Jian Lou Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2003 to Sep 2025
- Last 24 months
- 6 permits filed
136 permits since 2000: 112 completed, 3 in progress, 15 never finaled, 6 expired or cancelled.
Of the 15 never-finaled permits, 2 are 3 to 5 years old, 5 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 136.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2025 | Completed final sign-off Sep 2026 | 2737 22nd St | comply with nov#: 202540372; revision 202504094023. reflecting the original condition of the 2nd flr, removing non-beaming wall at the foyer/stair and bearing wall at the rear to create an open layout, enlarging the slideing in the (n) dining room, replacing windows in the (n) kitchen and dining ofDetails
comply with nov#: 202540372; revision 202504094023. reflecting the original condition of the 2nd flr, removing non-beaming wall at the foyer/stair and bearing wall at the rear to create an open layout, enlarging the slideing in the (n) dining room, replacing windows in the (n) kitchen and dining of | $30,000 |
| Jul 11, 2025 | Completed final sign-off Feb 2026 | 1276 29th Av | repair stucco in kind front of house.Details
repair stucco in kind front of house. | $10,000 |
| Apr 9, 2025 | Expired or cancelled expired Sep 2026 | 2737 22nd St | relocate (e) kitchen, remodel bathroom. volunteer upgrade (e) ceiling joists & relocate (e) sheetrock w/ new in dining room at 2/f. construct closet at 3/f.Details
relocate (e) kitchen, remodel bathroom. volunteer upgrade (e) ceiling joists & relocate (e) sheetrock w/ new in dining room at 2/f. construct closet at 3/f. | $68,000 |
| Feb 21, 2025 | In progress issued Mar 2025 | 220 08th Av | revision to pa 2024-0606-3850 remove basement remodel from scope. no workshop, bath, below grade stair, sprinklers. no change to (e) structureDetails
revision to pa 2024-0606-3850 remove basement remodel from scope. no workshop, bath, below grade stair, sprinklers. no change to (e) structure | |
| Nov 18, 2024 | Completed final sign-off Apr 2025 | 53 Alvarado St | non structural bathroom remodelDetails
non structural bathroom remodel | $24,000 |
| Nov 1, 2024 | In progress issued Nov 2024 | 220 08th Av | to comply w/ nov: 202301839 -like for like remodel of 1st and 2nd floor bathrooms (4 total) and kitchens (2) total, no change in plumbing fixture count, no wall demolition or construction. exterior siding replacement, painting and window replacement (max. 0.3 u-value),Details
to comply w/ nov: 202301839 -like for like remodel of 1st and 2nd floor bathrooms (4 total) and kitchens (2) total, no change in plumbing fixture count, no wall demolition or construction. exterior siding replacement, painting and window replacement (max. 0.3 u-value), | $200,000 |
| Oct 4, 2024 | Completed final sign-off Jun 2025 | 2350 40th Av | replace 2 front facing windows.Details
replace 2 front facing windows. | $5,000 |
| Jun 6, 2024 | In progress issued Aug 2024 | 220 08th Av | basement remodel (293sf) workshop and add full bathroom. excavate 29.59cu yrds. 3rd floor (224 8th ave) remodel kitchen and bathroom, add full bathroom. remove wall @ kitchen. add (2) windows at lightwell and replace (1) window at rear facade.Details
basement remodel (293sf) workshop and add full bathroom. excavate 29.59cu yrds. 3rd floor (224 8th ave) remodel kitchen and bathroom, add full bathroom. remove wall @ kitchen. add (2) windows at lightwell and replace (1) window at rear facade. | $240,000 |
| Dec 4, 2023 | Completed final sign-off Nov 2024 | 300 Eucalyptus Dr | remodel kitchen and two bathrooms. in kind. no walls removedDetails
remodel kitchen and two bathrooms. in kind. no walls removed | $4,300 |
| Nov 15, 2023 | Completed final sign-off May 2025 | 1623 43rd Av | 1st floor: converting 260 sf. 338 sf remodel. mew interior tankless gas water heater. upgrading existing electric panel to 200 am. new gas furnace.Details
1st floor: converting 260 sf. 338 sf remodel. mew interior tankless gas water heater. upgrading existing electric panel to 200 am. new gas furnace. | $250,000 |
| Jul 11, 2023 | Completed final sign-off Aug 2023 | 855 Folsom St | cosmetic bathroom remodel with replacement of flooring, vanity cabinet, storage cabinet, and installation of decrotive wall tiling. must maitain accessibility that was required at the time of original construction. this is a covered multi-family dwelling unit.Details
