Block 0268, lot 012
369 Pine St
- City’s use
- Commercial Office
- Built
- 1918
- Stories
- 8
- Units
- 3
- Rooms
- 12 bathrooms
- Building
- 67,507 sq ft
- Lot
- 8,719 sq ft
- Zoning
- C3O
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
71 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 9, 2026 | Completed final sign-off Mar 2026 | 369 Pine St | Mcclure Electric Inc | 6th/f title 24 compliance for lighting only ref to t.i. 202508294240Details
6th/f title 24 compliance for lighting only ref to t.i. 202508294240 | $25,900 |
| Jan 9, 2026 | Completed final sign-off Mar 2026 | 369 Pine St | Mcclure Electric Inc | 6th/f title 24 compliance for lighting only ref to t.i. 202508294280Details
6th/f title 24 compliance for lighting only ref to t.i. 202508294280 | $11,000 |
| Jan 6, 2026 | Completed final sign-off Mar 2026 | 369 Pine St | Mcclure Electric Inc | title 24 compliance for lighting only. ref pa #202509034512Details
title 24 compliance for lighting only. ref pa #202509034512 | $14,500 |
| Jan 6, 2026 | Completed final sign-off Mar 2026 | 369 Pine St | Mcclure Electric Inc | 4/f suite 410: title 24 compliance for lighting only. ref permit 202509024393Details
4/f suite 410: title 24 compliance for lighting only. ref permit 202509024393 | $35,400 |
| Dec 17, 2025 | Completed final sign-off Feb 2026 | 369 Pine St | Siemens Industry, Inc. | 4th floor: fire only for the suite 410 remodel done under pa #202509024393. additions are 3 speaker/strobes, as well as the relocation of 1 speaker/strobe.Details
4th floor: fire only for the suite 410 remodel done under pa #202509024393. additions are 3 speaker/strobes, as well as the relocation of 1 speaker/strobe. | $5,086 |
| Dec 17, 2025 | Completed final sign-off Feb 2026 | 369 Pine St | Siemens Industry, Inc. | 6/f suite 610 - fire only. remodel done under permit 202508294240. additions are 5 speaker/strobes and 1 strobe.Details
6/f suite 610 - fire only. remodel done under permit 202508294240. additions are 5 speaker/strobes and 1 strobe. | $5,426 |
| Dec 17, 2025 | Completed final sign-off Feb 2026 | 369 Pine St | Siemens Industry, Inc. | 5/f suite 518 - fire only. remodel done under permit 202509034512. 1 speaker/strobe is added.Details
5/f suite 518 - fire only. remodel done under permit 202509034512. 1 speaker/strobe is added. | $961 |
| Dec 12, 2025 | Completed final sign-off Jan 2026 | 369 Pine St | Pioneer Fire Inc. | 6th fl, suite 610 - relocate 7 pendents; convert 17 uprights to pendents; remove 6 pendents; add 1 pendent ref pa 202508294240Details
6th fl, suite 610 - relocate 7 pendents; convert 17 uprights to pendents; remove 6 pendents; add 1 pendent ref pa 202508294240 | $7,750 |
| Dec 12, 2025 | Completed final sign-off Jan 2026 | 369 Pine St | Pioneer Fire Inc. | suite 410 and 518 on 4th and 5th floor. convert 9 pendents to uprighs, relocate 2 pendents, remove 1 pendent ref pa 202509024393 & 202509034512Details
suite 410 and 518 on 4th and 5th floor. convert 9 pendents to uprighs, relocate 2 pendents, remove 1 pendent ref pa 202509024393 & 202509034512 | $3,000 |
| Sep 3, 2025 | Completed final sign-off Jun 2026 | 369 Pine St | San Francisco Commercial Builders Inc | suite 518: ti to include demolition of non structural partitions, electrical & ceiling construction of new partitions, ceilings, power & finishes. market ready condition suite will be used for marketing of vacant suite and is not intended for occupancy at this time.Details
suite 518: ti to include demolition of non structural partitions, electrical & ceiling construction of new partitions, ceilings, power & finishes. market ready condition suite will be used for marketing of vacant suite and is not intended for occupancy at this time. | $136,000 |
