Back to bathroom remodel contractors
Jian Lou Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2003 to Sep 2025
- Last 24 months
- 6 permits filed
136 permits since 2000: 112 completed, 3 in progress, 15 never finaled, 6 expired or cancelled.
Of the 15 never-finaled permits, 2 are 3 to 5 years old, 5 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
79 bathroom remodel permits: 68 completed, 3 in progress, 6 never finaled, 2 expired or cancelled. Typically 4 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 9, 2025 | Expired or cancelled expired Sep 2026 | 2737 22nd St | relocate (e) kitchen, remodel bathroom. volunteer upgrade (e) ceiling joists & relocate (e) sheetrock w/ new in dining room at 2/f. construct closet at 3/f.Details
relocate (e) kitchen, remodel bathroom. volunteer upgrade (e) ceiling joists & relocate (e) sheetrock w/ new in dining room at 2/f. construct closet at 3/f. | $68,000 |
| Feb 21, 2025 | In progress issued Mar 2025 | 220 08th Av | revision to pa 2024-0606-3850 remove basement remodel from scope. no workshop, bath, below grade stair, sprinklers. no change to (e) structureDetails
revision to pa 2024-0606-3850 remove basement remodel from scope. no workshop, bath, below grade stair, sprinklers. no change to (e) structure | |
| Nov 18, 2024 | Completed final sign-off Apr 2025 | 53 Alvarado St | non structural bathroom remodelDetails
non structural bathroom remodel | $24,000 |
| Nov 1, 2024 | In progress issued Nov 2024 | 220 08th Av | to comply w/ nov: 202301839 -like for like remodel of 1st and 2nd floor bathrooms (4 total) and kitchens (2) total, no change in plumbing fixture count, no wall demolition or construction. exterior siding replacement, painting and window replacement (max. 0.3 u-value),Details
to comply w/ nov: 202301839 -like for like remodel of 1st and 2nd floor bathrooms (4 total) and kitchens (2) total, no change in plumbing fixture count, no wall demolition or construction. exterior siding replacement, painting and window replacement (max. 0.3 u-value), | $200,000 |
| Jun 6, 2024 | In progress issued Aug 2024 | 220 08th Av | basement remodel (293sf) workshop and add full bathroom. excavate 29.59cu yrds. 3rd floor (224 8th ave) remodel kitchen and bathroom, add full bathroom. remove wall @ kitchen. add (2) windows at lightwell and replace (1) window at rear facade.Details
basement remodel (293sf) workshop and add full bathroom. excavate 29.59cu yrds. 3rd floor (224 8th ave) remodel kitchen and bathroom, add full bathroom. remove wall @ kitchen. add (2) windows at lightwell and replace (1) window at rear facade. | $240,000 |
| Dec 4, 2023 | Completed final sign-off Nov 2024 | 300 Eucalyptus Dr | remodel kitchen and two bathrooms. in kind. no walls removedDetails
remodel kitchen and two bathrooms. in kind. no walls removed | $4,300 |
| Jul 11, 2023 | Completed final sign-off Aug 2023 | 855 Folsom St | cosmetic bathroom remodel with replacement of flooring, vanity cabinet, storage cabinet, and installation of decrotive wall tiling. must maitain accessibility that was required at the time of original construction. this is a covered multi-family dwelling unit.Details
cosmetic bathroom remodel with replacement of flooring, vanity cabinet, storage cabinet, and installation of decrotive wall tiling. must maitain accessibility that was required at the time of original construction. this is a covered multi-family dwelling unit. | $5,000 |
| Apr 24, 2023 | Completed final sign-off Jul 2023 | 7 03rd Av | apt 2 -bath remodel including vanity, tub into shower and retiling floors and walls. no removal of wallsDetails
