Block 0206, lot 008
500 Sansome St
The 200 most recent permits filed for this property.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 20, 2026 | In progress issued Jul 2026 | 500 Sansome St | Centric Construction Inc | 6/f suite 600 - t.i buildout of an (e) office space. scope include new open office space, enclosed office space, employeee kitchenette and storage. new office space will utilize (e) men's and women's restrooms on 6/f. | $1,300,000 |
| Oct 15, 2025 | Completed final sign-off Oct 2025 | 500 Sansome St | Bilcor Inc | 1st floor & mezz: relocate 9 wall mount horn strobes and install 2 wall mount strobes. ref to 202503263112 | $2,664 |
| Aug 29, 2025 | Completed final sign-off Dec 2025 | 500 Sansome St | C B F Inc | #100: new lighting, branch circuiting.provide new power and signal. ref pa#202503263112 | $440,000 |
| Jul 30, 2025 | Completed final sign-off Sep 2025 | 500 Sansome St | Act Now Fire Inspection | ti: on existing vacant office space fire sprinkler relocation. ref# 202503263112 | $8,000 |
| May 30, 2025 | Completed final sign-off Dec 2025 | 500 Sansome St | Centric Construction Inc | 1st floor: deferred structural for pa #202503263112 | |
| Mar 26, 2025 | Completed final sign-off Dec 2025 | 500 Sansome St | Centric Construction Inc | 1/fl and mezzanine- ti including dmeo and construction of non structual partitions ceilings, finishes and ffe. (n) restrooms and breakroom. deferred mep | $4,360,000 |
| Nov 10, 2023 | Completed final sign-off Jan 2025 | 500 Sansome St | Bilcor Inc | (1) flush mount control relay. arch ref#: 202102043991 | $666 |
| May 12, 2021 | Completed final sign-off Sep 2021 | 500 Sansome St | R L H Fire Protection Inc | ti/upgrade of existing fire sprinkler system 1 relocated pendent sprinkler 2 relocated upright sprinklers 1 additional upright sprinkler ref. # 2020-1120-9425 | $1,500 |
| Feb 4, 2021 | Completed final sign-off Jan 2024 | 500 Sansome St | Centric Construction Inc | demolition of (e) front door, glazing & finishes per plan.construction of (n) front doors and glaszing at (e) opening.construction of new structural supports as needed for (n) construction. | $30,000 |
| Nov 20, 2020 | Completed final sign-off Dec 2021 | 500 Sansome St | Centric Construction Inc | demo and removal of (e) walls and (1) run of stairs within stairwell 1. construction of (n) walls, stairs and landing to accomodate (n) layout within stairwell 1. | $150,000 |
| Jul 17, 2020 | Never finaled issued Sep 2020, no final | 500 Sansome St | Bilcor Inc | fire life safety. install(3) wall mount strobes, (7) wall mount horn stobes, (6) duct detectors and (6) control relay modules. reference t.i. #2020-0228-5671 | $14,520 |
| Jun 12, 2020 | Never finaled filed Jun 2020, never issued | 500 Sansome St | R L H Fire Protection Inc | ste. #402 - t.i. fire sprinkler: relocate 49 heads, add 16 heads, remove 11 sprinkler heads. ref ti pa202002285671. maher n/a. | $19,000 |
| Feb 28, 2020 | Never finaled issued Mar 2020, no final | 500 Sansome St | Centric Construction Inc | ste. #402 - demo of (e) non-load bearing partitions, doors & lighting; construction of (n) non-load bearing partitions, doors, finishing & lighting. | $605,646 |
| Sep 25, 2018 | Never finaled issued Oct 2018, no final | 500 Sansome St | Hathaway Dinwiddie Co. | partial tenant improvement for single full floor tenant. enclose small office space, install presentation rails. replace ceiling tiles and finishe upgrades in selected rooms. minor elec to install av screen and back lit panel in 2 rooms will be design build under sep permit. no structural scope. no | $5,000 |
| Nov 22, 2017 | Completed final sign-off Dec 2017 | 500 Sansome St | R L H Fire Protection Inc | fire sprinkler relocate 2, add 10, delete 3 pendent sprinklers. relocate 4, delete 1 upright sprinkler 4th fl ti 201710171389 | $6,500 |
| Nov 21, 2017 | Completed final sign-off Jan 2018 | 500 Sansome St | Bilcor Inc | suite 410: f/a t.i.: insatll 3 celing mount hron strones,, 1 ceiling mount strobe, 1 wall mount horn/strobe. wall mount strobe, 2 duct detectors w/ sampling tube, 2 control relay mods, ref t.i. 201710171389. maher n/a. | $5,000 |
| Oct 17, 2017 | Completed final sign-off Jan 2018 | 500 Sansome St | Centric Construction Inc | suite 410, construction of new non load bearin partitions, doors paint, lighting, finishes maher not req | $350,000 |
| Mar 27, 2017 | Completed final sign-off Apr 2017 | 500 Sansome St | Turner Construction Co | ref 201702149331 electrical permit maher not req | $150,000 |
| Mar 21, 2017 | Completed final sign-off Apr 2017 | 500 Sansome St | Ingram Fire Protection Inc | relocate 4 head fire sprinklers. ref pa 2017-0214-9331 | $4,100 |
| Mar 20, 2017 | Completed final sign-off Apr 2017 | 500 Sansome St | Bilcor Inc | suite #370: fire alarm t.i. to relocate 1 wall mount horn strobe. ref app#201702149331 | $1,000 |
| Mar 2, 2017 | Completed final sign-off Apr 2017 | 500 Sansome St | Bilcor Inc | fire alarm tenant improvement install (1) ceiling mount horn strobe ref pa 2017-0201-8375. maher na | $500 |
| Feb 22, 2017 | Completed final sign-off Mar 2017 | 500 Sansome St | R L H Fire Protection Inc | 5th flr, suite 510: fire sprinkler permit. relocate 18 and add 1. ref ti 2017-0201-8375 maher na | $5,500 |
| Feb 14, 2017 | Completed final sign-off Apr 2017 | 500 Sansome St | Turner Construction Co | 3rd fl suite 370 partial remodel of the 3rd fl walls. ceilings, new non load bearing walls, doors, ceiling etc. mep sprinklers, fire protection and signs under seperate permits. maher not req | $80,000 |
