Back to kitchen remodel contractors
Barahona Brothers Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2014 to Sep 2026
- Last 24 months
- 5 permits filed
61 permits since 2000: 46 completed, 5 in progress, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 13 completed, 2 in progress, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2026 | In progress issued Sep 2026 | 3 Balmy St | interior remodel of (e) kitchen. new powder room at 2/f.Details
interior remodel of (e) kitchen. new powder room at 2/f. | $65,000 |
| Oct 24, 2022 | In progress issued Feb 2024 | 2530 14th Av | 1st fl:remove & replace(e)interior stair with a (n)stair to 2nd fl. 2nd fl:interior remodel,kitchen,full bath, add 1/2 bath,remove bedroom,new stair to 1st & 3rd fl.3rd fl:add bed and full bath to (e)fl,new stair to 2nd fl.Details
1st fl:remove & replace(e)interior stair with a (n)stair to 2nd fl. 2nd fl:interior remodel,kitchen,full bath, add 1/2 bath,remove bedroom,new stair to 1st & 3rd fl.3rd fl:add bed and full bath to (e)fl,new stair to 2nd fl. | $200,000 |
| Jul 29, 2021 | Never finaled issued Jul 2021, no final | 10 Prospect Av | one full bathroom remodel in kind, kitchen remodel in kind. full home rewire. main service upgrade to 120amp, gas line upgrade. in attic <200#.Details
one full bathroom remodel in kind, kitchen remodel in kind. full home rewire. main service upgrade to 120amp, gas line upgrade. in attic <200#. | $72,000 |
| Apr 16, 2021 | Completed final sign-off Jul 2022 | 112 Molimo Dr | 1st fl: garage infill, 1 bedroom, 1 bathroom, laundry, (n) stair, furnace & tankless water heater. 2nd fl: remodel kitchen /dining /living room. remodel bathroom in-kind replacements. reroof. patch & repair (e) skylights.Details
1st fl: garage infill, 1 bedroom, 1 bathroom, laundry, (n) stair, furnace & tankless water heater. 2nd fl: remodel kitchen /dining /living room. remodel bathroom in-kind replacements. reroof. patch & repair (e) skylights. | $300,000 |
| Feb 28, 2020 | Completed final sign-off Mar 2021 | 76 Molimo Dr | 1/f: relocate (e) stair, bedroom, 1 closet remodel, new furnace & tankless water heater. 2/f: kitchen & dining room remodel, new stair, remove f.p, add 1/2 bathDetails
1/f: relocate (e) stair, bedroom, 1 closet remodel, new furnace & tankless water heater. 2/f: kitchen & dining room remodel, new stair, remove f.p, add 1/2 bath | $110,000 |
| Dec 18, 2019 | Expired or cancelled expired Dec 2023 | 43 Molimo Dr | new bathroom & laundry at 1st fl. create 2 car tandem parking at 1st fl. remove (e) concrete patio. 2nd fl: relocate kitchen, new bedrm in area of (e) kitchen. update closet/entry in (e) bedrm, remove (e) sunroom. replace rear windows w/patio doors & guards.Details
new bathroom & laundry at 1st fl. create 2 car tandem parking at 1st fl. remove (e) concrete patio. 2nd fl: relocate kitchen, new bedrm in area of (e) kitchen. update closet/entry in (e) bedrm, remove (e) sunroom. replace rear windows w/patio doors & guards. | $120,000 |
| Oct 9, 2019 | Never finaled issued Oct 2019, no final | 106 Wool St | remodel existing bath and kitchen in kindDetails
remodel existing bath and kitchen in kind | $12,000 |
| May 20, 2019 | Completed final sign-off Jul 2022 | 84 Molimo Dr | interior remodel: 1st floor: relocate extg stair to 2nd floor, master bedroom/bath/office remodel, relocate laundry, add entry closet,new furnace, tankless water heater. 2nd fl: kitchen/dining remodel, remodel 2 bedrooms, 1 bathroom.Details
interior remodel: 1st floor: relocate extg stair to 2nd floor, master bedroom/bath/office remodel, relocate laundry, add entry closet,new furnace, tankless water heater. 2nd fl: kitchen/dining remodel, remodel 2 bedrooms, 1 bathroom. | $190,000 |
| Aug 21, 2018 | Completed final sign-off Jul 2020 | 48 Molimo Dr | 1st flr: rear yard ground level addition w/ roof dekc above. add 1/2 bathroom & family room. 2nd flr: new patio door to roof deck. clearestory skylight over kitchen island.Details
1st flr: rear yard ground level addition w/ roof dekc above. add 1/2 bathroom & family room. 2nd flr: new patio door to roof deck. clearestory skylight over kitchen island. | $110,000 |