| Sep 2, 2025 | Completed final sign-off Mar 2026 | 369 Pine St | San Francisco Commercial Builders Inc | suite 410: t.i. improvement to include demolition of non - structural partitions, electrical and ceiling, construction of new partitions, ceiling, power, finishes and make restroom ada compliant. market ready condition suite will be used for marketing of vacant site and is not intended forDetails
suite 410: t.i. improvement to include demolition of non - structural partitions, electrical and ceiling, construction of new partitions, ceiling, power, finishes and make restroom ada compliant. market ready condition suite will be used for marketing of vacant site and is not intended for | $136,000 |
| Aug 29, 2025 | Completed final sign-off Mar 2026 | 369 Pine St | San Francisco Commercial Builders Inc | 6/fl- ste 610- ti to include demo of no structrual partitions and ceiling, construction of (n) partitions, ceiling, power and finishes under separate permit. mep and fire alarm/sprinkler on another permit.Details
6/fl- ste 610- ti to include demo of no structrual partitions and ceiling, construction of (n) partitions, ceiling, power and finishes under separate permit. mep and fire alarm/sprinkler on another permit. | $136,000 |
| Aug 29, 2025 | Completed final sign-off Mar 2026 | 369 Pine St | San Francisco Commercial Builders Inc | 6/fl- (n) common area for tenants to include demo of non sturctural partitions and ceiling, construction of (n) partitions, ceiling power and finishes. mep, fire, life safety, fire sprinklers to be filed separatelyDetails
6/fl- (n) common area for tenants to include demo of non sturctural partitions and ceiling, construction of (n) partitions, ceiling power and finishes. mep, fire, life safety, fire sprinklers to be filed separately | $136,000 |
| Jun 17, 2025 | Completed final sign-off Mar 2026 | 369 Pine St | Siemens Industry, Inc. | fl/3: fire only for the suite 300 remodel on the floor 3 done under ref permit app#2025-0327-3176; 4 speaker srobes are addedDetails
fl/3: fire only for the suite 300 remodel on the floor 3 done under ref permit app#2025-0327-3176; 4 speaker srobes are added | $3,844 |
| Jun 4, 2025 | Completed final sign-off Mar 2026 | 369 Pine St | C B F Inc | suite 300: new electrical power & signal device througout the space. noew t-24 compliant lighting & controls. ref pa 202503273176.Details
suite 300: new electrical power & signal device througout the space. noew t-24 compliant lighting & controls. ref pa 202503273176. | $10,000 |
| Apr 25, 2025 | Completed final sign-off Mar 2026 | 369 Pine St | Pioneer Fire Inc. | suite#300: relocate 4 , add 1. plug one pendent, remove 17 pendents, relocate 2 pendents. gc pa #202503273176Details
suite#300: relocate 4 , add 1. plug one pendent, remove 17 pendents, relocate 2 pendents. gc pa #202503273176 | $5,200 |
| Mar 27, 2025 | Completed final sign-off Mar 2026 | 369 Pine St | San Francisco Commercial Builders Inc | 3/fl- ti to include demo non strutural partitions and ceiling construction of (n) partitions, ceiling power and fnishes. mep,fire/life safety /fire sprinklers to be submitted under separate permitsDetails
3/fl- ti to include demo non strutural partitions and ceiling construction of (n) partitions, ceiling power and fnishes. mep,fire/life safety /fire sprinklers to be submitted under separate permits | $95,000 |
| Aug 22, 2024 | Completed final sign-off Sep 2024 | 369 Pine St | Pioneer Fire Inc. | relocate 20 pendents, replace 13 pendents to uprights, demo drops ref pa 202406265267Details
relocate 20 pendents, replace 13 pendents to uprights, demo drops ref pa 202406265267 | $9,000 |