cosmetic bathroom remodel with replacement of flooring, vanity cabinet, storage cabinet, and installation of decrotive wall tiling. must maitain accessibility that was required at the time of original construction. this is a covered multi-family dwelling unit. | $5,000 |
| May 1, 2023 | Completed final sign-off May 2023 | 2082 33rd Av | revision to pa 2020-0626-9207 ground floor - relocate entry door to family room; reconfigure mechanical closet to house only the water heater and move furnace to 2nd floor hallway closetDetails
revision to pa 2020-0626-9207 ground floor - relocate entry door to family room; reconfigure mechanical closet to house only the water heater and move furnace to 2nd floor hallway closet | |
| Apr 24, 2023 | Completed final sign-off Jul 2023 | 7 03rd Av | apt 2 -bath remodel including vanity, tub into shower and retiling floors and walls. no removal of wallsDetails
apt 2 -bath remodel including vanity, tub into shower and retiling floors and walls. no removal of walls | $15,000 |
| Mar 1, 2023 | Completed final sign-off Aug 2023 | 7 03rd Av | apt 2#:kitchen remodel including cabinetry installation, new switches, outlets and lighting, and plumbing, and sink update. repair water damage in ceiling plaster and replace w/ sheetrock.Details
apt 2#:kitchen remodel including cabinetry installation, new switches, outlets and lighting, and plumbing, and sink update. repair water damage in ceiling plaster and replace w/ sheetrock. | $15,000 |
| Dec 19, 2022 | Completed final sign-off May 2023 | 4123 Noriega St | remodel one kitchen and one bathroom. replace drywalls in 2 bedrooms on ceilingDetails
remodel one kitchen and one bathroom. replace drywalls in 2 bedrooms on ceiling | $45,000 |
| Nov 29, 2022 | Never finaled issued Dec 2022, no final | 3830 Divisadero St | unit 102 on 2/f: interior remodel. remodel kitchen and bath. add bath, den, laundry closet.Details
unit 102 on 2/f: interior remodel. remodel kitchen and bath. add bath, den, laundry closet. | $92,000 |
| May 31, 2022 | Completed final sign-off Oct 2022 | 355 Teresita Bl | kitchen and bathrooom remodelDetails
kitchen and bathrooom remodel | $30,000 |
| May 26, 2022 | Completed final sign-off Dec 2022 | 121 03rd Av | remodel kitchen & 2-1/2 bathrooms.Details
remodel kitchen & 2-1/2 bathrooms. | $40,000 |
| Apr 7, 2022 | Never finaled issued May 2022, no final | 1945 23rd Av | revision to pa#202002184656. 1) add one laundry room on 1st floor. 2)relocate furnace. 3)relocate/replace water heater (tankless type)Details
revision to pa#202002184656. 1) add one laundry room on 1st floor. 2)relocate furnace. 3)relocate/replace water heater (tankless type) | |
| Jan 6, 2022 | Completed final sign-off Mar 2023 | 215 Alpha St | ground floor: provide new office, entertainment room, family room and bathroom at ground floor. replace ground floor rear window as shown on plans. voluntary structual up-grade at ground 1 st. floor.Details
ground floor: provide new office, entertainment room, family room and bathroom at ground floor. replace ground floor rear window as shown on plans. voluntary structual up-grade at ground 1 st. floor. | $80,000 |
| Dec 10, 2021 | Completed final sign-off Aug 2022 | 1576 Kirkwood Av | ground floor remodel - infill under sunroom, add 2 bedrooms, office, bathroom, family room, kitchenette. replace exterior stair to rear yardDetails
ground floor remodel - infill under sunroom, add 2 bedrooms, office, bathroom, family room, kitchenette. replace exterior stair to rear yard | $98,000 |
| Jul 20, 2021 | Completed final sign-off Aug 2022 | 51 Hale St | provide new bedroom, family room, & bathroom at the ground floor. interior work only. no work at the 2nd fl.Details
provide new bedroom, family room, & bathroom at the ground floor. interior work only. no work at the 2nd fl. | $80,000 |
| May 13, 2021 | Never finaled issued May 2021, no final | 1821 18th Av | remodel kitchen approx 12' x 15' on 2nd fl, replace floor, cabinets, island in kind. remodel one full bath on second floor, no change in floor planDetails
remodel kitchen approx 12' x 15' on 2nd fl, replace floor, cabinets, island in kind. remodel one full bath on second floor, no change in floor plan | $30,000 |
| Mar 30, 2021 | Completed final sign-off Aug 2022 | 461 02nd St | work @ unit# 556. remodel and reconfigure (e) loft. remodel kitchen and bathroom. relocate stair to loft.Details
work @ unit# 556. remodel and reconfigure (e) loft. remodel kitchen and bathroom. relocate stair to loft. | $150,000 |
