Block 0198, lot 008
550 Battery St
- City’s use
- Multi-Family Residential
- Built
- 1965
- Stories
- 22
- Units
- 416
- Rooms
- 420 bathrooms
- Lot
- 94,381 sq ft
- Zoning
- RC4
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 550 Battery St | lobby/1st floor: revision to pa# 202604239962. added package, room 403 and storage room 404Details
lobby/1st floor: revision to pa# 202604239962. added package, room 403 and storage room 404 | ||
| Sep 3, 2026 | In progress filed Sep 2026, not yet issued | 550 Battery St | unit 903: rehabilitate (e) kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit 903: rehabilitate (e) kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 | |
| Sep 3, 2026 | In progress filed Sep 2026, not yet issued | 500 Battery St | unit #713: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryerDetails
unit #713: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer | $60,000 | |
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 550 Battery St | General Air Technology | install (n) mini split ac system at elevator equipment room. evaporative coils to be installed in the equipment room and condenser to be installed on the roof of the exterior of the building. connect power circuit to equipment and provide condensate drains from the evaporative coils to drain at roofDetails
install (n) mini split ac system at elevator equipment room. evaporative coils to be installed in the equipment room and condenser to be installed on the roof of the exterior of the building. connect power circuit to equipment and provide condensate drains from the evaporative coils to drain at roof | $40,000 |
| Aug 25, 2026 | In progress issued Aug 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit#: 1410: one bathroom one kitchen remodel in kind like for like.Details
unit#: 1410: one bathroom one kitchen remodel in kind like for like. | $60,000 |
| Aug 25, 2026 | Completed final sign-off Sep 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit#: 1809: one bathroom one kitchen remodel in kind like for like.Details
unit#: 1809: one bathroom one kitchen remodel in kind like for like. | $60,000 |
| Aug 20, 2026 | Completed final sign-off Sep 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #918: one kitchen, one bathroom remodel in kind like for like. kitchen approximately 80sf, bathroom approximately 42sf.Details
unit #918: one kitchen, one bathroom remodel in kind like for like. kitchen approximately 80sf, bathroom approximately 42sf. | $60,000 |
| Aug 20, 2026 | In progress issued Aug 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #511: one kitchen, one bathroom remodel in kind like for like. kitchen approximately 94sf, bathroom approximately 42sf.Details
unit #511: one kitchen, one bathroom remodel in kind like for like. kitchen approximately 94sf, bathroom approximately 42sf. | $60,000 |
| Aug 20, 2026 | In progress issued Aug 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1018: one kitchen (80sf), one bathroom (42sf) remodel in kind like for like.Details
unit #1018: one kitchen (80sf), one bathroom (42sf) remodel in kind like for like. | $60,000 |
| Aug 18, 2026 | Completed final sign-off Sep 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 2110: rehabilitate e) kitchen & bathroom, no removal of structural walls, install washer/dryerDetails
unit 2110: rehabilitate e) kitchen & bathroom, no removal of structural walls, install washer/dryer | $60,000 |
| Aug 18, 2026 | In progress issued Aug 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit#: 1017. rehabitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit#: 1017. rehabitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Aug 18, 2026 | Completed final sign-off Sep 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit#: 1515. rehabitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit#: 1515. rehabitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Aug 11, 2026 | Completed final sign-off Sep 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 1308: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit 1308: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Jul 13, 2026 | Completed final sign-off Jul 2026 | 550 Battery St | Bay Area Activo Inc. | to address nov#202657962, door closer installation (58).Details
to address nov#202657962, door closer installation (58). | $3,200 |
| Jun 24, 2026 | Completed final sign-off Oct 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 08: rehabilitate existing kitchen and bathroom. no removal of structural walls. replace and relocate washer and dryer.Details
unit 08: rehabilitate existing kitchen and bathroom. no removal of structural walls. replace and relocate washer and dryer. | $60,000 |
| Jun 16, 2026 | In progress issued Jun 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit#: 310: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. no new penetrations into existing concrete elements.Details
unit#: 310: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. no new penetrations into existing concrete elements. | $60,000 |
| Jun 16, 2026 | Completed final sign-off Sep 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 1604: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. no new penetrations into existing concrete elements.Details
unit 1604: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. no new penetrations into existing concrete elements. | $60,000 |
| Jun 11, 2026 | Completed final sign-off Sep 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit#: 1910: rehabitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. no new penetrations into existing concrete elements.Details
unit#: 1910: rehabitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. no new penetrations into existing concrete elements. | $60,000 |
| May 19, 2026 | Completed final sign-off Jul 2026 | 550 Battery St | Giampolini & Co Dba Giampolini/Courtney | survery concrete patching and crack repairs at exterior walls and balconies. patching will be compelted at different levels of to exterior building elevationDetails
survery concrete patching and crack repairs at exterior walls and balconies. patching will be compelted at different levels of to exterior building elevation | $45,838 |
| May 14, 2026 | Completed final sign-off Jun 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit#: 811: one kitchen, two bedroom remodel in kind. like for like.Details
unit#: 811: one kitchen, two bedroom remodel in kind. like for like. | $60,000 |
| Apr 28, 2026 | Completed final sign-off Jun 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 1905: rehablitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls.Details
unit 1905: rehablitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. | $60,000 |
| Apr 28, 2026 | Completed final sign-off Jun 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 1520: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls.Details
unit 1520: rehabilitate existing kitchen and bathroom. install washer and dryer. no removal of structural walls. | $60,000 |
| Apr 23, 2026 | In progress issued Sep 2026 | 550 Battery St | City Building Inc. | 1/f: t.i include interior re-finishes of existing resid. tower main lobby, no change of use occupancy, occ load or egrewss replace in kind new front entry doors. (n) floor covering and all finishes. all (n) or revised mep and life safety work will be design build and submitted sepately.Details
1/f: t.i include interior re-finishes of existing resid. tower main lobby, no change of use occupancy, occ load or egrewss replace in kind new front entry doors. (n) floor covering and all finishes. all (n) or revised mep and life safety work will be design build and submitted sepately. | $315,000 |