| Feb 1, 2017 | Completed final sign-off Apr 2017 | 500 Sansome St | Centric Construction Inc | 5th floor: demo of extg non-load bearing partitions, doors, lighting, & finishes. construction of new non-load bearing partitions, doors, paint, new lighting and finishes. n/a for maher. alarm/sprinkler deferred. | $200,000 |
| Oct 11, 2016 | Completed final sign-off Nov 2016 | 500 Sansome St | Bilcor Inc | 4th floor: fire alarm t.i. install 1 small detector with base. ref app# 201507141392. n/a for maher | $400 |
| Jun 23, 2016 | Completed final sign-off Aug 2016 | 500 Sansome St | Bilcor Inc | suite 350: fire alarm ti install (4) ceiling mount horn-strobes, install (1) ceiling mount strove, install (6) duct detectors, install (6) control relay modules. ref ti 2016-0405-3980 | $6,800 |
| May 12, 2016 | Never finaled issued May 2016, no final | 500 Sansome St | Bilcor Inc | 3rd floor - install 4 horn/strobes, 1 strobe, 6 duct detectors, & 6 control relays. ref pa #201604053980. n/a maher ordinance | $5,500 |
| May 3, 2016 | Completed final sign-off Jun 2016 | 500 Sansome St | R L H Fire Protection Inc | fire sprinkler permit, relocate 30, add 3 and delete 15 pendent sprinklers, install 55 new uprights and delete 3 uprights on the 3/f. t.i. pa#201604053980. n/a ordinance #155-13 | $34,900 |
| Apr 5, 2016 | Never finaled issued Apr 2016, no final | 500 Sansome St | Centric Construction Inc | ste 350, demo of (e) non-load bearing partitions, doors, lighting & mechanical system; construction of (n) non-load bearing partitions, doors & paint, (n) lighting & (n) mechanical system. maher na | $648,490 |
| Mar 4, 2016 | Completed final sign-off Jun 2016 | 500 Sansome St | Johnson Controls Fire | 1st & basement: relocate (e) facu from 1st flr to basement, provide & install new (1) smoke detector above facu and (1) remote annunciation in the lobby; maher n/a | $25,000 |
| Aug 25, 2015 | Completed final sign-off Sep 2015 | 500 Sansome St | R L H Fire Protection Inc | 4th floor suite 450 fire sprinkler for tenant improvement - 72 heads. reference pa #201507141392. n/a maher ordinance | $18,910 |
| Aug 19, 2015 | Completed final sign-off Jan 2016 | 500 Sansome St | Bilcor Inc | suite #450: fire alarm t.i. install 5 ceiling mount horn-strobes, 5 ceiling mount strobes, 5 control relays, and 5 duct detectors. ref. appl. 2015.0714.1392. maher n/a. | $8,000 |
| Jul 14, 2015 | Never finaled issued Jul 2015, no final | 500 Sansome St | Centric Construction Inc | 4th floor suite 450 - demo of (e) non-load bearing partitions, doors & lighting. construction of (n) non-load bearing partitions, doors & paint & lighting. n/a maher ordinance | $605,646 |
| May 19, 2015 | Completed final sign-off Jun 2015 | 500 Sansome St | Bilcor Inc | unit #615: fire alarm t.i. install 3 ceiling mount horn-strobes. install 1 ceiling mount strobe. maher na | $1,600 |
| Apr 20, 2015 | Completed final sign-off May 2015 | 500 Sansome St | R L H Fire Protection Inc | 6th flr: fire sprinkle ti - relocate 8 and add/modify 11, total 19 heads. ref 2015 0311 0547 maher - not req'd | $8,990 |
| Mar 11, 2015 | Never finaled issued Mar 2015, no final | 500 Sansome St | Centric Construction Inc | demo of (e) non-load bearing partitions, doors, (e) out of commission, mech duct. construction of (n) non load bearing partitions, doors, paint maher - not req'd | $341,935 |
| Feb 23, 2015 | Completed final sign-off Mar 2015 | 500 Sansome St | Bilcor Inc | ste. 500: fire alarm tenant improvement: install 6 ceiling mount horn strobes. install 5 duct detectors with built in relay. parent ti permit: 2014-1202-2783 maher - not req'd | $4,400 |
| Feb 12, 2015 | Completed final sign-off Mar 2015 | 500 Sansome St | R L H Fire Protection Inc | fire sprinkler ti 5th fl suite 500. add 38 pendents and relocate 2 upright. 40 heads total (also, removing 25 uprights) ref 201412022783 maher not req | $11,960 |
| Feb 9, 2015 | Completed final sign-off Jul 2015 | 500 Sansome St | Bilcor Inc | fire alarm t.i. in basement - relocate 1 ceiling mount horn-strobe, install 2 smoke detectors with base. n/a ordinance #155-13 | $1,200 |
| Dec 26, 2014 | Completed final sign-off Aug 2015 | 500 Sansome St | Centric Construction Inc | basement:construction of new non-load bearing partitions, doors and carpet. there is no electrical work or mechanical work on this permit. n/a for the maher. | $27,740 |
| Dec 15, 2014 | Never finaled issued Dec 2014, no final | 500 Sansome St | Bilcor Inc | #300- fire alarm tenant improvement, install 9 ceiling mount horn-strobes, install 4 duct detectors. t.i. pa# 201410290219. n/a ordinance #155-13. | $5,200 |
| Dec 4, 2014 | Completed final sign-off Mar 2015 | 500 Sansome St | R L H Fire Protection Inc | basement & 1st flr: fire sprinkler permit, add 16 upright sprinklers in the basement, t.i. 201302260933, relocate 3 and add 1 pendant on the 1st flr t.i. 20141010810; maher n/a | $10,280 |
| Dec 2, 2014 | Completed final sign-off May 2015 | 500 Sansome St | Centric Construction Inc | construction of (n) non-load bearing partitions, doors, side lights, ceiling, paint, carpet, lightight & electrical work. all work in suite 500, 5th floor. f/a and sprinklers under separate permit. | $1,172,000 |
| Dec 1, 2014 | Completed final sign-off Jan 2015 | 500 Sansome St | R L H Fire Protection Inc | fire sprinkler relocate 33, add 3, delete 7 pendents. relocte 1, add 4, delete 3 uprights on 3rd fl. | $20,560 |
