Back to bathroom remodel contractors
Barahona Brothers Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2014 to Sep 2026
- Last 24 months
- 5 permits filed
61 permits since 2000: 46 completed, 5 in progress, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
28 bathroom remodel permits: 23 completed, 1 in progress, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 156 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 31, 2025 | Completed final sign-off May 2025 | 180 Bocana St | bathroom renovation in kind.Details
bathroom renovation in kind. | $24,600 |
| Jun 12, 2023 | Completed final sign-off Oct 2023 | 874 Silver Av | second floor bathroom renovation in kindDetails
second floor bathroom renovation in kind | $23,000 |
| Oct 24, 2022 | In progress issued Feb 2024 | 2530 14th Av | 1st fl:remove & replace(e)interior stair with a (n)stair to 2nd fl. 2nd fl:interior remodel,kitchen,full bath, add 1/2 bath,remove bedroom,new stair to 1st & 3rd fl.3rd fl:add bed and full bath to (e)fl,new stair to 2nd fl.Details
1st fl:remove & replace(e)interior stair with a (n)stair to 2nd fl. 2nd fl:interior remodel,kitchen,full bath, add 1/2 bath,remove bedroom,new stair to 1st & 3rd fl.3rd fl:add bed and full bath to (e)fl,new stair to 2nd fl. | $200,000 |
| Sep 19, 2022 | Completed final sign-off Apr 2023 | 712 Dorado Tr | unit 12: one bathroom renovation in kindDetails
unit 12: one bathroom renovation in kind | $22,000 |
| May 24, 2022 | Completed final sign-off May 2023 | 218 Yale St | second floor bathroom renovation (in kind)Details
second floor bathroom renovation (in kind) | $22,000 |
| Apr 29, 2022 | Never finaled issued May 2022, no final | 2530 14th Av | demolition of (e) partitions & finishes, structural & foundation upgrades, remove & replace fau & water heater. add bedroom & bathroom & laundry @ garage level.Details
demolition of (e) partitions & finishes, structural & foundation upgrades, remove & replace fau & water heater. add bedroom & bathroom & laundry @ garage level. | $60,000 |
| Jul 29, 2021 | Never finaled issued Jul 2021, no final | 10 Prospect Av | one full bathroom remodel in kind, kitchen remodel in kind. full home rewire. main service upgrade to 120amp, gas line upgrade. in attic <200#.Details
one full bathroom remodel in kind, kitchen remodel in kind. full home rewire. main service upgrade to 120amp, gas line upgrade. in attic <200#. | $72,000 |
| Apr 16, 2021 | Completed final sign-off Jul 2022 | 112 Molimo Dr | 1st fl: garage infill, 1 bedroom, 1 bathroom, laundry, (n) stair, furnace & tankless water heater. 2nd fl: remodel kitchen /dining /living room. remodel bathroom in-kind replacements. reroof. patch & repair (e) skylights.Details
1st fl: garage infill, 1 bedroom, 1 bathroom, laundry, (n) stair, furnace & tankless water heater. 2nd fl: remodel kitchen /dining /living room. remodel bathroom in-kind replacements. reroof. patch & repair (e) skylights. | $300,000 |
| Feb 28, 2020 | Completed final sign-off Mar 2021 | 76 Molimo Dr | 1/f: relocate (e) stair, bedroom, 1 closet remodel, new furnace & tankless water heater. 2/f: kitchen & dining room remodel, new stair, remove f.p, add 1/2 bathDetails
1/f: relocate (e) stair, bedroom, 1 closet remodel, new furnace & tankless water heater. 2/f: kitchen & dining room remodel, new stair, remove f.p, add 1/2 bath | $110,000 |
| Dec 18, 2019 | Expired or cancelled expired Dec 2023 | 43 Molimo Dr | new bathroom & laundry at 1st fl. create 2 car tandem parking at 1st fl. remove (e) concrete patio. 2nd fl: relocate kitchen, new bedrm in area of (e) kitchen. update closet/entry in (e) bedrm, remove (e) sunroom. replace rear windows w/patio doors & guards.Details
