Leanne Goff
- Listed as
- architect, contractor, designer, engineer
- Firm
- C B F Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to May 2026
819 permits since 2000 (contractor on 794 permits, designer on 15 permits, engineer on 13 permits, architect on 2 permits): 523 completed, 6 in progress, 120 never finaled, 170 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 819.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 19, 2026 | Completed final sign-off Sep 2026 | 160 Pine St | C B F Inc | new light (51) lights, new power (22) receptacles. new light controls. ref#: 202603117357Details
new light (51) lights, new power (22) receptacles. new light controls. ref#: 202603117357 | $109,860 |
| May 1, 2026 | In progress issued Jun 2026 | 2225 Jerrold Av | C B F Inc | ref 202506178846. new power for ev chargers (using load management software) install equipment for 12 ev chargers. deferred anchorage for equipmentDetails
ref 202506178846. new power for ev chargers (using load management software) install equipment for 12 ev chargers. deferred anchorage for equipment | |
| Mar 4, 2026 | In progress issued Mar 2026 | 410 Townsend St | C B F Inc | 3/f: new power and signal devices throughout the space. new 2022 title 24 compliant lighting and controls. ref permit 202508042220Details
3/f: new power and signal devices throughout the space. new 2022 title 24 compliant lighting and controls. ref permit 202508042220 | $10,000 |
| Mar 4, 2026 | In progress issued Mar 2026 | 410 Townsend St | C B F Inc | 2nd fl: new power + signal devises throughout the space. new 2022 title 24 complaint lighting + controls. ref # 202507221314.Details
2nd fl: new power + signal devises throughout the space. new 2022 title 24 complaint lighting + controls. ref # 202507221314. | $10,000 |
| Jan 29, 2026 | Completed final sign-off Jun 2026 | 525 Market St | C B F Inc | 34th floor: reference pa#202511179739. power, lighting, and signal title 24Details
34th floor: reference pa#202511179739. power, lighting, and signal title 24 | $15,000 |
| Oct 30, 2025 | Completed final sign-off Jan 2026 | 3471 California St | C B F Inc | deferred electrical for t.i. 202505166619Details
deferred electrical for t.i. 202505166619 | $120,000 |
| Aug 29, 2025 | Completed final sign-off Dec 2025 | 500 Sansome St | C B F Inc | #100: new lighting, branch circuiting.provide new power and signal. ref pa#202503263112Details
#100: new lighting, branch circuiting.provide new power and signal. ref pa#202503263112 | $440,000 |
| Jul 8, 2025 | Completed final sign-off May 2026 | 274 Brannan St | C B F Inc | generator load adjustmentsDetails
generator load adjustments | $127,000 |
| Jun 27, 2025 | In progress issued Jul 2025 | 101 California St | C B F Inc | 42/f new power & signal devices. ref ti 202504164515Details
42/f new power & signal devices. ref ti 202504164515 | $10,000 |
| Jun 4, 2025 | Completed final sign-off Mar 2026 | 369 Pine St | C B F Inc | suite 300: new electrical power & signal device througout the space. noew t-24 compliant lighting & controls. ref pa 202503273176.Details
suite 300: new electrical power & signal device througout the space. noew t-24 compliant lighting & controls. ref pa 202503273176. | $10,000 |
| Apr 22, 2025 | Completed final sign-off Jun 2025 | 101 Post St | C B F Inc | to obtain a final inspection for work approved under permit 202204252917. all work complete.Details
to obtain a final inspection for work approved under permit 202204252917. all work complete. | $60,000 |
| Mar 5, 2025 | Completed final sign-off Jul 2025 | 555 California St | C B F Inc | 33rd/f, ste 3325: new power & signal, title 24. ref to 202501319419Details
33rd/f, ste 3325: new power & signal, title 24. ref to 202501319419 | $10,000 |
| Feb 27, 2025 | In progress issued Feb 2025 | 1155 Battery St | C B F Inc | 5th fl- ref pa # 2024-0927-1790 new power a signal title 24Details
5th fl- ref pa # 2024-0927-1790 new power a signal title 24 | $18,500 |
| Sep 25, 2024 | In progress issued Sep 2024 | 505 Montgomery St | C B F Inc | 13/fl-(n) power and signal devices title 24Details
13/fl-(n) power and signal devices title 24 | |
| Apr 15, 2024 | Completed final sign-off Jul 2024 | 185 Post St | C B F Inc | ref pa# 2024-0118-4174 office ti new lighting & lighting controls. minimal receptacle adds. (58) recessed fixtures. (6) added receptacles. luton wire lighting controlsDetails