apt 2 -bath remodel including vanity, tub into shower and retiling floors and walls. no removal of walls | $15,000 |
| Dec 19, 2022 | Completed final sign-off May 2023 | 4123 Noriega St | remodel one kitchen and one bathroom. replace drywalls in 2 bedrooms on ceilingDetails
remodel one kitchen and one bathroom. replace drywalls in 2 bedrooms on ceiling | $45,000 |
| Nov 29, 2022 | Never finaled issued Dec 2022, no final | 3830 Divisadero St | unit 102 on 2/f: interior remodel. remodel kitchen and bath. add bath, den, laundry closet.Details
unit 102 on 2/f: interior remodel. remodel kitchen and bath. add bath, den, laundry closet. | $92,000 |
| May 26, 2022 | Completed final sign-off Dec 2022 | 121 03rd Av | remodel kitchen & 2-1/2 bathrooms.Details
remodel kitchen & 2-1/2 bathrooms. | $40,000 |
| Jan 6, 2022 | Completed final sign-off Mar 2023 | 215 Alpha St | ground floor: provide new office, entertainment room, family room and bathroom at ground floor. replace ground floor rear window as shown on plans. voluntary structual up-grade at ground 1 st. floor.Details
ground floor: provide new office, entertainment room, family room and bathroom at ground floor. replace ground floor rear window as shown on plans. voluntary structual up-grade at ground 1 st. floor. | $80,000 |
| Dec 10, 2021 | Completed final sign-off Aug 2022 | 1576 Kirkwood Av | ground floor remodel - infill under sunroom, add 2 bedrooms, office, bathroom, family room, kitchenette. replace exterior stair to rear yardDetails
ground floor remodel - infill under sunroom, add 2 bedrooms, office, bathroom, family room, kitchenette. replace exterior stair to rear yard | $98,000 |
| Jul 20, 2021 | Completed final sign-off Aug 2022 | 51 Hale St | provide new bedroom, family room, & bathroom at the ground floor. interior work only. no work at the 2nd fl.Details
provide new bedroom, family room, & bathroom at the ground floor. interior work only. no work at the 2nd fl. | $80,000 |
| May 13, 2021 | Never finaled issued May 2021, no final | 1821 18th Av | remodel kitchen approx 12' x 15' on 2nd fl, replace floor, cabinets, island in kind. remodel one full bath on second floor, no change in floor planDetails
remodel kitchen approx 12' x 15' on 2nd fl, replace floor, cabinets, island in kind. remodel one full bath on second floor, no change in floor plan | $30,000 |
| Mar 30, 2021 | Completed final sign-off Aug 2022 | 461 02nd St | work @ unit# 556. remodel and reconfigure (e) loft. remodel kitchen and bathroom. relocate stair to loft.Details
work @ unit# 556. remodel and reconfigure (e) loft. remodel kitchen and bathroom. relocate stair to loft. | $150,000 |
| Dec 14, 2020 | Completed final sign-off Jun 2022 | 558 35th Av | remodel (e) kitchen, (e) bath, add 1 new bath & toilet room. reconfigure (e) rooms @ 2nd floor per plan. replace (e) gypsum board & infill (e) lightwell 2nd floor to ground floor. 2 new bedrooms, 2 bathrooms, and media room to be constructed at ground floor. replace partial footing & concrete slab.Details
remodel (e) kitchen, (e) bath, add 1 new bath & toilet room. reconfigure (e) rooms @ 2nd floor per plan. replace (e) gypsum board & infill (e) lightwell 2nd floor to ground floor. 2 new bedrooms, 2 bathrooms, and media room to be constructed at ground floor. replace partial footing & concrete slab. | $100,000 |
| Oct 24, 2020 | Completed final sign-off Jan 2022 | 15 Lake Forest Ct | 2/f: remodel 2 (e) bathrooms & kitchen. g/f: add 1 (n) full bathroom, englarge (e) bedroom into garage area. sheet rock garage area.Details
