Ellerbe Becket
- Listed as
- architect
- Firm
- Roland Lazzarotto
- On San Francisco permits
- Jun 2008 to Aug 2009
2 permits since 2000 (architect on 2 permits): 2 completed.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 12, 2009 | Completed final sign-off Dec 2009 | 500 Sansome St | Peacock Construction Inc | remove and replace existing doors with rated doors, add soffits at elevator lobby. replace light fixtures with new, apply new finishes to lobby and corridor walls, change ceiling tiles to new- sprinklers and removal of hose rack separate permitDetails
remove and replace existing doors with rated doors, add soffits at elevator lobby. replace light fixtures with new, apply new finishes to lobby and corridor walls, change ceiling tiles to new- sprinklers and removal of hose rack separate permit | $85,000 |
| Jun 6, 2008 | Completed final sign-off Dec 2008 | 501 02nd St | Dpr Construction Inc | 7th floor-removal of temporary dry wall partitions. relocate 4 electrical outlets, paint and carpetDetails
7th floor-removal of temporary dry wall partitions. relocate 4 electrical outlets, paint and carpet | $35,000 |