| Oct 29, 2014 | Never finaled issued Nov 2014, no final | 500 Sansome St | Centric Construction Inc | 3rd floor - demolition of (e) non load bearing partitions, doors, ceilings, carpet and lighting. construction of new non-load bearing partiions, doors, sidelights, ceiling, paint, carpet, lighting and power. sprinklers, fire alarm sep. permits maher n/a. | $801,000 |
| Oct 10, 2014 | Never finaled issued Oct 2014, no final | 500 Sansome St | Centric Construction Inc | 1st flr: demolition of (e) signage, construction of (n)n non-load bearing ceilings & lights; maher n/a | $84,003 |
| Sep 30, 2014 | Completed final sign-off Sep 2014 | 500 Sansome St | Bilcor Inc | as built revision to pa#: 2014-0813-3742 | |
| Aug 15, 2014 | Never finaled issued Aug 2014, no final | 500 Sansome St | Centric Construction Inc | suite 750 - demolition of (e) non-load bearing partitions + doors. construction of (n) non-load bearing partitions, door, paint. compliance with maher ordinance 155-13 not required. | $37,330 |
| Aug 14, 2014 | Completed final sign-off Sep 2014 | 500 Sansome St | R L H Fire Protection Inc | 2nd floor fire sprinkler permit - relcoate 32 pendents & 6 upright sprinklers, add 73 pendents & 1 upright. ref t.i. #2014.0612.8262. n/a maher ordinance | $56,540 |
| Aug 13, 2014 | Completed final sign-off Oct 2014 | 500 Sansome St | Bilcor Inc | install 11 ceiling mount horn strobes, install 7 duct detectors with built in control relay | $7,200 |
| Jul 9, 2014 | Never finaled issued Jul 2014, no final | 500 Sansome St | Bilcor Inc | remove and replace 5 booster panels, ti #201309096337 and 201207124658.; maher n/a; (fire lite fcps -24f56) | $2,000 |
| Jun 12, 2014 | Completed final sign-off Nov 2014 | 500 Sansome St | Centric Construction Inc | 2nd flr, ste 200: construction of new non-load bearing partitions, ceiling, paint, carpet & lighting; compliance with ord 155-13 not required, fire alarm/sprinkler under seperate permit. | $1,105,000 |
| Jun 5, 2014 | Never finaled issued Jun 2014, no final | 500 Sansome St | Bilcor Inc | install: 1 booster panel, 1 ceiling mount strobe, 6 ceiling mount horn-strobes, 2 wall mount strobes, 2 wall mount horn-strobes, 3 smode detectors with base, 2 duct detectors with relay control, 2 relay control modules, 1 signal module. ref pa# 2014-0328-1887. | $8,000 |
| May 16, 2014 | Completed final sign-off Aug 2014 | 500 Sansome St | Anderson, Rowe & Buckley, Inc. | 2nd floor:fire sprinkler t.i. relocate 30 heads and adding 16 heads. total 46. n/a for the maher ordinance #155-13. t.i. 201403281887 | $24,272 |
| Mar 28, 2014 | Completed final sign-off Aug 2014 | 500 Sansome St | Centric Construction Inc | 2nd fl: demo e non load bearing partitions, ceiling, lights. new non load bearing partitions, ceiling, paint, carpet, lighting. 2nd fl 220: demo e non load bearing partitons, ceiling, lights. new non load bearing partitions, ceiling, paint, carpet, lighting. 5th fl demo e non load bearing partitons, | $375,000 |
| Mar 28, 2014 | Completed final sign-off Sep 2014 | 500 Sansome St | Centric Construction Inc | (rooftop): construction of new stairs and new raised walkways at e equipment platforms | $55,000 |
| Dec 17, 2013 | Never finaled issued Dec 2013, no final | 500 Sansome St | street space | ||
| Dec 16, 2013 | Completed final sign-off Jan 2014 | 500 Sansome St | Johnson Controls Fire | renovation of existing fire alarm system. add 1 smoke detector, 30 h0rn strobes, 7 strobes, 15 duct detectors. ti 1st fl and mezzanine | $14,000 |
| Dec 12, 2013 | Completed final sign-off Jan 2014 | 500 Sansome St | Potter Fire Protection | 2nd fl. install fire sprinkler system on the 2nd floor. total 118 sprinklers. | $45,000 |
| Nov 25, 2013 | Completed final sign-off Jul 2014 | 500 Sansome St | R L H Fire Protection Inc | fire sprinklers: remove 36 sprinklers and piping from stairwell #2 on all floors. relocate 1 upright | $5,000 |
| Nov 8, 2013 | Completed final sign-off Jul 2014 | 500 Sansome St | R L H Fire Protection Inc | fire sprinkler permit:install 44 pendents and 10 uprights on floors on 3-7 floors. relocate 4 pendents on 8th floor. t.i. app#201309096337 and 201207124658 and for 8th floor 201302140246. | $29,812 |
| Nov 1, 2013 | Completed final sign-off Sep 2014 | 500 Sansome St | Johnson Controls Fire | 1st floor to 7th floor: fire alarm t.i. add 4 control zam, 25 smoke sensors, 13 duct detectors, 6 door holders, 3 strobes, 29 horn/strobes, relocated 1 (e) smoke, 1 horn/strobe, 1 pull station to new location. remove 4 (e) smoke sensors. | $14,000 |
| Oct 31, 2013 | Completed final sign-off Dec 2013 | 500 Sansome St | Potter Fire Protection | relocate 30 fire sprinkler on the 5th floor. ref app#201307010869 | $13,000 |
| Oct 28, 2013 | Completed final sign-off Jan 2014 | 500 Sansome St | Potter Fire Protection | 1st floor and mezz:install a fire sprinkler system on the 1st floor. bldg app#201308124076 | $70,000 |
| Oct 23, 2013 | Completed final sign-off Jan 2014 | 500 Sansome St | Centric Construction Inc | demo of extg non-load bearing partitions. construction of new non-load bearing partitions, paint, and carpet. sprinkers separate permit ste 350 | $75,000 |
| Oct 1, 2013 | Completed final sign-off Apr 2014 | 500 Sansome St | Centric Construction Inc | 1st floor and mezz:project consists of mechanical and electrical interior t. i. architectural improvements under prior approval app#201308124076.extent of work is limitted to 1st floor and mezzanine. no change in bldg height or floor area. bldg is fully accessible. | $565,000 |
