Barahona Brothers Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2014 to Sep 2026
- Last 24 months
- 5 permits filed
61 permits since 2000: 46 completed, 5 in progress, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2026 | In progress issued Sep 2026 | 3 Balmy St | interior remodel of (e) kitchen. new powder room at 2/f.Details
interior remodel of (e) kitchen. new powder room at 2/f. | $65,000 |
| Jul 21, 2026 | In progress issued Jul 2026 | 3 Balmy St | chimney demolitionDetails
chimney demolition | $18,000 |
| Jul 14, 2026 | In progress issued Sep 2026 | 1250 Sunnydale Av | restroom floor demo and replacement in kind. restroom fixtures replacement in kind. electrical devices in restroom replacement in kind. utility sink replacement in kind.Details
restroom floor demo and replacement in kind. restroom fixtures replacement in kind. electrical devices in restroom replacement in kind. utility sink replacement in kind. | $28,000 |
| Jun 1, 2026 | In progress issued Jun 2026 | 3526 17th St | powder room refresh: new paint, new vanity, replace toilet. all work in-kid.Details
powder room refresh: new paint, new vanity, replace toilet. all work in-kid. | $24,000 |
| Jan 31, 2025 | Completed final sign-off May 2025 | 180 Bocana St | bathroom renovation in kind.Details
bathroom renovation in kind. | $24,600 |
| Jun 12, 2023 | Completed final sign-off Oct 2023 | 874 Silver Av | second floor bathroom renovation in kindDetails
second floor bathroom renovation in kind | $23,000 |
| Mar 17, 2023 | Completed final sign-off Dec 2023 | 43 Molimo Dr | to obtain final inspection for work approved under pa# 201912189834. all work is complete.Details
to obtain final inspection for work approved under pa# 201912189834. all work is complete. | |
| Oct 24, 2022 | In progress issued Feb 2024 | 2530 14th Av | 1st fl:remove & replace(e)interior stair with a (n)stair to 2nd fl. 2nd fl:interior remodel,kitchen,full bath, add 1/2 bath,remove bedroom,new stair to 1st & 3rd fl.3rd fl:add bed and full bath to (e)fl,new stair to 2nd fl.Details
1st fl:remove & replace(e)interior stair with a (n)stair to 2nd fl. 2nd fl:interior remodel,kitchen,full bath, add 1/2 bath,remove bedroom,new stair to 1st & 3rd fl.3rd fl:add bed and full bath to (e)fl,new stair to 2nd fl. | $200,000 |
| Sep 19, 2022 | Completed final sign-off Apr 2023 | 712 Dorado Tr | unit 12: one bathroom renovation in kindDetails
unit 12: one bathroom renovation in kind | $22,000 |
| Sep 12, 2022 | Completed final sign-off Mar 2023 | 281 Nevada St | to obtain final inspection for work approved under pa# 201801310001. all work is complete.Details
to obtain final inspection for work approved under pa# 201801310001. all work is complete. | |
| Aug 3, 2022 | Never finaled issued Aug 2022, no final | 2530 14th Av | revision to bpa# 202204293330 ; widen and deepen continuous footingsDetails
revision to bpa# 202204293330 ; widen and deepen continuous footings | $25,000 |
| May 24, 2022 | Completed final sign-off May 2023 | 218 Yale St | second floor bathroom renovation (in kind)Details
second floor bathroom renovation (in kind) | $22,000 |
| Apr 29, 2022 | Never finaled issued May 2022, no final | 2530 14th Av | demolition of (e) partitions & finishes, structural & foundation upgrades, remove & replace fau & water heater. add bedroom & bathroom & laundry @ garage level.Details
demolition of (e) partitions & finishes, structural & foundation upgrades, remove & replace fau & water heater. add bedroom & bathroom & laundry @ garage level. | $60,000 |
| Mar 29, 2022 | Completed final sign-off May 2022 | 2530 14th Av | removal of declorative pig board from garage. open stud wall about 60 lf.Details
removal of declorative pig board from garage. open stud wall about 60 lf. | $11,500 |
| Feb 16, 2022 | Completed final sign-off Feb 2022 | 84 Molimo Dr | renewal permrit# 201904228644. all work is complete. drywall patch repairs. lite demo work.Details
renewal permrit# 201904228644. all work is complete. drywall patch repairs. lite demo work. | |
| Jul 29, 2021 | Never finaled issued Jul 2021, no final | 10 Prospect Av | one full bathroom remodel in kind, kitchen remodel in kind. full home rewire. main service upgrade to 120amp, gas line upgrade. in attic <200#.Details
