Permit GraphShortlistSan Francisco building permits since 2000

Via Us Construction Inc

Contractor license
1028734
State license record
Based in
Daly City
On San Francisco permits
Aug 2017 to May 2026
Last 24 months
4 permits filed

20 permits since 2000: 19 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllDeck 1Stairs 2Kitchen remodel 7Bathroom remodel 8
FiledOutcomeAddressWork described on the permitDeclared cost
May 7, 2026Completed
final sign-off Aug 2026
65 Garnett Trremodel (e) kitchen in-kind, no structural removal. replace 1 sink & kitchen cabinet & new countertop.
Details
Permit
202605070899
Status
complete
Filed
May 7, 2026
Permit issued
May 7, 2026
Final sign-off
Aug 26, 2026
Declared cost
$16,000
Address
65 Garnett Tr

remodel (e) kitchen in-kind, no structural removal. replace 1 sink & kitchen cabinet & new countertop.

Open the permit page

$16,000
Dec 9, 2025Completed
final sign-off Jun 2026
114 10th Avrevision to permit 202404301066. revised window size of the proposed windows at 1/f and 2/f rear sliding door. revised interior stair from 2/f to 1/f. to comply with nov# 202538271 (for front stair)
Details
Permit
202512091307
Status
complete
Filed
Dec 9, 2025
Permit issued
Dec 29, 2025
Final sign-off
Jun 18, 2026
Declared cost
$1,000
Address
114 10th Av

revision to permit 202404301066. revised window size of the proposed windows at 1/f and 2/f rear sliding door. revised interior stair from 2/f to 1/f. to comply with nov# 202538271 (for front stair)

Open the permit page

$1,000
Nov 21, 2025Completed
final sign-off Feb 2026
3621 Broderick Streplace 4 front windows in kind
Details
Permit
202511210244
Status
complete
Filed
Nov 21, 2025
Permit issued
Nov 21, 2025
Final sign-off
Feb 17, 2026
Declared cost
$4,500
Address
3621 Broderick St

replace 4 front windows in kind

Open the permit page

$4,500
Jun 26, 2025Completed
final sign-off Jun 2026
114 10th Avto comply with nov 202538271. remove tile on existing stairs. keep/repair existing wooden stairs as needed. street visible front of home. less than 50% of stairs.
Details
Permit
202506269509
Status
complete
Filed
Jun 26, 2025
Permit issued
Jul 18, 2025
Final sign-off
Jun 18, 2026
Declared cost
$500
Address
114 10th Av

to comply with nov 202538271. remove tile on existing stairs. keep/repair existing wooden stairs as needed. street visible front of home. less than 50% of stairs.

Open the permit page

$500
Sep 24, 2024Completed
final sign-off Dec 2024
2078 Bay Shore Blreplace (e) 1 front window.
Details
Permit
202409241493
Status
complete
Filed
Sep 24, 2024
Permit issued
Sep 24, 2024
Final sign-off
Dec 31, 2024
Declared cost
$5,000
Address
2078 Bay Shore Bl

replace (e) 1 front window.

Open the permit page

$5,000
Aug 6, 2024Completed
final sign-off Dec 2024
495 12th Avrepair front patio ceiling wood joints in kind.
Details
Permit
202408068036
Status
complete
Filed
Aug 6, 2024
Permit issued
Aug 6, 2024
Final sign-off
Dec 6, 2024
Declared cost
$20,000
Address
495 12th Av

repair front patio ceiling wood joints in kind.

Open the permit page

$20,000
Jul 15, 2024Completed
final sign-off Jul 2026
1161 Alemany Bladd 2 bedrooms, 1 family rm, remodel 1 bath, remodel storage rm on 1st fl. add wet bar w/ cooktop on 1st fl. total new condition space in grould fl is 972 sf
Details
Permit
202407156514
Status
complete
Filed
Jul 15, 2024
Permit issued
Sep 5, 2024
Final sign-off
Jul 21, 2026
Declared cost
$135,000
Address
1161 Alemany Bl

add 2 bedrooms, 1 family rm, remodel 1 bath, remodel storage rm on 1st fl. add wet bar w/ cooktop on 1st fl. total new condition space in grould fl is 972 sf

