Saiful Islam
- License
- 4803
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- On San Francisco permits
- Jun 2022 to Nov 2023
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Plant Construction Co, Lp (2)
- Architects
- Lisa M Yergovich
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 21, 2023 | Completed final sign-off Dec 2024 | 550 Battery St | Plant Construction Co, Lp | voluntarily upgrade structurally to increase capacity of reinf conc transfer bms at lvl 3 in long. direction and reinf conc sw in transverse direction at lvl 3 to 6. str is not being brought into compliance w/ current code. the objective is collapse prevention at the 475-year eq per asce 41-17Details
voluntarily upgrade structurally to increase capacity of reinf conc transfer bms at lvl 3 in long. direction and reinf conc sw in transverse direction at lvl 3 to 6. str is not being brought into compliance w/ current code. the objective is collapse prevention at the 475-year eq per asce 41-17 | $5,000,000 |
| Jun 28, 2022 | Completed final sign-off Dec 2023 | 440 Davis Ct | Plant Construction Co, Lp | voluntary structural upgrade. work includes frp & concrete jacketing reinforcement. work on floors 3-6. 3rd floor infill opening between gl's i & h and fiber overlay to 3rd floor floor beam. all other work is interior frp & reinforcement. the entire structure is not being brought into complianceDetails
voluntary structural upgrade. work includes frp & concrete jacketing reinforcement. work on floors 3-6. 3rd floor infill opening between gl's i & h and fiber overlay to 3rd floor floor beam. all other work is interior frp & reinforcement. the entire structure is not being brought into compliance | $3,200,000 |