| Sep 10, 2013 | Completed final sign-off Nov 2013 | 500 Sansome St | R L H Fire Protection Inc | 4th floor fire sprinkler t.i. - 38 fire sprinkler heads. ref pa #201307010872 | $9,532 |
| Sep 9, 2013 | Completed final sign-off Sep 2014 | 500 Sansome St | Centric Construction Inc | 7th floor corridor: demo of extg non load bearing partitions, ceiling and lights. construction of new non-load bearing partitions, ceilings, paint, carpet and lighting. | $60,000 |
| Aug 12, 2013 | Completed final sign-off Apr 2014 | 500 Sansome St | Centric Construction Inc | 1st floor & mezz - interior tenant improvement including new partitions, ceilings, finishes, new stair & guardrail. mep deferred. | $1,122,600 |
| Aug 9, 2013 | Never finaled issued Aug 2013, no final | 500 Sansome St | Simplexgrinnell Lp. | revision to 201304124377. adding 12 duct smoke detectors. reference approved mechanical 2013.0809.3912 | $7,000 |
| Aug 9, 2013 | Never finaled issued Aug 2013, no final | 500 Sansome St | Centric Construction Inc | replacement of 1st fl/mezzanine windows and front entry. new window to match e frames in finish and color. new windows have spandrel at floor level as it currently does | $200,000 |
| Aug 9, 2013 | Completed final sign-off Apr 2014 | 500 Sansome St | Centric Construction Inc | hvac equipment and ducts; ref. 201302140246; 1 new fire smoke damper, smoke detector, required in air handlers, fire alarm separate permit | $162,000 |
| Aug 2, 2013 | Never finaled issued Aug 2013, no final | 500 Sansome St | street space | ||
| Jul 30, 2013 | Completed final sign-off Jul 2014 | 500 Sansome St | Simplexgrinnell Lp. | fire alarm ti for 1st fl through roof and mezzaninie 10 duct detectors | $10,000 |
| Jul 30, 2013 | Completed final sign-off Jun 2014 | 500 Sansome St | Simplexgrinnell Lp. | fire alarm ti new elevator power on roof. add 1 new smoke sensor 5 heat sensors, 4 control zam, 2 supervised iam. reference ti 2013.0523.7736 | $8,000 |
| Jul 25, 2013 | Completed final sign-off Jun 2014 | 500 Sansome St | Simplexgrinnell Lp. | 3rd floor:fire alarm t.i- add 9 new horn/strobe, 5th strobes, 5 smoke detectors, 7 duct detectors with 7 remote test station, 2 door holders. remove and cover extg 1 horn/strobe, relocate extg horn/strobe to new location. t.i. #201305177209 | $14,000 |
| Jul 23, 2013 | Never finaled issued Jul 2013, no final | 500 Sansome St | Potter Fire Protection | 3rd floor - relocate 33 add 1 fire sprinklers. ref pa #2013.05.17.7209 | $13,500 |
| Jul 22, 2013 | Completed final sign-off Aug 2013 | 500 Sansome St | Simplexgrinnell Lp. | all floors-add 9 smoke detectors on each floor for new risers | $9,000 |
| Jul 3, 2013 | Never finaled issued Jul 2013, no final | 500 Sansome St | street space | ||
| Jul 1, 2013 | Completed final sign-off Sep 2014 | 500 Sansome St | Centric Construction Inc | 5th floor-corridor-demo of (e) non load bearing partitions, ceiling & lights. construct of new non load bearing partitions, ceiling, paint, carpet & lighting. suite #501/502/503-demo of (e) non load bearing partitions. construct new non load bearing partitions, doors, sidelghts, ceiling, carpet, pa | $375,000 |
| Jul 1, 2013 | Completed final sign-off Aug 2014 | 500 Sansome St | Centric Construction Inc | 4th floor-corridor-demo of (e) non load bearing partitions, ceiling & lights. constr. new non load bearing partitions, ceiling, paint, carpet & lighting. suite #402/450-demo of (e) non load bearing partitions. construct new non load bearing partitions, doors, sidelghts, ceiling, carpet, paint, li | $370,000 |
| May 24, 2013 | Never finaled issued May 2013, no final | 500 Sansome St | street space | ||
| May 23, 2013 | Never finaled issued Oct 2013, no final | 500 Sansome St | Centric Construction Inc | demolition of (e) elevator shaft at penthouse. construction of new elevator shaft & hoistway beam at penthouse. construction of new mechanical units & support & new rated fresh air shaft | $250,000 |
| May 20, 2013 | Completed final sign-off Apr 2014 | 500 Sansome St | Simplexgrinnell Lp. | fire alarm t.i. rest room renovation to mezz, 2nd, 3rd, 4th,5th, 6th, 7th, 8th floors. 16 strobes, 8 duct detectors with relay. | $9,800 |
| May 17, 2013 | Completed final sign-off Aug 2014 | 500 Sansome St | Centric Construction Inc | 3rd floor-corridor area-demo of (e) non load bearing partitions, ceiling & lights. construction of new non load bearing partitions, ceiling, paint, carpet & lighting. 3rd fl-demo of (e) non load bearing partitions, construction of new non load bearing partitions, new carpet, paint & lighting & power | $350,000 |
| May 13, 2013 | Completed final sign-off Aug 2013 | 500 Sansome St | R L H Fire Protection Inc | 8th floor fire sprinkler permit - relocate 138 pendents & 14 uprights. ref pa #2013.02.14.0246 | $78,128 |
| May 6, 2013 | Never finaled issued May 2013, no final | 500 Sansome St | street space | ||
| Apr 30, 2013 | Completed final sign-off Jul 2014 | 500 Sansome St | Centric Construction Inc | 8th floor:signage at one conference room stating max. occupant load per attached sf bldg code ab-005, local equivalency for alternative design. an automatic fire protection system is installed throughout the bldg. | $500 |
| Apr 26, 2013 | Completed final sign-off Apr 2014 | 500 Sansome St | Centric Construction Inc | demolition of (e) non load bearing walls & stairs, construction of (n) wall, doors, stairs, construction of (n) concrete slab, structural support. add (n) elevator smoke door. | $35,000 |