ref pa# 2024-0118-4174 office ti new lighting & lighting controls. minimal receptacle adds. (58) recessed fixtures. (6) added receptacles. luton wire lighting controls | $63,000 |
| Feb 22, 2024 | Completed final sign-off Oct 2024 | 747 Front St | C B F Inc | 4/f: deferred electrical work for bldg permit# 202401103702, 150 lights, 160 receptacles and relocation of 1 electrical panel.Details
4/f: deferred electrical work for bldg permit# 202401103702, 150 lights, 160 receptacles and relocation of 1 electrical panel. | $495,000 |
| Dec 18, 2023 | Completed final sign-off Mar 2024 | 425 California St | C B F Inc | ste #2200: new lighting and power. ref permit# 202307111907Details
ste #2200: new lighting and power. ref permit# 202307111907 | $159,286 |
| Sep 19, 2023 | Never finaled issued Sep 2023, no final | 33 New Montgomery St | C B F Inc | 20/f- ste 2010: new lighting /controls and power for new ti 26-lights, 14-new receptacles, ref pa# 202308033602.Details
20/f- ste 2010: new lighting /controls and power for new ti 26-lights, 14-new receptacles, ref pa# 202308033602. | $77,000 |
| Sep 12, 2023 | Completed final sign-off Dec 2023 | 1 Post St | C B F Inc | 3/f: electrical work such as lighting and power install. ref bpa 202302141994Details
3/f: electrical work such as lighting and power install. ref bpa 202302141994 | $50,000 |
| Sep 7, 2023 | Completed final sign-off Oct 2023 | 755 Sansome St | Sc Builders, Inc | ste 300: deferred submittal to altered lighting system. new power and data for workstations. new power for breakroom equipment. new lighting and controls. ref pa# 2023-0705-1473Details
ste 300: deferred submittal to altered lighting system. new power and data for workstations. new power for breakroom equipment. new lighting and controls. ref pa# 2023-0705-1473 | |
| Aug 24, 2023 | Completed final sign-off Apr 2025 | 1155 Mission St | Novo Construction Inc | mechanical electrical work. install new dx split system to service basement. ref pa# 2023-0320-4017.Details
mechanical electrical work. install new dx split system to service basement. ref pa# 2023-0320-4017. | $38,000 |
| May 30, 2023 | Completed final sign-off Jun 2023 | 135 Townsend St | C B F Inc | 4/f & 5/f: as builts, ref bpa#202203018956 fire alarm revisionDetails
4/f & 5/f: as builts, ref bpa#202203018956 fire alarm revision | |
| May 18, 2023 | Completed final sign-off Jun 2023 | 55 Stockton St | C B F Inc | lobby: title 24 compliance for new power & signal devices. ref t.i. pa 202205053663.Details
lobby: title 24 compliance for new power & signal devices. ref t.i. pa 202205053663. | $199,000 |
| May 9, 2023 | Never finaled issued May 2023, no final | 101 Mission St | C B F Inc | suite 450: electrical / title 24 compliance for tenant improvement to include new power for work stations and offices, new lighting and controls. ref t.i. pa#202303153732Details
suite 450: electrical / title 24 compliance for tenant improvement to include new power for work stations and offices, new lighting and controls. ref t.i. pa#202303153732 | $162,000 |
| May 2, 2023 | Never finaled issued May 2023, no final | 4 Embarcadero Center | Peacock Construction | 1/f: new lighting & controlsDetails
1/f: new lighting & controls | $5,000 |
| Oct 14, 2022 | Completed final sign-off Jul 2023 | 55 02nd St | C B F Inc | power lighting a signal. reference 202206156443.Details
power lighting a signal. reference 202206156443. | $55,000 |
| Jun 30, 2022 | Never finaled issued Sep 2022, no final | 180 Montgomery St | C B F Inc | new power for breakroom. new lighting and controls. ref 202206146275Details
new power for breakroom. new lighting and controls. ref 202206146275 | $6,800 |
| Jun 23, 2022 | Never finaled issued Sep 2022, no final | 180 Montgomery St | C B F Inc | 17th fl ste 1750: 12 receptacles, 4 light relocated, no control upgrades. ref pa# 202204283212.Details
17th fl ste 1750: 12 receptacles, 4 light relocated, no control upgrades. ref pa# 202204283212. | $27,000 |
| Jun 23, 2022 | Never finaled issued Sep 2022, no final | 180 Montgomery St | C B F Inc | 19th fl ste 1950: 36 receptacles, 64 new light fixtures, new lighting controls. ref pa# 202204283213.Details
19th fl ste 1950: 36 receptacles, 64 new light fixtures, new lighting controls. ref pa# 202204283213. | $136,000 |
