Block 6300, lot 043
1250 Sunnydale Ave
- City’s use
- Multi-Family Residential
- Built
- 2000
- Stories
- 3
- Units
- 92
- Rooms
- 221 bedrooms, 123 bathrooms
- Building
- 95,469 sq ft
- Lot
- 160,159 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
32 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 14, 2026 | In progress issued Sep 2026 | 1250 Sunnydale Av | Barahona Brothers Construction Inc. | restroom floor demo and replacement in kind. restroom fixtures replacement in kind. electrical devices in restroom replacement in kind. utility sink replacement in kind.Details
restroom floor demo and replacement in kind. restroom fixtures replacement in kind. electrical devices in restroom replacement in kind. utility sink replacement in kind. | $28,000 |
| Feb 1, 2024 | Completed final sign-off Apr 2024 | 1250 Sunnydale Av | Grid Alternatives | install (16) level-2 ev chargers (evcs) from existing common area electrical panels and mount to pedestals adjacent to vehicle parking space. parking for evcs will be assigned to tenants and not visible to the general public.Details
install (16) level-2 ev chargers (evcs) from existing common area electrical panels and mount to pedestals adjacent to vehicle parking space. parking for evcs will be assigned to tenants and not visible to the general public. | $80,000 |
| Aug 13, 2021 | Completed final sign-off Sep 2021 | 1250 Sunnydale Av | United Systems Fire And Security Llc | f/a revised as-built to update matrix to include manual pull station sequence. 2021 0726 5091. original pa # 2021 0518 0532.Details
f/a revised as-built to update matrix to include manual pull station sequence. 2021 0726 5091. original pa # 2021 0518 0532. | |
| Jul 26, 2021 | Completed final sign-off Sep 2021 | 1250 Sunnydale Av | United Systems Fire And Security Llc | as builts for bpa#202105180532 adding lcd annunciatorDetails
as builts for bpa#202105180532 adding lcd annunciator | |
| May 18, 2021 | Completed final sign-off Dec 2021 | 1250 Sunnydale Av | United Systems Fire And Security Llc | replacement of old facu with new est-3 the old panel is no longer reparable and must be replacedDetails
replacement of old facu with new est-3 the old panel is no longer reparable and must be replaced | $4,000 |
| Mar 16, 2021 | Completed final sign-off Nov 2021 | 1250 Sunnydale Av | Siemens Industry, Inc. | fire only review of updated "as-built" fire aarm drawings for the system upgrade project. this is the second as-built permit being obtained for this job.Details
fire only review of updated "as-built" fire aarm drawings for the system upgrade project. this is the second as-built permit being obtained for this job. | |
| Feb 4, 2021 | Completed final sign-off Feb 2021 | 1250 Sunnydale Av | D.F.P.F Corp Dba Fine Line Construction | to obtain final inspection for work approved under permit application #'s: 201812067575 and 201809129896. all work is completed.Details
to obtain final inspection for work approved under permit application #'s: 201812067575 and 201809129896. all work is completed. | $2,000,000 |
| Aug 24, 2020 | Completed final sign-off Sep 2021 | 1250 Sunnydale Av | Siemens Industry, Inc. | fire alarm as-built drawings for the rehabilitation remodel; the fire alarm matrix has been revised to match the system as it is programmed/installed. no new devices are added to the initial fa permit under pa#201901110200. ref pa# 201704063370.Details
fire alarm as-built drawings for the rehabilitation remodel; the fire alarm matrix has been revised to match the system as it is programmed/installed. no new devices are added to the initial fa permit under pa#201901110200. ref pa# 201704063370. | |
| Oct 16, 2019 | Completed final sign-off Feb 2021 | 1250 Sunnydale Av | D.F.P.F Corp Dba Fine Line Construction | replace sport cout w/ picnic area and play structure for resident use onlyDetails
replace sport cout w/ picnic area and play structure for resident use only | $60,000 |
| Sep 6, 2019 | Completed final sign-off Jan 2021 | 1250 Sunnydale Av | D.F.P.F Corp Dba Fine Line Construction | (building i ): in kind replacement of one damaged glulam beam and exterior bridge deck hall due to wood rot at bldg i units 195 e-f on tag 3rd floor.Details