| Aug 22, 2024 | Completed final sign-off Dec 2024 | 369 Pine St | Mcclure Electric Inc | 7/fl- compliance for title 24 lighting only. ref pa 202406265267Details
7/fl- compliance for title 24 lighting only. ref pa 202406265267 | |
| Aug 5, 2024 | Completed final sign-off Oct 2024 | 369 Pine St | Siemens Industry, Inc. | 7/f: fire only - additions are 6 speaker/strobes and 1 strobe. ref permit 202406265267Details
7/f: fire only - additions are 6 speaker/strobes and 1 strobe. ref permit 202406265267 | $6,390 |
| Jun 26, 2024 | Completed final sign-off Dec 2024 | 369 Pine St | San Francisco Commercial Builders Inc | 7/f: tenant improvement to include demolition of non-structural partitions and ceilings. construction of new partitions, ceiling, power and finishes.Details
7/f: tenant improvement to include demolition of non-structural partitions and ceilings. construction of new partitions, ceiling, power and finishes. | $150,000 |
| Mar 2, 2021 | Never finaled filed Mar 2021, never issued | 369 Pine St | remove (e) exterior awing fabric and replace with new. (e) awning frame and structural to remain.Details
remove (e) exterior awing fabric and replace with new. (e) awning frame and structural to remain. | $15,000 | |
| Oct 15, 2019 | Never finaled issued Oct 2019, no final | 369 Pine St | street spaceDetails
street space | ||
| Mar 25, 2019 | Completed final sign-off Apr 2019 | 369 Pine St | San Francisco Commercial Builders Inc | accessibility upgrades at bldg entrance to comply with accessible business entrance program: secure extg door mats, adjust door closers, request technical infisabilty for upgrade to extg sidewalk.Details
accessibility upgrades at bldg entrance to comply with accessible business entrance program: secure extg door mats, adjust door closers, request technical infisabilty for upgrade to extg sidewalk. | $400 |
| Jul 25, 2018 | Expired or cancelled withdrawn Jun 2019 | 369 Pine St | install 1 non electric, wall, single face, sign.Details
install 1 non electric, wall, single face, sign. | $1,000 | |
| Jul 25, 2018 | Never finaled issued Jul 2019, no final | 369 Pine St | Maguire Inc Dba Lahue And Associates | install 1 projecting, electric, double-faced sign "369 pine".Details
install 1 projecting, electric, double-faced sign "369 pine". | $5,000 |
| Nov 6, 2017 | Completed final sign-off May 2020 | 369 Pine St | Mcclure Electric Inc | 3/f- title 24 only. t.i. pa#201708225499. n/a ordinance #155-13Details
3/f- title 24 only. t.i. pa#201708225499. n/a ordinance #155-13 | |
| Aug 22, 2017 | Completed final sign-off Dec 2017 | 369 Pine St | San Francisco Commercial Builders Inc | 3rd floor restroom upgrades. work scope includes removal of all existing finishes, plumbing fixtures, accessories, ceiling & lighting. provide new accessible toilet stalls, plumbing fixtures & accessories as well as new finsihes, ceiling & lighting.Details
3rd floor restroom upgrades. work scope includes removal of all existing finishes, plumbing fixtures, accessories, ceiling & lighting. provide new accessible toilet stalls, plumbing fixtures & accessories as well as new finsihes, ceiling & lighting. | $100,000 |
| Jul 7, 2016 | Completed final sign-off Oct 2016 | 369 Pine St | San Francisco Commercial Builders Inc | 7th fl restroom barrier removal. replace tile, fixtures, lighting, plumbing. existing sprinkler and fls to remain existingDetails
7th fl restroom barrier removal. replace tile, fixtures, lighting, plumbing. existing sprinkler and fls to remain existing | $80,000 |
| Aug 27, 2015 | Never finaled filed Aug 2015, never issued | 369 Pine St | ada upgrades to unisex restroom in basement. structural work to include soil grouting under existing foundation and localized slab on grade repairDetails