| Apr 18, 2013 | Never finaled issued Apr 2013, no final | 500 Sansome St | street space | ||
| Apr 12, 2013 | Never finaled issued Apr 2013, no final | 500 Sansome St | Simplexgrinnell Lp. | 8th floor - addioitn new (1) nac panel, 1 signal zam, 2 smoke sensors, 24 horn/strobes, 3 strobes, 2 relay base, remvoe exisitng 9 horn/strobes. t.i. #2013.02.14.0246 | $11,000 |
| Mar 29, 2013 | Never finaled issued Mar 2013, no final | 500 Sansome St | street space and mta | ||
| Mar 27, 2013 | Completed final sign-off Jul 2014 | 500 Sansome St | R L H Fire Protection Inc | basement level-relocate (e) ssu & ssp sprinklers. replace (e) semi-recessed to concealed heads in the t-bar & gyp board ceilings. total of 53 sprinklers | $8,500 |
| Mar 27, 2013 | Completed final sign-off Jun 2014 | 500 Sansome St | Simplexgrinnell Lp. | basement & 1st floor-fire alarm alteration-2 power supplies, 12 smokes, 10 duct detectors, 2 relays, 16 horn/strobes, 14 strobes, relocate 2 (e) power supplies. relocate 9 (e) devices, remove 3 (e) devices. ti pa# 2012-1207-5743 | $18,000 |
| Mar 1, 2013 | Completed final sign-off Apr 2014 | 500 Sansome St | Centric Construction Inc | revision to pa #201111169069 of revised detail 15/s5.1 & 11/s5.1 | |
| Feb 26, 2013 | Never finaled issued Mar 2013, no final | 500 Sansome St | Centric Construction Inc | bsmt-rev.to pa #201212075743 storage b06 & 07 changed to bike storage,conf. rm b11 changed into 2 offices, corridor b28- 2 doors removed & 2 doors relocated, addition of rm b04 for bike storage & corridor b31 path of travel revised, addition of mech. sys.-maintain elevator lobbies- sp-ls sep.permit | $150,000 |
| Feb 19, 2013 | Completed final sign-off Jul 2014 | 500 Sansome St | Centric Construction Inc | new mech equipment on roof, new structural platform on roof. new exhaust throughout the bldg. | $700,000 |
| Feb 14, 2013 | Completed final sign-off May 2014 | 500 Sansome St | Centric Construction Inc | 8th floor-interior t.i. including partitions, ceilings & finishes w/ interior courtyard "bridge" spanning 16'-0". structural drawings & calcs attached. design build mech, elect, fire protection filed under separate permit. | $485,000 |
| Jan 18, 2013 | Completed final sign-off May 2013 | 500 Sansome St | R L H Fire Protection Inc | fire sprinkler permit. add 1 and relocate 6 uprights in the electrical rooms on floors 3-8. ti. pa# 201208016219 | $3,500 |
| Jan 16, 2013 | Never finaled issued Jan 2013, no final | 500 Sansome St | street space permit | ||
| Jan 9, 2013 | Completed final sign-off Sep 2013 | 500 Sansome St | R L H Fire Protection Inc | install a new sprinkler system in 1st floor- new electrical room, bathrooms and corridor,28 heads. install a new 4" riser and connect to (e) on the 2nd floor and existing standpipe that feeds upper flrs t.i. # 201209250608,201206253332. see pre-app letter 1-29-2012 | $15,000 |
| Dec 21, 2012 | Completed final sign-off Dec 2014 | 500 Sansome St | Centric Construction Inc | revision to pa#2012-06-25-3332 (1st floor & basement) electrical room, exit corridor, restroom & basement elevator lobby layout changes. | |
| Dec 7, 2012 | Never finaled issued Jan 2013, no final | 500 Sansome St | Centric Construction Inc | basement level-construction of new non load bearing partitions, doors, side lights, ceiling & soffits. new carpet, paint, lighting & power. construction of 1 ada shower room & 1 non ada shower room-sprinklers and fire alrm separate permit- new corridors and elevator doors, hvac under separate permit | $850,000 |
| Nov 26, 2012 | Never finaled issued Nov 2012, no final | 500 Sansome St | street space | ||
| Nov 26, 2012 | Never finaled issued Nov 2012, no final | 500 Sansome St | street space | ||
| Nov 14, 2012 | Completed final sign-off Aug 2014 | 500 Sansome St | R L H Fire Protection Inc | new basement fire sprinkler system, with 131 heads, new piping, new fdc piping and two areas calculated. new seismic calculations- | $65,500 |
| Oct 16, 2012 | Completed final sign-off Jun 2015 | 500 Sansome St | 1st thru 8th floors-new restoom exhaust throughout the building. (restrooms under seperate permits) | $75,000 | |
| Sep 25, 2012 | Completed final sign-off Jun 2014 | 500 Sansome St | Centric Construction Inc | consturction of new accessible bathrooms and drinking fountains at vacant first floor and mezzanine | $75,000 |
| Aug 17, 2012 | Never finaled issued Aug 2012, no final | 500 Sansome St | street space | ||
| Aug 7, 2012 | Never finaled issued Aug 2012, no final | 500 Sansome St | street space with meters | ||
| Aug 1, 2012 | Completed final sign-off Jun 2015 | 500 Sansome St | Centric Construction Inc | all floors: barrier removal & replacement of elevator. 3rd-8th floors: phase 2 of a 2 phase voluntary seismic strengthening. phase 1 pa# 2011/11/16/9069. | $2,000,000 |
| Jul 12, 2012 | Completed final sign-off Jun 2014 | 500 Sansome St | 2nd/3rd/4th/5th/6th floors-removal of (e) bathrooms, non load bearing walls. construction of new accessible bathrooms & drinking fountains- mep, sprinklers and fire alarm separate permit | $500,000 | |
| Jul 2, 2012 | Completed final sign-off Jun 2014 | 500 Sansome St | Centric Construction Inc | 7th floor: removal of existing bathrooms. construction of new accessible bathrooms & drinking fountains. 8th floor: removal of existing non-load bearing walls at vacant suite. removal of existing bathrooms. construction of new accessible bathrooms & drinking fountains. | $300,000 |