(building i ): in kind replacement of one damaged glulam beam and exterior bridge deck hall due to wood rot at bldg i units 195 e-f on tag 3rd floor. | $30,000 |
| Aug 26, 2019 | Completed final sign-off Oct 2021 | 1250 Sunnydale Av | D.F.P.F Corp Dba Fine Line Construction | replace in-kind of (1) damaged glulam beam and exterior bridge deck wall due to wood rot located in building "k" at units 185e and 185f. not visible from streetDetails
replace in-kind of (1) damaged glulam beam and exterior bridge deck wall due to wood rot located in building "k" at units 185e and 185f. not visible from street | $30,000 |
| Jul 16, 2019 | Never finaled issued Jul 2019, no final | 1250 Sunnydale Av | street spaceDetails
street space | ||
| Jul 12, 2019 | Completed final sign-off Sep 2021 | 1250 Sunnydale Av | L P G Fire Protection Inc | revises (e) fire sprinkler system due to new partition. bld pa 201705186936Details
revises (e) fire sprinkler system due to new partition. bld pa 201705186936 | $39,000 |
| Jan 15, 2019 | Never finaled issued Jan 2019, no final | 1250 Sunnydale Av | street spaceDetails
street space | ||
| Jan 11, 2019 | Completed final sign-off Sep 2021 | 1250 Sunnydale Av | Siemens Industry, Inc. | fire alarm - add 1 smk det, 21 heat det, 2 pull stations, 8 horns/strobes, 4 strobes ref 201704063370Details
fire alarm - add 1 smk det, 21 heat det, 2 pull stations, 8 horns/strobes, 4 strobes ref 201704063370 | $22,000 |
| Dec 6, 2018 | Completed final sign-off Feb 2021 | 1250 Sunnydale Av | D.F.P.F Corp Dba Fine Line Construction | revision to pa 201705186936. modifiy sw corner along sunnydale ave to keep (e) electrical panels & fire riser in place. minor interior redesign to accomodate exterior changeDetails
revision to pa 201705186936. modifiy sw corner along sunnydale ave to keep (e) electrical panels & fire riser in place. minor interior redesign to accomodate exterior change | $50,000 |
| Sep 12, 2018 | Completed final sign-off Feb 2021 | 1250 Sunnydale Av | D.F.P.F Corp Dba Fine Line Construction | rev to pa#201704063370; removal of (e) wood retaining wall & construction of (n) cip conc site retaining wall in same locationDetails
rev to pa#201704063370; removal of (e) wood retaining wall & construction of (n) cip conc site retaining wall in same location | $17,500 |
| Aug 17, 2018 | Completed final sign-off Feb 2019 | 1250 Sunnydale Av | D.F.P.F Corp Dba Fine Line Construction | revision to pa # 201704063370. change of ramp slope from 1:12 to 1:10 due to (e) conditions preventing ada ramp. ramp to be removed from site accessbile path of travelDetails
revision to pa # 201704063370. change of ramp slope from 1:12 to 1:10 due to (e) conditions preventing ada ramp. ramp to be removed from site accessbile path of travel | |
| Jun 22, 2018 | Never finaled issued Jun 2018, no final | 1250 Sunnydale Av | street spaceDetails
street space | ||
| May 18, 2017 | Completed final sign-off Feb 2021 | 1250 Sunnydale Av | D.F.P.F Corp Dba Fine Line Construction | addition & renovation of commons area in an exiting multi family development, including a community room, management office, and other associated spaces.Details
addition & renovation of commons area in an exiting multi family development, including a community room, management office, and other associated spaces. | $433,000 |
| Apr 6, 2017 | Completed final sign-off Jan 2021 | 1250 Sunnydale Av | rehabilitation of (e) bldg 6, consisting of these unit addresses: 145c, 145d,145e,165c,165d,165e,165f britton street. see drawings for full scope of work description.Details
rehabilitation of (e) bldg 6, consisting of these unit addresses: 145c, 145d,145e,165c,165d,165e,165f britton street. see drawings for full scope of work description. | $276,710 | |
| Apr 6, 2017 | Completed final sign-off Jan 2021 | 1250 Sunnydale Av | rehabilitation of (e) bldg 4, consisting of these unit addresses: 140c,140d,140e,160c,160d,160e,160f, britton. 155c,155d,155e,155f,175c,175d,175e, loehr. see drawing for full scope of work.Details
rehabilitation of (e) bldg 4, consisting of these unit addresses: 140c,140d,140e,160c,160d,160e,160f, britton. 155c,155d,155e,155f,175c,175d,175e, loehr. see drawing for full scope of work. | $553,420 | |