2/f: remodel 2 (e) bathrooms & kitchen. g/f: add 1 (n) full bathroom, englarge (e) bedroom into garage area. sheet rock garage area. | $55,000 |
| Sep 20, 2020 | Completed final sign-off Mar 2022 | 201 South Hill Bl | propose new bathroom on 2/f. relocate 1/2 bathroom on g/f and propose bathroom #3. relocate laundry room, wh, fau to g/f and new office/media room.Details
propose new bathroom on 2/f. relocate 1/2 bathroom on g/f and propose bathroom #3. relocate laundry room, wh, fau to g/f and new office/media room. | $80,000 |
| Aug 26, 2020 | Completed final sign-off Jun 2021 | 1585 10th Av | unit 4 - kitchen (150 sf) and bathroom (75 sf) remodel in-kind. no structural work.Details
unit 4 - kitchen (150 sf) and bathroom (75 sf) remodel in-kind. no structural work. | $15,000 |
| Jun 26, 2020 | Completed final sign-off May 2023 | 2082 33rd Av | 2nd fl: reconfigure & remodel kitchen & full bath, add master bath, demolish interior staircase; add exterior staricase at rear. ground fl: add family room, (2) bedroom & full bath. reference complaint #202021447.Details
2nd fl: reconfigure & remodel kitchen & full bath, add master bath, demolish interior staircase; add exterior staricase at rear. ground fl: add family room, (2) bedroom & full bath. reference complaint #202021447. | $110,000 |
| Mar 13, 2019 | Completed final sign-off May 2019 | 283 Parker Av | unit a: remodel kitchen (10x10) and two bathrooms (5x8).Details
unit a: remodel kitchen (10x10) and two bathrooms (5x8). | $30,000 |
| Sep 25, 2018 | Completed final sign-off Jun 2020 | 234 06th Av | add (2) bedrooms, two 3-fixtures bathroom & a media room on 1st fl. reconfigure interior layout on 2nd & 3rd fl. ad roof deck on 3rd fl. (rear of building)Details
add (2) bedrooms, two 3-fixtures bathroom & a media room on 1st fl. reconfigure interior layout on 2nd & 3rd fl. ad roof deck on 3rd fl. (rear of building) | $60,000 |
| Aug 28, 2018 | Completed final sign-off Jan 2019 | 262 Ramsell St | add 2 bedrooms and 1 bath room on ground floor.Details
add 2 bedrooms and 1 bath room on ground floor. | $60,000 |
| Jul 19, 2018 | Completed final sign-off Jun 2020 | 1910 Palou Av | 1st fl: add 2 bedrooms, 2 bath, 1 media, 1 den, and laundy. 2nd: total remodel. add 1 bath and new stairs. new deck at rear. attic: add 1 bedroom, 1 bath, 1 loft, and 1 office. new dormers.Details
1st fl: add 2 bedrooms, 2 bath, 1 media, 1 den, and laundy. 2nd: total remodel. add 1 bath and new stairs. new deck at rear. attic: add 1 bedroom, 1 bath, 1 loft, and 1 office. new dormers. | $100,000 |
| Jun 7, 2018 | Completed final sign-off Sep 2018 | 31 Castillo St | remodel (e) bathroom & kitchen, (1) fan in each, no structural work.Details
remodel (e) bathroom & kitchen, (1) fan in each, no structural work. | $15,000 |
| Oct 3, 2017 | Completed final sign-off Apr 2018 | 1809 Gough St | interior remodel upgrade e layout and finishes for kitchen, dining, bathroom, laundry. no change to overall layout no new bedrooms. upgrade e master bath/plumbing fixtures, wall floor finishes.demo (e) interior non load bearing wall, update (n) lightingDetails
interior remodel upgrade e layout and finishes for kitchen, dining, bathroom, laundry. no change to overall layout no new bedrooms. upgrade e master bath/plumbing fixtures, wall floor finishes.demo (e) interior non load bearing wall, update (n) lighting | $30,000 |
| Aug 2, 2017 | Completed final sign-off Feb 2018 | 148 08th Av | remodel bathroom. no change on wall.Details