one full bathroom remodel in kind, kitchen remodel in kind. full home rewire. main service upgrade to 120amp, gas line upgrade. in attic <200#. | $72,000 |
| Apr 16, 2021 | Completed final sign-off Jul 2022 | 112 Molimo Dr | 1st fl: garage infill, 1 bedroom, 1 bathroom, laundry, (n) stair, furnace & tankless water heater. 2nd fl: remodel kitchen /dining /living room. remodel bathroom in-kind replacements. reroof. patch & repair (e) skylights.Details
1st fl: garage infill, 1 bedroom, 1 bathroom, laundry, (n) stair, furnace & tankless water heater. 2nd fl: remodel kitchen /dining /living room. remodel bathroom in-kind replacements. reroof. patch & repair (e) skylights. | $300,000 |
| Jan 28, 2021 | Completed final sign-off Dec 2023 | 43 Molimo Dr | phase ii 375 sq.ft. rear addition with two 1st floor bedrooms and 2nd floor roof deck (phase i improvements to the existing structure per approved application 2019-1218-9834 is about to be completed)Details
phase ii 375 sq.ft. rear addition with two 1st floor bedrooms and 2nd floor roof deck (phase i improvements to the existing structure per approved application 2019-1218-9834 is about to be completed) | $120,000 |
| Jan 25, 2021 | Completed final sign-off Feb 2021 | 75 Molimo Dr | basement overhaul. install walls insulation- drywall@ basement. install floors. install replaced doors, fire tape and mud, paint work. install new floors @ stairs leading to basement. (e) basement is storage only, non conditioned space.Details
basement overhaul. install walls insulation- drywall@ basement. install floors. install replaced doors, fire tape and mud, paint work. install new floors @ stairs leading to basement. (e) basement is storage only, non conditioned space. | $32,000 |
| Jan 22, 2021 | Completed final sign-off Apr 2023 | 71 Molimo Dr | demolish exterior staircase at rear of property and construct (2) wooden decks, one at the street level and one at the 2nd floor, and (1) staircase from street level deck to backyard. please note that the proposed 2nd floor deck will be more than 10'-0" above finish grade at backyard.Details
demolish exterior staircase at rear of property and construct (2) wooden decks, one at the street level and one at the 2nd floor, and (1) staircase from street level deck to backyard. please note that the proposed 2nd floor deck will be more than 10'-0" above finish grade at backyard. | $25,000 |
| Jul 17, 2020 | Never finaled issued Jul 2020, no final | 63 Molimo Dr | vinyl siding replacement. install new hardie cement planks. thickness 0.312. length 12" ft with 8.25". exposures 7". rear wall.Details
vinyl siding replacement. install new hardie cement planks. thickness 0.312. length 12" ft with 8.25". exposures 7". rear wall. | $8,000 |
| Jul 17, 2020 | Completed final sign-off Oct 2020 | 377 Elsie St | dormer siding replacement. from vinyl to cider. not visible stret, total 160 sq feet.Details
dormer siding replacement. from vinyl to cider. not visible stret, total 160 sq feet. | $6,000 |
| Feb 28, 2020 | Completed final sign-off Mar 2021 | 76 Molimo Dr | 1/f: relocate (e) stair, bedroom, 1 closet remodel, new furnace & tankless water heater. 2/f: kitchen & dining room remodel, new stair, remove f.p, add 1/2 bathDetails
1/f: relocate (e) stair, bedroom, 1 closet remodel, new furnace & tankless water heater. 2/f: kitchen & dining room remodel, new stair, remove f.p, add 1/2 bath | $110,000 |
| Dec 18, 2019 | Expired or cancelled expired Dec 2023 | 43 Molimo Dr | new bathroom & laundry at 1st fl. create 2 car tandem parking at 1st fl. remove (e) concrete patio. 2nd fl: relocate kitchen, new bedrm in area of (e) kitchen. update closet/entry in (e) bedrm, remove (e) sunroom. replace rear windows w/patio doors & guards.Details
new bathroom & laundry at 1st fl. create 2 car tandem parking at 1st fl. remove (e) concrete patio. 2nd fl: relocate kitchen, new bedrm in area of (e) kitchen. update closet/entry in (e) bedrm, remove (e) sunroom. replace rear windows w/patio doors & guards. | $120,000 |
| Oct 9, 2019 | Never finaled issued Oct 2019, no final | 106 Wool St | remodel existing bath and kitchen in kindDetails
remodel existing bath and kitchen in kind | $12,000 |