| Jan 13, 2021 | Completed final sign-off Nov 2022 | 1360 47th Av | add (n) accessory dwelling unit (adu) to (e) 2-unit residential buildingDetails
add (n) accessory dwelling unit (adu) to (e) 2-unit residential building | $88,103 |
| Dec 14, 2020 | Completed final sign-off Jun 2022 | 558 35th Av | remodel (e) kitchen, (e) bath, add 1 new bath & toilet room. reconfigure (e) rooms @ 2nd floor per plan. replace (e) gypsum board & infill (e) lightwell 2nd floor to ground floor. 2 new bedrooms, 2 bathrooms, and media room to be constructed at ground floor. replace partial footing & concrete slab.Details
remodel (e) kitchen, (e) bath, add 1 new bath & toilet room. reconfigure (e) rooms @ 2nd floor per plan. replace (e) gypsum board & infill (e) lightwell 2nd floor to ground floor. 2 new bedrooms, 2 bathrooms, and media room to be constructed at ground floor. replace partial footing & concrete slab. | $100,000 |
| Oct 24, 2020 | Completed final sign-off Jan 2022 | 15 Lake Forest Ct | 2/f: remodel 2 (e) bathrooms & kitchen. g/f: add 1 (n) full bathroom, englarge (e) bedroom into garage area. sheet rock garage area.Details
2/f: remodel 2 (e) bathrooms & kitchen. g/f: add 1 (n) full bathroom, englarge (e) bedroom into garage area. sheet rock garage area. | $55,000 |
| Sep 20, 2020 | Completed final sign-off Mar 2022 | 201 South Hill Bl | propose new bathroom on 2/f. relocate 1/2 bathroom on g/f and propose bathroom #3. relocate laundry room, wh, fau to g/f and new office/media room.Details
propose new bathroom on 2/f. relocate 1/2 bathroom on g/f and propose bathroom #3. relocate laundry room, wh, fau to g/f and new office/media room. | $80,000 |
| Aug 26, 2020 | Completed final sign-off Jun 2021 | 1585 10th Av | unit 4 - kitchen (150 sf) and bathroom (75 sf) remodel in-kind. no structural work.Details
unit 4 - kitchen (150 sf) and bathroom (75 sf) remodel in-kind. no structural work. | $15,000 |
| Jun 26, 2020 | Completed final sign-off May 2023 | 2082 33rd Av | 2nd fl: reconfigure & remodel kitchen & full bath, add master bath, demolish interior staircase; add exterior staricase at rear. ground fl: add family room, (2) bedroom & full bath. reference complaint #202021447.Details
2nd fl: reconfigure & remodel kitchen & full bath, add master bath, demolish interior staircase; add exterior staricase at rear. ground fl: add family room, (2) bedroom & full bath. reference complaint #202021447. | $110,000 |
| Feb 28, 2020 | Completed final sign-off Jun 2020 | 126 Thrift St | to comply with nov202016771. r/r front exterior wall about 4ft hi (framing & stucco). replace front entry security gate.Details
to comply with nov202016771. r/r front exterior wall about 4ft hi (framing & stucco). replace front entry security gate. | $5,000 |
| Aug 1, 2019 | Completed final sign-off Jun 2020 | 234 06th Av | revision to bpa #201810163305. add exterior wall sconces on 1st fl. replace solid guardrail/handrail at front stair with horizontal stain-less steel able rail (no structural work). change windows size & style at front facade. remove non-bearing wall at porch.Details
revision to bpa #201810163305. add exterior wall sconces on 1st fl. replace solid guardrail/handrail at front stair with horizontal stain-less steel able rail (no structural work). change windows size & style at front facade. remove non-bearing wall at porch. | $10,000 |
| Jun 4, 2019 | Completed final sign-off Jan 2021 | 1463 19th Av | replacement of (5) street facing windows from (e) single pane. alum slider to alum clad wood windows. (2) fixed windows, (3) awning type windows w/ 4" swing limit.Details
replacement of (5) street facing windows from (e) single pane. alum slider to alum clad wood windows. (2) fixed windows, (3) awning type windows w/ 4" swing limit. | $6,000 |
| Jun 4, 2019 | Completed final sign-off Jan 2021 | 1461 19th Av | revision to app#201807033696. change location of laundry, and add a security gate and entry alcove, to front entrance of adu.Details
revision to app#201807033696. change location of laundry, and add a security gate and entry alcove, to front entrance of adu. | $2,000 |
| Mar 13, 2019 | Completed final sign-off May 2019 | 283 Parker Av | unit a: remodel kitchen (10x10) and two bathrooms (5x8).Details
unit a: remodel kitchen (10x10) and two bathrooms (5x8). | $30,000 |
| Oct 16, 2018 | Completed final sign-off Jun 2020 | 234 06th Av | replace stone veneer at front stair & 1st floor w/stucco finish. replace vinyl siding at front of facade w/hardie board siding. replace vinyl siding at bay w/stucco finish.Details