remodel bathroom. no change on wall. | $10,000 |
| Jun 9, 2017 | Never finaled issued Jun 2017, no final | 150 Ledyard St | remodel kitchen& bathroom. upgrade electric main service to 100 ampDetails
remodel kitchen& bathroom. upgrade electric main service to 100 amp | $19,000 |
| Mar 10, 2017 | Completed final sign-off Jul 2017 | 3736 Quintara St | reference complaint 201765731; remodel 2/f full bath, no walls moved/removed/added/infilled. all (e) layouts to remain unchanged.Details
reference complaint 201765731; remodel 2/f full bath, no walls moved/removed/added/infilled. all (e) layouts to remain unchanged. | $4,000 |
| Jul 15, 2016 | Never finaled issued May 2018, no final | 1945 23rd Av | rear horizontal addition. ground floor: 1 new bedroom, 1 new office, 1 new bath, family room & home theater. new roof deck above new grd/fl addition with stair to rear yard.Details
rear horizontal addition. ground floor: 1 new bedroom, 1 new office, 1 new bath, family room & home theater. new roof deck above new grd/fl addition with stair to rear yard. | $130,000 |
| Jul 11, 2016 | Completed final sign-off May 2018 | 362 03rd Av | relocate/remodel (e) kitchen and bathroom at 2nd floor. rebuilt/replace part of (e) interior stair. remodel (e) bathroom and nw bathroom at 3rd floor.Details
relocate/remodel (e) kitchen and bathroom at 2nd floor. rebuilt/replace part of (e) interior stair. remodel (e) bathroom and nw bathroom at 3rd floor. | $49,000 |
| Apr 11, 2016 | Completed final sign-off Mar 2017 | 2 Otsego Av | add 2 new bedrooms, 1 office, 1 bathroom, 1 powder room & 1 home theater @1st floor. add half bath in garage. no exterior work is visible.Details
add 2 new bedrooms, 1 office, 1 bathroom, 1 powder room & 1 home theater @1st floor. add half bath in garage. no exterior work is visible. | $70,000 |
| Mar 10, 2016 | Completed final sign-off Oct 2017 | 124 Danvers St | interior remodel: add new entertainment room, bathroom and laundry area at ground flr.Details
interior remodel: add new entertainment room, bathroom and laundry area at ground flr. | $38,000 |
| Feb 11, 2016 | Completed final sign-off Oct 2016 | 274 Chester Av | to add two bedrooms, two full bathroom & laundry room on existing ground floor per plan.Details
to add two bedrooms, two full bathroom & laundry room on existing ground floor per plan. | $50,000 |
| Feb 8, 2016 | Completed final sign-off Mar 2017 | 121 Ottawa Av | g/f: add 3 new nathroomd, 3 bedrooms, 1 theater, 1 family room, replace (2) vinyl windows at rear. 2/f: add 1 new bathroom,1 office, 1 stdy, remodel (e) kitchen & (e) bathroom. exterior: add 3 new skylights, add wooden landing, patio doors to lead to rear yard.Details
g/f: add 3 new nathroomd, 3 bedrooms, 1 theater, 1 family room, replace (2) vinyl windows at rear. 2/f: add 1 new bathroom,1 office, 1 stdy, remodel (e) kitchen & (e) bathroom. exterior: add 3 new skylights, add wooden landing, patio doors to lead to rear yard. | $88,000 |
| Jan 19, 2016 | Completed final sign-off Feb 2019 | 700 11th Av | revision to pa#201412224288: to comply with complaint# 201578631 (ref. to pa# 201511243445) & comply complaint# 201578572 & 201583591, relocate bathroom on 2/f & 3/f, remove one bath on 3/f, add full bath on 4/f, add 2 domers on 4/f.Details
revision to pa#201412224288: to comply with complaint# 201578631 (ref. to pa# 201511243445) & comply complaint# 201578572 & 201583591, relocate bathroom on 2/f & 3/f, remove one bath on 3/f, add full bath on 4/f, add 2 domers on 4/f. | $35,000 |