| May 20, 2019 | Completed final sign-off Jul 2022 | 84 Molimo Dr | interior remodel: 1st floor: relocate extg stair to 2nd floor, master bedroom/bath/office remodel, relocate laundry, add entry closet,new furnace, tankless water heater. 2nd fl: kitchen/dining remodel, remodel 2 bedrooms, 1 bathroom.Details
interior remodel: 1st floor: relocate extg stair to 2nd floor, master bedroom/bath/office remodel, relocate laundry, add entry closet,new furnace, tankless water heater. 2nd fl: kitchen/dining remodel, remodel 2 bedrooms, 1 bathroom. | $190,000 |
| Apr 22, 2019 | Never finaled issued Apr 2019, no final | 67 Arroyo Wy | at front façade, remove (e) vinyl siding and restore stucco. replace garage door. no other work. no street spaceDetails
at front façade, remove (e) vinyl siding and restore stucco. replace garage door. no other work. no street space | $8,000 |
| Apr 22, 2019 | Expired or cancelled expired Mar 2022 | 84 Molimo Dr | brick fireplace removal inside, not visible from outside, some drywall around, light demo work, no street spaceDetails
brick fireplace removal inside, not visible from outside, some drywall around, light demo work, no street space | $4,000 |
| Apr 3, 2019 | Completed final sign-off May 2019 | 124 Benton Av | bathroom remodeling like-for-like, approx. 35 sq. ft., no wall removalDetails
bathroom remodeling like-for-like, approx. 35 sq. ft., no wall removal | $15,000 |
| Sep 26, 2018 | Completed final sign-off Apr 2019 | 259 Tocoloma Av | reroofingDetails
reroofing | $10,000 |
| Aug 21, 2018 | Completed final sign-off Jul 2020 | 48 Molimo Dr | 1st flr: rear yard ground level addition w/ roof dekc above. add 1/2 bathroom & family room. 2nd flr: new patio door to roof deck. clearestory skylight over kitchen island.Details
1st flr: rear yard ground level addition w/ roof dekc above. add 1/2 bathroom & family room. 2nd flr: new patio door to roof deck. clearestory skylight over kitchen island. | $110,000 |
| Mar 8, 2018 | Completed final sign-off Aug 2018 | 129 Ellert St | to obtain final inspector for work approved under bpa#200507268656, 200502074969, 200411108903. all work is completeDetails
to obtain final inspector for work approved under bpa#200507268656, 200502074969, 200411108903. all work is complete | |
| Mar 8, 2018 | Completed final sign-off Mar 2018 | 129 Ellert St | to obtain final inspection for work approved under pa#9608852, finalize permit. all work is complete.Details
to obtain final inspection for work approved under pa#9608852, finalize permit. all work is complete. | |
| Mar 8, 2018 | Completed final sign-off Aug 2018 | 129 Ellert St | to obtain final inspector for work approved under bpa#200410126522. all work is completeDetails
to obtain final inspector for work approved under bpa#200410126522. all work is complete | |
| Mar 7, 2018 | Completed final sign-off Sep 2018 | 48 Molimo Dr | residential interior remodel due to structural fire next door and fire dept fighting fire. remodel kitchen, dining, living, stairs, entry, bedrooms, laundry, bathroom, new hvac and water heater relocated. patch rear siding to match (e), patch & repair roof.Details
residential interior remodel due to structural fire next door and fire dept fighting fire. remodel kitchen, dining, living, stairs, entry, bedrooms, laundry, bathroom, new hvac and water heater relocated. patch rear siding to match (e), patch & repair roof. | $80,000 |
| Feb 6, 2018 | Completed final sign-off Sep 2018 | 48 Molimo Dr | fire loss - water damage - demo work - removed kitchen cabinetry; water damaged drywall - damaged floors - remove knob and tub wiring - existing plumbingDetails
fire loss - water damage - demo work - removed kitchen cabinetry; water damaged drywall - damaged floors - remove knob and tub wiring - existing plumbing | $12,500 |
| Jan 31, 2018 | Completed final sign-off Mar 2023 | 281 Nevada St | to construct a new 2-story front yard addition to an (e) house. scope includes a new 1-car garage, family rm, (2) bdrms & (2) bathrms. variance app #2017-006809 var.Details
to construct a new 2-story front yard addition to an (e) house. scope includes a new 1-car garage, family rm, (2) bdrms & (2) bathrms. variance app #2017-006809 var. | $250,000 |