replace stone veneer at front stair & 1st floor w/stucco finish. replace vinyl siding at front of facade w/hardie board siding. replace vinyl siding at bay w/stucco finish. | $60,000 |
| Sep 25, 2018 | Completed final sign-off Jun 2020 | 234 06th Av | add (2) bedrooms, two 3-fixtures bathroom & a media room on 1st fl. reconfigure interior layout on 2nd & 3rd fl. ad roof deck on 3rd fl. (rear of building)Details
add (2) bedrooms, two 3-fixtures bathroom & a media room on 1st fl. reconfigure interior layout on 2nd & 3rd fl. ad roof deck on 3rd fl. (rear of building) | $60,000 |
| Aug 28, 2018 | Completed final sign-off Jan 2019 | 262 Ramsell St | add 2 bedrooms and 1 bath room on ground floor.Details
add 2 bedrooms and 1 bath room on ground floor. | $60,000 |
| Jul 19, 2018 | Completed final sign-off Jun 2020 | 1910 Palou Av | 1st fl: add 2 bedrooms, 2 bath, 1 media, 1 den, and laundy. 2nd: total remodel. add 1 bath and new stairs. new deck at rear. attic: add 1 bedroom, 1 bath, 1 loft, and 1 office. new dormers.Details
1st fl: add 2 bedrooms, 2 bath, 1 media, 1 den, and laundy. 2nd: total remodel. add 1 bath and new stairs. new deck at rear. attic: add 1 bedroom, 1 bath, 1 loft, and 1 office. new dormers. | $100,000 |
| Jul 3, 2018 | Completed final sign-off Jan 2021 | 1461 19th Av | construction of an adu per ordinance #162-16 by a partial garage conversion of a single family home with an existing ground floor. structural covered by separate permit.Details
construction of an adu per ordinance #162-16 by a partial garage conversion of a single family home with an existing ground floor. structural covered by separate permit. | $60,000 |
| Jun 7, 2018 | Completed final sign-off Sep 2018 | 31 Castillo St | remodel (e) bathroom & kitchen, (1) fan in each, no structural work.Details
remodel (e) bathroom & kitchen, (1) fan in each, no structural work. | $15,000 |
| Dec 20, 2017 | Completed final sign-off Aug 2018 | 1749 Waller St | interior ti of 2080 sf to include upgrade of (e) restroom, adding 1 restroom, add new 1 hr exit corridor, new interior finishes, change of use change of occupancy from retail to group e daycare. install nfpa 13 sprinkler system under separate permitDetails
interior ti of 2080 sf to include upgrade of (e) restroom, adding 1 restroom, add new 1 hr exit corridor, new interior finishes, change of use change of occupancy from retail to group e daycare. install nfpa 13 sprinkler system under separate permit | $165,500 |
| Nov 21, 2017 | Never finaled issued Nov 2017, no final | 1550 Noriega St | replace fire & water damaged area from fire at kitchen ceiling. 2nd floor walls and ceiling, roof and exhaust ductDetails
replace fire & water damaged area from fire at kitchen ceiling. 2nd floor walls and ceiling, roof and exhaust duct | $4,000 |
| Oct 3, 2017 | Completed final sign-off Apr 2018 | 1809 Gough St | interior remodel upgrade e layout and finishes for kitchen, dining, bathroom, laundry. no change to overall layout no new bedrooms. upgrade e master bath/plumbing fixtures, wall floor finishes.demo (e) interior non load bearing wall, update (n) lightingDetails
interior remodel upgrade e layout and finishes for kitchen, dining, bathroom, laundry. no change to overall layout no new bedrooms. upgrade e master bath/plumbing fixtures, wall floor finishes.demo (e) interior non load bearing wall, update (n) lighting | $30,000 |
| Sep 11, 2017 | Completed final sign-off Jun 2018 | 1331 23rd Av | soft story retrofit per sfbc chapter 4d. 2016 cebc appendez a-4.Details
soft story retrofit per sfbc chapter 4d. 2016 cebc appendez a-4. | $30,000 |
| Aug 2, 2017 | Completed final sign-off Feb 2018 | 148 08th Av | remodel bathroom. no change on wall.Details
remodel bathroom. no change on wall. | $10,000 |
| Jun 9, 2017 | Never finaled issued Jun 2017, no final | 150 Ledyard St | remodel kitchen& bathroom. upgrade electric main service to 100 ampDetails
remodel kitchen& bathroom. upgrade electric main service to 100 amp | $19,000 |
| Mar 10, 2017 | Completed final sign-off Jul 2017 | 3736 Quintara St | reference complaint 201765731; remodel 2/f full bath, no walls moved/removed/added/infilled. all (e) layouts to remain unchanged.Details
reference complaint 201765731; remodel 2/f full bath, no walls moved/removed/added/infilled. all (e) layouts to remain unchanged. | $4,000 |