| Apr 22, 2026 | In progress issued Jun 2026 | 560 Battery St | Metcon Ti, Inc | combine two commercial suites 560 and 570 to be used as one commercial space. remodel existing b-occupancy spaces into a single b-occupancy gym, add one new accessible bathroom and shower. add shower and secondary restroom, new hvac system, two meditation rooms, locker room and a laundry closet...Details
combine two commercial suites 560 and 570 to be used as one commercial space. remodel existing b-occupancy spaces into a single b-occupancy gym, add one new accessible bathroom and shower. add shower and secondary restroom, new hvac system, two meditation rooms, locker room and a laundry closet... | $639,000 |
| Apr 2, 2026 | Completed final sign-off Jun 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 2216: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit 2216: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Apr 2, 2026 | Completed final sign-off Jun 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | #1418: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
#1418: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Mar 23, 2026 | Completed final sign-off May 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 1404: remodel (e) kitchen and bathroom. no removal of structrual walls. install washer and dryer.Details
unit 1404: remodel (e) kitchen and bathroom. no removal of structrual walls. install washer and dryer. | $60,000 |
| Mar 19, 2026 | Completed final sign-off May 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 2209; rehabitlitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit 2209; rehabitlitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Mar 5, 2026 | Completed final sign-off Apr 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit#316: revision to pa#202601083442, to adjust unit layout to reflect current existing site conditions and dimensionsDetails
unit#316: revision to pa#202601083442, to adjust unit layout to reflect current existing site conditions and dimensions | |
| Feb 26, 2026 | In progress filed Feb 2026, not yet issued | 500 Battery St | ground floor:exterior improvemnts include the replacement of murals/infill panels and restoration of store front glazing to match existing.all new or revised meps and life safety work will be design-build & submitted for permit separately(building not fully sprinklered)included is(enveloope t/24)Details
ground floor:exterior improvemnts include the replacement of murals/infill panels and restoration of store front glazing to match existing.all new or revised meps and life safety work will be design-build & submitted for permit separately(building not fully sprinklered)included is(enveloope t/24) | $28,100 | |
| Feb 12, 2026 | Completed final sign-off Apr 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit#1312: one kitchen, one bathroom,remodel in kind like for likeDetails
unit#1312: one kitchen, one bathroom,remodel in kind like for like | $60,000 |
| Feb 11, 2026 | In progress filed Feb 2026, not yet issued | 205 Jackson St | ground floor:t.i. includes the demo of non-structural partitions & bldg new non-structural partitions. restrooms & lighting. all new or revised mep, life safety work will be design build & submitted for permit seperately.Details
ground floor:t.i. includes the demo of non-structural partitions & bldg new non-structural partitions. restrooms & lighting. all new or revised mep, life safety work will be design build & submitted for permit seperately. | $201,417 | |
| Feb 3, 2026 | Completed final sign-off Apr 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1120/ rahabilitate: (1) kitchen, (1) bathroom remodel no removal of structural walls. install washer and dryer.Details
unit #1120/ rahabilitate: (1) kitchen, (1) bathroom remodel no removal of structural walls. install washer and dryer. | $60,000 |
| Feb 3, 2026 | Completed final sign-off Apr 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #820/ rahabilitate: (1) kitchen, (1) bathroom remodel no removal of structural walls. install washer and dryer.Details
unit #820/ rahabilitate: (1) kitchen, (1) bathroom remodel no removal of structural walls. install washer and dryer. | $60,000 |
| Jan 29, 2026 | Completed final sign-off Apr 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #907: (1) kitchen, (1) bathroom remodel in kind, like for like.Details
unit #907: (1) kitchen, (1) bathroom remodel in kind, like for like. | $60,000 |
| Jan 29, 2026 | Completed final sign-off Apr 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1901: (1) kitchen, (1) bathroom remodel in kind, like for like.Details
unit #1901: (1) kitchen, (1) bathroom remodel in kind, like for like. | $60,000 |
| Jan 26, 2026 | Completed final sign-off Apr 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit#1415: one kitchen, one bathroom remodel in kind, like for likeDetails
unit#1415: one kitchen, one bathroom remodel in kind, like for like | $60,000 |
| Jan 8, 2026 | Completed final sign-off Apr 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit#: 316; rehabiliate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit#: 316; rehabiliate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Jan 8, 2026 | Completed final sign-off Apr 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit#: 1902; rehabiliate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit#: 1902; rehabiliate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Jan 8, 2026 | Completed final sign-off Mar 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit#: 419; rehabiliate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit#: 419; rehabiliate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Jan 6, 2026 | Completed final sign-off Mar 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #35: rehabilitate (e) kitchen and bathroom. relocate washer and dryerDetails
unit #35: rehabilitate (e) kitchen and bathroom. relocate washer and dryer | $60,000 |
| Dec 16, 2025 | In progress issued Dec 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 1511; revision to pa#: 202511048829 to change wash dryer size; modify closet walls, annd ad light and closets.Details
unit 1511; revision to pa#: 202511048829 to change wash dryer size; modify closet walls, annd ad light and closets. | $60,000 |
| Dec 16, 2025 | Completed final sign-off Feb 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit#: 611; rehabiliate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit#: 611; rehabiliate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Dec 11, 2025 | In progress filed Dec 2025, not yet issued | 500 Battery St | 1/f: demo of nonstructural partitions - demo only - ab-017Details
1/f: demo of nonstructural partitions - demo only - ab-017 | $45,513 | |
| Dec 11, 2025 | Completed final sign-off Feb 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 1007; one kitchen, one bathroom remodel in kind like for like. no removal of wallsDetails
unit 1007; one kitchen, one bathroom remodel in kind like for like. no removal of walls | $60,000 |
| Dec 10, 2025 | Completed final sign-off Jan 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 2016- remodel (e) kitchen and bathroom . no removal of sturctural walls.Details
unit 2016- remodel (e) kitchen and bathroom . no removal of sturctural walls. | $60,000 |
| Nov 4, 2025 | Completed final sign-off Jan 2026 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1511: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer.Details
unit #1511: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. | $60,000 |
| Aug 26, 2025 | Completed final sign-off Oct 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1107: rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit #1107: rehabilitate existing kitchen and bathroom. no removal of structural walls | $60,000 |