| Jun 23, 2022 | Never finaled issued Sep 2022, no final | 180 Montgomery St | C B F Inc | 15th fl ste 1520: 15 receptacles, 31 new light fixtures, new lighting controls. ref pa# 202204283189.Details
15th fl ste 1520: 15 receptacles, 31 new light fixtures, new lighting controls. ref pa# 202204283189. | $64,000 |
| May 2, 2022 | Completed final sign-off Jun 2022 | 400 Howard St | C B F Inc | 1/f: fire life safety: install 2 ceiling mount speaker strobes, 1 smoke detector, 2 duct detectors, 3 control modules. ref permit 202112224861.Details
1/f: fire life safety: install 2 ceiling mount speaker strobes, 1 smoke detector, 2 duct detectors, 3 control modules. ref permit 202112224861. | $3,960 |
| Mar 3, 2022 | Never finaled issued Mar 2022, no final | 275 Battery St | Source Planning And Construction Inc | 18th fl, ste #1850: electrical work for pa# 202110019674.Details
18th fl, ste #1850: electrical work for pa# 202110019674. | $52,000 |
| Jan 25, 2022 | Completed final sign-off Aug 2022 | 101 Mission St | Gci, Inc | 11/f: restroom remodel. power, lighting & signal. ref pa# 202112063717Details
11/f: restroom remodel. power, lighting & signal. ref pa# 202112063717 | $7,761 |
| Jan 25, 2022 | Completed final sign-off May 2023 | 101 Mission St | Gci, Inc | suite 1115: new power for suite. new poer for break room equipment. new lighting & controls. title 24 compliance.Details
suite 1115: new power for suite. new poer for break room equipment. new lighting & controls. title 24 compliance. | |
| Dec 6, 2021 | Completed final sign-off Mar 2022 | 434 Pacific Av | Novo Construction Inc | 1/f & 2/f: electrical title 24 compliance for t.i. pa 202111011525.Details
1/f & 2/f: electrical title 24 compliance for t.i. pa 202111011525. | $5,000 |
| Oct 7, 2021 | Completed final sign-off Dec 2021 | 601 California St | C B F Inc | office t.i. new lighting and power. new lighting control. ste 1300Details
office t.i. new lighting and power. new lighting control. ste 1300 | $96,907 |
| Oct 7, 2021 | Completed final sign-off Feb 2023 | 222 02nd St | C B F Inc | new lighting and power in breakroom and conference room per floor. tie into existing controls. fl 7, 11, 15.Details
new lighting and power in breakroom and conference room per floor. tie into existing controls. fl 7, 11, 15. | $196,746 |
| Oct 7, 2021 | Completed final sign-off Feb 2023 | 222 02nd St | C B F Inc | floors 5,9,13: new lighting and power in breakroom and conference room per floor. tie into existing controls.Details
floors 5,9,13: new lighting and power in breakroom and conference room per floor. tie into existing controls. | $177,108 |
| Aug 24, 2021 | Never finaled issued Aug 2021, no final | 350 Bush St | C B F Inc | 20th flr - electrical - power signal. title 24. no arch ref. rm 2015.Details
20th flr - electrical - power signal. title 24. no arch ref. rm 2015. | $21,000 |
| Jul 20, 2021 | Expired or cancelled cancelled Jan 2026 | 100 Grant Av | replace (e) strike on existing door with electrical strike & access button. no change/mod of (e) door or framing.Details
replace (e) strike on existing door with electrical strike & access button. no change/mod of (e) door or framing. | $1,475 | |
| Jul 6, 2021 | Never finaled issued Aug 2021, no final | 655 Montgomery St | C B F Inc | 4th & 14th fl - t24 lighting. ref pa 2020-1203-0187Details
4th & 14th fl - t24 lighting. ref pa 2020-1203-0187 | $48,540 |
| Jul 6, 2021 | Completed final sign-off Nov 2021 | 425 Market St | C B F Inc | 9th & 10th fl - common area lighting upgrades. only electrical workDetails
9th & 10th fl - common area lighting upgrades. only electrical work | $80,534 |
| Jun 10, 2021 | Completed final sign-off Jun 2021 | 1 Embarcadero Center | C B F Inc | as-builts to 2020-0908-3672 to reflect address corrections for bike room fire alarmDetails
as-builts to 2020-0908-3672 to reflect address corrections for bike room fire alarm | $29,460 |
| Jun 8, 2021 | Never finaled issued Jun 2021, no final | 564 Bush St | C B F Inc | (18) down lights, (3) linear pendants, (39) receptacles, ref pa# 2019-1211-92131Details
(18) down lights, (3) linear pendants, (39) receptacles, ref pa# 2019-1211-92131 | $35,000 |
| Jun 7, 2021 | Completed final sign-off Dec 2021 | 655 Montgomery St | C B F Inc | 20th flr - electrical only, lights, controls, plugs. ref t.i. bpa#202012030187 & 202002114168.Details