| Mar 7, 2018 | Completed final sign-off Sep 2018 | 48 Molimo Dr | residential interior remodel due to structural fire next door and fire dept fighting fire. remodel kitchen, dining, living, stairs, entry, bedrooms, laundry, bathroom, new hvac and water heater relocated. patch rear siding to match (e), patch & repair roof.Details
residential interior remodel due to structural fire next door and fire dept fighting fire. remodel kitchen, dining, living, stairs, entry, bedrooms, laundry, bathroom, new hvac and water heater relocated. patch rear siding to match (e), patch & repair roof. | $80,000 |
| Feb 6, 2018 | Completed final sign-off Sep 2018 | 48 Molimo Dr | fire loss - water damage - demo work - removed kitchen cabinetry; water damaged drywall - damaged floors - remove knob and tub wiring - existing plumbingDetails
fire loss - water damage - demo work - removed kitchen cabinetry; water damaged drywall - damaged floors - remove knob and tub wiring - existing plumbing | $12,500 |
| Aug 1, 2016 | Completed final sign-off Dec 2016 | 624 Moultrie St | kitchen remodel. no change on walls.Details
kitchen remodel. no change on walls. | $14,000 |
| Aug 14, 2015 | Completed final sign-off Sep 2018 | 75 Molimo Dr | rear yard addition. 1st floor: master bed / bath remodel. laundry. 2nd floor: kitchen / dining remodel. new rear windows. replace (e) decks with new rear decks.Details
rear yard addition. 1st floor: master bed / bath remodel. laundry. 2nd floor: kitchen / dining remodel. new rear windows. replace (e) decks with new rear decks. | $140,000 |
| Aug 7, 2015 | Never finaled issued Aug 2015, no final | 281 Nevada St | kitchen cabinet installation, recessed lights, remove pony wall, plumbing-electrical work, laundry room relocation, reconfigure bedroom closets, light framing doorways.Details
kitchen cabinet installation, recessed lights, remove pony wall, plumbing-electrical work, laundry room relocation, reconfigure bedroom closets, light framing doorways. | $18,500 |
| Jul 13, 2015 | Completed final sign-off Aug 2015 | 3235 Gough St | apt. #206: kitchen cabinet replacement. add recessed lights in kitchen and hallway. sub-panel upgrade. maintain fire ratings at walls and ceilings at penetrations per 714.3 and 714.4 cbcDetails
apt. #206: kitchen cabinet replacement. add recessed lights in kitchen and hallway. sub-panel upgrade. maintain fire ratings at walls and ceilings at penetrations per 714.3 and 714.4 cbc | $11,500 |
| May 27, 2015 | Completed final sign-off Jun 2015 | 3235 Gough St | # 205: replace (e) kitchen cabinets - plumbing - electrical: new counter tops - back splash - appliances, new outlets - 4 led lightsDetails
# 205: replace (e) kitchen cabinets - plumbing - electrical: new counter tops - back splash - appliances, new outlets - 4 led lights | $11,000 |
| Feb 9, 2015 | Completed final sign-off Jul 2015 | 2817 24th St | unit a - no change in layout; replace kitchen cabinets, remodel bathroom, laundry room,; electrical sub-panel, gas upgrade, install tankless water heater, bring electrical to code - mechanical soffit. to comply with cec150.0(k)5. compliance with maher ordinance no. 155-13 not required.Details
unit a - no change in layout; replace kitchen cabinets, remodel bathroom, laundry room,; electrical sub-panel, gas upgrade, install tankless water heater, bring electrical to code - mechanical soffit. to comply with cec150.0(k)5. compliance with maher ordinance no. 155-13 not required. | $32,000 |
| Dec 10, 2014 | Completed final sign-off Apr 2015 | 129 Ellert St | swap kitchen cab. swap appliances. electrical outlets: 9 recessed led lighting. remove bearing wall, frame work, swap entry door paintwork, and drywall patching.Details
swap kitchen cab. swap appliances. electrical outlets: 9 recessed led lighting. remove bearing wall, frame work, swap entry door paintwork, and drywall patching. | $11,000 |
| Jul 17, 2014 | Completed final sign-off Oct 2014 | 3676 23rd St | kitchen cabinets - new floor appliances. pumbing: sink - d.w., stove, range hood, countertop - recessed light frame work. paint work. kitchen sub panel - lighting to be efficacy new range to be connected to existing duct.Details
kitchen cabinets - new floor appliances. pumbing: sink - d.w., stove, range hood, countertop - recessed light frame work. paint work. kitchen sub panel - lighting to be efficacy new range to be connected to existing duct. |