Warner Schmalz
- Listed as
- architect, authorized agent-others, engineer, pmt consultant/expediter
- Firm
- Forum Design
- Based in
- San Francisco
- On San Francisco permits
- Feb 2004 to Jun 2018
88 permits since 2000 (architect on 85 permits, authorized agent-others on 1 permit, engineer on 1 permit, pmt consultant/expediter on 1 permit): 54 completed, 16 never finaled, 18 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 13, 2018 | Completed final sign-off Nov 2020 | 1601 Mariposa St | building 1 - 1601 mariposa addition, occupied roof deck with added (2) stair case pent house(s), 1 elevator level stop and added (1) level bridge connection between building 1 & 2. use for residents only, amenities for occupants include planters, bbq and seating layoutDetails
building 1 - 1601 mariposa addition, occupied roof deck with added (2) stair case pent house(s), 1 elevator level stop and added (1) level bridge connection between building 1 & 2. use for residents only, amenities for occupants include planters, bbq and seating layout | $200,000 | |
| May 3, 2018 | Completed final sign-off Aug 2020 | 210 Arkansas St | revisions to permitted plans associated with pa #2016-0301-0904 s2 & s3. modify non-vented roof assemblies; removal of water pump room; notes for fire treated wood. elevator hoistway access. maher n/a.Details
revisions to permitted plans associated with pa #2016-0301-0904 s2 & s3. modify non-vented roof assemblies; removal of water pump room; notes for fire treated wood. elevator hoistway access. maher n/a. | ||
| May 3, 2018 | Completed final sign-off Mar 2021 | 1601 Mariposa St | revisions to permitted plans associated with pa #201603031058 s2 & s3. modify non-vented roof assemblies; removal of water pump room; notes for fire treated wood. elevator hoistway access. maher n/a.Details
revisions to permitted plans associated with pa #201603031058 s2 & s3. modify non-vented roof assemblies; removal of water pump room; notes for fire treated wood. elevator hoistway access. maher n/a. | ||
| Feb 23, 2018 | Completed final sign-off Apr 2019 | 4648 Mission St | Paradigm General Contractors | non structural interior ti. new finishes, doors, paritions, \\Details
non structural interior ti. new finishes, doors, paritions, \\ | $220,902 |
| Feb 8, 2018 | Never finaled issued Feb 2018, no final | 1555 Mariposa St | replace certain property line windows on the south wall of 1555 mariposa st, bldg along w/ the recordation of a no-build easement on the related/mariposa development property at 1601 mariposa st, adjacent to the south wall. maher n/aDetails
replace certain property line windows on the south wall of 1555 mariposa st, bldg along w/ the recordation of a no-build easement on the related/mariposa development property at 1601 mariposa st, adjacent to the south wall. maher n/a | $50,000 | |
| Dec 20, 2017 | Expired or cancelled cancelled Dec 2024 | 150 Executive Park Bl | bldg 2. erect a type i&iii twenty story two basement 305 dwelling unit and retail building. maher n/aDetails
bldg 2. erect a type i&iii twenty story two basement 305 dwelling unit and retail building. maher n/a | $25,000,000 | |
| Dec 20, 2017 | Expired or cancelled cancelled Dec 2024 | 100 Executive Park Bl | bldg 8. erect a type i&iii five story two basement 74 dwelling unit and retail building. maher n/aDetails
bldg 8. erect a type i&iii five story two basement 74 dwelling unit and retail building. maher n/a | $25,000,000 | |
| Dec 20, 2017 | Expired or cancelled cancelled Sep 2024 | 250 Executive Park Bl | bldg 7. erect a type i&iii (5) story (3) basement 167 dwelling unit and retail building. maher n/aDetails
bldg 7. erect a type i&iii (5) story (3) basement 167 dwelling unit and retail building. maher n/a | $25,000,000 | |
| Nov 21, 2017 | Expired or cancelled suspend Dec 2017 | 1999 Bryant St | Picone Renovations | establishment of light manufacturing use in (e) 11,653 sf building. no construciton under this permit no final cfc issued until a t/i permit is issued and finaled. maher not reqDetails
establishment of light manufacturing use in (e) 11,653 sf building. no construciton under this permit no final cfc issued until a t/i permit is issued and finaled. maher not req | |
| Oct 20, 2017 | Expired or cancelled withdrawn Jan 2019 | 612 Alabama St | Principal Builders Inc. | core & shell improvement to demo partitions & doors. install new ada hydranlic elevator to accomodate gurney. add fire rated doors, skylights, mechanical & plumbing system improvement. upgrade restrooms & create communicating openning to 600 alabama st to expand t.i. ** maher: n/a **Details
core & shell improvement to demo partitions & doors. install new ada hydranlic elevator to accomodate gurney. add fire rated doors, skylights, mechanical & plumbing system improvement. upgrade restrooms & create communicating openning to 600 alabama st to expand t.i. ** maher: n/a ** | $306,000 |
| Oct 20, 2017 | Expired or cancelled withdrawn Jan 2019 | 600 Alabama St | Principal Builders Inc. | core & shell upgrades to demo & reconstruct stairs, offices & restrooms in (e) tenant space & create communicating opening to 612-614 alabama street for expansion of tenant space. upgrade ada van parking. ** maher: n/a **Details
