Barahona Brothers Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2014 to Sep 2026
- Last 24 months
- 5 permits filed
61 permits since 2000: 46 completed, 5 in progress, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 7 completed, 1 in progress. Typically 19 days from filing to permit and 381 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 24, 2022 | In progress issued Feb 2024 | 2530 14th Av | 1st fl:remove & replace(e)interior stair with a (n)stair to 2nd fl. 2nd fl:interior remodel,kitchen,full bath, add 1/2 bath,remove bedroom,new stair to 1st & 3rd fl.3rd fl:add bed and full bath to (e)fl,new stair to 2nd fl.Details
1st fl:remove & replace(e)interior stair with a (n)stair to 2nd fl. 2nd fl:interior remodel,kitchen,full bath, add 1/2 bath,remove bedroom,new stair to 1st & 3rd fl.3rd fl:add bed and full bath to (e)fl,new stair to 2nd fl. | $200,000 |
| Apr 16, 2021 | Completed final sign-off Jul 2022 | 112 Molimo Dr | 1st fl: garage infill, 1 bedroom, 1 bathroom, laundry, (n) stair, furnace & tankless water heater. 2nd fl: remodel kitchen /dining /living room. remodel bathroom in-kind replacements. reroof. patch & repair (e) skylights.Details
1st fl: garage infill, 1 bedroom, 1 bathroom, laundry, (n) stair, furnace & tankless water heater. 2nd fl: remodel kitchen /dining /living room. remodel bathroom in-kind replacements. reroof. patch & repair (e) skylights. | $300,000 |
| Jan 25, 2021 | Completed final sign-off Feb 2021 | 75 Molimo Dr | basement overhaul. install walls insulation- drywall@ basement. install floors. install replaced doors, fire tape and mud, paint work. install new floors @ stairs leading to basement. (e) basement is storage only, non conditioned space.Details
basement overhaul. install walls insulation- drywall@ basement. install floors. install replaced doors, fire tape and mud, paint work. install new floors @ stairs leading to basement. (e) basement is storage only, non conditioned space. | $32,000 |
| Jan 22, 2021 | Completed final sign-off Apr 2023 | 71 Molimo Dr | demolish exterior staircase at rear of property and construct (2) wooden decks, one at the street level and one at the 2nd floor, and (1) staircase from street level deck to backyard. please note that the proposed 2nd floor deck will be more than 10'-0" above finish grade at backyard.Details
demolish exterior staircase at rear of property and construct (2) wooden decks, one at the street level and one at the 2nd floor, and (1) staircase from street level deck to backyard. please note that the proposed 2nd floor deck will be more than 10'-0" above finish grade at backyard. | $25,000 |
| Feb 28, 2020 | Completed final sign-off Mar 2021 | 76 Molimo Dr | 1/f: relocate (e) stair, bedroom, 1 closet remodel, new furnace & tankless water heater. 2/f: kitchen & dining room remodel, new stair, remove f.p, add 1/2 bathDetails
1/f: relocate (e) stair, bedroom, 1 closet remodel, new furnace & tankless water heater. 2/f: kitchen & dining room remodel, new stair, remove f.p, add 1/2 bath | $110,000 |
| May 20, 2019 | Completed final sign-off Jul 2022 | 84 Molimo Dr | interior remodel: 1st floor: relocate extg stair to 2nd floor, master bedroom/bath/office remodel, relocate laundry, add entry closet,new furnace, tankless water heater. 2nd fl: kitchen/dining remodel, remodel 2 bedrooms, 1 bathroom.Details
interior remodel: 1st floor: relocate extg stair to 2nd floor, master bedroom/bath/office remodel, relocate laundry, add entry closet,new furnace, tankless water heater. 2nd fl: kitchen/dining remodel, remodel 2 bedrooms, 1 bathroom. | $190,000 |
| Mar 7, 2018 | Completed final sign-off Sep 2018 | 48 Molimo Dr | residential interior remodel due to structural fire next door and fire dept fighting fire. remodel kitchen, dining, living, stairs, entry, bedrooms, laundry, bathroom, new hvac and water heater relocated. patch rear siding to match (e), patch & repair roof.Details
residential interior remodel due to structural fire next door and fire dept fighting fire. remodel kitchen, dining, living, stairs, entry, bedrooms, laundry, bathroom, new hvac and water heater relocated. patch rear siding to match (e), patch & repair roof. | $80,000 |
| Jun 23, 2016 | Completed final sign-off Sep 2016 | 6 Whitney St | stair repair. infill sides and replace railing. drawings are revision to pa#2016-0112-6834Details
stair repair. infill sides and replace railing. drawings are revision to pa#2016-0112-6834 | $10,000 |