Back to bathroom remodel contractors
Via Us Construction Inc
- Based in
- Daly City
- On San Francisco permits
- Aug 2017 to May 2026
- Last 24 months
- 4 permits filed
20 permits since 2000: 19 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 7 completed, 1 never finaled. Typically 64 days from filing to permit and 179 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 15, 2024 | Completed final sign-off Jul 2026 | 1161 Alemany Bl | add 2 bedrooms, 1 family rm, remodel 1 bath, remodel storage rm on 1st fl. add wet bar w/ cooktop on 1st fl. total new condition space in grould fl is 972 sfDetails
add 2 bedrooms, 1 family rm, remodel 1 bath, remodel storage rm on 1st fl. add wet bar w/ cooktop on 1st fl. total new condition space in grould fl is 972 sf | $135,000 |
| Jun 11, 2024 | Completed final sign-off Jun 2026 | 114 10th Av | interior remodeling: 1/f addition of 507sf to convert storage space tand crawl space to 1 bed, 1 family rm. relocate and remodel 1 bath. add 3 new windows. 2/f: remove (e) wall b/t kitchen and dining. add sliding door to access (e) rear deck. remodel 1 bath. seismic strengthening to lowest level.Details
interior remodeling: 1/f addition of 507sf to convert storage space tand crawl space to 1 bed, 1 family rm. relocate and remodel 1 bath. add 3 new windows. 2/f: remove (e) wall b/t kitchen and dining. add sliding door to access (e) rear deck. remodel 1 bath. seismic strengthening to lowest level. | $100,000 |
| Jun 10, 2024 | Completed final sign-off Dec 2024 | 2078 Bay Shore Bl | remove wall between kitchen & living room, and wall between hallway and living room. remodel 2/f 1) kitchen & 1) bathroom (new drywall & insulation). no exterior work and no work on g/f.Details
remove wall between kitchen & living room, and wall between hallway and living room. remodel 2/f 1) kitchen & 1) bathroom (new drywall & insulation). no exterior work and no work on g/f. | $100,000 |
| Mar 21, 2024 | Completed final sign-off Jun 2026 | 114 10th Av | remodeling w kitchen @ 2nd fl & bathroom @ 3rd/f. add n bedroom & bath at 2nd/f. n furnace at attic. n bathroom at bedroom #1 at 3rd/f. relocate clset at bedroom #2 at 3rd/f. n skylight.Details
remodeling w kitchen @ 2nd fl & bathroom @ 3rd/f. add n bedroom & bath at 2nd/f. n furnace at attic. n bathroom at bedroom #1 at 3rd/f. relocate clset at bedroom #2 at 3rd/f. n skylight. | $50,000 |
| Aug 12, 2019 | Never finaled issued Aug 2019, no final | 530 Banks St | replace 6 exterior windows w/ u-factor 0.32 at rear of house. guest bathroom remodel 2nd floor -replace vanity, toilets, shower stand and re-tile floor and replace lights. replacements in-kind, same layout.Details
replace 6 exterior windows w/ u-factor 0.32 at rear of house. guest bathroom remodel 2nd floor -replace vanity, toilets, shower stand and re-tile floor and replace lights. replacements in-kind, same layout. | $10,000 |
| Apr 11, 2019 | Completed final sign-off Jun 2019 | 2162 32nd Av | (e) 2nd fl bathroom: replace tile to walkin shower, replace lights, replace vanity & replace (e) fan w/heater. all in kind.Details
(e) 2nd fl bathroom: replace tile to walkin shower, replace lights, replace vanity & replace (e) fan w/heater. all in kind. | $9,000 |
| Feb 12, 2019 | Completed final sign-off Sep 2019 | 33 Morningside Dr | 2nd floor: add master bathroom, reconfigure and remodel guest bathroom. replace rear facing window in master bedroom. work not visible from public right of way.Details
2nd floor: add master bathroom, reconfigure and remodel guest bathroom. replace rear facing window in master bedroom. work not visible from public right of way. | $25,000 |
| Aug 25, 2017 | Completed final sign-off Mar 2018 | 305 Moscow St | 1st floor - add 1 bath, 1 living room and storage. no work to be done on the exterior and 2nd floorDetails
1st floor - add 1 bath, 1 living room and storage. no work to be done on the exterior and 2nd floor | $10,000 |