| Jan 12, 2016 | Completed final sign-off Jan 2021 | 578 44th Av | horiontal addition on all floors. vertical addition for a new 3rd floor. new home shall have 4 bedrooms & 3.5 baths.Details
horiontal addition on all floors. vertical addition for a new 3rd floor. new home shall have 4 bedrooms & 3.5 baths. | $290,000 |
| Aug 24, 2015 | Never finaled issued Sep 2015, no final | 243 Stratford Dr | revision to 201506118767. relocate bath opening on garage floor per plan. turn dining area into bedroom and relocate full bath on 1st fl. add office on 2nd floor per plan. relocate full bath on 2nd fl per planDetails
revision to 201506118767. relocate bath opening on garage floor per plan. turn dining area into bedroom and relocate full bath on 1st fl. add office on 2nd floor per plan. relocate full bath on 2nd fl per plan | |
| Jun 3, 2015 | Completed final sign-off Jul 2015 | 1225 18th Av | unit #6: remodel kitchen & bathroom, replace 3 windows at backside not visible from street, same size same location max u factor .32Details
unit #6: remodel kitchen & bathroom, replace 3 windows at backside not visible from street, same size same location max u factor .32 | $16,000 |
| Jun 1, 2015 | Completed final sign-off Oct 2015 | 44 Nahua Av | gr fl add 1 study, 1 office, 1 full bath, 1 home theater. update garage, replace 2 vinyl windows at rear. 2nd fl no workDetails
gr fl add 1 study, 1 office, 1 full bath, 1 home theater. update garage, replace 2 vinyl windows at rear. 2nd fl no work | $58,000 |
| Apr 15, 2015 | Completed final sign-off Jun 2015 | 1637 Hyde St | unit #5: remodel kitchen and bathroom. replace ext. fan. all fire raed assembles to be maintained. all new lights will be led. no wals to be moved/no structural work.Details
unit #5: remodel kitchen and bathroom. replace ext. fan. all fire raed assembles to be maintained. all new lights will be led. no wals to be moved/no structural work. | $17,800 |
| Apr 3, 2015 | Completed final sign-off May 2015 | 1225 18th Av | unit #3 - kitchen and bathroom remodel; to comply with cec150.0(k)3 & 5;; to replace 3 windows at rear; u factor not > .32Details
unit #3 - kitchen and bathroom remodel; to comply with cec150.0(k)3 & 5;; to replace 3 windows at rear; u factor not > .32 | $18,000 |
| Dec 22, 2014 | Expired or cancelled expired Apr 2017 | 708 Buchanan St | remodel two kitchens, two bathrooms, upgrade electrical.Details
remodel two kitchens, two bathrooms, upgrade electrical. | $88,000 |
| Dec 22, 2014 | Completed final sign-off Feb 2019 | 700 11th Av | add one bedrm,bath and living rm on 1st flr;add one bedrm,elevator&laundry rm;remodel (e)bath&kitchen on 2nd flr;remodel (e) kitchen,(e)bedrm &(e)bath on 3rd flr per plan; add one bath; remodel (e) bedrm on 4th flr.Details
add one bedrm,bath and living rm on 1st flr;add one bedrm,elevator&laundry rm;remodel (e)bath&kitchen on 2nd flr;remodel (e) kitchen,(e)bedrm &(e)bath on 3rd flr per plan; add one bath; remodel (e) bedrm on 4th flr. | $50,000 |
| Sep 16, 2014 | Completed final sign-off Nov 2014 | 2545 Polk St | remodel kitchen & 1-1/2 bathroom. add subpanel at 2nd fl, upgrade electric wiring. replace furnace. replace left & backside 6 windows. no structural work, same configuration.Details
remodel kitchen & 1-1/2 bathroom. add subpanel at 2nd fl, upgrade electric wiring. replace furnace. replace left & backside 6 windows. no structural work, same configuration. | $25,000 |
| Jan 14, 2014 | Completed final sign-off Jun 2014 | 2754 40th Av | gr fl remodel including 1 bedroom, 1 new bath. convert e bedroom into recreation roomDetails