20th flr - electrical only, lights, controls, plugs. ref t.i. bpa#202012030187 & 202002114168. | $83,000 |
| May 28, 2021 | Never finaled issued May 2021, no final | 2300 Harrison St | Novo Construction Inc | new lighting and controls for restrooms on the 1st, 2nd and 3rd floors. ref pa 2021-0322-70131Details
new lighting and controls for restrooms on the 1st, 2nd and 3rd floors. ref pa 2021-0322-70131 | $15,000 |
| Dec 17, 2020 | Expired or cancelled cancelled Jan 2026 | 2201 Bay Shore Bl | C B F Inc | new lighting, plug outlet & appliance power, new main electrical service, distribution & new lighting control systems. new pg&e transformer in front of building. ref arch pa# 201507010504 r3 deferred.Details
new lighting, plug outlet & appliance power, new main electrical service, distribution & new lighting control systems. new pg&e transformer in front of building. ref arch pa# 201507010504 r3 deferred. | $850,000 |
| Dec 8, 2020 | Completed final sign-off Apr 2021 | 620 Davis St | Field Construction Inc. | tenant improvement: demo of non-load bearing partitions, doors, millwork, glazing, power lighting, plumbing & finishes. new partitions, door and hardware, glazing, power, plumbing, ceiling, lighting, finishes & millwork.Details
tenant improvement: demo of non-load bearing partitions, doors, millwork, glazing, power lighting, plumbing & finishes. new partitions, door and hardware, glazing, power, plumbing, ceiling, lighting, finishes & millwork. | $455,745 |
| Dec 3, 2020 | Completed final sign-off Nov 2021 | 650 Davis St | Field Construction Inc. | furnish & install new landscape lighting. rev to pa202001172184. new landscape lighting.Details
furnish & install new landscape lighting. rev to pa202001172184. new landscape lighting. | |
| Nov 18, 2020 | Completed final sign-off Feb 2021 | 225 Bush St | C B F Inc | ste #1850: ref pa# 202007220705. electrical buildout of space, which includes 33 lights, 20 outlets, 6 data outlets and lighting controls.Details
ste #1850: ref pa# 202007220705. electrical buildout of space, which includes 33 lights, 20 outlets, 6 data outlets and lighting controls. | $51,295 |
| Nov 17, 2020 | Never finaled issued Nov 2020, no final | 235 Pine St | C B F Inc | 17/f: electrical buildout including (45) plugs, (55) light fixtures and controls. reference t.i pa# 202008061204.Details
17/f: electrical buildout including (45) plugs, (55) light fixtures and controls. reference t.i pa# 202008061204. | $118,651 |
| Oct 28, 2020 | Completed final sign-off Mar 2025 | 440 Davis Ct | C B F Inc | building #4: mechanical and electrical replacement of (e) motor control centers (mcc) located in vista east, building #4. the mcc replacement shall involve modification of (e) hvac equipment to supply integral motor starters or vfds as required.Details
building #4: mechanical and electrical replacement of (e) motor control centers (mcc) located in vista east, building #4. the mcc replacement shall involve modification of (e) hvac equipment to supply integral motor starters or vfds as required. | $25,000 |
| Oct 28, 2020 | Completed final sign-off Mar 2025 | 155 Jackson St | C B F Inc | building 2: mechanical and electrical replacement of (e) motor control centers (mcc) located in vista north, west east and south. the mcc replacement shall involve modification of (e) hvac equipment to supply integral motor starters or vfds as required.Details
building 2: mechanical and electrical replacement of (e) motor control centers (mcc) located in vista north, west east and south. the mcc replacement shall involve modification of (e) hvac equipment to supply integral motor starters or vfds as required. | $25,000 |
| Oct 28, 2020 | Completed final sign-off Mar 2025 | 550 Battery St | C B F Inc | bldg#1: mechanical + electrical. replacement of existing motor control centers (mcc) located in vista west bldg 1. the mcc replacement shall involve modifications of existing hvac equipment to supply integral motor starters or veds as required.Details
bldg#1: mechanical + electrical. replacement of existing motor control centers (mcc) located in vista west bldg 1. the mcc replacement shall involve modifications of existing hvac equipment to supply integral motor starters or veds as required. | $25,000 |