| Apr 6, 2017 | Completed final sign-off Jan 2021 | 1250 Sunnydale Av | rehabilitation of (e) bldg 3, consisting of these units addresses: 140a, 140b,140g,140h,148,160a,160b,160g,160h,166,180a,180b,180d,180e,180f - britton street. 155a,155b,155g,155h,157,175a,175b,175g,175h,177,195a to f loehr. 1230,1232,1262,1272 sunnydale st. see drawing for full scope of work.Details
rehabilitation of (e) bldg 3, consisting of these units addresses: 140a, 140b,140g,140h,148,160a,160b,160g,160h,166,180a,180b,180d,180e,180f - britton street. 155a,155b,155g,155h,157,175a,175b,175g,175h,177,195a to f loehr. 1230,1232,1262,1272 sunnydale st. see drawing for full scope of work. | $1,423,080 | |
| Apr 6, 2017 | Completed final sign-off Jan 2021 | 1250 Sunnydale Av | rehabilitation of (e) bldg 5, consisting of these units addresses 145a,145b,145g,145h,147,165a,165b,165g,165h,167,185a,185b,185c,185d,185e, 185f, britton. 1200,1202,1212 sunnydale. see drawings for full scope of work description.Details
rehabilitation of (e) bldg 5, consisting of these units addresses 145a,145b,145g,145h,147,165a,165b,165g,165h,167,185a,185b,185c,185d,185e, 185f, britton. 1200,1202,1212 sunnydale. see drawings for full scope of work description. | $751,070 | |
| Apr 6, 2017 | Completed final sign-off Jan 2021 | 1250 Sunnydale Av | rehabilitation of (e) bldg 2, consisting of these units addresses: 150a, 150b,150f,150g,156,170a,170b,170g,170h - loehr street - see drawings for full scope of work description.Details
rehabilitation of (e) bldg 2, consisting of these units addresses: 150a, 150b,150f,150g,156,170a,170b,170g,170h - loehr street - see drawings for full scope of work description. | $355,770 | |
| Apr 5, 2017 | Completed final sign-off Jan 2021 | 1250 Sunnydale Av | rehabilitation of (e) bldging 1, consisting of these unit addresses 150c,150e,170c,150d,170d,170e,170f - loehr street - see drawings for full scope of work descriptionDetails
rehabilitation of (e) bldging 1, consisting of these unit addresses 150c,150e,170c,150d,170d,170e,170f - loehr street - see drawings for full scope of work description | $276,710 | |
| Apr 5, 2017 | Never finaled issued Apr 2017, no final | 1250 Sunnydale Av | administration permit for delete address 148 britton st & 171 loeher st from block 6300, lot 043 per mercy housing project. this project has one address only as;1250 sunnydaleDetails
administration permit for delete address 148 britton st & 171 loeher st from block 6300, lot 043 per mercy housing project. this project has one address only as;1250 sunnydale | ||
| Mar 28, 2014 | Completed final sign-off Apr 2014 | 148 Britton St | Giuliani Construction Incorp | work in unit #167: comply with nov #201454691 dated 3/5/14 repair damaged walls at ground floor. work shall be drywall repair in bathroom, hallway area, some insulation at exterior wall, 30 lf of drywall up to 2'-0" height with area not to exceed 30 sf. all new drywall shall be 5/8" type x gyp bd.Details
work in unit #167: comply with nov #201454691 dated 3/5/14 repair damaged walls at ground floor. work shall be drywall repair in bathroom, hallway area, some insulation at exterior wall, 30 lf of drywall up to 2'-0" height with area not to exceed 30 sf. all new drywall shall be 5/8" type x gyp bd. | $6,500 |
| Oct 17, 2013 | Never finaled issued Oct 2013, no final | 171 Loehr St | Giuliani Construction Incorp | 16 sq ft decking replaced/repair damaged electrical (small fire) 2nd floor deck. repair in kindDetails
16 sq ft decking replaced/repair damaged electrical (small fire) 2nd floor deck. repair in kind | $6,493 |
| Feb 5, 2009 | Completed final sign-off Mar 2009 | 171 Loehr St | Interstate Restoration Group Inc. | work @ 2 units known as 160a & 160b britton street. replace sheetrock, insulation, carpet, cabinets, & other misc. (floor repair).Details
work @ 2 units known as 160a & 160b britton street. replace sheetrock, insulation, carpet, cabinets, & other misc. (floor repair). | $35,000 |
| Sep 23, 2005 | Never finaled issued Sep 2005, no final | 171 Loehr St | replacement of office address from 1250 sunnydale ave to 171 loehr street (formerly block 6299 lot 007a)Details
replacement of office address from 1250 sunnydale ave to 171 loehr street (formerly block 6299 lot 007a) | ||
| Sep 23, 2005 | Never finaled issued Sep 2005, no final | 148 Britton St | additional address permitDetails
additional address permit |