gr fl remodel including 1 bedroom, 1 new bath. convert e bedroom into recreation room | $18,000 |
| Dec 27, 2013 | Completed final sign-off Jan 2014 | 875 36th Av | remodel (e) bathroom on 2/f, new sheetrock and new tile, new shower. see complaint 201344161Details
remodel (e) bathroom on 2/f, new sheetrock and new tile, new shower. see complaint 201344161 | $8,000 |
| Dec 19, 2013 | Completed final sign-off Feb 2014 | 365 03rd Av | work in unit #4: remodel kitchen and 2 bathrooms.Details
work in unit #4: remodel kitchen and 2 bathrooms. | $26,000 |
| Oct 2, 2013 | Completed final sign-off Apr 2014 | 730 23rd Av | remodel (e) kitchen,(2)(e) bathrooms, upgrade 3rd flr bedroom plugs, replace rear side 11 windows; not visible from the streetDetails
remodel (e) kitchen,(2)(e) bathrooms, upgrade 3rd flr bedroom plugs, replace rear side 11 windows; not visible from the street | $23,000 |
| Jul 24, 2013 | Completed final sign-off Oct 2013 | 2331 24th Av | bathroom remodel, kitchen counter, & electrical upgrade for both units.Details
bathroom remodel, kitchen counter, & electrical upgrade for both units. | $18,000 |
| Jul 5, 2013 | Completed final sign-off Feb 2014 | 1647 44th Av | ground floor:add 1 bedroom, 1 home office and one bathroom. replace windows and patio door at rear. update garage.Details
ground floor:add 1 bedroom, 1 home office and one bathroom. replace windows and patio door at rear. update garage. | $60,000 |
| Jun 3, 2013 | Completed final sign-off Aug 2013 | 657 Palmetto Av | remodel 2nd fl bath and kitchenDetails
remodel 2nd fl bath and kitchen | $15,000 |
| Feb 11, 2013 | Completed final sign-off Aug 2013 | 657 Palmetto Av | to remodel ground fl. add (2) two bedrooms, add (2) full bathrooms & (1) one storage. second floor legalize (1) one full bathroom.Details
to remodel ground fl. add (2) two bedrooms, add (2) full bathrooms & (1) one storage. second floor legalize (1) one full bathroom. | $55,000 |
| Jan 9, 2013 | Completed final sign-off Sep 2013 | 314 21st Av | convert unit#1 @ second & 3rd fl. & create unit#2 at ground floor. convert (e) bedrm to dining rm. open wall between dining rm. convert full bath to 1/2 bath. add closet to (e) bedrm#1. 3rd fl remove (e) kitchen convert (e) closet to master bath.Details
convert unit#1 @ second & 3rd fl. & create unit#2 at ground floor. convert (e) bedrm to dining rm. open wall between dining rm. convert full bath to 1/2 bath. add closet to (e) bedrm#1. 3rd fl remove (e) kitchen convert (e) closet to master bath. | $55,000 |
| Dec 21, 2012 | Completed final sign-off Aug 2013 | 167 Fair Oaks St | revision to existing pa# 201204027383 per field inspector comments. 1. revision wall detail at skylight. rise floor at proposed bathroom.Details
revision to existing pa# 201204027383 per field inspector comments. 1. revision wall detail at skylight. rise floor at proposed bathroom. | |
| Nov 6, 2012 | Completed final sign-off Sep 2013 | 314 21st Av | 314 - 21st ave.: kitchen and 2 bathroom remodel in kind. replace 16 windows (7 windows @ front). stucco repair at front entry stairs and around windows.Details
314 - 21st ave.: kitchen and 2 bathroom remodel in kind. replace 16 windows (7 windows @ front). stucco repair at front entry stairs and around windows. | $62,000 |
| Oct 12, 2012 | Completed final sign-off May 2013 | 278 Munich St | add 2 bedrooms, 1 family room, 1 full bathroom & 1 half bathroom at ground floor. relocate 1 door at the rear. replace 2 exterior windows at the rearDetails
