Block 3001A, lot 037
75 Molimo Dr
- City’s use
- Single Family Residential
- Built
- 1958
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 2,066 sq ft
- Lot
- 2,687 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 25, 2021 | Completed final sign-off Feb 2021 | 75 Molimo Dr | Barahona Brothers Construction Inc. | basement overhaul. install walls insulation- drywall@ basement. install floors. install replaced doors, fire tape and mud, paint work. install new floors @ stairs leading to basement. (e) basement is storage only, non conditioned space.Details
basement overhaul. install walls insulation- drywall@ basement. install floors. install replaced doors, fire tape and mud, paint work. install new floors @ stairs leading to basement. (e) basement is storage only, non conditioned space. | $32,000 |
| Feb 15, 2017 | Completed final sign-off Sep 2018 | 75 Molimo Dr | Barahona Brothers Construction Inc. | demo existing bath, pull out carpet, demo ktichen. remove existing bath, plaster and remove ivy from wall. fire resistive wall finishes to remain until construction permit issuedDetails
demo existing bath, pull out carpet, demo ktichen. remove existing bath, plaster and remove ivy from wall. fire resistive wall finishes to remain until construction permit issued | $3,500 |
| Aug 14, 2015 | Completed final sign-off Sep 2018 | 75 Molimo Dr | Barahona Brothers Construction Inc. | rear yard addition. 1st floor: master bed / bath remodel. laundry. 2nd floor: kitchen / dining remodel. new rear windows. replace (e) decks with new rear decks.Details
rear yard addition. 1st floor: master bed / bath remodel. laundry. 2nd floor: kitchen / dining remodel. new rear windows. replace (e) decks with new rear decks. | $140,000 |
| Oct 16, 2008 | Completed final sign-off Jan 2009 | 75 Molimo Dr | replace rotten deck board & post with new material. no change in shape or size. existing concrete footing to be replaced. bring railing up to code. less than 50% of deck.Details
replace rotten deck board & post with new material. no change in shape or size. existing concrete footing to be replaced. bring railing up to code. less than 50% of deck. | $2,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Barahona Brothers Construction Inc. (3)
- Architects
- Peter Zepponi
- Engineers
- Nathan Williams
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.