| Jul 29, 2025 | Completed final sign-off Oct 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit # 1908: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit # 1908: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Jul 17, 2025 | Completed final sign-off Sep 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1012: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit #1012: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Jul 17, 2025 | Completed final sign-off Sep 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1108: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit #1108: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Jul 10, 2025 | Completed final sign-off Sep 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #814: rehabilitate existing kitchen and bathroom in kind. no removal of structural walls.Details
unit #814: rehabilitate existing kitchen and bathroom in kind. no removal of structural walls. | $60,000 |
| Jul 10, 2025 | Completed final sign-off Sep 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #2218: rehabilitate existing kitchen and bathroom in kind. demo existing closet. no removal of structural walls.Details
unit #2218: rehabilitate existing kitchen and bathroom in kind. demo existing closet. no removal of structural walls. | $60,000 |
| Jun 12, 2025 | Completed final sign-off Aug 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #707 rehabilitate (e) kitchen and bathroom. no removal of strcutural wallsDetails
unit #707 rehabilitate (e) kitchen and bathroom. no removal of strcutural walls | $60,000 |
| May 22, 2025 | Completed final sign-off Jul 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | #1620: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
#1620: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| May 22, 2025 | Completed final sign-off Jul 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | #1814: rehabilitate existing kitchen and bathroom. no removal of structural walls. install new washer and dryer.Details
#1814: rehabilitate existing kitchen and bathroom. no removal of structural walls. install new washer and dryer. | $60,000 |
| May 20, 2025 | In progress filed May 2025, not yet issued | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit # 1220: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit # 1220: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| May 12, 2025 | Completed final sign-off Jul 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1212: rehabilitate (e) kitchen and bathroom. no removal of structural walls.Details
unit #1212: rehabilitate (e) kitchen and bathroom. no removal of structural walls. | $60,000 |
| May 12, 2025 | Completed final sign-off Jul 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1220: rehabilitate (e) kitchen and bathroom. no removal of structural walls.Details
unit #1220: rehabilitate (e) kitchen and bathroom. no removal of structural walls. | $60,000 |
| Apr 30, 2025 | Completed final sign-off Jun 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #601 rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit #601 rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Apr 30, 2025 | Completed final sign-off Jul 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #519 rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit #519 rehabilitate existing kitchen and bathroom. no removal of structural walls | $60,000 |
| Apr 17, 2025 | Completed final sign-off Jul 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #414: rehabilitate (e) kitchen and bathroom. no removal of structural walls. install washer & dryerDetails
unit #414: rehabilitate (e) kitchen and bathroom. no removal of structural walls. install washer & dryer | $60,000 |
| Apr 10, 2025 | Completed final sign-off Oct 2025 | 550 Battery St | Lynn Safety Inc. | installing rooftop equipment for exterior building maintenanceDetails
installing rooftop equipment for exterior building maintenance | $22,177 |
| Apr 10, 2025 | Completed final sign-off Jun 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #2206- remodel (e) kitchen and bathroom. no removal of structrual wallsDetails
unit #2206- remodel (e) kitchen and bathroom. no removal of structrual walls | $60,000 |
| Mar 27, 2025 | Completed final sign-off Jul 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit#1716: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit#1716: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Mar 27, 2025 | Completed final sign-off May 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 705: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 705: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Mar 6, 2025 | Completed final sign-off May 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 516: rehabilitate e kitchen and bath. no removal of structural walls. install washer dryer.Details
unit 516: rehabilitate e kitchen and bath. no removal of structural walls. install washer dryer. | $60,000 |
| Mar 4, 2025 | Completed final sign-off May 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | 6th/fl: unit# 615 rehabilitate existing kitchen and bathroom. no rem.oval structural wallsDetails
6th/fl: unit# 615 rehabilitate existing kitchen and bathroom. no rem.oval structural walls | $60,000 |
| Mar 4, 2025 | Completed final sign-off May 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | 5th/fl: unit# 517 rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
5th/fl: unit# 517 rehabilitate existing kitchen and bathroom. no removal of structural walls | $60,000 |
| Feb 6, 2025 | Completed final sign-off Mar 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit#512 (5/fl) rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit#512 (5/fl) rehabilitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Feb 4, 2025 | Completed final sign-off Mar 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 508: rehabilitation e) kitchen & bathroom. no removal of structural wallsDetails
unit 508: rehabilitation e) kitchen & bathroom. no removal of structural walls | $60,000 |
| Feb 4, 2025 | Completed final sign-off Mar 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 412 - rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit 412 - rehabilitate existing kitchen and bathroom. no removal of structural walls | $60,000 |
| Feb 4, 2025 | Completed final sign-off Mar 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 1907: rehabilitation e) kitchen & bathroom. no removal of structural wallsDetails
unit 1907: rehabilitation e) kitchen & bathroom. no removal of structural walls | $60,000 |
| Jan 7, 2025 | Completed final sign-off Feb 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #305: rehabilitate (e) kitchen and bathroom no removal of structurl wallsDetails
unit #305: rehabilitate (e) kitchen and bathroom no removal of structurl walls | $60,000 |
| Dec 12, 2024 | Completed final sign-off Feb 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 1219- rehabitate (e) kitchen and bathroom. no removal of walls.Details
unit 1219- rehabitate (e) kitchen and bathroom. no removal of walls. | $60,000 |
| Dec 12, 2024 | In progress issued Dec 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 1118- remodel (e) kitchen adn bathroom . no removal of walls.Details
unit 1118- remodel (e) kitchen adn bathroom . no removal of walls. | $60,000 |
| Dec 3, 2024 | Completed final sign-off Feb 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 304- remodel (e) kitchen and bathroom no removal of strutuctral wallsDetails
unit 304- remodel (e) kitchen and bathroom no removal of strutuctral walls | $60,000 |
| Dec 3, 2024 | Completed final sign-off Feb 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 306- remodel (e) kitchen and bathroom no removal of strutuctral wallsDetails