add 2 bedrooms, 1 family room, 1 full bathroom & 1 half bathroom at ground floor. relocate 1 door at the rear. replace 2 exterior windows at the rear | $40,000 |
| Oct 10, 2012 | Completed final sign-off May 2013 | 2343 46th Av | kitchen & bathroom remodel.Details
kitchen & bathroom remodel. | $15,000 |
| Jun 22, 2012 | Completed final sign-off Aug 2012 | 245 Leavenworth St | unit #8-remodel the kitchen & bathroom. no lighting changeDetails
unit #8-remodel the kitchen & bathroom. no lighting change | $15,000 |
| Jun 22, 2012 | Completed final sign-off Jul 2012 | 245 Leavenworth St | comply with nov# 201185868 #2 & #6/unit #32-remodel the kitchen, new bathroom window, no lighting changeDetails
comply with nov# 201185868 #2 & #6/unit #32-remodel the kitchen, new bathroom window, no lighting change | $15,000 |
| Apr 2, 2012 | Completed final sign-off Aug 2013 | 167 Fair Oaks St | interior remodel: unit #5. convert portion of existing living room into bedroom, add new bathroom, enlarge existing study room. unit #12: remove (e) pantry remodel existing kitchen. remodel (e) bathroom, add new bathroom.Details
interior remodel: unit #5. convert portion of existing living room into bedroom, add new bathroom, enlarge existing study room. unit #12: remove (e) pantry remodel existing kitchen. remodel (e) bathroom, add new bathroom. | $15,000 |
| Apr 2, 2012 | Completed final sign-off Dec 2012 | 3158 Mission St | #1- revision to exiting approved pa# 201202033553. relocate proposed half bath to closet area. partial compliance of open code enforcement cases.Details
#1- revision to exiting approved pa# 201202033553. relocate proposed half bath to closet area. partial compliance of open code enforcement cases. | $5,000 |
| Mar 12, 2012 | Completed final sign-off Jun 2012 | 10 Neptune St | upgrade electrical panel, upgrade kitchen and bathroom lighting; will comply with cec 150(k) 8and cec 150(k)10Details
upgrade electrical panel, upgrade kitchen and bathroom lighting; will comply with cec 150(k) 8and cec 150(k)10 | $10,000 |
| Feb 29, 2012 | Completed final sign-off May 2012 | 2608 Sutter St | remodel kitchen and bathroom. replace (1) front window & (2) rear windowsDetails
remodel kitchen and bathroom. replace (1) front window & (2) rear windows | $15,000 |
| Feb 3, 2012 | Completed final sign-off Dec 2012 | 3158 Mission St | #1 - comply w/nov# 201159467 dated 11/14/2001-2nd floor (front unit)-interior remodel, remodel (e) kitchen, convert (e) living room into bedroom & office. convert (e) laundry room into bedroom. add new powder room (half bathroom). remodel (e) bahtroomDetails
#1 - comply w/nov# 201159467 dated 11/14/2001-2nd floor (front unit)-interior remodel, remodel (e) kitchen, convert (e) living room into bedroom & office. convert (e) laundry room into bedroom. add new powder room (half bathroom). remodel (e) bahtroom | $60,000 |
| Jan 19, 2012 | Completed final sign-off Aug 2012 | 167 Fair Oaks St | #2 - remodel bathroom & kitchen. no structural work.Details
#2 - remodel bathroom & kitchen. no structural work. | $9,000 |
| Jan 4, 2012 | Completed final sign-off Feb 2012 | 264 Faxon Av | interior remofel on 1st floor - nov #200929778, 201185612 has been addressed in pa #201108142722. interior partition on 1st floor add two bedroom, 1/2 bath, 1 gym room, 1 laundry room per plan.Details
interior remofel on 1st floor - nov #200929778, 201185612 has been addressed in pa #201108142722. interior partition on 1st floor add two bedroom, 1/2 bath, 1 gym room, 1 laundry room per plan. | $40,000 |
