Jian Lou Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2003 to Sep 2025
- Last 24 months
- 6 permits filed
136 permits since 2000: 112 completed, 3 in progress, 15 never finaled, 6 expired or cancelled.
Of the 15 never-finaled permits, 2 are 3 to 5 years old, 5 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 8 days from filing to permit and 379 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 19, 2018 | Completed final sign-off Jun 2020 | 1910 Palou Av | 1st fl: add 2 bedrooms, 2 bath, 1 media, 1 den, and laundy. 2nd: total remodel. add 1 bath and new stairs. new deck at rear. attic: add 1 bedroom, 1 bath, 1 loft, and 1 office. new dormers.Details
1st fl: add 2 bedrooms, 2 bath, 1 media, 1 den, and laundy. 2nd: total remodel. add 1 bath and new stairs. new deck at rear. attic: add 1 bedroom, 1 bath, 1 loft, and 1 office. new dormers. | $100,000 |
| Jun 9, 2016 | Never finaled issued Jun 2016, no final | 2 Otsego Av | addition work to permit 201604114467, repair, reinforce (e) concrete footing, make g/f 8'-0' ceiling ht, remove partial land @ side of back yard to make court yard, install patio decks to side court yard.Details
addition work to permit 201604114467, repair, reinforce (e) concrete footing, make g/f 8'-0' ceiling ht, remove partial land @ side of back yard to make court yard, install patio decks to side court yard. | $40,000 |
| May 6, 2014 | Expired or cancelled cancelled Jan 2026 | 2754 40th Av | new redwood deck at rear of 2nd floor.Details
new redwood deck at rear of 2nd floor. | $4,500 |
| Oct 9, 2008 | Completed final sign-off Jan 2009 | 8 Nahua Av | add new bedroom, playroom and bathroom at ground floor, relocate (e) wh and furnace. remodel (e) bathroom, add new full bath to (e) bedroom. replace (e) window with new exterior door to new deck with satirs to ground level back yard.++++++Details
add new bedroom, playroom and bathroom at ground floor, relocate (e) wh and furnace. remodel (e) bathroom, add new full bath to (e) bedroom. replace (e) window with new exterior door to new deck with satirs to ground level back yard.++++++ | $45,000 |