| Oct 28, 2020 | Completed final sign-off Mar 2025 | 405 Davis Ct | C B F Inc | building #3: mechanical and electrical replacement of (e) motor control centers (mcc) located in vista south. the mcc replacement shall involve modification of (e) hvac equipment to supply integral motor starters or vfds as required.Details
building #3: mechanical and electrical replacement of (e) motor control centers (mcc) located in vista south. the mcc replacement shall involve modification of (e) hvac equipment to supply integral motor starters or vfds as required. | $25,000 |
| Sep 28, 2020 | Completed final sign-off Apr 2021 | 140 New Montgomery St | Skyline Construction | 18/f: electrical work for tenant improvement on the 18th floor. reference bpa #201909192076.**maher n/a**Details
18/f: electrical work for tenant improvement on the 18th floor. reference bpa #201909192076.**maher n/a** | $22,000 |
| Sep 4, 2020 | Never finaled issued Sep 2020, no final | 650 Townsend St | C B F Inc | suite #150c: new power, new lighting, office ti, only electrical work. ti permit #2019-1220-0153Details
suite #150c: new power, new lighting, office ti, only electrical work. ti permit #2019-1220-0153 | $250,000 |
| Aug 4, 2020 | Never finaled issued Aug 2020, no final | 49 Stevenson St | C B F Inc | suite 300: t-24 - new electrical lighting / power for t.i. pa202002134417. maher n/a.Details
suite 300: t-24 - new electrical lighting / power for t.i. pa202002134417. maher n/a. | $135,000 |
| Jul 6, 2020 | Completed final sign-off Dec 2020 | 101 Montgomery St | Novo Construction Inc | suite #2600: interior ti - remove non-structural partitions. new partitions, door assemblies, electrical, light fixtures & finishes. fire life safety and sprinklers under separate permit. maher naDetails
suite #2600: interior ti - remove non-structural partitions. new partitions, door assemblies, electrical, light fixtures & finishes. fire life safety and sprinklers under separate permit. maher na | $250,000 |
| Mar 12, 2020 | Expired or cancelled cancelled Feb 2024 | 1 Daniel Burnham Ct | C B F Inc | 3rd fl, ste 300-c - install 20 new light fixtures; install 15 new receptacles; ref pa 2019-1206-8832Details
3rd fl, ste 300-c - install 20 new light fixtures; install 15 new receptacles; ref pa 2019-1206-8832 | $39,985 |
| Feb 25, 2020 | Completed final sign-off Mar 2021 | 601 California St | Peacock Construction | 7th fl - electrical for work under pa 2020-0116-2034Details
7th fl - electrical for work under pa 2020-0116-2034 | |
| Feb 25, 2020 | Completed final sign-off Aug 2020 | 601 California St | Peacock Construction | t24 electrical for work under 201910114235Details
t24 electrical for work under 201910114235 | |
| Feb 25, 2020 | Completed final sign-off Aug 2020 | 601 California St | Peacock Construction | 7th fl - electrical for work under pa 2020-1218-9863Details
7th fl - electrical for work under pa 2020-1218-9863 | |
| Jan 7, 2020 | Never finaled issued Jan 2020, no final | 550 Kearny St | C B F Inc | 2nd fl: new lighting upgrades, lighting control upgrades and life safety upgrades. reference p.a. #2019 0722 6477. electrical onlyDetails
2nd fl: new lighting upgrades, lighting control upgrades and life safety upgrades. reference p.a. #2019 0722 6477. electrical only | $500,000 |
| Dec 30, 2019 | Completed final sign-off Jul 2020 | 77 Maiden Ln | Bcci Construction Company | 4th fl - mep deferred submittal to support previously approved arch permit #201912179727. redistribute existing ductwork and install (2) new wshps. electrical work for 3rd, 4th , 5th fl.Details
4th fl - mep deferred submittal to support previously approved arch permit #201912179727. redistribute existing ductwork and install (2) new wshps. electrical work for 3rd, 4th , 5th fl. | $50,000 |
| Dec 12, 2019 | Never finaled issued Dec 2019, no final | 1 Market St | C B F Inc | ref pa# 20191147262; 41st fl: (2) plugs, (1) futnitre feed, (1) floor core, (11) downlights, t-24 compliant controlsDetails
ref pa# 20191147262; 41st fl: (2) plugs, (1) futnitre feed, (1) floor core, (11) downlights, t-24 compliant controls | $15,000 |
| Nov 25, 2019 | Never finaled issued Dec 2019, no final | 55 Green St | Dome Construction Corp | ti of level 5 office space. improvement include non-structural partitions, doors, ceilings, lighting & finishes. electrical & mechicanl system are withing the socpe of work. maher naDetails