| Dec 13, 2011 | Completed final sign-off May 2012 | 1867 40th Av | remodel ground floor. add 2 bedrooms, full bath and storage/laundryDetails
remodel ground floor. add 2 bedrooms, full bath and storage/laundry | $40,000 |
| Dec 7, 2011 | Never finaled issued Mar 2012, no final | 1029 Jackson St | lower extg basement 2'-0" and convert info habitable space.(901 sq ft). remodel extg 2nd and 3rd floor and add new bathroom at 2nd and 3rd floor.Details
lower extg basement 2'-0" and convert info habitable space.(901 sq ft). remodel extg 2nd and 3rd floor and add new bathroom at 2nd and 3rd floor. | $70,000 |
| Oct 14, 2011 | Completed final sign-off Dec 2011 | 791 14th Av | bathroom remodel (single). layout change of toilet, vanity, shower.Details
bathroom remodel (single). layout change of toilet, vanity, shower. | $4,000 |
| Jan 24, 2011 | Completed final sign-off Jun 2011 | 855 La Playa | unit # 260: remodel (1) kitchen and 2 bathroomsDetails
unit # 260: remodel (1) kitchen and 2 bathrooms | $3,000 |
| Oct 13, 2010 | Completed final sign-off Feb 2011 | 2376 16th Av | remodel grond floor - add one bedroom, study room, full bath & storage.Details
remodel grond floor - add one bedroom, study room, full bath & storage. | $43,000 |
| Oct 4, 2010 | Completed final sign-off Dec 2010 | 365 03rd Av | #2- remodel kitchen & bathroom, change lighting in dining room.Details
#2- remodel kitchen & bathroom, change lighting in dining room. | $11,000 |
| Jun 24, 2010 | Completed final sign-off Aug 2010 | 365 03rd Av | unit #1: to comply with his nov 201042285 dtd 4-14-10, no structural work, bathroom replace plumbing fixtures & retile floor, upgrade kitchen & bathroom, kitchen replace cabinet & counterDetails
unit #1: to comply with his nov 201042285 dtd 4-14-10, no structural work, bathroom replace plumbing fixtures & retile floor, upgrade kitchen & bathroom, kitchen replace cabinet & counter | $12,500 |
| Mar 23, 2010 | Completed final sign-off Sep 2010 | 855 La Playa | remodel 2 bathroom & change the countertop in the kitchen. bathroom: replace plumbing fixtures & floor tiles, replace kitchen no cabinets & countertop, no structural work, provide high efficacy lighting per cec 151kDetails
remodel 2 bathroom & change the countertop in the kitchen. bathroom: replace plumbing fixtures & floor tiles, replace kitchen no cabinets & countertop, no structural work, provide high efficacy lighting per cec 151k | $14,000 |
| Sep 28, 2009 | Completed final sign-off Jan 2010 | 175 Bright St | remodel (e) bedroom on 1st floor, replace (e) window, relocate door. add one (n) bedroom & one (e) bathroom on 1st floorDetails
remodel (e) bedroom on 1st floor, replace (e) window, relocate door. add one (n) bedroom & one (e) bathroom on 1st floor | $10,000 |
| Oct 9, 2008 | Completed final sign-off Jan 2009 | 8 Nahua Av | add new bedroom, playroom and bathroom at ground floor, relocate (e) wh and furnace. remodel (e) bathroom, add new full bath to (e) bedroom. replace (e) window with new exterior door to new deck with satirs to ground level back yard.++++++Details
add new bedroom, playroom and bathroom at ground floor, relocate (e) wh and furnace. remodel (e) bathroom, add new full bath to (e) bedroom. replace (e) window with new exterior door to new deck with satirs to ground level back yard.++++++ | $45,000 |
| Aug 15, 2008 | Completed final sign-off Oct 2008 | 138 Gambier St | remodel kitchen & bathroom on the 2nd floor. work to meet title 24 energy codes.Details
remodel kitchen & bathroom on the 2nd floor. work to meet title 24 energy codes. | $17,000 |