Block 1669, lot 032
846 27th Ave
- City’s use
- Single Family Residential
- Built
- 1932
- Stories
- 1
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 1,794 sq ft
- Lot
- 3,497 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 2, 2024 | Completed final sign-off Aug 2024 | 846 27th Av | revision to pa # 2022-0805-9989 demo exterior heavily corroded spiral staircase at rear deck & infill opening with wooden railing to matchDetails
revision to pa # 2022-0805-9989 demo exterior heavily corroded spiral staircase at rear deck & infill opening with wooden railing to match | $600 | |
| Jun 20, 2023 | Completed final sign-off Aug 2024 | 846 27th Av | revision to bpa#202208059989, 2/f change bath #2 layout, change size of skylights in master bath #1 & kitchen, add skylight over staircase; ground/f change bedroom #3 sliding door to window, increase width of french door in family room, add laungry sink in garageDetails
revision to bpa#202208059989, 2/f change bath #2 layout, change size of skylights in master bath #1 & kitchen, add skylight over staircase; ground/f change bedroom #3 sliding door to window, increase width of french door in family room, add laungry sink in garage | ||
| May 2, 2023 | Completed final sign-off Jul 2024 | 846 27th Av | Cal State Roofing Co Inc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,000 |
| Aug 5, 2022 | Completed final sign-off Aug 2024 | 846 27th Av | Dbf Construction Co Inc | 2nd/f: infill center patio to create living/dining rm & kitchen, relocate interior stairs, add master bath, reconfigure & remodel full bath. groud/f: relocate family rm & bath, add bedroom & office. replace windows @ front and rear. replace furnace and water heater.Details
2nd/f: infill center patio to create living/dining rm & kitchen, relocate interior stairs, add master bath, reconfigure & remodel full bath. groud/f: relocate family rm & bath, add bedroom & office. replace windows @ front and rear. replace furnace and water heater. | $240,000 |
| Sep 17, 2012 | Completed final sign-off May 2013 | 846 27th Av | Sears Home Improvemt Prod, | replace door on back of house, not visable from street, no structural changes.Details
replace door on back of house, not visable from street, no structural changes. | $8,790 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cal State Roofing Co Inc, Dbf Construction Co Inc, Sears Home Improvemt Prod,
- Engineers
- William Liang (3)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.