Block 1532, lot 014
495 12th Ave
- City’s use
- Single Family Residential
- Built
- 1916
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 3,090 sq ft
- Lot
- 3,371 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 22, 2024 | Completed final sign-off Dec 2024 | 495 12th Av | Hubert Penny | revision to bpa: 2024.0806.8036 - additional dry rot found to replace walls and post at front porch that are dry rot. (in kind)not visible from street.Details
revision to bpa: 2024.0806.8036 - additional dry rot found to replace walls and post at front porch that are dry rot. (in kind)not visible from street. | $1,000 |
| Aug 6, 2024 | Completed final sign-off Dec 2024 | 495 12th Av | Via Us Construction Inc | repair front patio ceiling wood joints in kind.Details
repair front patio ceiling wood joints in kind. | $20,000 |
| Mar 31, 2017 | Expired or cancelled suspend Aug 2025 | 495 12th Av | replace (e) stair to (n) sprial staircase, construct one full bath room & relocate furnace/water heater at ground floor, convert half bathroom to full bathroom at 2/f, construct one new full bathroom at 3/f.Details
replace (e) stair to (n) sprial staircase, construct one full bath room & relocate furnace/water heater at ground floor, convert half bathroom to full bathroom at 2/f, construct one new full bathroom at 3/f. | $65,000 | |
| Aug 21, 2014 | Completed final sign-off Aug 2016 | 495 12th Av | Quick Connect Electric Co | remodel kitchen with new cabinets, countertops, electrical plugs, lights, sink, & faucets. remodel 3-1/2 baths with tiled floors/walls, tub/shower, toilets & lighting, sheetrock areas of work as needed.Details
remodel kitchen with new cabinets, countertops, electrical plugs, lights, sink, & faucets. remodel 3-1/2 baths with tiled floors/walls, tub/shower, toilets & lighting, sheetrock areas of work as needed. | $53,000 |
| Aug 21, 2014 | Completed final sign-off Apr 2015 | 495 12th Av | Quick Connect Electric Co | repair cracked stucco. new stucco to match existing. repair stucco on garage face of building & rear & repair cracksDetails
repair cracked stucco. new stucco to match existing. repair stucco on garage face of building & rear & repair cracks | $10,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Quick Connect Electric Co (2), Hubert Penny, Via Us Construction Inc
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.