Via Us Construction Inc
- Based in
- Daly City
- On San Francisco permits
- Aug 2017 to May 2026
- Last 24 months
- 4 permits filed
20 permits since 2000: 19 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 185 days from filing to permit and 556 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2024 | Completed final sign-off Jun 2026 | 114 10th Av | interior remodeling: 1/f addition of 507sf to convert storage space tand crawl space to 1 bed, 1 family rm. relocate and remodel 1 bath. add 3 new windows. 2/f: remove (e) wall b/t kitchen and dining. add sliding door to access (e) rear deck. remodel 1 bath. seismic strengthening to lowest level.Details
interior remodeling: 1/f addition of 507sf to convert storage space tand crawl space to 1 bed, 1 family rm. relocate and remodel 1 bath. add 3 new windows. 2/f: remove (e) wall b/t kitchen and dining. add sliding door to access (e) rear deck. remodel 1 bath. seismic strengthening to lowest level. | $100,000 |