Back to bathroom remodel contractors
Tianda Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2018 to Oct 2026
- Last 24 months
- 5 permits filed
20 permits since 2000: 18 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Where they worked
- Single-family 8
- Multi-family (2-family, apartments) 4
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Bathroom remodel permits
12 bathroom remodel permits: 10 completed, 2 in progress. Typically 3 days from filing to permit and 146 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 13, 2026 | In progress issued Oct 2026 | 2587 22nd Av | 1)at 2nd fl: a)convert (e) kitchen to bathroom and move kitchen to dining room. b) add new office & reconfigure (e) bathroom & stair. 2) at 1st fl: a)convert (e) study room & game room to bedrooms with one bathroom. b)relocate (e) bathroom. not subject to ab-112Details
1)at 2nd fl: a)convert (e) kitchen to bathroom and move kitchen to dining room. b) add new office & reconfigure (e) bathroom & stair. 2) at 1st fl: a)convert (e) study room & game room to bedrooms with one bathroom. b)relocate (e) bathroom. not subject to ab-112 | $180,000 |
| Aug 28, 2026 | In progress issued Oct 2026 | 135 Clearfield Dr | 2/f: reconfigure and remodel kitchen & master bath. g/f: add kitchenette with 2-burner cooktop (no oven) to (e) family room; convert bedroom to master bath.Details
2/f: reconfigure and remodel kitchen & master bath. g/f: add kitchenette with 2-burner cooktop (no oven) to (e) family room; convert bedroom to master bath. | $120,000 |
| Jul 3, 2025 | Completed final sign-off Jan 2026 | 22 Annapolis Tr | revision to pa #202506209062: 2nd floor bathroom with plans (move toilet, shower, vanity in master bathroom). 3rd floor: bathroom with plans (move toilet, shower, vanity in master bath). both existing bathrooms.Details
revision to pa #202506209062: 2nd floor bathroom with plans (move toilet, shower, vanity in master bathroom). 3rd floor: bathroom with plans (move toilet, shower, vanity in master bath). both existing bathrooms. | |
| Apr 3, 2025 | Completed final sign-off Jun 2025 | 1259 20th Av | unit #3 1 kitchen and 2 bathrooms remodel in kind (toilet and sink replacement only)Details
unit #3 1 kitchen and 2 bathrooms remodel in kind (toilet and sink replacement only) | $30,000 |
| May 6, 2024 | Completed final sign-off Aug 2025 | 731 34th Av | convert (e) half bathroom and laundry room to a full bathroom at 2nd floor.Details
convert (e) half bathroom and laundry room to a full bathroom at 2nd floor. | $7,000 |
| Jul 12, 2022 | Completed final sign-off Sep 2023 | 242 Jules Av | to comply w/nov #202290558: legalize bedroom, family room, media room & 2 full bathrooms. all work at g/f.Details
to comply w/nov #202290558: legalize bedroom, family room, media room & 2 full bathrooms. all work at g/f. | $78,000 |
| Dec 1, 2021 | Completed final sign-off Dec 2021 | 1485 Van Dyke Av | inkind to remodel extg bathroom.Details
inkind to remodel extg bathroom. | $7,000 |
| Oct 26, 2021 | Completed final sign-off Jul 2022 | 423 Silver Av | add 1 bedroom, 1 media room and a bathroom to ground floor.Details
add 1 bedroom, 1 media room and a bathroom to ground floor. | $60,000 |
| Jun 30, 2021 | Completed final sign-off Dec 2021 | 1547 Larkin St | apt. a: in-kind existing one kitchen and one bathroom remodel. replace existing old wire and add an electrical subpanel. add insulation to exterior wall.Details
apt. a: in-kind existing one kitchen and one bathroom remodel. replace existing old wire and add an electrical subpanel. add insulation to exterior wall. | $42,000 |
| Jun 17, 2021 | Completed final sign-off Aug 2021 | 1934 30th Av | 1) in kind remodel existing kitchen. 2) upgrade electrical panel from 30 amp to 200amp, replace existing old wire on 2nd fl bedrooms and living room but not for bathroom. add a sub panel on 2nd floor.Details
1) in kind remodel existing kitchen. 2) upgrade electrical panel from 30 amp to 200amp, replace existing old wire on 2nd fl bedrooms and living room but not for bathroom. add a sub panel on 2nd floor. | $20,000 |
| Oct 19, 2020 | Completed final sign-off Feb 2021 | 809 Kirkham St | in kind remodel of existing kitchen & bathroomDetails
in kind remodel of existing kitchen & bathroom | $30,000 |
| Sep 3, 2020 | Completed final sign-off Oct 2020 | 157 Whittier St | remodel (e) bathroom on 2/f. new fixtures. change (e) tub to shower. no change on layout or remove any walls.Details
remodel (e) bathroom on 2/f. new fixtures. change (e) tub to shower. no change on layout or remove any walls. | $6,000 |