Via Us Construction Inc
- Based in
- Daly City
- On San Francisco permits
- Aug 2017 to May 2026
- Last 24 months
- 4 permits filed
20 permits since 2000: 19 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 21 days from filing to permit and 253 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 9, 2025 | Completed final sign-off Jun 2026 | 114 10th Av | revision to permit 202404301066. revised window size of the proposed windows at 1/f and 2/f rear sliding door. revised interior stair from 2/f to 1/f. to comply with nov# 202538271 (for front stair)Details
revision to permit 202404301066. revised window size of the proposed windows at 1/f and 2/f rear sliding door. revised interior stair from 2/f to 1/f. to comply with nov# 202538271 (for front stair) | $1,000 |
| Jun 26, 2025 | Completed final sign-off Jun 2026 | 114 10th Av | to comply with nov 202538271. remove tile on existing stairs. keep/repair existing wooden stairs as needed. street visible front of home. less than 50% of stairs.Details
to comply with nov 202538271. remove tile on existing stairs. keep/repair existing wooden stairs as needed. street visible front of home. less than 50% of stairs. | $500 |