unit 306- remodel (e) kitchen and bathroom no removal of strutuctral walls | $60,000 |
| Nov 26, 2024 | Completed final sign-off Jan 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #311: rehabilitate (e) kitchen and bathroom no removal of structurl wallsDetails
unit #311: rehabilitate (e) kitchen and bathroom no removal of structurl walls | $60,000 |
| Nov 21, 2024 | Completed final sign-off Feb 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 3: rehabilitate (e) kitchen & bathroom. no removal of structural wallsDetails
unit 3: rehabilitate (e) kitchen & bathroom. no removal of structural walls | $60,000 |
| Nov 19, 2024 | Completed final sign-off Feb 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 1805: rehabilitate e) kitchen & bathroom. no removal of structural wallsDetails
unit 1805: rehabilitate e) kitchen & bathroom. no removal of structural walls | $60,000 |
| Nov 7, 2024 | In progress issued Nov 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 309: rehabilitate e) kitchen & bathroom. no removal of structural wallsDetails
unit 309: rehabilitate e) kitchen & bathroom. no removal of structural walls | $60,000 |
| Nov 7, 2024 | Completed final sign-off Feb 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 415: rehabilitate e) kitchen & bathroom. no removal of structural wallsDetails
unit 415: rehabilitate e) kitchen & bathroom. no removal of structural walls | $60,000 |
| Oct 29, 2024 | Completed final sign-off Jun 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 916- remodel (e) kitchen and bathroom. no removal of wallsDetails
unit 916- remodel (e) kitchen and bathroom. no removal of walls | $60,000 |
| Oct 24, 2024 | Completed final sign-off Jan 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 1016 rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit 1016 rehabilitate existing kitchen and bathroom. no removal of structural walls | $50,000 |
| Oct 24, 2024 | Completed final sign-off Jun 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 1818 rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit 1818 rehabilitate existing kitchen and bathroom. no removal of structural walls | $60,000 |
| Oct 22, 2024 | Completed final sign-off Jun 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit # 1612: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer & dryer.Details
unit # 1612: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer & dryer. | $60,000 |
| Oct 22, 2024 | Completed final sign-off Jun 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1710 rehabilitate (e) kitchen & bathroom. no removal of structural wallsDetails
unit #1710 rehabilitate (e) kitchen & bathroom. no removal of structural walls | $60,000 |
| Oct 22, 2024 | Completed final sign-off Jan 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | 21st flr. unit#: 2102. rehabitate existing kitchen and bathroom. no removal of structural walls.Details
21st flr. unit#: 2102. rehabitate existing kitchen and bathroom. no removal of structural walls. | $60,000 |
| Oct 22, 2024 | Completed final sign-off Dec 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1203 rehabilitate (e) kitchen & bathroom. no removal of structural wallsDetails
unit #1203 rehabilitate (e) kitchen & bathroom. no removal of structural walls | $60,000 |
| Sep 26, 2024 | Completed final sign-off Nov 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1013: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit #1013: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $50,000 |
| Sep 11, 2024 | Completed final sign-off May 2025 | 550 Battery St | G Legarte Construction | replace existing fencing, repair rellises slats (all work in kind)Details
replace existing fencing, repair rellises slats (all work in kind) | $175,000 |
| Sep 3, 2024 | Completed final sign-off Jun 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1717 rehabilitate existing kitchen & bathroom. no removal of structural wallsDetails
unit #1717 rehabilitate existing kitchen & bathroom. no removal of structural walls | $50,000 |
| Aug 9, 2024 | Completed final sign-off Jun 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 1615 - rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit 1615 - rehabilitate existing kitchen and bathroom. no removal of structural walls | $50,000 |
| Aug 9, 2024 | Completed final sign-off Oct 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 2019 - rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit 2019 - rehabilitate existing kitchen and bathroom. no removal of structural walls | $50,000 |
| Jul 5, 2024 | Expired or cancelled withdrawn Aug 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit # 1908: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit # 1908: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $50,000 |
| Jul 2, 2024 | Completed final sign-off Oct 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | apt 905: rehab (e) kitchen and bathroom. no remoal of structural walls.Details
apt 905: rehab (e) kitchen and bathroom. no remoal of structural walls. | $50,000 |
| Jun 10, 2024 | Completed final sign-off Oct 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1904: rehab (e) kitchen and bathroom. no removal of structural walls. add washer/dryer.Details
unit #1904: rehab (e) kitchen and bathroom. no removal of structural walls. add washer/dryer. | $50,000 |
| Jun 10, 2024 | Completed final sign-off Aug 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #2115: rehab (e) kitchen and bathroom. no removal of structural walls.Details
unit #2115: rehab (e) kitchen and bathroom. no removal of structural walls. | $50,000 |
| Jun 10, 2024 | In progress issued Jun 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1510: rehab (e) kitchen and bathroom. no removal of structural walls. add washer/dryer.Details
unit #1510: rehab (e) kitchen and bathroom. no removal of structural walls. add washer/dryer. | $50,000 |
| May 30, 2024 | Completed final sign-off Oct 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit# 1718 rehabilitate existing kitchen & bathroom. no removal of structural wallsDetails
unit# 1718 rehabilitate existing kitchen & bathroom. no removal of structural walls | $50,000 |
| May 30, 2024 | In progress issued May 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit# 2002 rehabilitate existing kitchen & bathroom. no removal of structural wallsDetails
unit# 2002 rehabilitate existing kitchen & bathroom. no removal of structural walls | $50,000 |
| May 20, 2024 | Completed final sign-off Aug 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit# 2117 rehabilitate existing kitchen & bathroom. no removal of structural walls.Details
unit# 2117 rehabilitate existing kitchen & bathroom. no removal of structural walls. | $50,000 |
| May 20, 2024 | Completed final sign-off Aug 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #2014: rehabilitate existing kitchen & bathroom. no removal of structural walls.Details
unit #2014: rehabilitate existing kitchen & bathroom. no removal of structural walls. | $50,000 |
| May 16, 2024 | Completed final sign-off Oct 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 1720: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 1720: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $50,000 |
| May 9, 2024 | In progress issued May 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit# 719: rehabilitate (e) kitchen and bathroom. no removal of structural walls.Details
unit# 719: rehabilitate (e) kitchen and bathroom. no removal of structural walls. | $50,000 |
| May 9, 2024 | Completed final sign-off Oct 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit# 1517: rehabilitate (e) kitchen and bathroom. no removal of structural walls.Details