ada upgrades to unisex restroom in basement. structural work to include soil grouting under existing foundation and localized slab on grade repair | $200,000 | |
| Aug 27, 2015 | Completed final sign-off Jan 2016 | 369 Pine St | Plant Construction Co, Lp | ada upgrades to unisex restroom in basement. structural work to include soil grouting under existing foundation and localized slab on grade repairDetails
ada upgrades to unisex restroom in basement. structural work to include soil grouting under existing foundation and localized slab on grade repair | $200,000 |
| Feb 11, 2014 | Completed final sign-off May 2025 | 369 Pine St | Ayoob & Peery Plumbing Co Inc | 1st flr: add one and relocate one fire sprinkler heads, per tenant improvements, ref. 201308154376Details
1st flr: add one and relocate one fire sprinkler heads, per tenant improvements, ref. 201308154376 | $1,028 |
| Aug 15, 2013 | Completed final sign-off Mar 2014 | 369 Pine St | Swift Construction | t.i. of existing office space, relocate equipment -Details
t.i. of existing office space, relocate equipment - | $165,000 |
| Sep 18, 2009 | Completed final sign-off Dec 2009 | 369 Pine St | Pribuss Engineering Inc | ground floor fire sprinkler t.i. - add 3 sprinklers.Details
ground floor fire sprinkler t.i. - add 3 sprinklers. | $800 |
| Sep 10, 2009 | Completed final sign-off Dec 2009 | 369 Pine St | Turner Construction Co | minor non-structural interior demolition only. vacant space per ab017. note: new construction on separate permit.Details
minor non-structural interior demolition only. vacant space per ab017. note: new construction on separate permit. | $8,200 |
| Aug 21, 2009 | Completed final sign-off Dec 2009 | 369 Pine St | Turner Construction Co | remodel of existing cafe and bakery dinning area;relocation of coffee service area; demolition of existing accessory glass structures, new finishes; mep under seperate permitDetails
remodel of existing cafe and bakery dinning area;relocation of coffee service area; demolition of existing accessory glass structures, new finishes; mep under seperate permit | $60,000 |
| Aug 11, 2009 | Never finaled issued Sep 2009, no final | 369 Pine St | Tube Art Displays Inc/Dba Tube Art Signs | install 2 illuminated, double-faced, projecting signs. specialty cafeDetails
install 2 illuminated, double-faced, projecting signs. specialty cafe | $5,000 |
| Mar 27, 2009 | Completed final sign-off Apr 2009 | 369 Pine St | Ayoob & Peery Plumbing Co Inc | renew pa# 2006/02/23/5224 to obtain final inspection. all work has been completed.Details
renew pa# 2006/02/23/5224 to obtain final inspection. all work has been completed. | |
| Mar 27, 2009 | Completed final sign-off Apr 2009 | 369 Pine St | Ayoob & Peery Plumbing Co Inc | renew pa# 2006/02/23/5221 to obtain final inspection. all work has been completed.Details
renew pa# 2006/02/23/5221 to obtain final inspection. all work has been completed. | |
| Mar 27, 2009 | Completed final sign-off Apr 2009 | 369 Pine St | Ayoob & Peery Plumbing Co Inc | renew pa# 2002/09/20/7119 to obtain final inspection. all work has been completed.Details
renew pa# 2002/09/20/7119 to obtain final inspection. all work has been completed. | |
| Mar 27, 2009 | Completed final sign-off Apr 2009 | 369 Pine St | Ayoob & Peery Plumbing Co Inc | renew pa# 2006/02/23/5223 to obtain final inspection. all work has been completed.Details
renew pa# 2006/02/23/5223 to obtain final inspection. all work has been completed. | |
| Mar 27, 2009 | Completed final sign-off Apr 2009 | 369 Pine St | Ayoob & Peery Plumbing Co Inc | renew pa# 2006/02/23/5222 to obtain final inspection. all work has been completed.Details