| Jun 25, 2012 | Completed final sign-off Dec 2014 | 500 Sansome St | Centric Construction Inc | 1st fl & bsmt - construction of new transformer room, new exit passageway, stairs & accessible restrooms. removal of (e) non load bearing walls, exit passageway & non complying stairs & ramps. | $500,000 |
| Jun 5, 2012 | Completed final sign-off Sep 2013 | 500 Sansome St | R L H Fire Protection Inc | basement-demo (e) 8" main & re-connect to 4" from pump room | $4,000 |
| May 18, 2012 | Never finaled issued May 2012, no final | 500 Sansome St | Simplexgrinnell Lp. | all floors: demo (e) fire alarm terminal cabinet riser in the elect. room near the main elevator. relocate (e) power supply and relays to new location in the elect. room near the freight elevator. | $8,000 |
| Apr 2, 2012 | Expired or cancelled withdrawn Apr 2012 | 500 Sansome St | barrier removal of non ada elevator including slab demolition and walls. new concrete walls and steel beams will be constructed. phase 1 of voluntary seismic upgrade in basement, first floor, mezzanine and 2nd floor. includes shear walls and collector beams. | $1,960,000 | |
| Feb 9, 2012 | Completed final sign-off Oct 2012 | 500 Sansome St | Centric Construction Inc | demo of non structural interior improvements in basement per ab17 | $35,000 |
| Dec 30, 2011 | Completed final sign-off Jan 2012 | 500 Sansome St | Simplex Grinnell | 7th floor-fire alarm system tenant improvement-4 horn/strobes, demo 2 smokes & 1 relay | $5,000 |
| Dec 27, 2011 | Completed final sign-off Feb 2012 | 500 Sansome St | R L H Fire Protection Inc | ste #750 fire sprinkerl only: relocate 9 heads, add 3 (upright), toatl 12 heads. | $6,000 |
| Dec 21, 2011 | Completed final sign-off Mar 2012 | 500 Sansome St | Innovative Mechanical Inc | suite #750-mechanical, re-route duct work, install 4 vav boxes, registers & thermostats | $42,000 |
| Dec 9, 2011 | Completed final sign-off Mar 2012 | 500 Sansome St | Centric Construction Inc | suite #750-remove & replace doors at suite & restrooms, enlarge suite entry, install non load bearing partitions, doors, side lights, ceiling & soffits. new paint, lighting & power/data | $276,562 |
| Nov 16, 2011 | Completed final sign-off Aug 2014 | 500 Sansome St | Centric Construction Inc | voluntary seismic strengthening in basement, 1st, mezz, and 2nd floor in accordance with ch 16 & 34 of the 2010 sfbc & elevator e02 upgrade replacement w/ new elevator & controls. also enlarge 2 hr elevator shaft. assessibility compliance exempt per sfbc ab-o17 for vacant bldg. at these floors. | $500,000 |
| Nov 10, 2011 | Completed final sign-off Nov 2011 | 500 Sansome St | Simplex Grinnell | fire alarm tenant improvement on #200. new devices include one new nac extender panel, six new horn/strobe and 6 new strobes. | $8,700 |
| Nov 3, 2011 | Completed final sign-off May 2012 | 500 Sansome St | R L H Fire Protection Inc | #200 - fire sprinkelr permit - relocate 33 & add 2 upgrights, relocate 1 pendent. | $18,000 |
| Oct 25, 2011 | Completed final sign-off Mar 2012 | 500 Sansome St | Centric Construction Inc | 2nd floor-demo non load bearinf interior office walls, install new soffits, double entry doors, carpets & paint. new electrical supply for new work stations. no changes to (e) mechanical & plumbing | $75,000 |
| Sep 21, 2011 | Never finaled issued Sep 2011, no final | 500 Sansome St | street space & mta parking meter | ||
| Aug 24, 2011 | Never finaled issued Aug 2011, no final | 500 Sansome St | Centric Construction Inc | demolition of all interior non structural improvents inthe following spaces: all tenant space on floors 1, mezzanine, floor 2, suite 325, suite 500 and suite 615 per ab 17 | $200,000 |
| Nov 18, 2009 | Completed final sign-off Nov 2009 | 500 Sansome St | Anderson, Rowe & Buckley, Inc. | umbrella permit - no work. compliance letter for high rise sprinkler ordinance # 377-93 | |
| Oct 9, 2009 | Completed final sign-off Nov 2009 | 500 Sansome St | R L H Fire Protection Inc | add sprinklers to make it a full sprinkler bldg. base-2hd,4th-8hd, 5th-1hd, 6th-5 hd, 7th 15hd, 8th-1 hd, roof-03 hd, total 35 heads | $5,000 |
| Sep 15, 2009 | Completed final sign-off Dec 2009 | 500 Sansome St | Peacock Construction Inc | 3rd floor lighting, t-24, ref pa #200908124654. | $3,000 |
| Sep 14, 2009 | Never finaled issued Sep 2009, no final | 500 Sansome St | R L H Fire Protection Inc | t/i upgrade to existing sprinkler system. add 212 new pendent heads and add 31 uprights to first floor and mezannine. | $51,000 |
| Aug 31, 2009 | Completed final sign-off Mar 2010 | 500 Sansome St | Ayoob & Peery Plumbing Co Inc | 3rd fl - relocate fire sprinkler heads per tenant improvements (2-relocate). pid #200993181. | $800 |
| Aug 12, 2009 | Completed final sign-off Dec 2009 | 500 Sansome St | Peacock Construction Inc | remove and replace existing doors with rated doors, add soffits at elevator lobby. replace light fixtures with new, apply new finishes to lobby and corridor walls, change ceiling tiles to new- sprinklers and removal of hose rack separate permit | $85,000 |
| Jun 25, 2009 | Completed final sign-off Jul 2009 | 500 Sansome St | Simplex Grinnell | install 5 wall mounted strobes and 4 wall mounted horn strobes on the 3rd floor. | $5,000 |
| Jun 9, 2009 | Completed final sign-off Jul 2009 | 500 Sansome St | Ayoob & Peery Plumbing Co Inc | 3rd floor relocate & remove fire sprinkelrs per teant improvement, (7 relocate & 2 remove) | $1,050 |