| Feb 21, 2017 | Completed final sign-off Mar 2017 | 1500 Ocean Av | change of use from (e) dry cleaner to retail. add ada button to front facade and power operated doorDetails
change of use from (e) dry cleaner to retail. add ada button to front facade and power operated door | $8,000 |
| Nov 23, 2016 | Completed final sign-off Mar 2017 | 1500 Ocean Av | remove the (e) plumbing & electrical outlets at laundry and cover up the opening on the walls.Details
remove the (e) plumbing & electrical outlets at laundry and cover up the opening on the walls. | $800 |
| Sep 29, 2016 | Completed final sign-off Nov 2016 | 1862 Green St | remodel kitchen.Details
remodel kitchen. | $8,000 |
| Jul 22, 2016 | Never finaled issued Nov 2016, no final | 362 03rd Av | enlarge (e) curb cut to 10'-o" curb cut for driveway.Details
enlarge (e) curb cut to 10'-o" curb cut for driveway. | $500 |
| Jul 15, 2016 | Never finaled issued May 2018, no final | 1945 23rd Av | rear horizontal addition. ground floor: 1 new bedroom, 1 new office, 1 new bath, family room & home theater. new roof deck above new grd/fl addition with stair to rear yard.Details
rear horizontal addition. ground floor: 1 new bedroom, 1 new office, 1 new bath, family room & home theater. new roof deck above new grd/fl addition with stair to rear yard. | $130,000 |
| Jul 11, 2016 | Completed final sign-off May 2018 | 362 03rd Av | relocate/remodel (e) kitchen and bathroom at 2nd floor. rebuilt/replace part of (e) interior stair. remodel (e) bathroom and nw bathroom at 3rd floor.Details
relocate/remodel (e) kitchen and bathroom at 2nd floor. rebuilt/replace part of (e) interior stair. remodel (e) bathroom and nw bathroom at 3rd floor. | $49,000 |
| Jun 13, 2016 | Completed final sign-off Jun 2017 | 3101 Scott St | seismic retrofit for soft story to comply with sf soft story ordinance per ch 34 b of sfbc code iebcDetails
seismic retrofit for soft story to comply with sf soft story ordinance per ch 34 b of sfbc code iebc | $60,000 |
| Jun 9, 2016 | Never finaled issued Jun 2016, no final | 2 Otsego Av | addition work to permit 201604114467, repair, reinforce (e) concrete footing, make g/f 8'-0' ceiling ht, remove partial land @ side of back yard to make court yard, install patio decks to side court yard.Details
addition work to permit 201604114467, repair, reinforce (e) concrete footing, make g/f 8'-0' ceiling ht, remove partial land @ side of back yard to make court yard, install patio decks to side court yard. | $40,000 |
| May 25, 2016 | Completed final sign-off Sep 2016 | 547 05th Av | replace 3 three windows at the front facade with wood double or single hung windows to fit the existing opening at the same location. no rough opening changes. u-factor for all new windows replacement shall not exceed 0.32.Details
replace 3 three windows at the front facade with wood double or single hung windows to fit the existing opening at the same location. no rough opening changes. u-factor for all new windows replacement shall not exceed 0.32. | $2,100 |
| Apr 11, 2016 | Completed final sign-off Mar 2017 | 2 Otsego Av | add 2 new bedrooms, 1 office, 1 bathroom, 1 powder room & 1 home theater @1st floor. add half bath in garage. no exterior work is visible.Details
add 2 new bedrooms, 1 office, 1 bathroom, 1 powder room & 1 home theater @1st floor. add half bath in garage. no exterior work is visible. | $70,000 |
| Mar 10, 2016 | Completed final sign-off Oct 2017 | 124 Danvers St | interior remodel: add new entertainment room, bathroom and laundry area at ground flr.Details
interior remodel: add new entertainment room, bathroom and laundry area at ground flr. | $38,000 |
| Feb 16, 2016 | Completed final sign-off Feb 2019 | 700 11th Av | this permit is only to document the payment for 2x penalty of $19500. which ref to the bpa# 201601197325. the compliance for nov# 201583591 has been done in ref to bpa# 201601197325Details
this permit is only to document the payment for 2x penalty of $19500. which ref to the bpa# 201601197325. the compliance for nov# 201583591 has been done in ref to bpa# 201601197325 | |
| Feb 11, 2016 | Completed final sign-off Oct 2016 | 274 Chester Av | to add two bedrooms, two full bathroom & laundry room on existing ground floor per plan.Details
to add two bedrooms, two full bathroom & laundry room on existing ground floor per plan. | $50,000 |