renew pa# 2006/02/23/5222 to obtain final inspection. all work has been completed. | |
| Mar 27, 2009 | Completed final sign-off Apr 2009 | 369 Pine St | Ayoob & Peery Plumbing Co Inc | renew pa# 2003/03/11/9378 to obtain final inspection. all work has been completed.Details
renew pa# 2003/03/11/9378 to obtain final inspection. all work has been completed. | |
| Mar 27, 2009 | Completed final sign-off Apr 2009 | 369 Pine St | Ayoob & Peery Plumbing Co Inc | renew pa# 2002/09/20/7123 to obtain final inspection. all work has been completed.Details
renew pa# 2002/09/20/7123 to obtain final inspection. all work has been completed. | |
| Mar 27, 2009 | Completed final sign-off Apr 2009 | 369 Pine St | Ayoob & Peery Plumbing Co Inc | umbrella permit - compliance with highrise sprinkler ordinance 377-93, no work.Details
umbrella permit - compliance with highrise sprinkler ordinance 377-93, no work. | |
| Mar 27, 2009 | Completed final sign-off Apr 2009 | 369 Pine St | Ayoob & Peery Plumbing Co Inc | renew pa# 2004/1/03/8386 to obtain final inspection. all work has been completed.Details
renew pa# 2004/1/03/8386 to obtain final inspection. all work has been completed. | |
| Mar 27, 2009 | Completed final sign-off Apr 2009 | 369 Pine St | Ayoob & Peery Plumbing Co Inc | renew pa# 2005/10/27/6645 to obtain final inspection. all work has been completed.Details
renew pa# 2005/10/27/6645 to obtain final inspection. all work has been completed. | |
| Feb 23, 2006 | Expired or cancelled expired Apr 2009 | 369 Pine St | Ayoob & Peery Plumbing Co Inc | install new fire sprnikler system, connect to (e) risen with floor control.Details
install new fire sprnikler system, connect to (e) risen with floor control. | $22,250 |
| Feb 23, 2006 | Expired or cancelled expired Apr 2009 | 369 Pine St | Ayoob & Peery Plumbing Co Inc | install new fire sprnikler system at 4th floor, connect to (e) risen with floor control valve.Details
install new fire sprnikler system at 4th floor, connect to (e) risen with floor control valve. | $14,250 |
| Feb 23, 2006 | Expired or cancelled expired Apr 2009 | 369 Pine St | Ayoob & Peery Plumbing Co Inc | install new fire sprnikler system, connect to (e) risen with floor control.Details
install new fire sprnikler system, connect to (e) risen with floor control. | $11,758 |
| Feb 23, 2006 | Expired or cancelled expired Apr 2009 | 369 Pine St | Ayoob & Peery Plumbing Co Inc | install fire sprnikler system at 5th floor, connect to (e) risen with valve assembly.Details
install fire sprnikler system at 5th floor, connect to (e) risen with valve assembly. | $19,250 |
| Oct 27, 2005 | Expired or cancelled expired Apr 2009 | 369 Pine St | Ayoob & Peery Plumbing Co Inc | install new fire sprinkler system connect to (e) riser.Details
install new fire sprinkler system connect to (e) riser. | $5,000 |
| Jun 8, 2005 | Completed final sign-off Aug 2005 | 369 Pine St | replacement of equipment ( no change to building finishes) ref: 930222.Details
replacement of equipment ( no change to building finishes) ref: 930222. | $3,000 | |
| Dec 13, 2004 | Completed final sign-off Mar 2005 | 369 Pine St | Swain Sign Inc | non structural signDetails
non structural sign | |
| Dec 13, 2004 | Completed final sign-off Mar 2005 | 369 Pine St | Swain Sign Inc | erect a single faced non-electric awning (copy change only)Details
erect a single faced non-electric awning (copy change only) | |
| Nov 3, 2004 | Expired or cancelled expired Apr 2009 | 369 Pine St | Ayoob & Peery Plumbing Co Inc | install fire sprinkler system at 7th floor connect to extg riser outletDetails
install fire sprinkler system at 7th floor connect to extg riser outlet | $18,500 |