unit# 1517: rehabilitate (e) kitchen and bathroom. no removal of structural walls. | $50,000 |
| May 2, 2024 | In progress issued May 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit#803: rehabilitate existing kitchen & bathroom. no removal of structural wallDetails
unit#803: rehabilitate existing kitchen & bathroom. no removal of structural wall | $50,000 |
| May 2, 2024 | Completed final sign-off Aug 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit#2003: rehabilitate existing kitchen & bathroom. no removal of structural wallDetails
unit#2003: rehabilitate existing kitchen & bathroom. no removal of structural wall | $50,000 |
| Apr 25, 2024 | Completed final sign-off Oct 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #919: rehabilitate extg kitchen and bathroom. no removal of structural walls.Details
unit #919: rehabilitate extg kitchen and bathroom. no removal of structural walls. | $50,000 |
| Apr 25, 2024 | In progress issued Apr 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1411: revision to pa# 202404089515- convert (e) closet to washer/dryer closet.Details
unit #1411: revision to pa# 202404089515- convert (e) closet to washer/dryer closet. | $10,000 |
| Apr 15, 2024 | In progress issued Apr 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1416: rehabilitate extg kitchen and bathroom. no removal of structural walls.Details
unit #1416: rehabilitate extg kitchen and bathroom. no removal of structural walls. | $50,000 |
| Apr 8, 2024 | In progress issued Apr 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1305: rehabilitate extg kitchen and bathroom. no removal of structural walls.Details
unit #1305: rehabilitate extg kitchen and bathroom. no removal of structural walls. | $50,000 |
| Apr 8, 2024 | In progress issued Apr 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1411: rehabilitate extg kitchen and bathroom. no removal of structural walls.Details
unit #1411: rehabilitate extg kitchen and bathroom. no removal of structural walls. | $50,000 |
| Apr 1, 2024 | Completed final sign-off Aug 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1608 rehabilitate existing kitchen and bathroom remodel. no removal of structural wallsDetails
unit #1608 rehabilitate existing kitchen and bathroom remodel. no removal of structural walls | $50,000 |
| Apr 1, 2024 | In progress issued Apr 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #2105 rehabilitate existing kitchen and bathroom remodel. no removal of structural wallsDetails
unit #2105 rehabilitate existing kitchen and bathroom remodel. no removal of structural walls | $50,000 |
| Apr 1, 2024 | Completed final sign-off Apr 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #608 rehabilitate existing kitchen and bathroom remodel. no removal of structural wallsDetails
unit #608 rehabilitate existing kitchen and bathroom remodel. no removal of structural walls | $50,000 |
| Apr 1, 2024 | Completed final sign-off Aug 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #407 - rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit #407 - rehabilitate existing kitchen and bathroom. no removal of structural walls | $50,000 |
| Apr 1, 2024 | Completed final sign-off Oct 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1115 rehabilitate existing kitchen and bathroom remodel. no removal of structural wallsDetails
unit #1115 rehabilitate existing kitchen and bathroom remodel. no removal of structural walls | $50,000 |
| Apr 1, 2024 | In progress issued Apr 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1405 rehabilitate existing kitchen and bathroom remodel. no removal of structural wallsDetails
unit #1405 rehabilitate existing kitchen and bathroom remodel. no removal of structural walls | $50,000 |
| Apr 1, 2024 | Completed final sign-off Aug 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #1006 - rehabilitate existing kitchen and bathroom. no removal of structural wallsDetails
unit #1006 - rehabilitate existing kitchen and bathroom. no removal of structural walls | $50,000 |
| Mar 25, 2024 | Completed final sign-off Aug 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 806- remodel (e) kitchen and bathroom. removal of kitchen wallDetails
unit 806- remodel (e) kitchen and bathroom. removal of kitchen wall | $50,000 |
| Mar 25, 2024 | In progress issued Mar 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 1106- remodel (e) kitchen and bathroom. removal of kitchen wallDetails
unit 1106- remodel (e) kitchen and bathroom. removal of kitchen wall | $50,000 |
| Mar 25, 2024 | Completed final sign-off Oct 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 505- remodel (e) kitchen and bathroom. removal of kitchen wallDetails
unit 505- remodel (e) kitchen and bathroom. removal of kitchen wall | $50,000 |
| Mar 25, 2024 | Completed final sign-off Aug 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 2104- remodel (e) kitchen and bathroom. removal of kitchen wallDetails
unit 2104- remodel (e) kitchen and bathroom. removal of kitchen wall | $50,000 |
| Feb 28, 2024 | Completed final sign-off Sep 2025 | 550 Battery St | Commercial Fire Protection Llc | upgrade (e) fire alarm devices to be replaced to include manuel pull stations & smoke detectors. (e) bells to be replaced with horn/strobes & strobes. units to have 520hz low-frequency audibles installed. fire alarm control panel shall be monitored with a starlink 24v cell gms-sole path communicatioDetails
upgrade (e) fire alarm devices to be replaced to include manuel pull stations & smoke detectors. (e) bells to be replaced with horn/strobes & strobes. units to have 520hz low-frequency audibles installed. fire alarm control panel shall be monitored with a starlink 24v cell gms-sole path communicatio | $180,000 |
| Feb 26, 2024 | Completed final sign-off May 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit # 1508; rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
unit # 1508; rehabilitate (e) kitchen and bathroom, no removal of structural walls | $50,000 |
| Feb 26, 2024 | Completed final sign-off May 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit # 1315; rehabilitate (e) kitchen and bathroom, no removal of structural wallsDetails
unit # 1315; rehabilitate (e) kitchen and bathroom, no removal of structural walls | $50,000 |
| Feb 2, 2024 | Completed final sign-off Apr 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit# 602: rehabilitate (e) kitchen and bathroom. no removal of structural walls.Details
unit# 602: rehabilitate (e) kitchen and bathroom. no removal of structural walls. | $50,000 |
| Jan 30, 2024 | Completed final sign-off Apr 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit# 1408: rehabilitate (e) kitchen and bathroom. no removal of structural walls.Details
unit# 1408: rehabilitate (e) kitchen and bathroom. no removal of structural walls. | $50,000 |
| Jan 16, 2024 | Completed final sign-off Apr 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 1406: rehabilitate existing kitchen and bath. no removal of structural walls.Details
unit 1406: rehabilitate existing kitchen and bath. no removal of structural walls. | $50,000 |
| Dec 26, 2023 | Completed final sign-off Mar 2025 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit# 708: remove and replace cabinets, sinks, counters, faucets, tub and tile at kitchen and bath.Details
unit# 708: remove and replace cabinets, sinks, counters, faucets, tub and tile at kitchen and bath. | $50,000 |
| Dec 26, 2023 | Completed final sign-off Mar 2024 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit# 816 remove and replace cabiinets, sinks, counters, faucets, tub and tile at kitchen and bathDetails
unit# 816 remove and replace cabiinets, sinks, counters, faucets, tub and tile at kitchen and bath | $50,000 |