| May 28, 2009 | Completed final sign-off Jul 2009 | 500 Sansome St | Peacock Construction Inc | 3rd floor suite 301 - demo of existing on-bearing partitions, build back non-bearing partitions to meet new office configuration. sprinkler, life safety, mech, elec under separate permit. | $125,000 |
| Jan 12, 2009 | Never finaled issued Jan 2009, no final | 500 Sansome St | R L H Fire Protection Inc | 2nd floor. relocate 144 sprnklr heads from upright to pendent. | $28,500 |
| Dec 1, 2008 | Never finaled issued Dec 2008, no final | 500 Sansome St | R L H Fire Protection Inc | tenant improvements. upgrade sprinkler system. add 146 pendents sprinklers to 3rd floor. | $30,000 |
| Oct 29, 2008 | Completed final sign-off Nov 2008 | 500 Sansome St | Peacock Construction Inc | renew pa# 2007/06/01/2773 to obtain final inspection. | |
| Jul 9, 2008 | Never finaled issued Jul 2008, no final | 500 Sansome St | non structural demo at g/f & mezzanine level partitions, demo of existing g/f restroom note, space is pending improvements and floors are no be occupied. | $89,000 | |
| Jul 9, 2008 | Completed final sign-off Nov 2008 | 500 Sansome St | Simplex Grinnell | take out 2 duct detectors/revision to app 200802285881 | $500 |
| Jul 3, 2008 | Completed final sign-off Aug 2008 | 500 Sansome St | Dinyari Construction Inc. | reroofing. | $106,350 |
| Jun 6, 2008 | Completed final sign-off Jul 2008 | 500 Sansome St | R L H Fire Protection Inc | 6th floor - renew 200706194374 and 200707247623 for final inspection. | |
| Feb 28, 2008 | Completed final sign-off Nov 2008 | 500 Sansome St | Simplex Grinnell | fire alarm ti to 6th floor corridor only includes addition of (3) horn strobes, (1) strobe and (2) duct detectors. | $5,800 |
| Feb 20, 2008 | Completed final sign-off Nov 2008 | 500 Sansome St | Ayoob & Peery Plumbing Co Inc | ti for sprinkler system on the 6th floor. relocate 12 heads | $2,200 |
| Dec 19, 2007 | Completed final sign-off Apr 2008 | 500 Sansome St | Simplex Grinnell | relocate (e) horn/strobes to new location. add 1 new strobe to 5th floor suite # 502 only. | $2,800 |
| Dec 18, 2007 | Completed final sign-off Apr 2008 | 500 Sansome St | revision to pa# 2007.11.14.8068. drinking fountain was not as originally drawn. correction to reflect the current configuration with the upgrade of the vinyl flooring. works on the 5th fl. | $1,000 | |
| Nov 14, 2007 | Completed final sign-off Apr 2008 | 500 Sansome St | t/i fifth floor-create two conference rooms and open workstation space. sprinklers,mech,elect. under sep app | $35,000 | |
| Nov 6, 2007 | Expired or cancelled expired Jun 2009 | 500 Sansome St | Simplex Grinnell | fire alarm modification: 6th floor add 1 horn/strobe,2 strobes,2 duct det. ,relocate 2 existing strobes | $8,500 |
| Sep 24, 2007 | Completed final sign-off Jul 2008 | 500 Sansome St | Allied Heating & Air Conditioning | demolish (e) air handler on 6th fl. install (n) airhandler and connect to the (e)chilled water. install (n) steam to hot water heat exchanger. install (n) ductwork and piping, see pa# 2007.06.01.2773 for 6th fl upgrades. | $145,000 |
| Aug 10, 2007 | Never finaled issued Aug 2007, no final | 500 Sansome St | Allied Heating & Air Conditioning | isntall 13 new vav boxes new distribution ductwork and new diffusers ref ap #200706042883 work on 6th floor | $42,500 |
| Jul 24, 2007 | Expired or cancelled expired Jul 2008 | 500 Sansome St | Simplex Grinnell | work on the 6th floor, 1 smoke, 6 strobes, 5 horn strobes, 1 door holder (1 set) | $7,000 |
| Jul 17, 2007 | Never finaled issued Jul 2007, no final | 500 Sansome St | California Roof Management | reroofing | $10,000 |
| Jun 19, 2007 | Expired or cancelled expired Jul 2008 | 500 Sansome St | R L H Fire Protection Inc | 6th floor-t.i. upgrade of fire sprinkelr system; relocate 9 sprinkler heads. | $4,386 |
| Jun 4, 2007 | Completed final sign-off Jul 2008 | 500 Sansome St | Dfi Construction Company | oti-1, 500 sansome llc, 6th fl, el, me, ls, sp. | $145,400 |
| Jun 1, 2007 | Never finaled issued Jun 2007, no final | 500 Sansome St | new hvac mech. room, upgrades to 6th floor tenant cooridor and elevator lobby including wall and ceiling finishes new lounge at property line wall. m/e to fire sprnklr filed under seperate permit. fsd seperate permit. lighting under seperate permit | $120,000 | |
| Dec 11, 2006 | Completed final sign-off Mar 2007 | 500 Sansome St | Commercial Interior Builders Inc | oti-2 m and j wilko 2nd fl sp | $6,000 |
| Nov 30, 2006 | Completed final sign-off Mar 2007 | 500 Sansome St | Commercial Interior Builders Inc | oti-1 2nd fl-sp. | $25,000 |
| Feb 14, 2006 | Completed final sign-off Apr 2006 | 500 Sansome St | Simplex Grinnell | addition of 1 nac power supply, 7 smoke det., 3 duct det., 1 control mod., 1 signal mod., 16 horn / strobes, 3 strobes, 2 door holders. all work to be done on 5th floor. | $7,000 |
| Jan 19, 2006 | Completed final sign-off Apr 2006 | 500 Sansome St | Dpw Inc. | relocate 18 pendents for new ceiling , relocate 18 upright for new wall and add 1 new head for new improvement on 7th floor | $9,000 |
| Dec 28, 2005 | Completed final sign-off Mar 2006 | 500 Sansome St | Commercial Interior Builders Inc | oti-2 bsmnt sp | $3,500 |
| Dec 12, 2005 | Completed final sign-off Apr 2006 | 500 Sansome St | Principal Builders Inc. | oti-2 7th floor el me | $400,000 |