| Dec 2, 2003 | Completed final sign-off Jan 2004 | 369 Pine St | oti-4,2nd floor- lsDetails
oti-4,2nd floor- ls | $5,300 | |
| Nov 18, 2003 | Completed final sign-off Jan 2004 | 369 Pine St | oti-3 2nd floor spDetails
oti-3 2nd floor sp | $1,500 | |
| Nov 14, 2003 | Completed final sign-off Jan 2004 | 369 Pine St | oti-2, 2nd floor, el, meDetails
oti-2, 2nd floor, el, me | $52,000 | |
| Oct 17, 2003 | Completed final sign-off Jan 2004 | 369 Pine St | oti-1 2nd fl-el, ls, spDetails
oti-1 2nd fl-el, ls, sp | $120,000 | |
| Jun 23, 2003 | Expired or cancelled expired Mar 2004 | 369 Pine St | Siemens Industry, Inc. | addition of 2 smoke detectors at a set of held open doors on the floor 1 lobby, no audible/visual deDetails
addition of 2 smoke detectors at a set of held open doors on the floor 1 lobby, no audible/visual de | $1,900 |
| Jun 5, 2003 | Completed final sign-off Jul 2003 | 369 Pine St | Dpr Construction Inc | oti-2 6th flr,elDetails
oti-2 6th flr,el | $3,000 |
| Mar 11, 2003 | Expired or cancelled expired Dec 2003 | 369 Pine St | Ayoob & Peery Plumbing Co Inc | install new fire sprinkler system at 3rd floor connect to existing 4" riserDetails
install new fire sprinkler system at 3rd floor connect to existing 4" riser | $15,200 |
| Nov 13, 2002 | Completed final sign-off Jul 2003 | 369 Pine St | 6/fl - oti-1, el, lsDetails
6/fl - oti-1, el, ls | $42,000 | |
| Sep 20, 2002 | Expired or cancelled expired Dec 2003 | 369 Pine St | Ayoob & Peery Plumbing Co Inc | install fire spsrinkler system at 6th fl.Details
install fire spsrinkler system at 6th fl. | $18,000 |
| Sep 20, 2002 | Expired or cancelled expired Dec 2003 | 369 Pine St | Ayoob & Peery Plumbing Co Inc | install fire sprinkler system at 2nd flr,connect to (e)riser & valve assemblyDetails
install fire sprinkler system at 2nd flr,connect to (e)riser & valve assembly | $18,000 |
| Jul 23, 2002 | Never finaled issued Aug 2002, no final | 369 Pine St | oti-1 basementDetails
oti-1 basement | $17,500 | |
| Jun 25, 2002 | Completed final sign-off Oct 2002 | 369 Pine St | remodel basement space for catering businessDetails
remodel basement space for catering business | $60,000 | |
| Jul 27, 2001 | Expired or cancelled expired Aug 2003 | 369 Pine St | Siemens Industry, Inc. | this is retrofit of the existing fire alarm system. that is now in place has no smoke control systemDetails
this is retrofit of the existing fire alarm system. that is now in place has no smoke control system | $57,000 |
| Feb 16, 2001 | Expired or cancelled expired Sep 2001 | 369 Pine St | Ayoob & Peery Plumbing Co Inc | install partial sprinkler system leave outlets at main for future extension connect to ex riser 4thDetails
install partial sprinkler system leave outlets at main for future extension connect to ex riser 4th | $5,600 |
| Jan 25, 2001 | Expired or cancelled expired Aug 2001 | 369 Pine St | Amiot & Boehm Inc | oti-1 4th floor el, me, l/sDetails
oti-1 4th floor el, me, l/s | $22,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ayoob & Peery Plumbing Co Inc (21), San Francisco Commercial Builders Inc (9), Siemens Industry, Inc. (7), Mcclure Electric Inc (6), Pioneer Fire Inc. (4), Swain Sign Inc (2), Turner Construction Co (2), Amiot & Boehm Inc, C B F Inc, Dpr Construction Inc, Maguire Inc Dba Lahue And Associates, Plant Construction Co, Lp, Pribuss Engineering Inc, Swift Construction, Tube Art Displays Inc/Dba Tube Art Signs
- Architects
- John Kamus (6), Teresa Emery (4), Jack Munson, Roger S Bernstein
- Engineers
- Prabhjeet Grewal (4), Stephen Shafeer
- Designers
- Andrew Erickson (3), Ronald Demartini (2), Siemens Industry, Inc.
Find contractors for work like this