| Nov 30, 2023 | Completed final sign-off Dec 2023 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | #1810: rehab (e) kitchen and bathroom. no removal of structural walls.Details
#1810: rehab (e) kitchen and bathroom. no removal of structural walls. | $60,000 |
| Nov 21, 2023 | Completed final sign-off Dec 2024 | 550 Battery St | Plant Construction Co, Lp | voluntarily upgrade structurally to increase capacity of reinf conc transfer bms at lvl 3 in long. direction and reinf conc sw in transverse direction at lvl 3 to 6. str is not being brought into compliance w/ current code. the objective is collapse prevention at the 475-year eq per asce 41-17Details
voluntarily upgrade structurally to increase capacity of reinf conc transfer bms at lvl 3 in long. direction and reinf conc sw in transverse direction at lvl 3 to 6. str is not being brought into compliance w/ current code. the objective is collapse prevention at the 475-year eq per asce 41-17 | $5,000,000 |
| Nov 17, 2023 | In progress issued Dec 2023 | 201 Jackson St | A Bit Of Character Remodeling And Renova | space a: construct full wall in gallery under temporary use authorization. this permit does not establish the use/occupancy. temporary use as gallery under the vacant to vibrant program.Details
space a: construct full wall in gallery under temporary use authorization. this permit does not establish the use/occupancy. temporary use as gallery under the vacant to vibrant program. | $5,000 |
| Aug 28, 2023 | Completed final sign-off Nov 2023 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit 1906: rehabilitate existing kitchen and bathroom. no removal of structural walls.Details
unit 1906: rehabilitate existing kitchen and bathroom. no removal of structural walls. | $40,000 |
| Jun 12, 2023 | Completed final sign-off Sep 2023 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | for unit #605 - 6th fl: revise pa# 202304196013 revise kitchen layout.Details
for unit #605 - 6th fl: revise pa# 202304196013 revise kitchen layout. | $6,000 |
| Apr 21, 2023 | Completed final sign-off Jun 2023 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | #418: rehabilitate existing kitchen, rehabiliate existing bathroom. no removal of structural walls.Details
#418: rehabilitate existing kitchen, rehabiliate existing bathroom. no removal of structural walls. | $50,000 |
| Apr 21, 2023 | Completed final sign-off Jul 2023 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit #817-20/f: rehabilitate existing kitchen, rehabiliate existing bathroom. no removal of structural walls.Details
unit #817-20/f: rehabilitate existing kitchen, rehabiliate existing bathroom. no removal of structural walls. | $50,000 |
| Apr 20, 2023 | Completed final sign-off Jun 2023 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | #618 - rehabilitate (e) kitchen, rehabilitate (e) bathroom, no removal of structural wallsDetails
#618 - rehabilitate (e) kitchen, rehabilitate (e) bathroom, no removal of structural walls | $50,000 |
| Apr 20, 2023 | Completed final sign-off Jun 2023 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | #603. rehabilitate existing kitchen, rehabiliate existing bathroom. no removal of structural walls.Details
#603. rehabilitate existing kitchen, rehabiliate existing bathroom. no removal of structural walls. | $50,000 |
| Apr 19, 2023 | Completed final sign-off May 2023 | 550 Battery St | Camp Roofing Ltd Dba Camp Construction | unit# 605: rehabilitate existing kitchen and bathroom, no removal of structural walls.Details
unit# 605: rehabilitate existing kitchen and bathroom, no removal of structural walls. | $50,000 |
| Jan 26, 2023 | Completed final sign-off May 2023 | 550 Battery St | Axel8 Construction | unit 1618 - rehabilitate (e) kitchen & (e) bathroom; no removal of structural walls. no structural work proposedDetails
unit 1618 - rehabilitate (e) kitchen & (e) bathroom; no removal of structural walls. no structural work proposed | $36,000 |
| Jan 26, 2023 | Completed final sign-off May 2023 | 550 Battery St | Axel8 Construction | unit 1414: rehabilitate (e) kitchen and bathroom. no removal of structural walls. no structural work.Details
unit 1414: rehabilitate (e) kitchen and bathroom. no removal of structural walls. no structural work. | $36,000 |
| Jan 26, 2023 | Completed final sign-off May 2023 | 550 Battery St | Axel8 Construction | unit 2004: rehabilitate (e) kitchen and bathroom. no removal of structural walls. no structural work.Details
unit 2004: rehabilitate (e) kitchen and bathroom. no removal of structural walls. no structural work. | $36,000 |
| Sep 22, 2022 | Completed final sign-off Dec 2022 | 550 Battery St | Axel8 Construction | unit 1313 - rehabilitate (e) kitchen and bathroom; no removal of structural walls and no structural work is proposedDetails
unit 1313 - rehabilitate (e) kitchen and bathroom; no removal of structural walls and no structural work is proposed | $20,000 |
| Sep 21, 2022 | Completed final sign-off Dec 2022 | 550 Battery St | Axel8 Construction | unit #2204: rehabilitate (e) kitchen & (e) bathroom. no removal of structural walls. no structural work is proposed.cDetails
unit #2204: rehabilitate (e) kitchen & (e) bathroom. no removal of structural walls. no structural work is proposed.c | $15,000 |
| Mar 11, 2022 | Completed final sign-off Jun 2022 | 550 Battery St | Axel8 Construction | unit# 1912 - rehab kitchen, bathroom. no removal of structural walls. no structural work proposed.Details
unit# 1912 - rehab kitchen, bathroom. no removal of structural walls. no structural work proposed. | $34,000 |
| Jul 8, 2021 | Completed final sign-off Sep 2021 | 550 Battery St | Axel8 Construction | unit 1420: rehabilitate (e) (1) kitchen, rehabilitate (e) (1) bathroom. non-structuralDetails
unit 1420: rehabilitate (e) (1) kitchen, rehabilitate (e) (1) bathroom. non-structural | $30,000 |
| Oct 28, 2020 | Completed final sign-off Mar 2025 | 550 Battery St | C B F Inc | bldg#1: mechanical + electrical. replacement of existing motor control centers (mcc) located in vista west bldg 1. the mcc replacement shall involve modifications of existing hvac equipment to supply integral motor starters or veds as required.Details
bldg#1: mechanical + electrical. replacement of existing motor control centers (mcc) located in vista west bldg 1. the mcc replacement shall involve modifications of existing hvac equipment to supply integral motor starters or veds as required. | $25,000 |
| Sep 23, 2020 | Expired or cancelled cancelled Jul 2024 | 500 Battery St | minor finish+lighting upgrade to the arcade of (e) build.replacment non-original(e)scones with globe scones that reflects original light fixtrue; barrier removal by means of replacement of a mix of(e)retail stroefront doors with(n)doors; infill walls below(e)exterior stairs. new mosaic accent tile.Details
minor finish+lighting upgrade to the arcade of (e) build.replacment non-original(e)scones with globe scones that reflects original light fixtrue; barrier removal by means of replacement of a mix of(e)retail stroefront doors with(n)doors; infill walls below(e)exterior stairs. new mosaic accent tile. | $60,000 | |
| Dec 23, 2019 | Never finaled issued Jan 2020, no final | 570 Battery St | street spaceDetails
street space | ||
| Dec 5, 2019 | Never finaled issued Dec 2019, no final | 570 Battery St | G A Higgins, Inc | revision to pa 2019-1118-7561 remove requirement "no ceiling work under this permit"Details
revision to pa 2019-1118-7561 remove requirement "no ceiling work under this permit" | |
| Nov 18, 2019 | Completed final sign-off May 2022 | 570 Battery St | G A Higgins, Inc | 1/f: demo (e) tenant improvement, protect structural components & fire rated separation partitions. maher ord 155-13 na. remain vacancy under ab-017. no ceiling demo workDetails