new bathroom & laundry at 1st fl. create 2 car tandem parking at 1st fl. remove (e) concrete patio. 2nd fl: relocate kitchen, new bedrm in area of (e) kitchen. update closet/entry in (e) bedrm, remove (e) sunroom. replace rear windows w/patio doors & guards. | $120,000 |
| Oct 9, 2019 | Never finaled issued Oct 2019, no final | 106 Wool St | remodel existing bath and kitchen in kindDetails
remodel existing bath and kitchen in kind | $12,000 |
| May 20, 2019 | Completed final sign-off Jul 2022 | 84 Molimo Dr | interior remodel: 1st floor: relocate extg stair to 2nd floor, master bedroom/bath/office remodel, relocate laundry, add entry closet,new furnace, tankless water heater. 2nd fl: kitchen/dining remodel, remodel 2 bedrooms, 1 bathroom.Details
interior remodel: 1st floor: relocate extg stair to 2nd floor, master bedroom/bath/office remodel, relocate laundry, add entry closet,new furnace, tankless water heater. 2nd fl: kitchen/dining remodel, remodel 2 bedrooms, 1 bathroom. | $190,000 |
| Apr 3, 2019 | Completed final sign-off May 2019 | 124 Benton Av | bathroom remodeling like-for-like, approx. 35 sq. ft., no wall removalDetails
bathroom remodeling like-for-like, approx. 35 sq. ft., no wall removal | $15,000 |
| Aug 21, 2018 | Completed final sign-off Jul 2020 | 48 Molimo Dr | 1st flr: rear yard ground level addition w/ roof dekc above. add 1/2 bathroom & family room. 2nd flr: new patio door to roof deck. clearestory skylight over kitchen island.Details
1st flr: rear yard ground level addition w/ roof dekc above. add 1/2 bathroom & family room. 2nd flr: new patio door to roof deck. clearestory skylight over kitchen island. | $110,000 |
| Mar 7, 2018 | Completed final sign-off Sep 2018 | 48 Molimo Dr | residential interior remodel due to structural fire next door and fire dept fighting fire. remodel kitchen, dining, living, stairs, entry, bedrooms, laundry, bathroom, new hvac and water heater relocated. patch rear siding to match (e), patch & repair roof.Details
residential interior remodel due to structural fire next door and fire dept fighting fire. remodel kitchen, dining, living, stairs, entry, bedrooms, laundry, bathroom, new hvac and water heater relocated. patch rear siding to match (e), patch & repair roof. | $80,000 |
| Apr 10, 2017 | Completed final sign-off Jun 2017 | 557 Anderson St | bathroom remodel like for like. replace (e) solar tube.Details
bathroom remodel like for like. replace (e) solar tube. | $17,000 |
| Feb 15, 2017 | Completed final sign-off Sep 2018 | 75 Molimo Dr | demo existing bath, pull out carpet, demo ktichen. remove existing bath, plaster and remove ivy from wall. fire resistive wall finishes to remain until construction permit issuedDetails
demo existing bath, pull out carpet, demo ktichen. remove existing bath, plaster and remove ivy from wall. fire resistive wall finishes to remain until construction permit issued | $3,500 |
| Feb 15, 2017 | Completed final sign-off May 2017 | 91 Wool St | bathroom remodel like for likeDetails
bathroom remodel like for like | $15,000 |
| Apr 21, 2016 | Completed final sign-off Sep 2016 | 511 Alvarado St | add full bathroom in garage, convert (e) enclosed exterior space into a bedroom, infill wall opening with door, replace (e) furnace & water heater with new.no work visible from street.Details
add full bathroom in garage, convert (e) enclosed exterior space into a bedroom, infill wall opening with door, replace (e) furnace & water heater with new.no work visible from street. | $60,000 |