| Nov 2, 2005 | Never finaled issued Nov 2005, no final | 500 Sansome St | Commercial Interior Builders Inc | oti-3 7th floor el, me | $9,000 |
| Oct 31, 2005 | Completed final sign-off Apr 2006 | 500 Sansome St | Principal Builders Inc. | oti-1 7/f el me ls sp | $200,000 |
| Oct 27, 2005 | Expired or cancelled expired May 2006 | 500 Sansome St | C B F Inc | life safety system modifications @500 sansome street 7/f corridor & lobby. f & i 3 horn/strobes, 1 smoke decetors, 1 strobes, dual sync.modules. | $2,500 |
| Oct 26, 2005 | Completed final sign-off Mar 2006 | 500 Sansome St | Commercial Interior Builders Inc | oti-1 bfl el mels sp | $9,926 |
| Oct 12, 2005 | Never finaled issued Oct 2005, no final | 500 Sansome St | Commercial Interior Builders Inc | oti-2 7th floor sp | $31,000 |
| Aug 22, 2005 | Never finaled issued Aug 2005, no final | 500 Sansome St | Commercial Interior Builders Inc | ot1-1 7th floor el, me, l/s, sp | $60,229 |
| Aug 22, 2005 | Completed final sign-off Oct 2005 | 500 Sansome St | Commercial Interior Builders Inc | oti-1 4th floor | $5,800 |
| Jul 13, 2005 | Never finaled issued Jul 2005, no final | 500 Sansome St | streetspace | ||
| Jul 22, 2004 | Completed final sign-off Feb 2005 | 500 Sansome St | C B F Inc | life safety system modification 500 sansome st floors 1-8 and bsmt, install simplex smoke det for co | $18,000 |
| Jun 25, 2004 | Completed final sign-off Feb 2005 | 500 Sansome St | Commercial Interior Builders Inc | oti-1 7/f el me ls sp | $198,777 |
| Apr 22, 2004 | Completed final sign-off Jun 2004 | 500 Sansome St | Commercial Interior Builders Inc | oti-2 4th floor, sp | $2,765 |
| Mar 25, 2004 | Completed final sign-off Jun 2004 | 500 Sansome St | Commercial Interior Builders Inc | oti-1 4th floor, el, l/s, me, sp | $30,000 |
| Mar 22, 2004 | Completed final sign-off Jul 2004 | 500 Sansome St | Commercial Interior Builders Inc | oti-2 4th fl -sp | $2,670 |
| Mar 16, 2004 | Expired or cancelled withdrawn Jul 2004 | 500 Sansome St | oti-1, 7th floor/ el, me, ls, sp | $160,300 | |
| Feb 20, 2004 | Expired or cancelled expired Dec 2005 | 500 Sansome St | Commercial Interior Builders Inc | oti-1 4th fl el, me, ls, sp | $39,200 |
| Feb 18, 2004 | Completed final sign-off Dec 2004 | 500 Sansome St | Bcci Construction Company | fire sprinkler work on the 8th fl | $12,000 |
| Feb 12, 2004 | Completed final sign-off Dec 2004 | 500 Sansome St | Bcci Construction Company | upgrade restroom & breakroom for accessability -provide new finishes @ reception & counter in servi | $100,000 |
| Jan 13, 2004 | Expired or cancelled expired Dec 2005 | 500 Sansome St | C B F Inc | remew fpr foma; 3rd 9114921 8th and 9120319 - 8th 9200053 8th | |
| Jan 13, 2004 | Completed final sign-off Jun 2004 | 500 Sansome St | C B F Inc | renew for final 9716832, 9716833, 4th floors & 9405916- 3rd floor | |
| Jan 12, 2004 | Expired or cancelled expired Dec 2005 | 500 Sansome St | C B F Inc | renew for final inspection : 9313146-3rd fl, 9314883- 3rd fl, & 9404844- 3rd floor. | |
| Jan 12, 2004 | Completed final sign-off Apr 2004 | 500 Sansome St | C B F Inc | renew for final 8204920, 8413172, 9133145 (3rd flr) | |
| Jul 29, 2003 | Expired or cancelled expired Dec 2005 | 500 Sansome St | Commercial Interior Builders Inc | oti-1 rev. #1 6th floor, ls, sp | $1,843 |
| Jul 15, 2003 | Expired or cancelled expired Dec 2005 | 500 Sansome St | Commercial Interior Builders Inc | oti-2 6th flfoor l/s | $5,000 |
| Jul 11, 2003 | Completed final sign-off Sep 2003 | 500 Sansome St | Potter Fire Protection | install 22 fire sprinkler from existing main & grand lines. remove 3/4" pipe and replace w/ 1". | $4,750 |
| Jun 23, 2003 | Expired or cancelled expired Dec 2005 | 500 Sansome St | Commercial Interior Builders Inc | oti-1 6th floor, ls, sp | $25,000 |
| May 21, 2003 | Completed final sign-off Jul 2003 | 500 Sansome St | Commercial Interior Builders Inc | oti-3 4/f sp | $15,000 |
| May 19, 2003 | Completed final sign-off Jul 2003 | 500 Sansome St | Commercial Interior Builders Inc | oti-2 4th fl-ls | $4,000 |
| May 8, 2003 | Completed final sign-off Sep 2003 | 500 Sansome St | infill of existing windows with 3 hour rated walls from interior side only. 5th, 6th, 7th, and 8th | $30,000 | |
| May 8, 2003 | Completed final sign-off Jul 2003 | 500 Sansome St | Commercial Interior Builders Inc | oti-1 4th floor el,,l/s, sp | $90,000 |
| Feb 21, 2003 | Completed final sign-off Feb 2003 | 500 Sansome St | C B F Inc | to renew app#2002/09/23/7185,9714286,9714289 for final inspection. | |
| Jan 21, 2003 | Completed final sign-off Mar 2003 | 500 Sansome St | Commercial Interior Builders Inc | oti-2 5th floor, ls | $3,500 |
| Jan 17, 2003 | Completed final sign-off Mar 2003 | 500 Sansome St | Commercial Interior Builders Inc | oti-3 5th floor el ls #502 | $5,000 |
| Jan 13, 2003 | Completed final sign-off Mar 2003 | 500 Sansome St | Commercial Interior Builders Inc | oti-2, 5th floor, sp | $950 |
| Dec 23, 2002 | Completed final sign-off Mar 2003 | 500 Sansome St | Commercial Interior Builders Inc | oti-1, 5th floor, ste 502, el, ls | $20,000 |
| Dec 23, 2002 | Completed final sign-off Mar 2003 | 500 Sansome St | Commercial Interior Builders Inc | oti-1, 5th floor, ste 501, el, ls | $20,000 |
| Sep 23, 2002 | Completed final sign-off Nov 2002 | 500 Sansome St | C B F Inc | renew permits 9802854 for final inspection. | $5,000 |
| Sep 23, 2002 | Expired or cancelled expired Jun 2003 | 500 Sansome St | C B F Inc | renew permits 9714286 & 9714289 for final inspection. | $5,000 |