1/f: demo (e) tenant improvement, protect structural components & fire rated separation partitions. maher ord 155-13 na. remain vacancy under ab-017. no ceiling demo work | $20,000 |
| Aug 15, 2019 | Completed final sign-off Oct 2019 | 550 Battery St | Ayoob & Peery Plumbing Co Inc | floors & basement, 3,5,6,7,11,13,15,17,19,21, & 22. connect sprinkler piping from (e) water service to new trash chute. new trash sprinklers have been provided and installed by the manufacturer. sprinkler water supply is from (e) domestic water system. add 1 sprinkler per fl. ref pa #201901241120.Details
floors & basement, 3,5,6,7,11,13,15,17,19,21, & 22. connect sprinkler piping from (e) water service to new trash chute. new trash sprinklers have been provided and installed by the manufacturer. sprinkler water supply is from (e) domestic water system. add 1 sprinkler per fl. ref pa #201901241120. | $6,300 |
| Jan 24, 2019 | Completed final sign-off Nov 2019 | 550 Battery St | C B 2 Builders Incorporated | maintenance repair - replace (e)trash chute with new discharge door and chute from 1st thru 22nd fls. remove (e) non-structural partitions as reqiured, construct new partition, replace in kind. maher n/a.Details
maintenance repair - replace (e)trash chute with new discharge door and chute from 1st thru 22nd fls. remove (e) non-structural partitions as reqiured, construct new partition, replace in kind. maher n/a. | $65,000 |
| Dec 14, 2018 | Never finaled issued Jun 2019, no final | 550 Battery St | Commercial Fire Protection Inc | new speaker in every bedroom to meet 75 dba requirement (398 total new speakers).per owner's request this work is done by a diffrent contarctor per previously approved fa permit # 2018-0226-2180Details
new speaker in every bedroom to meet 75 dba requirement (398 total new speakers).per owner's request this work is done by a diffrent contarctor per previously approved fa permit # 2018-0226-2180 | $177,000 |
| Feb 26, 2018 | Never finaled issued Feb 2018, no final | 550 Battery St | Tri-Signal Integration Inc. | fa ti includes: upgrade residential units at 550 battery to meet sound level required by nfpa-72 p.18.4.1 per meeting minutes from 9/13/17. install 378 speakers in sleeping area. readjust speakers in each one and multi bedroom units; n/a maherDetails
fa ti includes: upgrade residential units at 550 battery to meet sound level required by nfpa-72 p.18.4.1 per meeting minutes from 9/13/17. install 378 speakers in sleeping area. readjust speakers in each one and multi bedroom units; n/a maher | $240,000 |
| Sep 26, 2017 | Expired or cancelled cancelled Jan 2026 | 165 Jackson St | Mina-Tree Signs, Inc | instll 1 illuminated wall sign for wells fargo atm maher not reqDetails
instll 1 illuminated wall sign for wells fargo atm maher not req | $3,000 |
| Sep 26, 2017 | Expired or cancelled cancelled Jan 2026 | 165 Jackson St | Mina-Tree Signs, Inc | painted awning on sign maher not reqDetails
painted awning on sign maher not req | $7,500 |
| Sep 26, 2017 | Expired or cancelled cancelled Jan 2026 | 165 Jackson St | Mina-Tree Signs, Inc | install 1 non illuminated awning 1'9 h 5' wx 3'6 d with painted sign under sep permitDetails
install 1 non illuminated awning 1'9 h 5' wx 3'6 d with painted sign under sep permit | $7,500 |
| Sep 1, 2017 | Completed final sign-off Nov 2018 | 165 Jackson St | Wfp Construction, Llc | remove 2 chase atms, remove existing awning,install 2 new well fargo atm's.run new conduct canduit cat -5, alarm, camera wire, run 30 amp & 20 amp install (3) new wall pack lights. hop for new atm 48"Details
remove 2 chase atms, remove existing awning,install 2 new well fargo atm's.run new conduct canduit cat -5, alarm, camera wire, run 30 amp & 20 amp install (3) new wall pack lights. hop for new atm 48" | $16,000 |
| Jun 27, 2017 | Completed final sign-off Jul 2017 | 550 Battery St | C B 2 Builders Incorporated | maintenance & repair, responding to nov #201780471, item #4. remove (e) non-structural partition for maintenance & repair of trash chute, construct new partitions, replace in kind.Details
maintenance & repair, responding to nov #201780471, item #4. remove (e) non-structural partition for maintenance & repair of trash chute, construct new partitions, replace in kind. | $8,500 |
| Jun 29, 2012 | Never finaled issued Jul 2012, no final | 165 Jackson St | Signtech Electrical Advertising Inc. | install (1) sunscreen w/ logo sign for "chase"Details
install (1) sunscreen w/ logo sign for "chase" | $4,000 |
| Mar 19, 2012 | Expired or cancelled cancelled Jan 2026 | 165 Jackson St | Signtech Electrical Advertising Inc. | install (1) sunscreen (99'hx177"w) and attach to (e) support posts; re-cover (e) awning with new materials.Details
install (1) sunscreen (99'hx177"w) and attach to (e) support posts; re-cover (e) awning with new materials. | $6,000 |
| Mar 19, 2012 | Completed final sign-off Oct 2012 | 165 Jackson St | Signtech Electrical Advertising Inc. | install (1) illuminted wall sign on atm sunscreen and install (2) illuminated atm wall sign for "chase".Details
install (1) illuminted wall sign on atm sunscreen and install (2) illuminated atm wall sign for "chase". | $4,000 |
| Dec 14, 2011 | Completed final sign-off May 2012 | 500 Battery St | Glen-Crete Products, Inc. | to comply with complaint #201168774- install cross-traffix metal barriers for cane detection and overhead hazard area underneath an existing exterior stairs only.Details
to comply with complaint #201168774- install cross-traffix metal barriers for cane detection and overhead hazard area underneath an existing exterior stairs only. | $1,500 |
| Jul 29, 2011 | Completed final sign-off May 2012 | 550 Battery St | Pyro-Comm Systems, Inc. | roof level-add 1 relay module for elevator hat flashDetails
roof level-add 1 relay module for elevator hat flash | $3,000 |
| Jul 9, 2009 | Never finaled issued Jul 2009, no final | 550 Battery St | street space & mtaDetails
street space & mta | ||
| Jun 25, 2009 | Completed final sign-off Jul 2009 | 500 Battery St | Sign Productions Inc.(Grant Sign Co) | to obtain final inspection for work competed under pa #200804180080, all work has been completed.Details
to obtain final inspection for work competed under pa #200804180080, all work has been completed. | |
| Jun 4, 2009 | Completed final sign-off Jan 2010 | 550 Battery St | Tri-Signal Integration Inc. | add 1 duct detector to existing fire alarm system.Details
add 1 duct detector to existing fire alarm system. | $1,980 |
| Jun 2, 2009 | Completed final sign-off Sep 2009 | 550 Battery St | The Lawson Roofing Co Inc. | reroofing.Details
reroofing. | $629,416 |
| May 6, 2009 | Completed final sign-off Jun 2009 | 555 Front St | Mc Millan Electric | ground floor - electrical work; install occupancy sensors & occupancy dual level throughout the bldg.Details
ground floor - electrical work; install occupancy sensors & occupancy dual level throughout the bldg. | $60,000 |
| Apr 30, 2009 | Never finaled issued Apr 2009, no final | 555 Front St | Hawk Mechanical Inc | 1st floor -install new fan coil, duct work, grilles & exhaust fan. t.i. appl#200903023166.Details
1st floor -install new fan coil, duct work, grilles & exhaust fan. t.i. appl#200903023166. | $14,400 |
| Apr 9, 2009 | Completed final sign-off Jun 2009 | 555 Front St | Tri-Signal Integration Inc. | 1st floor new fire alarm system includes: (1) fire alarm panel, (1) anunciator, (2) manual pull stations, (6) smoke detectors, (1) horn, (3) horn/strobes, (3) strobes. building in large complex...Details
1st floor new fire alarm system includes: (1) fire alarm panel, (1) anunciator, (2) manual pull stations, (6) smoke detectors, (1) horn, (3) horn/strobes, (3) strobes. building in large complex... | $4,900 |