| Feb 8, 2016 | Completed final sign-off Mar 2017 | 121 Ottawa Av | g/f: add 3 new nathroomd, 3 bedrooms, 1 theater, 1 family room, replace (2) vinyl windows at rear. 2/f: add 1 new bathroom,1 office, 1 stdy, remodel (e) kitchen & (e) bathroom. exterior: add 3 new skylights, add wooden landing, patio doors to lead to rear yard.Details
g/f: add 3 new nathroomd, 3 bedrooms, 1 theater, 1 family room, replace (2) vinyl windows at rear. 2/f: add 1 new bathroom,1 office, 1 stdy, remodel (e) kitchen & (e) bathroom. exterior: add 3 new skylights, add wooden landing, patio doors to lead to rear yard. | $88,000 |
| Feb 4, 2016 | Never finaled issued Mar 2016, no final | 243 Stratford Dr | revision to pa 2015-0611-8767, reduce 1 window size located at kitchen on main floor comply with 201578721, window at front.Details
revision to pa 2015-0611-8767, reduce 1 window size located at kitchen on main floor comply with 201578721, window at front. | $1,000 |
| Jan 19, 2016 | Completed final sign-off Feb 2019 | 700 11th Av | revision to pa#201412224288: to comply with complaint# 201578631 (ref. to pa# 201511243445) & comply complaint# 201578572 & 201583591, relocate bathroom on 2/f & 3/f, remove one bath on 3/f, add full bath on 4/f, add 2 domers on 4/f.Details
revision to pa#201412224288: to comply with complaint# 201578631 (ref. to pa# 201511243445) & comply complaint# 201578572 & 201583591, relocate bathroom on 2/f & 3/f, remove one bath on 3/f, add full bath on 4/f, add 2 domers on 4/f. | $35,000 |
| Jan 12, 2016 | Completed final sign-off Jan 2021 | 578 44th Av | horiontal addition on all floors. vertical addition for a new 3rd floor. new home shall have 4 bedrooms & 3.5 baths.Details
horiontal addition on all floors. vertical addition for a new 3rd floor. new home shall have 4 bedrooms & 3.5 baths. | $290,000 |
| Nov 24, 2015 | Completed final sign-off Feb 2016 | 700 11th Av | provide shoring beams to support existing structure. for shoring pit only per plan.Details
provide shoring beams to support existing structure. for shoring pit only per plan. | $5,000 |
| Aug 24, 2015 | Never finaled issued Sep 2015, no final | 243 Stratford Dr | revision to 201506118767. relocate bath opening on garage floor per plan. turn dining area into bedroom and relocate full bath on 1st fl. add office on 2nd floor per plan. relocate full bath on 2nd fl per planDetails
revision to 201506118767. relocate bath opening on garage floor per plan. turn dining area into bedroom and relocate full bath on 1st fl. add office on 2nd floor per plan. relocate full bath on 2nd fl per plan | |
| Jun 3, 2015 | Completed final sign-off Jul 2015 | 1225 18th Av | unit #6: remodel kitchen & bathroom, replace 3 windows at backside not visible from street, same size same location max u factor .32Details
unit #6: remodel kitchen & bathroom, replace 3 windows at backside not visible from street, same size same location max u factor .32 | $16,000 |
| Jun 1, 2015 | Completed final sign-off Oct 2015 | 44 Nahua Av | gr fl add 1 study, 1 office, 1 full bath, 1 home theater. update garage, replace 2 vinyl windows at rear. 2nd fl no workDetails
gr fl add 1 study, 1 office, 1 full bath, 1 home theater. update garage, replace 2 vinyl windows at rear. 2nd fl no work | $58,000 |
| Apr 15, 2015 | Completed final sign-off Jun 2015 | 1637 Hyde St | unit #5: remodel kitchen and bathroom. replace ext. fan. all fire raed assembles to be maintained. all new lights will be led. no wals to be moved/no structural work.Details
unit #5: remodel kitchen and bathroom. replace ext. fan. all fire raed assembles to be maintained. all new lights will be led. no wals to be moved/no structural work. | $17,800 |
| Apr 3, 2015 | Completed final sign-off May 2015 | 1225 18th Av | unit #3 - kitchen and bathroom remodel; to comply with cec150.0(k)3 & 5;; to replace 3 windows at rear; u factor not > .32Details
unit #3 - kitchen and bathroom remodel; to comply with cec150.0(k)3 & 5;; to replace 3 windows at rear; u factor not > .32 | $18,000 |
| Dec 24, 2014 | Completed final sign-off Mar 2015 | 172 Funston Av | remodel kitchen; to comply with cec150.0(k)3; and replace 7 windows at rear, u factor .32Details
remodel kitchen; to comply with cec150.0(k)3; and replace 7 windows at rear, u factor .32 | $12,500 |
| Dec 22, 2014 | Completed final sign-off Feb 2019 | 700 11th Av | add one bedrm,bath and living rm on 1st flr;add one bedrm,elevator&laundry rm;remodel (e)bath&kitchen on 2nd flr;remodel (e) kitchen,(e)bedrm &(e)bath on 3rd flr per plan; add one bath; remodel (e) bedrm on 4th flr.Details