ti of level 5 office space. improvement include non-structural partitions, doors, ceilings, lighting & finishes. electrical & mechicanl system are withing the socpe of work. maher na | $2,700,000 |
| Oct 24, 2019 | Completed final sign-off Mar 2021 | 139 Townsend St | C B F Inc | electrical installation including 15 new lights, 10 outlets and 1 poke thruDetails
electrical installation including 15 new lights, 10 outlets and 1 poke thru | $19,019 |
| Oct 10, 2019 | Completed final sign-off Feb 2020 | 1200 Mississippi St | C B F Inc | new linear fixtures installed in garage/warehouse as well as convenience power, stand alone controls. new 2x4 fixtures in training room. ref pa 2019-0916-1779 r1Details
new linear fixtures installed in garage/warehouse as well as convenience power, stand alone controls. new 2x4 fixtures in training room. ref pa 2019-0916-1779 r1 | $50,000 |
| Sep 9, 2019 | Never finaled issued Sep 2019, no final | 410 Townsend St | C B F Inc | 4th fl: new lighting & controls. install (1) 52' linear fixture and (1) 56' linear fixture in corridor.Details
4th fl: new lighting & controls. install (1) 52' linear fixture and (1) 56' linear fixture in corridor. | $25,000 |
| Sep 9, 2019 | Never finaled issued Sep 2019, no final | 655 Montgomery St | C B F Inc | 17th fl - provide new lighting and blanch circuiting to existing panel, maintained some existing power & signal outlets & provide additional power blanch circuiting & raceway system as required. provide t24 forms. ref pa #201907085266. maher na.Details
17th fl - provide new lighting and blanch circuiting to existing panel, maintained some existing power & signal outlets & provide additional power blanch circuiting & raceway system as required. provide t24 forms. ref pa #201907085266. maher na. | $30,000 |
| Sep 9, 2019 | Never finaled issued Sep 2019, no final | 655 Montgomery St | C B F Inc | 14th fl - provide new lighting and blanch circuiting, maintained some existing powr & signal outlets and provide new power branch circuiting and raceway system as required. provide t24 forms. ref pa #201907196360. maher na.Details
14th fl - provide new lighting and blanch circuiting, maintained some existing powr & signal outlets and provide new power branch circuiting and raceway system as required. provide t24 forms. ref pa #201907196360. maher na. | $30,000 |
| Sep 4, 2019 | Completed final sign-off Dec 2019 | 505 Sansome St | Skyline Construction | suite 1700 - electrical work for ti on 17th ref 201907186245Details
suite 1700 - electrical work for ti on 17th ref 201907186245 | $20,000 |
| Sep 4, 2019 | Completed final sign-off Dec 2019 | 350 Bush St | Skyline Construction | electrical work for ti on the ground floor retail space ref 201902253726Details
electrical work for ti on the ground floor retail space ref 201902253726 | $15,000 |
| Aug 28, 2019 | Never finaled issued Aug 2019, no final | 731 Market St | C B F Inc | suite 200: lighting control system - title 24. retrofit 14 down lights, demo 30 light fixtures, install 23 new light fixtures. electrical work only.Details
suite 200: lighting control system - title 24. retrofit 14 down lights, demo 30 light fixtures, install 23 new light fixtures. electrical work only. | $80,000 |
| Aug 12, 2019 | Completed final sign-off Sep 2019 | 135 Main St | Skyline Construction | 21st floor: electrial work for tenant improvement on the 21st floor. ref 2019-0125-1244Details
21st floor: electrial work for tenant improvement on the 21st floor. ref 2019-0125-1244 | $8,000 |
| Jul 19, 2019 | Completed final sign-off Nov 2019 | 2601 Mission St | C B F Inc | 9/f: t-24 compliance, new lighting, controls, power, fire alarm devices, ref t.i. #201905201145. new break roomDetails
9/f: t-24 compliance, new lighting, controls, power, fire alarm devices, ref t.i. #201905201145. new break room | $240,000 |
| May 24, 2019 | Completed final sign-off Jan 2020 | 300 Brannan St | Peacock Construction | t-24 electrical for work under pa 2019-0404-7109Details
t-24 electrical for work under pa 2019-0404-7109 | |
| May 13, 2019 | Completed final sign-off Jun 2019 | 246 01st St | Bcci Construction Company | 3rd, 4th, 5th, 6th fl - mechanical, electrical, plumbing, permit to install new fancoil system, branch selector, supply & return diffusers. new power, data, new lighting & controls. ref pa #201905080099.Details
