Block 0208, lot 010
662 Clay St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
25 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 2, 2020 | Completed final sign-off Mar 2021 | 662 Clay St | Aligned Technologies Llc Dba Aligned Dev | ti of (e) ground fl restaurant space. change of use from restaurant to consulate office. new interior non-structural partitions and assoicated finishes & new lighting. demising of (e) tenant space. mep and fire protection are deferred. new address request on merchant sDetails
ti of (e) ground fl restaurant space. change of use from restaurant to consulate office. new interior non-structural partitions and assoicated finishes & new lighting. demising of (e) tenant space. mep and fire protection are deferred. new address request on merchant s | $455,000 |
| Jan 29, 2020 | Never finaled issued Jan 2020, no final | 670 Clay St | 4 Diamond Construction Inc | non electeric wall signDetails
non electeric wall sign | $1,000 |
| Jan 29, 2020 | Never finaled issued Jan 2020, no final | 670 Clay St | 4 Diamond Construction Inc | repair exterior trim, repaint. repair & replace tile. reference pa #2019-1119-7676Details
repair exterior trim, repaint. repair & replace tile. reference pa #2019-1119-7676 | $8,000 |
| Jan 16, 2020 | Completed final sign-off Apr 2020 | 670 Clay St | San Francisco Fire Protection | ref pa# 201908027770 & 201911197676; install smoke detectors, manual pull, horn strobes and strobes in common area of showroom to be tied in to (e) fire alarm systemDetails
ref pa# 201908027770 & 201911197676; install smoke detectors, manual pull, horn strobes and strobes in common area of showroom to be tied in to (e) fire alarm system | $3,000 |
| Dec 30, 2019 | Expired or cancelled cancelled Jan 2026 | 662 Clay St | demolish portion of front storefront, install new storefront, new entry door.Details
demolish portion of front storefront, install new storefront, new entry door. | $35,000 | |
| Nov 19, 2019 | Never finaled issued Nov 2019, no final | 670 Clay St | 4 Diamond Construction Inc | new ada batroom, mop sink room, pantry, storage room, new ceiling & lighting, new millwork, new fan exhaust unit, elec panel relocationDetails
new ada batroom, mop sink room, pantry, storage room, new ceiling & lighting, new millwork, new fan exhaust unit, elec panel relocation | $152,500 |
| Nov 1, 2019 | Never finaled issued Nov 2019, no final | 662 Clay St | Aligned Technologies Llc Dba Aligned Dev | demolition of non structural partitions in a vacant commercial space in preperation for leasing to a future tenant per ab-017.Details
demolition of non structural partitions in a vacant commercial space in preperation for leasing to a future tenant per ab-017. | $20,000 |
| Aug 23, 2019 | Expired or cancelled cancelled Jan 2026 | 670 Clay St | int remodel: lighting, outlets, bathroom, bar sink, floor, interior walls ref 201711204470Details
int remodel: lighting, outlets, bathroom, bar sink, floor, interior walls ref 201711204470 | $50,000 | |
| Aug 2, 2019 | Completed final sign-off Sep 2019 | 668 Clay St | San Francisco Fire Protection | adding 2 new relya modules to (e) fire alarm system to release power form door holders to close doors. ref pa201808288518.Details
adding 2 new relya modules to (e) fire alarm system to release power form door holders to close doors. ref pa201808288518. | $500 |
| Jan 23, 2019 | Completed final sign-off Sep 2019 | 668 Clay St | Aligned Technologies Llc Dba Aligned Dev | replace existing plumbing anbd lighting fixtures. new floor and wall tile in baths. new stair flooring. new kitchen countertop. new rated partitions and doors at e stairs, new handrails at stairs new hallway flooringDetails
replace existing plumbing anbd lighting fixtures. new floor and wall tile in baths. new stair flooring. new kitchen countertop. new rated partitions and doors at e stairs, new handrails at stairs new hallway flooring | $400,000 |
| Sep 20, 2018 | Completed final sign-off May 2019 | 660 Clay St | Aligned Technologies Llc Dba Aligned Dev | alteration of existing storefront in ground floor retail space. new automatic door opener. electrical under sep permit. no mech. barrier removal.Details
alteration of existing storefront in ground floor retail space. new automatic door opener. electrical under sep permit. no mech. barrier removal. | $6,000 |