add one bedrm,bath and living rm on 1st flr;add one bedrm,elevator&laundry rm;remodel (e)bath&kitchen on 2nd flr;remodel (e) kitchen,(e)bedrm &(e)bath on 3rd flr per plan; add one bath; remodel (e) bedrm on 4th flr. | $50,000 |
| Dec 22, 2014 | Never finaled issued Dec 2014, no final | 1637 Hyde St | unit #7 - remodel kitchen.Details
unit #7 - remodel kitchen. | $9,500 |
| Dec 22, 2014 | Expired or cancelled expired Apr 2017 | 708 Buchanan St | remodel two kitchens, two bathrooms, upgrade electrical.Details
remodel two kitchens, two bathrooms, upgrade electrical. | $88,000 |
| Oct 14, 2014 | Completed final sign-off Feb 2015 | 875 36th Av | restore original plan under appl 200404060610. removal of stove and sink on ground floor to comply with complaint #201344161.Details
restore original plan under appl 200404060610. removal of stove and sink on ground floor to comply with complaint #201344161. | $1,000 |
| Sep 16, 2014 | Completed final sign-off Nov 2014 | 2545 Polk St | remodel kitchen & 1-1/2 bathroom. add subpanel at 2nd fl, upgrade electric wiring. replace furnace. replace left & backside 6 windows. no structural work, same configuration.Details
remodel kitchen & 1-1/2 bathroom. add subpanel at 2nd fl, upgrade electric wiring. replace furnace. replace left & backside 6 windows. no structural work, same configuration. | $25,000 |
| May 6, 2014 | Expired or cancelled cancelled Jan 2026 | 2754 40th Av | new redwood deck at rear of 2nd floor.Details
new redwood deck at rear of 2nd floor. | $4,500 |
| Mar 25, 2014 | Never finaled issued Mar 2014, no final | 664 Clay St | rev. to pa#201306210144: (n) slope at entrance door and (n) powered door operator to be added for upgrading door to be accessible for person with disability per ab-011 & ab-012Details
rev. to pa#201306210144: (n) slope at entrance door and (n) powered door operator to be added for upgrading door to be accessible for person with disability per ab-011 & ab-012 | |
| Jan 14, 2014 | Completed final sign-off Jun 2014 | 2754 40th Av | gr fl remodel including 1 bedroom, 1 new bath. convert e bedroom into recreation roomDetails
gr fl remodel including 1 bedroom, 1 new bath. convert e bedroom into recreation room | $18,000 |
| Dec 27, 2013 | Completed final sign-off Jan 2014 | 875 36th Av | remodel (e) bathroom on 2/f, new sheetrock and new tile, new shower. see complaint 201344161Details
remodel (e) bathroom on 2/f, new sheetrock and new tile, new shower. see complaint 201344161 | $8,000 |
| Dec 19, 2013 | Completed final sign-off Feb 2014 | 365 03rd Av | work in unit #4: remodel kitchen and 2 bathrooms.Details
work in unit #4: remodel kitchen and 2 bathrooms. | $26,000 |
| Oct 2, 2013 | Completed final sign-off Apr 2014 | 730 23rd Av | remodel (e) kitchen,(2)(e) bathrooms, upgrade 3rd flr bedroom plugs, replace rear side 11 windows; not visible from the streetDetails
remodel (e) kitchen,(2)(e) bathrooms, upgrade 3rd flr bedroom plugs, replace rear side 11 windows; not visible from the street | $23,000 |
| Jul 24, 2013 | Completed final sign-off Oct 2013 | 2331 24th Av | bathroom remodel, kitchen counter, & electrical upgrade for both units.Details
bathroom remodel, kitchen counter, & electrical upgrade for both units. | $18,000 |
| Jul 5, 2013 | Completed final sign-off Feb 2014 | 1647 44th Av | ground floor:add 1 bedroom, 1 home office and one bathroom. replace windows and patio door at rear. update garage.Details
ground floor:add 1 bedroom, 1 home office and one bathroom. replace windows and patio door at rear. update garage. | $60,000 |
| Jun 3, 2013 | Completed final sign-off Aug 2013 | 657 Palmetto Av | remodel 2nd fl bath and kitchenDetails
remodel 2nd fl bath and kitchen | $15,000 |
| May 22, 2013 | Completed final sign-off Sep 2013 | 75 Broadmoor Dr | kitchen remodel, replace kitchen window on right side in kind, replace furnace in kind, replace 2 garage doors 8x7 on back in same locationDetails
kitchen remodel, replace kitchen window on right side in kind, replace furnace in kind, replace 2 garage doors 8x7 on back in same location | $11,000 |
| Feb 11, 2013 | Completed final sign-off Aug 2013 | 657 Palmetto Av | to remodel ground fl. add (2) two bedrooms, add (2) full bathrooms & (1) one storage. second floor legalize (1) one full bathroom.Details
to remodel ground fl. add (2) two bedrooms, add (2) full bathrooms & (1) one storage. second floor legalize (1) one full bathroom. | $55,000 |