3rd, 4th, 5th, 6th fl - mechanical, electrical, plumbing, permit to install new fancoil system, branch selector, supply & return diffusers. new power, data, new lighting & controls. ref pa #201905080099. | $85,000 |
| May 13, 2019 | Completed final sign-off Nov 2019 | 246 01st St | Bcci Construction Company | basement, 1st, 2nd fl - new power & data, new breakrooms, new lighting & controls.Details
basement, 1st, 2nd fl - new power & data, new breakrooms, new lighting & controls. | $30,000 |
| Apr 22, 2019 | Completed final sign-off Nov 2019 | 1 Embarcadero Center | Bcci Construction Company | 17, 18 and 19th fl - electrical only permit to support architechtural. new lighting & controls for restroom. ref pa 2019-0211-2591, 2019-0117-0637 and 2019-0108-9816Details
17, 18 and 19th fl - electrical only permit to support architechtural. new lighting & controls for restroom. ref pa 2019-0211-2591, 2019-0117-0637 and 2019-0108-9816 | $60,000 |
| Apr 8, 2019 | Never finaled issued Apr 2019, no final | 735 Market St | C B F Inc | new downlight fixtures and controls new power outlets throughout space using currently @ (e) panel. reference p.a# 2019 0131 1760. electrical onlyDetails
new downlight fixtures and controls new power outlets throughout space using currently @ (e) panel. reference p.a# 2019 0131 1760. electrical only | $30,000 |
| Mar 27, 2019 | Completed final sign-off May 2019 | 135 Main St | C B F Inc | new lighting system, receptacles and furniture feeds maher naDetails
new lighting system, receptacles and furniture feeds maher na | $50,000 |
| Feb 6, 2019 | Never finaled issued Feb 2019, no final | 555 Montgomery St | C B F Inc | ste 300 - electrical scope - install 110 lights, 37 outlest, 2 life safety devices, 2 mechanical connections. ref pa 2018-1024-3972Details
ste 300 - electrical scope - install 110 lights, 37 outlest, 2 life safety devices, 2 mechanical connections. ref pa 2018-1024-3972 | $150,000 |
| Jan 15, 2019 | Completed final sign-off Jul 2019 | 222 02nd St | C B F Inc | 1st flr, t.i. 1,760 sq mercantile space. all gender restroom and pantry, new lighting new power. ref p.a. #2018 1010 2865. title 24 compliance. maher n/a.Details
1st flr, t.i. 1,760 sq mercantile space. all gender restroom and pantry, new lighting new power. ref p.a. #2018 1010 2865. title 24 compliance. maher n/a. | $167,350 |
| Jan 15, 2019 | Never finaled issued Jan 2019, no final | 625 02nd St | C B F Inc | 4th flr. new led lighting and lighting controls. 8 new duplex receptacles. ref pa 201810243992. title 24 compliance. maher n/a.Details
4th flr. new led lighting and lighting controls. 8 new duplex receptacles. ref pa 201810243992. title 24 compliance. maher n/a. | $80,000 |
| Jan 15, 2019 | Completed final sign-off Jun 2019 | 75 Hawthorne St | C B F Inc | 5th floor: mep only in ref to approved permit# 201809281701. new power and data for work stations and offices. new lighting and controls.Details
5th floor: mep only in ref to approved permit# 201809281701. new power and data for work stations and offices. new lighting and controls. | |
| Oct 16, 2018 | Completed final sign-off Jan 2019 | 655 Montgomery St | C B F Inc | provide new lighting & branch circuiting to (e) panel, provid ca title 24 compliance formsDetails
provide new lighting & branch circuiting to (e) panel, provid ca title 24 compliance forms | $10,000 |
| Oct 2, 2018 | Never finaled issued Oct 2018, no final | 115 Sansome St | C B F Inc | new lighting & controls, power & data for offices, title 24, kitchen power arch ref # 201805149068Details
new lighting & controls, power & data for offices, title 24, kitchen power arch ref # 201805149068 | $20,000 |
| Aug 24, 2018 | Never finaled issued Aug 2018, no final | 1 Grant Av | C B F Inc | t-24 approval for lighting.Details
t-24 approval for lighting. | $15,000 |
| Aug 24, 2018 | Completed final sign-off Nov 2018 | 160 Spear St | C B F Inc | 14th fl: electrical upgrade: new lighting & power for new break area. new break room equip. new power for conference, team room, open offices, and furniture feed.Details
14th fl: electrical upgrade: new lighting & power for new break area. new break room equip. new power for conference, team room, open offices, and furniture feed. | $15,000 |
