Back to kitchen remodel contractors
Via Us Construction Inc
- Based in
- Daly City
- On San Francisco permits
- Aug 2017 to May 2026
- Last 24 months
- 4 permits filed
20 permits since 2000: 19 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 0 days from filing to permit and 179 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 7, 2026 | Completed final sign-off Aug 2026 | 65 Garnett Tr | remodel (e) kitchen in-kind, no structural removal. replace 1 sink & kitchen cabinet & new countertop.Details
remodel (e) kitchen in-kind, no structural removal. replace 1 sink & kitchen cabinet & new countertop. | $16,000 |
| Jun 11, 2024 | Completed final sign-off Jun 2026 | 114 10th Av | interior remodeling: 1/f addition of 507sf to convert storage space tand crawl space to 1 bed, 1 family rm. relocate and remodel 1 bath. add 3 new windows. 2/f: remove (e) wall b/t kitchen and dining. add sliding door to access (e) rear deck. remodel 1 bath. seismic strengthening to lowest level.Details
interior remodeling: 1/f addition of 507sf to convert storage space tand crawl space to 1 bed, 1 family rm. relocate and remodel 1 bath. add 3 new windows. 2/f: remove (e) wall b/t kitchen and dining. add sliding door to access (e) rear deck. remodel 1 bath. seismic strengthening to lowest level. | $100,000 |
| Jun 10, 2024 | Completed final sign-off Dec 2024 | 2078 Bay Shore Bl | remove wall between kitchen & living room, and wall between hallway and living room. remodel 2/f 1) kitchen & 1) bathroom (new drywall & insulation). no exterior work and no work on g/f.Details
remove wall between kitchen & living room, and wall between hallway and living room. remodel 2/f 1) kitchen & 1) bathroom (new drywall & insulation). no exterior work and no work on g/f. | $100,000 |
| Mar 21, 2024 | Completed final sign-off Jun 2026 | 114 10th Av | remodeling w kitchen @ 2nd fl & bathroom @ 3rd/f. add n bedroom & bath at 2nd/f. n furnace at attic. n bathroom at bedroom #1 at 3rd/f. relocate clset at bedroom #2 at 3rd/f. n skylight.Details
remodeling w kitchen @ 2nd fl & bathroom @ 3rd/f. add n bedroom & bath at 2nd/f. n furnace at attic. n bathroom at bedroom #1 at 3rd/f. relocate clset at bedroom #2 at 3rd/f. n skylight. | $50,000 |
| Oct 2, 2019 | Completed final sign-off Nov 2019 | 160 Andover St | remodel (e) kitchen, no wall removal, new cabinet, new tile new counter, new lighting. remodel in kind.Details
remodel (e) kitchen, no wall removal, new cabinet, new tile new counter, new lighting. remodel in kind. | $15,000 |
| Feb 13, 2019 | Completed final sign-off Apr 2019 | 724 Chenery St | sun room: new inuslation and new 5/8" drywal. new light switches, new flooring, (no wall removal) no structural work. kitchen new lights, new flooring, new hood/vent (no wall removed) no structural work.Details
sun room: new inuslation and new 5/8" drywal. new light switches, new flooring, (no wall removal) no structural work. kitchen new lights, new flooring, new hood/vent (no wall removed) no structural work. | $14,000 |
| Mar 20, 2018 | Completed final sign-off Oct 2018 | 724 Chenery St | 1/f - converting (e) coat closet & pantry to powder rm. coat closet separated from adjoining pantry by wall-wall to be taken out, kitchen access door to pantry to be boarded up, walls in new space taken out, insul. added, tank in wall toilet & small sink plus plumbing &Details
1/f - converting (e) coat closet & pantry to powder rm. coat closet separated from adjoining pantry by wall-wall to be taken out, kitchen access door to pantry to be boarded up, walls in new space taken out, insul. added, tank in wall toilet & small sink plus plumbing & | $30,000 |