| Jan 22, 2018 | Completed final sign-off Apr 2019 | 259 Tocoloma Av | to remodel and enlarge an extg ground floor space to create a new master suite and family room.Details
to remodel and enlarge an extg ground floor space to create a new master suite and family room. | $65,000 |
| Jul 5, 2017 | Completed final sign-off Sep 2017 | 91 Wool St | build a photoroom, electrical main panel upgrade 200 ampDetails
build a photoroom, electrical main panel upgrade 200 amp | $9,000 |
| Apr 10, 2017 | Completed final sign-off Jun 2017 | 557 Anderson St | bathroom remodel like for like. replace (e) solar tube.Details
bathroom remodel like for like. replace (e) solar tube. | $17,000 |
| Feb 15, 2017 | Completed final sign-off Sep 2018 | 75 Molimo Dr | demo existing bath, pull out carpet, demo ktichen. remove existing bath, plaster and remove ivy from wall. fire resistive wall finishes to remain until construction permit issuedDetails
demo existing bath, pull out carpet, demo ktichen. remove existing bath, plaster and remove ivy from wall. fire resistive wall finishes to remain until construction permit issued | $3,500 |
| Feb 15, 2017 | Completed final sign-off May 2017 | 91 Wool St | bathroom remodel like for likeDetails
bathroom remodel like for like | $15,000 |
| Sep 16, 2016 | Completed final sign-off Oct 2017 | 1512 Clay St | seismic strengthening of gr level per sf mandatory seismic retrofit program. sfbc chap 34 b 2012 iebc appendix a4Details
seismic strengthening of gr level per sf mandatory seismic retrofit program. sfbc chap 34 b 2012 iebc appendix a4 | $30,000 |
| Aug 1, 2016 | Completed final sign-off Dec 2016 | 624 Moultrie St | kitchen remodel. no change on walls.Details
kitchen remodel. no change on walls. | $14,000 |
| Jun 23, 2016 | Completed final sign-off Sep 2016 | 6 Whitney St | stair repair. infill sides and replace railing. drawings are revision to pa#2016-0112-6834Details
stair repair. infill sides and replace railing. drawings are revision to pa#2016-0112-6834 | $10,000 |
| Apr 21, 2016 | Completed final sign-off Sep 2016 | 511 Alvarado St | add full bathroom in garage, convert (e) enclosed exterior space into a bedroom, infill wall opening with door, replace (e) furnace & water heater with new.no work visible from street.Details
add full bathroom in garage, convert (e) enclosed exterior space into a bedroom, infill wall opening with door, replace (e) furnace & water heater with new.no work visible from street. | $60,000 |
| Oct 5, 2015 | Completed final sign-off Dec 2015 | 129 Ellert St | bathroom remodel: electrical work, plumbing wwork, framing, tile, shower pan test, paint work, fixtures installation, dry wall/demoDetails
bathroom remodel: electrical work, plumbing wwork, framing, tile, shower pan test, paint work, fixtures installation, dry wall/demo | $16,500 |
| Sep 16, 2015 | Completed final sign-off Dec 2015 | 387 Mullen Av | bathroom remodel, shower, tile work, plubming & electrical work, fixtures, shower pan.Details
bathroom remodel, shower, tile work, plubming & electrical work, fixtures, shower pan. | $16,500 |
| Aug 31, 2015 | Completed final sign-off Mar 2018 | 207 Bella Vista Wy | addition of master bedroom, bathroom & (n) rear yard deckDetails
addition of master bedroom, bathroom & (n) rear yard deck | $100,000 |
| Aug 14, 2015 | Completed final sign-off Sep 2018 | 75 Molimo Dr | rear yard addition. 1st floor: master bed / bath remodel. laundry. 2nd floor: kitchen / dining remodel. new rear windows. replace (e) decks with new rear decks.Details
rear yard addition. 1st floor: master bed / bath remodel. laundry. 2nd floor: kitchen / dining remodel. new rear windows. replace (e) decks with new rear decks. | $140,000 |
| Aug 7, 2015 | Never finaled issued Aug 2015, no final | 281 Nevada St | kitchen cabinet installation, recessed lights, remove pony wall, plumbing-electrical work, laundry room relocation, reconfigure bedroom closets, light framing doorways.Details
kitchen cabinet installation, recessed lights, remove pony wall, plumbing-electrical work, laundry room relocation, reconfigure bedroom closets, light framing doorways. | $18,500 |
| Jul 13, 2015 | Completed final sign-off Aug 2015 | 3235 Gough St | apt. #206: kitchen cabinet replacement. add recessed lights in kitchen and hallway. sub-panel upgrade. maintain fire ratings at walls and ceilings at penetrations per 714.3 and 714.4 cbcDetails