Open the permit page

$135,000
Jun 11, 2024Completed
final sign-off Jun 2026
114 10th Avinterior remodeling: 1/f addition of 507sf to convert storage space tand crawl space to 1 bed, 1 family rm. relocate and remodel 1 bath. add 3 new windows. 2/f: remove (e) wall b/t kitchen and dining. add sliding door to access (e) rear deck. remodel 1 bath. seismic strengthening to lowest level.
Details
Permit
202404301066
Status
complete
Filed
Jun 11, 2024
Permit issued
Dec 13, 2024
Final sign-off
Jun 22, 2026
Declared cost
$100,000
Address
114 10th Av

interior remodeling: 1/f addition of 507sf to convert storage space tand crawl space to 1 bed, 1 family rm. relocate and remodel 1 bath. add 3 new windows. 2/f: remove (e) wall b/t kitchen and dining. add sliding door to access (e) rear deck. remodel 1 bath. seismic strengthening to lowest level.

Open the permit page

$100,000
Jun 10, 2024Completed
final sign-off Dec 2024
2078 Bay Shore Blremove wall between kitchen & living room, and wall between hallway and living room. remodel 2/f 1) kitchen & 1) bathroom (new drywall & insulation). no exterior work and no work on g/f.
Details
Permit
202406104070
Status
complete
Filed
Jun 10, 2024
Permit issued
Jul 5, 2024
Final sign-off
Dec 31, 2024
Declared cost
$100,000
Address
2078 Bay Shore Bl

remove wall between kitchen & living room, and wall between hallway and living room. remodel 2/f 1) kitchen & 1) bathroom (new drywall & insulation). no exterior work and no work on g/f.

Open the permit page

$100,000
Mar 21, 2024Completed
final sign-off Jun 2026
114 10th Avremodeling w kitchen @ 2nd fl & bathroom @ 3rd/f. add n bedroom & bath at 2nd/f. n furnace at attic. n bathroom at bedroom #1 at 3rd/f. relocate clset at bedroom #2 at 3rd/f. n skylight.
Details
Permit
202403218328
Status
complete
Filed
Mar 21, 2024
Permit issued
Jul 3, 2024
Final sign-off
Jun 18, 2026
Declared cost
$50,000
Address
114 10th Av

remodeling w kitchen @ 2nd fl & bathroom @ 3rd/f. add n bedroom & bath at 2nd/f. n furnace at attic. n bathroom at bedroom #1 at 3rd/f. relocate clset at bedroom #2 at 3rd/f. n skylight.

Open the permit page

$50,000
Oct 2, 2019Completed
final sign-off Nov 2019
160 Andover Stremodel (e) kitchen, no wall removal, new cabinet, new tile new counter, new lighting. remodel in kind.
Details
Permit
201910023346
Status
complete
Filed
Oct 2, 2019
Permit issued
Oct 2, 2019
Final sign-off
Nov 25, 2019
Declared cost
$15,000
Address
160 Andover St

remodel (e) kitchen, no wall removal, new cabinet, new tile new counter, new lighting. remodel in kind.

Open the permit page

$15,000
Aug 12, 2019Never finaled
issued Aug 2019, no final
530 Banks Streplace 6 exterior windows w/ u-factor 0.32 at rear of house. guest bathroom remodel 2nd floor -replace vanity, toilets, shower stand and re-tile floor and replace lights. replacements in-kind, same layout.
Details
Permit
201908128514
Status
issued
Filed
Aug 12, 2019
Permit issued
Aug 12, 2019
Declared cost
$10,000
Address
530 Banks St

replace 6 exterior windows w/ u-factor 0.32 at rear of house. guest bathroom remodel 2nd floor -replace vanity, toilets, shower stand and re-tile floor and replace lights. replacements in-kind, same layout.

Open the permit page

$10,000
Apr 11, 2019Completed
final sign-off Jun 2019
2162 32nd Av(e) 2nd fl bathroom: replace tile to walkin shower, replace lights, replace vanity & replace (e) fan w/heater. all in kind.
Details
Permit
201904117769
Status
complete
Filed
Apr 11, 2019
Permit issued
Apr 11, 2019
Final sign-off
Jun 28, 2019
Declared cost
$9,000
Address
2162 32nd Av

(e) 2nd fl bathroom: replace tile to walkin shower, replace lights, replace vanity & replace (e) fan w/heater. all in kind.