| Aug 10, 2018 | Never finaled issued Aug 2018, no final | 600 Townsend St | C B F Inc | 5th fl electrocal only: provide new lighting and branch circuiting to (e) and new panels. provide ca title 24 compliance forms. ref #201804186646. maher naDetails
5th fl electrocal only: provide new lighting and branch circuiting to (e) and new panels. provide ca title 24 compliance forms. ref #201804186646. maher na | $546,000 |
| Jul 23, 2018 | Never finaled issued Jul 2018, no final | 655 Montgomery St | C B F Inc | ref bpa# 2018-0615-2011.provide new lighting & branch circuiting to exissting panel.maintained some of the existing power and signal outlets and provide additional new power branch circuiting and raceway systems as requiered to new power and signal outlets. provide california title 24 forms.Details
ref bpa# 2018-0615-2011.provide new lighting & branch circuiting to exissting panel.maintained some of the existing power and signal outlets and provide additional new power branch circuiting and raceway systems as requiered to new power and signal outlets. provide california title 24 forms. | $3,000 |
| Jul 19, 2018 | Completed final sign-off Nov 2018 | 655 Montgomery St | C B F Inc | ste#900 interior ti lighting and branch circuiting to existing panel. maintain some of the e power and signal outlets and provide additional new power branch circuiting and raceway systems as req. provide title 24 compliance forms ref 201806252795. n/a for maher.Details
ste#900 interior ti lighting and branch circuiting to existing panel. maintain some of the e power and signal outlets and provide additional new power branch circuiting and raceway systems as req. provide title 24 compliance forms ref 201806252795. n/a for maher. | $15,000 |
| Jul 9, 2018 | Never finaled issued Jul 2018, no final | 660 03rd St | C B F Inc | title 24 - electrical for t.i pa#201805239884.Details
title 24 - electrical for t.i pa#201805239884. | $30,000 |
| May 25, 2018 | Completed final sign-off Jun 2018 | 1045 Sansome St | C B F Inc | partial scope office tenant retrofit: lighting power & signal, wiring, lighting & controls, remodel panel board. ref #201712065627. maher naDetails
partial scope office tenant retrofit: lighting power & signal, wiring, lighting & controls, remodel panel board. ref #201712065627. maher na | $35,000 |
| Apr 13, 2018 | Never finaled issued Apr 2018, no final | 250 Montgomery St | C B F Inc | provide new lighting & branch circuiting to existing panel, maintained some of the existing power & signal outlets & provide additonal new power branch circuiting and raceway systems as required to new power and signal outlets. ref pa# 201712227248. maher naDetails
provide new lighting & branch circuiting to existing panel, maintained some of the existing power & signal outlets & provide additonal new power branch circuiting and raceway systems as required to new power and signal outlets. ref pa# 201712227248. maher na | $55,000 |
| Feb 2, 2018 | Never finaled issued Feb 2018, no final | 580 California St | C B F Inc | title 24: install lighting fixtures and constrols. ref t.i. pa201612013949. maher n/a.Details
title 24: install lighting fixtures and constrols. ref t.i. pa201612013949. maher n/a. | $20,000 |
| Jan 8, 2018 | Completed final sign-off Jan 2018 | 455 Market St | C B F Inc | provide new lighting and branch circuiting to existing panel; maintain some existing power/provide additional power and railways as required to power and signal outlets. ref pa 2016-0825-5970; n/a maherDetails
provide new lighting and branch circuiting to existing panel; maintain some existing power/provide additional power and railways as required to power and signal outlets. ref pa 2016-0825-5970; n/a maher | $50,000 |
| Dec 7, 2017 | Never finaled issued Dec 2017, no final | 49 Geary St | C B F Inc | suite #402 -provide new lighting/branch circuiting to existing panel. maintain some of existing power and signal outlets and provided additional new ppower branch circuiting and raceways systems as required to new power and signal outlets. ref# 2017-0919-8939. n/a maherDetails
suite #402 -provide new lighting/branch circuiting to existing panel. maintain some of existing power and signal outlets and provided additional new ppower branch circuiting and raceways systems as required to new power and signal outlets. ref# 2017-0919-8939. n/a maher | $25,000 |