apt. #206: kitchen cabinet replacement. add recessed lights in kitchen and hallway. sub-panel upgrade. maintain fire ratings at walls and ceilings at penetrations per 714.3 and 714.4 cbc | $11,500 |
| May 27, 2015 | Completed final sign-off Jun 2015 | 3235 Gough St | # 205: replace (e) kitchen cabinets - plumbing - electrical: new counter tops - back splash - appliances, new outlets - 4 led lightsDetails
# 205: replace (e) kitchen cabinets - plumbing - electrical: new counter tops - back splash - appliances, new outlets - 4 led lights | $11,000 |
| Feb 9, 2015 | Completed final sign-off Jul 2015 | 2817 24th St | unit a - no change in layout; replace kitchen cabinets, remodel bathroom, laundry room,; electrical sub-panel, gas upgrade, install tankless water heater, bring electrical to code - mechanical soffit. to comply with cec150.0(k)5. compliance with maher ordinance no. 155-13 not required.Details
unit a - no change in layout; replace kitchen cabinets, remodel bathroom, laundry room,; electrical sub-panel, gas upgrade, install tankless water heater, bring electrical to code - mechanical soffit. to comply with cec150.0(k)5. compliance with maher ordinance no. 155-13 not required. | $32,000 |
| Feb 9, 2015 | Completed final sign-off Jul 2015 | 2817 24th St | unit b - expand bathroom approx. 16" - laundry room - electrical sub-panel; bring electrical to code - gas to code - install tankless water heater; to comply with cec150.0(k)5. compliance with maher ordinance no 155-13 not required.Details
unit b - expand bathroom approx. 16" - laundry room - electrical sub-panel; bring electrical to code - gas to code - install tankless water heater; to comply with cec150.0(k)5. compliance with maher ordinance no 155-13 not required. | $36,000 |
| Jan 13, 2015 | Completed final sign-off Feb 2015 | 137 Prentiss St | 5 x 7 bathroom remodeling, tile work, drywall, paint. like for likeDetails
5 x 7 bathroom remodeling, tile work, drywall, paint. like for like | $11,000 |
| Dec 23, 2014 | Never finaled issued Dec 2014, no final | 148 Highland Av | exterior cracked tile replacement. apply new grout. exterior wood trim replacement. prime & paint rotted siding first two rows about 60 ln ft. rear patio.Details
exterior cracked tile replacement. apply new grout. exterior wood trim replacement. prime & paint rotted siding first two rows about 60 ln ft. rear patio. | $2,500 |
| Dec 10, 2014 | Completed final sign-off Apr 2015 | 129 Ellert St | swap kitchen cab. swap appliances. electrical outlets: 9 recessed led lighting. remove bearing wall, frame work, swap entry door paintwork, and drywall patching.Details
swap kitchen cab. swap appliances. electrical outlets: 9 recessed led lighting. remove bearing wall, frame work, swap entry door paintwork, and drywall patching. | $11,000 |
| Aug 12, 2014 | Completed final sign-off Jun 2015 | 9 Ardenwood Wy | bathroom remodel. demo, new tub, new pedestal sink and shower and toilet, fan,replace 2 windows not visible, tileDetails
bathroom remodel. demo, new tub, new pedestal sink and shower and toilet, fan,replace 2 windows not visible, tile | $11,000 |
| Jul 17, 2014 | Completed final sign-off Oct 2014 | 3676 23rd St | kitchen cabinets - new floor appliances. pumbing: sink - d.w., stove, range hood, countertop - recessed light frame work. paint work. kitchen sub panel - lighting to be efficacy new range to be connected to existing duct.Details
kitchen cabinets - new floor appliances. pumbing: sink - d.w., stove, range hood, countertop - recessed light frame work. paint work. kitchen sub panel - lighting to be efficacy new range to be connected to existing duct. | |
| Jul 14, 2014 | Completed final sign-off Sep 2014 | 145 Escolta Wy | to comply with bid complaint #201481342 dated 6/30/2014, replace old upstairs bathroom fixtures for new, plumbing work, drywall patch, tile work, repalce (e) lightwell window at bathroom, max u-factor 0.40Details
to comply with bid complaint #201481342 dated 6/30/2014, replace old upstairs bathroom fixtures for new, plumbing work, drywall patch, tile work, repalce (e) lightwell window at bathroom, max u-factor 0.40 | $6,500 |