| Apr 6, 2009 | Completed final sign-off Jun 2010 | 550 Battery St | Marina Mechanical Services | remove extg corridor swap cooler fan unit 30,000 cfm. replace with one energy lab 30,000 cfm. indirect to direct evaporative air handling unit. reconfigure extg electrical, water, condensate and control.Details
remove extg corridor swap cooler fan unit 30,000 cfm. replace with one energy lab 30,000 cfm. indirect to direct evaporative air handling unit. reconfigure extg electrical, water, condensate and control. | $339,480 |
| Mar 2, 2009 | Completed final sign-off Jun 2009 | 555 Front St | Peacock Construction Inc | 1st /fl .office t.i.existing ground floor shell space was demolished under a separate permit. bldg. new interior partition walls and suspended ceiling to create new medical offices treatment rooms and accessible restrooms (mep under separate permit).Details
1st /fl .office t.i.existing ground floor shell space was demolished under a separate permit. bldg. new interior partition walls and suspended ceiling to create new medical offices treatment rooms and accessible restrooms (mep under separate permit). | $200,000 |
| Dec 19, 2008 | Completed final sign-off Jun 2009 | 555 Front St | demolish existing non-structural partition walls, restrooms, ceilings, & mezzanine in the ground floor, retail space per ab-017.Details
demolish existing non-structural partition walls, restrooms, ceilings, & mezzanine in the ground floor, retail space per ab-017. | $15,000 | |
| Oct 7, 2008 | Expired or cancelled expired Aug 2021 | 550 Battery St | Pankow Special Projects Lp | new steel framed + metal panel clad entry canopies at extg concrete arcade to remain. all work within property line. replace extg lt fixture with new. seperate permit for electricalDetails
new steel framed + metal panel clad entry canopies at extg concrete arcade to remain. all work within property line. replace extg lt fixture with new. seperate permit for electrical | $50,000 |
| May 8, 2008 | Expired or cancelled expired May 2011 | 550 Battery St | re-paving 550 battery st plaza, including city sidewalk re-paving, replacement of drainage grates and installation of in-grade lighting fixtures, uplighting w/ be added to existing trees, understory planting w/ be replaced and automated irrigation system will be instaled, seperate lighting electcalDetails
re-paving 550 battery st plaza, including city sidewalk re-paving, replacement of drainage grates and installation of in-grade lighting fixtures, uplighting w/ be added to existing trees, understory planting w/ be replaced and automated irrigation system will be instaled, seperate lighting electcal | $332,820 | |
| Apr 18, 2008 | Expired or cancelled expired Jul 2009 | 500 Battery St | Sign Productions Inc.(Grant Sign Co) | install 2 identical illuminated interior wall signsDetails
install 2 identical illuminated interior wall signs | |
| Apr 15, 2008 | Completed final sign-off May 2008 | 440 Davis Ct | Alpha Restoration & Wateproof | renew pa# 200701111563 for final inspection.Details
renew pa# 200701111563 for final inspection. | |
| Apr 15, 2008 | Completed final sign-off Apr 2008 | 550 Battery St | Alpha Restoration & Wateproof | renew pa#200605121449, #200608250522 for final inspection.Details
renew pa#200605121449, #200608250522 for final inspection. | |
| Feb 6, 2008 | Completed final sign-off May 2009 | 550 Battery St | interior refinishing of existing residential tower main lobby and mezzanine. 2 new front entry doors, new floor coverings, new t-24 compliant lighing and relocate fire alarm main control panel.Details
interior refinishing of existing residential tower main lobby and mezzanine. 2 new front entry doors, new floor coverings, new t-24 compliant lighing and relocate fire alarm main control panel. | $210,000 | |
| Jan 17, 2008 | Completed final sign-off Apr 2008 | 550 Battery St | Roberts And Sons Builders | unit 2220: apartment renovation: remodel kitchen and bathroom, update electrical, install new cabinetry, dishwasher, disposal, alter existing non-bearing wall to create peninsula at kitchen.Details
unit 2220: apartment renovation: remodel kitchen and bathroom, update electrical, install new cabinetry, dishwasher, disposal, alter existing non-bearing wall to create peninsula at kitchen. | $40,000 |
| Aug 25, 2006 | Expired or cancelled expired Apr 2008 | 550 Battery St | Alpha Restoration & Wateproof | rev. to pa#2006/05/12/1449 (permit #1086527) clarification of original scope of work per inspector's reportDetails
rev. to pa#2006/05/12/1449 (permit #1086527) clarification of original scope of work per inspector's report | |
| May 12, 2006 | Completed final sign-off Apr 2008 | 550 Battery St | Alpha Restoration & Wateproof | facade repair to include concrete spall repair, painting, deck coating, sealant replacement. no alterations or additions. repair in kind.Details
facade repair to include concrete spall repair, painting, deck coating, sealant replacement. no alterations or additions. repair in kind. | $700,000 |
| Jan 10, 2006 | Completed final sign-off May 2006 | 556 Battery St | Westridge Builders, Inc. | renew appl#200411129005 for final inspectionDetails
renew appl#200411129005 for final inspection | |
| Jun 24, 2005 | Never finaled issued Jun 2005, no final | 550 Battery St | street spaceDetails
street space | ||
| Dec 30, 2004 | Completed final sign-off Jun 2005 | 560 Battery St | Westridge Builders, Inc. | relocate existing hvac from 556 to 560 battery street; transfer electrical for unit as well as condeDetails
relocate existing hvac from 556 to 560 battery street; transfer electrical for unit as well as conde | $7,000 |
| Dec 30, 2004 | Expired or cancelled expired May 2006 | 556 Battery St | Westridge Builders, Inc. | correction of address only from 560 to 556 battery street- 1 unit was split into 2 . change adress oDetails
correction of address only from 560 to 556 battery street- 1 unit was split into 2 . change adress o | |
| Nov 12, 2004 | Expired or cancelled expired May 2006 | 556 Battery St | Westridge Builders, Inc. | installation of life safety system in suite.comply nov 200454875Details
installation of life safety system in suite.comply nov 200454875 | $9,000 |
| Nov 3, 2004 | Expired or cancelled expired May 2006 | 560 Battery St | Westridge Builders, Inc. | relocate finance counter 3 feet per pa# 2004/05/25/4824.Details
relocate finance counter 3 feet per pa# 2004/05/25/4824. | |
| Oct 4, 2004 | Expired or cancelled expired May 2006 | 556 Battery St | Westridge Builders, Inc. | installation of pre manufactured metal cabinet and piping to accommodate delivery system for nitrousDetails
installation of pre manufactured metal cabinet and piping to accommodate delivery system for nitrous | $2,000 |
| Jun 29, 2004 | Never finaled issued Jun 2004, no final | 550 Battery St | street spaceDetails
street space | ||
| Jun 7, 2004 | Never finaled issued Jun 2004, no final | 556 Battery St | address assignmentDetails
address assignment | ||
| May 25, 2004 | Completed final sign-off May 2006 | 560 Battery St | Westridge Builders, Inc. | construction of dental office to include non-bearing walls/pressured cylander cabnts under seperateDetails
construction of dental office to include non-bearing walls/pressured cylander cabnts under seperate | $190,000 |
| Apr 20, 2004 | Never finaled issued Apr 2004, no final | 550 Battery St | street space/ sidewalk repairDetails
street space/ sidewalk repair | ||
| Feb 11, 2003 | Expired or cancelled expired Nov 2004 | 550 Battery St | Potter Fire Protection | relocate 10 fire sprinklers to accomodate a new wall installation @ bsmnt floor onlyDetails
relocate 10 fire sprinklers to accomodate a new wall installation @ bsmnt floor only | $910 |
Find contractors for work like this