non street facing windows | $30,000 | |
| Mar 29, 2019 | Expired or cancelled expired Dec 2019 | 2054 Wawona St | to comply with nov 201931771 along north & south property line walls. add retaining wall in front of (e) concrete foundation to accommodate increased ceiling ht on ground fl for future developemtn into habitable space. install concrete slab. add glass sliding door leading to backyard. build siteDetails
to comply with nov 201931771 along north & south property line walls. add retaining wall in front of (e) concrete foundation to accommodate increased ceiling ht on ground fl for future developemtn into habitable space. install concrete slab. add glass sliding door leading to backyard. build site | $18,000 | |
| Feb 12, 2019 | Completed final sign-off Sep 2019 | 33 Morningside Dr | Via Us Construction Inc | 2nd floor: add master bathroom, reconfigure and remodel guest bathroom. replace rear facing window in master bedroom. work not visible from public right of way.Details
2nd floor: add master bathroom, reconfigure and remodel guest bathroom. replace rear facing window in master bedroom. work not visible from public right of way. | $25,000 |
| Jan 8, 2019 | Completed final sign-off May 2019 | 40 Northwood Dr | B W H Builder Inc. | rebuild interior staircase ground fl. add family room, entertainment room, bedroom & 2 full bathrooms. maher n/a.Details
rebuild interior staircase ground fl. add family room, entertainment room, bedroom & 2 full bathrooms. maher n/a. | $110,000 |
| Dec 4, 2018 | Completed final sign-off Oct 2019 | 4839 Anza St | B W H Builder Inc. | 2nd fl: relocate kitchen, remodel bath, demolish rear staircase. gr fl add 2 bedrooms and full bathDetails
2nd fl: relocate kitchen, remodel bath, demolish rear staircase. gr fl add 2 bedrooms and full bath | $70,000 |
| Aug 7, 2018 | Expired or cancelled cancelled Jan 2026 | 1386 15th Av | 2nd fl: remodel kitchen, reconfig & remodel bathroom, add master bath. ground fl: add family rm, bedroom, & full bath, add deck w/finish floor no greater than 2'-6" above finish grade.Details
2nd fl: remodel kitchen, reconfig & remodel bathroom, add master bath. ground fl: add family rm, bedroom, & full bath, add deck w/finish floor no greater than 2'-6" above finish grade. | $60,000 | |
| Aug 1, 2018 | Completed final sign-off Sep 2020 | 937 Howard St | Scott Lu's Construction Inc. | to comply with nov #201877801. demolish fire damaged egress staircase at rear of property & provide in-kind replacement. for residential units onlyDetails
to comply with nov #201877801. demolish fire damaged egress staircase at rear of property & provide in-kind replacement. for residential units only | $12,000 |
| Jul 10, 2018 | Completed final sign-off Oct 2018 | 2503 Post St | Caruso Construction Inc. | work on 3rd fl unit only: remove non-load bearing wall to create open foor plan for kitchen, family room & nook.Details
work on 3rd fl unit only: remove non-load bearing wall to create open foor plan for kitchen, family room & nook. | $15,000 |