| Jan 17, 2013 | Never finaled issued Jan 2013, no final | 200 04th Av | repair/replace some stair treads, hand/guard raisl landing (less than 50%) nov #201268561Details
repair/replace some stair treads, hand/guard raisl landing (less than 50%) nov #201268561 | $800 |
| Jan 9, 2013 | Completed final sign-off Sep 2013 | 314 21st Av | convert unit#1 @ second & 3rd fl. & create unit#2 at ground floor. convert (e) bedrm to dining rm. open wall between dining rm. convert full bath to 1/2 bath. add closet to (e) bedrm#1. 3rd fl remove (e) kitchen convert (e) closet to master bath.Details
convert unit#1 @ second & 3rd fl. & create unit#2 at ground floor. convert (e) bedrm to dining rm. open wall between dining rm. convert full bath to 1/2 bath. add closet to (e) bedrm#1. 3rd fl remove (e) kitchen convert (e) closet to master bath. | $55,000 |
| Dec 21, 2012 | Completed final sign-off Aug 2013 | 167 Fair Oaks St | revision to existing pa# 201204027383 per field inspector comments. 1. revision wall detail at skylight. rise floor at proposed bathroom.Details
revision to existing pa# 201204027383 per field inspector comments. 1. revision wall detail at skylight. rise floor at proposed bathroom. | |
| Nov 6, 2012 | Completed final sign-off Sep 2013 | 314 21st Av | 314 - 21st ave.: kitchen and 2 bathroom remodel in kind. replace 16 windows (7 windows @ front). stucco repair at front entry stairs and around windows.Details
314 - 21st ave.: kitchen and 2 bathroom remodel in kind. replace 16 windows (7 windows @ front). stucco repair at front entry stairs and around windows. | $62,000 |
| Oct 12, 2012 | Completed final sign-off May 2013 | 278 Munich St | add 2 bedrooms, 1 family room, 1 full bathroom & 1 half bathroom at ground floor. relocate 1 door at the rear. replace 2 exterior windows at the rearDetails
add 2 bedrooms, 1 family room, 1 full bathroom & 1 half bathroom at ground floor. relocate 1 door at the rear. replace 2 exterior windows at the rear | $40,000 |
| Oct 10, 2012 | Completed final sign-off May 2013 | 2343 46th Av | kitchen & bathroom remodel.Details
kitchen & bathroom remodel. | $15,000 |
| Sep 17, 2012 | Never finaled issued Sep 2012, no final | 477 14th St | comply with nov# 201261242 & 201259961,repair rear stairs less than 50% provide handrails at exit stairs, replace the (e0 kitchen exhaust(metal) hood duct at same location,htro lightwell,rapair damage wall at item 2, no penetration into other unitsDetails
comply with nov# 201261242 & 201259961,repair rear stairs less than 50% provide handrails at exit stairs, replace the (e0 kitchen exhaust(metal) hood duct at same location,htro lightwell,rapair damage wall at item 2, no penetration into other units | $4,000 |
| Aug 15, 2012 | Completed final sign-off Sep 2012 | 1153 Stockton St | apt.#2- fix the fire damage at one side of kitchen, remove sheetrock, replace base cabinet.Details
apt.#2- fix the fire damage at one side of kitchen, remove sheetrock, replace base cabinet. | $3,000 |
| Jul 16, 2012 | Completed final sign-off Jul 2012 | 100 Shotwell St | to comply with nov # 201239282. repair damaged fire proofing at #1, #3, #4 garage ceilingDetails
to comply with nov # 201239282. repair damaged fire proofing at #1, #3, #4 garage ceiling | $8,000 |
| Jul 9, 2012 | Completed final sign-off Aug 2012 | 245 Leavenworth St | common area- replace front & rear door at basement, permit required to restore path of travel from rear to front, restore ground floor exit path to comply with nov #201848138 item #2 and nov# 201162209 item #6. replacement of doors at front & rear exempted work for permit section 106a.2, sfbc2010Details
common area- replace front & rear door at basement, permit required to restore path of travel from rear to front, restore ground floor exit path to comply with nov #201848138 item #2 and nov# 201162209 item #6. replacement of doors at front & rear exempted work for permit section 106a.2, sfbc2010 | $600 |
| Jun 22, 2012 | Completed final sign-off Aug 2012 | 245 Leavenworth St | unit #8-remodel the kitchen & bathroom. no lighting changeDetails
unit #8-remodel the kitchen & bathroom. no lighting change | $15,000 |
| Jun 22, 2012 | Completed final sign-off Jul 2012 | 245 Leavenworth St | comply with nov# 201185868 #2 & #6/unit #32-remodel the kitchen, new bathroom window, no lighting changeDetails
comply with nov# 201185868 #2 & #6/unit #32-remodel the kitchen, new bathroom window, no lighting change | $15,000 |