| Sep 17, 2018 | Completed final sign-off Dec 2018 | 670 Clay St | Aligned Technologies Llc Dba Aligned Dev | storefront repair add automatic door opener separate permit ro relocate exterior fire dept connection and electrical under sep permit. maher n/a.Details
storefront repair add automatic door opener separate permit ro relocate exterior fire dept connection and electrical under sep permit. maher n/a. | $8,000 |
| Aug 28, 2018 | Completed final sign-off Sep 2018 | 668 Clay St | San Francisco Fire Protection | like for like replacement to prepare for 1103.7.6.1. replace 1 facp, 2 heat detectors, 21 smoke detectorsDetails
like for like replacement to prepare for 1103.7.6.1. replace 1 facp, 2 heat detectors, 21 smoke detectors | $8,000 |
| Jun 19, 2018 | Never finaled issued Jun 2018, no final | 660 Clay St | Aligned Technologies Llc Dba Aligned Dev | remove signs and awnings for painingDetails
remove signs and awnings for paining | $2,000 |
| Jan 3, 2018 | Never finaled issued Jan 2018, no final | 660 Clay St | Aligned Technologies Llc Dba Aligned Dev | administration permit. address changes: add 1 new address for commercial space and re-number address to existing demised spaces, from 664 clay street to 660 clay street.Details
administration permit. address changes: add 1 new address for commercial space and re-number address to existing demised spaces, from 664 clay street to 660 clay street. | |
| Nov 20, 2017 | Never finaled issued Apr 2018, no final | 670 Clay St | Aligned Technologies Llc Dba Aligned Dev | demolition of non structural partitions in 1st floor commercial space in preparation for leasing to future tenant. electrical under seperate permit. no mechanical. n/a for maherDetails
demolition of non structural partitions in 1st floor commercial space in preparation for leasing to future tenant. electrical under seperate permit. no mechanical. n/a for maher | $8,000 |
| Mar 25, 2014 | Never finaled issued Mar 2014, no final | 664 Clay St | Jian Lou Construction Co. | rev. to pa#201306210144: (n) slope at entrance door and (n) powered door operator to be added for upgrading door to be accessible for person with disability per ab-011 & ab-012Details
rev. to pa#201306210144: (n) slope at entrance door and (n) powered door operator to be added for upgrading door to be accessible for person with disability per ab-011 & ab-012 | |
| Jun 21, 2013 | Completed final sign-off Apr 2014 | 664 Clay St | convert existing retail space to laurel health center. comply (e) bath rm to h.c. bath rm & add shower rm. (e) mezzanine level to be removedDetails
convert existing retail space to laurel health center. comply (e) bath rm to h.c. bath rm & add shower rm. (e) mezzanine level to be removed | $30,000 | |
| May 29, 2013 | Completed final sign-off Jun 2013 | 668 Clay St | Alpha Construction Company | to comply wtih ordinance 029-13 only installation of grab bars in sro at the following locations, 3 baths & 3 showersDetails
to comply wtih ordinance 029-13 only installation of grab bars in sro at the following locations, 3 baths & 3 showers | $1,200 |
| Aug 23, 2007 | Never finaled issued Aug 2007, no final | 668 Clay St | street space & sidewalkDetails
street space & sidewalk | ||
| Apr 2, 2007 | Expired or cancelled expired Aug 2011 | 668 Clay St | Grand Roofing Inc. | reroofingDetails
reroofing | $8,500 |
| Jul 26, 2006 | Expired or cancelled expired Aug 2011 | 668 Clay St | Grand Roofing Inc. | reroofingDetails
reroofing | $54,000 |
| Oct 19, 2004 | Expired or cancelled expired Nov 2006 | 668 Clay St | Bay Alarm Company | install 1 duct to monito 1 (e) facu.Details
install 1 duct to monito 1 (e) facu. | $625 |
| Oct 8, 2004 | Never finaled issued Oct 2004, no final | 668 Clay St | Grand Roofing Inc. | reroofingDetails
reroofing | $72,000 |
| Aug 27, 2003 | Expired or cancelled expired Nov 2006 | 668 Clay St | change out existing speakers. added corridor speaker, toilets, utility rooms, alter existing fireDetails
change out existing speakers. added corridor speaker, toilets, utility rooms, alter existing fire | $35,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Aligned Technologies Llc Dba Aligned Dev (8), 4 Diamond Construction Inc (3), Grand Roofing Inc. (3), San Francisco Fire Protection (3), Alpha Construction Company, Bay Alarm Company, Jian Lou Construction Co.
- Architects
- Sharon Cox (7), Abigail Lubniewski, David Kozolchyk Plotkin
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.