Saiful Islam
- Listed as
- engineer
- On San Francisco permits
- Jun 2022 to Nov 2023
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 21, 2023 | Completed final sign-off Dec 2024 | 550 Battery St | Plant Construction Co, Lp | voluntarily upgrade structurally to increase capacity of reinf conc transfer bms at lvl 3 in long. direction and reinf conc sw in transverse direction at lvl 3 to 6. str is not being brought into compliance w/ current code. the objective is collapse prevention at the 475-year eq per asce 41-17Details
voluntarily upgrade structurally to increase capacity of reinf conc transfer bms at lvl 3 in long. direction and reinf conc sw in transverse direction at lvl 3 to 6. str is not being brought into compliance w/ current code. the objective is collapse prevention at the 475-year eq per asce 41-17 | $5,000,000 |
| Jun 28, 2022 | Completed final sign-off Dec 2023 | 440 Davis Ct | Plant Construction Co, Lp | voluntary structural upgrade. work includes frp & concrete jacketing reinforcement. work on floors 3-6. 3rd floor infill opening between gl's i & h and fiber overlay to 3rd floor floor beam. all other work is interior frp & reinforcement. the entire structure is not being brought into complianceDetails
voluntary structural upgrade. work includes frp & concrete jacketing reinforcement. work on floors 3-6. 3rd floor infill opening between gl's i & h and fiber overlay to 3rd floor floor beam. all other work is interior frp & reinforcement. the entire structure is not being brought into compliance | $3,200,000 |