Tianda Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2018 to Sep 2025
- Last 24 months
- 4 permits filed
18 permits since 2000: 18 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 5, 2025 | Completed final sign-off Feb 2026 | 2415 Noriega St | to comply with nov:202538016. in kind replace2x6 studs and sill plate, install new waterproofing 1/2" pywood sheating and new stucco finish at rear exterior wall, replace in kind 2x6 truss or sister new 2x6 truss at rear of roof bldg, patch and torch down roof about 8x8', replace 200amps 3 meDetails
to comply with nov:202538016. in kind replace2x6 studs and sill plate, install new waterproofing 1/2" pywood sheating and new stucco finish at rear exterior wall, replace in kind 2x6 truss or sister new 2x6 truss at rear of roof bldg, patch and torch down roof about 8x8', replace 200amps 3 me | $50,000 |
| Jul 3, 2025 | Completed final sign-off Jan 2026 | 22 Annapolis Tr | revision to pa #202506209062: 2nd floor bathroom with plans (move toilet, shower, vanity in master bathroom). 3rd floor: bathroom with plans (move toilet, shower, vanity in master bath). both existing bathrooms.Details
revision to pa #202506209062: 2nd floor bathroom with plans (move toilet, shower, vanity in master bathroom). 3rd floor: bathroom with plans (move toilet, shower, vanity in master bath). both existing bathrooms. | |
| Apr 3, 2025 | Completed final sign-off Jun 2025 | 1259 20th Av | unit #3 1 kitchen and 2 bathrooms remodel in kind (toilet and sink replacement only)Details
unit #3 1 kitchen and 2 bathrooms remodel in kind (toilet and sink replacement only) | $30,000 |
| Oct 8, 2024 | Completed final sign-off Jan 2025 | 1453 York St | front stair repair in-kind.Details
front stair repair in-kind. | $20,000 |
| May 6, 2024 | Completed final sign-off Aug 2025 | 731 34th Av | convert (e) half bathroom and laundry room to a full bathroom at 2nd floor.Details
convert (e) half bathroom and laundry room to a full bathroom at 2nd floor. | $7,000 |
| Sep 7, 2023 | Completed final sign-off Feb 2024 | 450 Faxon Av | in kind repair of front stair.Details
in kind repair of front stair. | $8,000 |
| Jul 12, 2022 | Completed final sign-off Sep 2023 | 242 Jules Av | to comply w/nov #202290558: legalize bedroom, family room, media room & 2 full bathrooms. all work at g/f.Details
to comply w/nov #202290558: legalize bedroom, family room, media room & 2 full bathrooms. all work at g/f. | $78,000 |
| Jul 12, 2022 | Completed final sign-off Nov 2022 | 437 Gennessee St | convert (e) 1 bedroom to kithentte with 2 burners cooktop on g/f. ref 200608179743.Details
convert (e) 1 bedroom to kithentte with 2 burners cooktop on g/f. ref 200608179743. | $15,000 |
| Dec 1, 2021 | Completed final sign-off Dec 2021 | 1485 Van Dyke Av | inkind to remodel extg bathroom.Details
inkind to remodel extg bathroom. | $7,000 |
| Oct 26, 2021 | Completed final sign-off Jul 2022 | 423 Silver Av | add 1 bedroom, 1 media room and a bathroom to ground floor.Details
add 1 bedroom, 1 media room and a bathroom to ground floor. | $60,000 |
| Oct 13, 2021 | Completed final sign-off Dec 2021 | 1637 Taraval St | new interior partitions with new pocket door, min 36 inches; no demo of (e) wall. install new laundry and wet bar, mirror, soap dispenser and towel dispenser. change of use from office to facial store.Details
new interior partitions with new pocket door, min 36 inches; no demo of (e) wall. install new laundry and wet bar, mirror, soap dispenser and towel dispenser. change of use from office to facial store. | $10,000 |
| Sep 3, 2021 | Completed final sign-off Mar 2022 | 460 Peninsula Av | upgrade electrical panel, repair front stairs due to leak less than 50%, replace/relocate damaged water pipe from main meter to front of houseDetails
upgrade electrical panel, repair front stairs due to leak less than 50%, replace/relocate damaged water pipe from main meter to front of house | $8,000 |
| Jun 30, 2021 | Completed final sign-off Dec 2021 | 1547 Larkin St | apt. a: in-kind existing one kitchen and one bathroom remodel. replace existing old wire and add an electrical subpanel. add insulation to exterior wall.Details
apt. a: in-kind existing one kitchen and one bathroom remodel. replace existing old wire and add an electrical subpanel. add insulation to exterior wall. | $42,000 |
| Jun 17, 2021 | Completed final sign-off Aug 2021 | 1934 30th Av | 1) in kind remodel existing kitchen. 2) upgrade electrical panel from 30 amp to 200amp, replace existing old wire on 2nd fl bedrooms and living room but not for bathroom. add a sub panel on 2nd floor.Details
1) in kind remodel existing kitchen. 2) upgrade electrical panel from 30 amp to 200amp, replace existing old wire on 2nd fl bedrooms and living room but not for bathroom. add a sub panel on 2nd floor. | $20,000 |
| Dec 17, 2020 | Completed final sign-off Jul 2021 | 224 Naylor St | in-kind remodel existing kitchen and update whole house electrical wire.Details
in-kind remodel existing kitchen and update whole house electrical wire. | $25,000 |
| Oct 19, 2020 | Completed final sign-off Feb 2021 | 809 Kirkham St | in kind remodel of existing kitchen & bathroomDetails
in kind remodel of existing kitchen & bathroom | $30,000 |
| Sep 3, 2020 | Completed final sign-off Oct 2020 | 157 Whittier St | remodel (e) bathroom on 2/f. new fixtures. change (e) tub to shower. no change on layout or remove any walls.Details
remodel (e) bathroom on 2/f. new fixtures. change (e) tub to shower. no change on layout or remove any walls. | $6,000 |
| Sep 13, 2018 | Completed final sign-off Aug 2024 | 4232 Judah St | compliance w/mandatory seismic retrofit program per 2016 sfpec sec 4d, a-4 & ab-107.Details
compliance w/mandatory seismic retrofit program per 2016 sfpec sec 4d, a-4 & ab-107. | $40,000 |