Open the permit page

$9,000
Mar 1, 2019Completed
final sign-off Sep 2019
788 Haight Streplace front stucco in kind & 8 wooden windows to double hung ogee wooden windows (in kind ) all windows same size as original stucco replace within 272 sq ft *n) windows within 130 sq ft
Details
Permit
201903014189
Status
complete
Filed
Mar 1, 2019
Permit issued
Mar 26, 2019
Final sign-off
Sep 20, 2019
Declared cost
$13,000
Address
788 Haight St

replace front stucco in kind & 8 wooden windows to double hung ogee wooden windows (in kind ) all windows same size as original stucco replace within 272 sq ft *n) windows within 130 sq ft

Open the permit page

$13,000
Feb 13, 2019Completed
final sign-off Apr 2019
724 Chenery Stsun room: new inuslation and new 5/8" drywal. new light switches, new flooring, (no wall removal) no structural work. kitchen new lights, new flooring, new hood/vent (no wall removed) no structural work.
Details
Permit
201902132881
Status
complete
Filed
Feb 13, 2019
Permit issued
Feb 13, 2019
Final sign-off
Apr 16, 2019
Declared cost
$14,000
Address
724 Chenery St

sun room: new inuslation and new 5/8" drywal. new light switches, new flooring, (no wall removal) no structural work. kitchen new lights, new flooring, new hood/vent (no wall removed) no structural work.

Open the permit page

$14,000
Feb 12, 2019Completed
final sign-off Sep 2019
33 Morningside Dr2nd floor: add master bathroom, reconfigure and remodel guest bathroom. replace rear facing window in master bedroom. work not visible from public right of way.
Details
Permit
201902122660
Status
complete
Filed
Feb 12, 2019
Permit issued
May 17, 2019
Final sign-off
Sep 17, 2019
Declared cost
$25,000
Address
33 Morningside Dr

2nd floor: add master bathroom, reconfigure and remodel guest bathroom. replace rear facing window in master bedroom. work not visible from public right of way.

Open the permit page

$25,000
Jan 28, 2019Completed
final sign-off Mar 2019
3976 Folsom Streplacement of dryrot siding on front 3rd level in kind,wood to mactch existing
Details
Permit
201901281387
Status
complete
Filed
Jan 28, 2019
Permit issued
Jan 28, 2019
Final sign-off
Mar 5, 2019
Declared cost
$3,000
Address
3976 Folsom St

replacement of dryrot siding on front 3rd level in kind,wood to mactch existing

Open the permit page

$3,000
Mar 20, 2018Completed
final sign-off Oct 2018
724 Chenery St1/f - converting (e) coat closet & pantry to powder rm. coat closet separated from adjoining pantry by wall-wall to be taken out, kitchen access door to pantry to be boarded up, walls in new space taken out, insul. added, tank in wall toilet & small sink plus plumbing &
Details
Permit
201803204139
Status
complete
Filed
Mar 20, 2018
Permit issued
Mar 20, 2018
Final sign-off
Oct 30, 2018
Declared cost
$30,000
Address
724 Chenery St

1/f - converting (e) coat closet & pantry to powder rm. coat closet separated from adjoining pantry by wall-wall to be taken out, kitchen access door to pantry to be boarded up, walls in new space taken out, insul. added, tank in wall toilet & small sink plus plumbing &

Open the permit page

$30,000
Oct 30, 2017Completed
final sign-off Sep 2020
718 Geneva Avto comply with violation #201796701. unit legalization per ordinance 43-14 at 1st flr.
Details
Permit
201710302604
Status
complete
Filed
Oct 30, 2017
Permit issued
Mar 10, 2020
Final sign-off
Sep 18, 2020
Declared cost
$5,000
Address
718 Geneva Av

to comply with violation #201796701. unit legalization per ordinance 43-14 at 1st flr.

Open the permit page

$5,000
Aug 25, 2017Completed
final sign-off Mar 2018
305 Moscow St1st floor - add 1 bath, 1 living room and storage. no work to be done on the exterior and 2nd floor
Details
Permit
201708255892
Status
complete
Filed
Aug 25, 2017
Permit issued
Nov 8, 2017
Final sign-off
Mar 9, 2018
Declared cost
$10,000
Address
305 Moscow St

1st floor - add 1 bath, 1 living room and storage. no work to be done on the exterior and 2nd floor

Open the permit page

$10,000