| Oct 5, 2015 | Completed final sign-off Dec 2015 | 129 Ellert St | bathroom remodel: electrical work, plumbing wwork, framing, tile, shower pan test, paint work, fixtures installation, dry wall/demoDetails
bathroom remodel: electrical work, plumbing wwork, framing, tile, shower pan test, paint work, fixtures installation, dry wall/demo | $16,500 |
| Sep 16, 2015 | Completed final sign-off Dec 2015 | 387 Mullen Av | bathroom remodel, shower, tile work, plubming & electrical work, fixtures, shower pan.Details
bathroom remodel, shower, tile work, plubming & electrical work, fixtures, shower pan. | $16,500 |
| Aug 31, 2015 | Completed final sign-off Mar 2018 | 207 Bella Vista Wy | addition of master bedroom, bathroom & (n) rear yard deckDetails
addition of master bedroom, bathroom & (n) rear yard deck | $100,000 |
| Aug 14, 2015 | Completed final sign-off Sep 2018 | 75 Molimo Dr | rear yard addition. 1st floor: master bed / bath remodel. laundry. 2nd floor: kitchen / dining remodel. new rear windows. replace (e) decks with new rear decks.Details
rear yard addition. 1st floor: master bed / bath remodel. laundry. 2nd floor: kitchen / dining remodel. new rear windows. replace (e) decks with new rear decks. | $140,000 |
| Feb 9, 2015 | Completed final sign-off Jul 2015 | 2817 24th St | unit a - no change in layout; replace kitchen cabinets, remodel bathroom, laundry room,; electrical sub-panel, gas upgrade, install tankless water heater, bring electrical to code - mechanical soffit. to comply with cec150.0(k)5. compliance with maher ordinance no. 155-13 not required.Details
unit a - no change in layout; replace kitchen cabinets, remodel bathroom, laundry room,; electrical sub-panel, gas upgrade, install tankless water heater, bring electrical to code - mechanical soffit. to comply with cec150.0(k)5. compliance with maher ordinance no. 155-13 not required. | $32,000 |
| Feb 9, 2015 | Completed final sign-off Jul 2015 | 2817 24th St | unit b - expand bathroom approx. 16" - laundry room - electrical sub-panel; bring electrical to code - gas to code - install tankless water heater; to comply with cec150.0(k)5. compliance with maher ordinance no 155-13 not required.Details
unit b - expand bathroom approx. 16" - laundry room - electrical sub-panel; bring electrical to code - gas to code - install tankless water heater; to comply with cec150.0(k)5. compliance with maher ordinance no 155-13 not required. | $36,000 |
| Jan 13, 2015 | Completed final sign-off Feb 2015 | 137 Prentiss St | 5 x 7 bathroom remodeling, tile work, drywall, paint. like for likeDetails
5 x 7 bathroom remodeling, tile work, drywall, paint. like for like | $11,000 |
| Aug 12, 2014 | Completed final sign-off Jun 2015 | 9 Ardenwood Wy | bathroom remodel. demo, new tub, new pedestal sink and shower and toilet, fan,replace 2 windows not visible, tileDetails
bathroom remodel. demo, new tub, new pedestal sink and shower and toilet, fan,replace 2 windows not visible, tile | $11,000 |
| Jul 14, 2014 | Completed final sign-off Sep 2014 | 145 Escolta Wy | to comply with bid complaint #201481342 dated 6/30/2014, replace old upstairs bathroom fixtures for new, plumbing work, drywall patch, tile work, repalce (e) lightwell window at bathroom, max u-factor 0.40Details
to comply with bid complaint #201481342 dated 6/30/2014, replace old upstairs bathroom fixtures for new, plumbing work, drywall patch, tile work, repalce (e) lightwell window at bathroom, max u-factor 0.40 | $6,500 |