core & shell upgrades to demo & reconstruct stairs, offices & restrooms in (e) tenant space & create communicating opening to 612-614 alabama street for expansion of tenant space. upgrade ada van parking. ** maher: n/a ** | $154,000 |
| Oct 11, 2017 | Completed final sign-off Feb 2021 | 490 South Van Ness Av | Nibbi Bros Assoc Inc., H & M Fire Protection, Inc. | alter site permit for pa# 2010/10/05/2342-s. change of record. 7 stories, 81 units with partial basement & no parking. a publicly founded 7 story 100% affordable housing residential bldg with ground floor public community flex space. 1 partial basement level for storage & building service. maher:n/aDetails
alter site permit for pa# 2010/10/05/2342-s. change of record. 7 stories, 81 units with partial basement & no parking. a publicly founded 7 story 100% affordable housing residential bldg with ground floor public community flex space. 1 partial basement level for storage & building service. maher:n/a | |
| Jul 7, 2017 | Expired or cancelled withdrawn Nov 2017 | 1999 Bryant St | change of use from an (e) permitted warehouse, fabrication, furniture gallery use to permitted by right event space use. scope of work includes interior t.i. of (n) storefront windows & door systems, (n) unisex bathrms, (n) kitchenette, (n) storage, (n) countertop w/ sink, renovate (e) interiorDetails
change of use from an (e) permitted warehouse, fabrication, furniture gallery use to permitted by right event space use. scope of work includes interior t.i. of (n) storefront windows & door systems, (n) unisex bathrms, (n) kitchenette, (n) storage, (n) countertop w/ sink, renovate (e) interior | $199,990 | |
| Apr 27, 2017 | Completed final sign-off Aug 2018 | 5050 Mission St | James E Roberts-Obayashi Corporation, Westates Mechanical Corporation Inc | revision to approved bldg appl 2010-06-10-4250. for fire sprinkler system only.Details
revision to approved bldg appl 2010-06-10-4250. for fire sprinkler system only. | |
| Apr 27, 2017 | Completed final sign-off Sep 2018 | 5050 Mission St | James E Roberts-Obayashi Corporation | revision to approved bldg appl 2010-06-10-4250. change exterior siding at corners from metal siding to plaster at bay/corner upper floors. no change to ground floors.Details
revision to approved bldg appl 2010-06-10-4250. change exterior siding at corners from metal siding to plaster at bay/corner upper floors. no change to ground floors. | |
| Apr 11, 2017 | Expired or cancelled cancelled Jul 2024 | 2140 Market St | erect a type v-a five story 27 residential and retail building.Details
erect a type v-a five story 27 residential and retail building. | $3,970,000 | |
| Apr 11, 2017 | Expired or cancelled cancelled Jul 2024 | 2140 Market St | demolition of type v one story bar commercial building.Details
demolition of type v one story bar commercial building. | $25,000 | |
| Mar 8, 2017 | Never finaled issued Apr 2018, no final | 582 Market St | City Building Inc. | window replacement only. exterior window replacement in the renovated restrooms in 3rd thru 12th floors. ref pa# 2015/03/27/2142.Details
window replacement only. exterior window replacement in the renovated restrooms in 3rd thru 12th floors. ref pa# 2015/03/27/2142. | $76,100 |
| Feb 15, 2017 | Never finaled issued Apr 2017, no final | 973 Mission St | Rinaldi Construction | rework bldg exterior of 973 mission along minna st to provide a gas meter alcoveDetails
rework bldg exterior of 973 mission along minna st to provide a gas meter alcove | $5,000 |
| Dec 28, 2016 | Completed final sign-off May 2026 | 4135 California St | Seamus Collins Construction, Inc. | demolish a gas stationDetails
demolish a gas station | $10,000 |
| Dec 27, 2016 | Completed final sign-off May 2026 | 4135 California St | Seamus Collins Construction, Inc. | erect 4 stories over 1 basement of 7 dwelling units. type 5 building.Details
erect 4 stories over 1 basement of 7 dwelling units. type 5 building. | $2,800,000 |
| Dec 20, 2016 | Completed final sign-off Aug 2018 | 973 Mission St | Rinaldi Construction | revision to 201605167545 add 1 toilet and urinal in mens restroom on 1st fl. relocate mech shaft to near handicap lift. reverse direction of stair 1. remove partition enclosure at hatch to roof on mezzanine. add mechanicalDetails
revision to 201605167545 add 1 toilet and urinal in mens restroom on 1st fl. relocate mech shaft to near handicap lift. reverse direction of stair 1. remove partition enclosure at hatch to roof on mezzanine. add mechanical | |
| Dec 20, 2016 | Expired or cancelled withdrawn Aug 2018 | 973 Mission St | revision 201605207999 rework exterior window wall on mission st to relocate bldg. entrance to the wall area between grid lines b and c. relocate fire dept connection to the wall area near grid line aDetails
revision 201605207999 rework exterior window wall on mission st to relocate bldg. entrance to the wall area between grid lines b and c. relocate fire dept connection to the wall area near grid line a | ||
| Nov 2, 2016 | Expired or cancelled withdrawn Apr 2018 | 2610 Mission St | demolish roof of (e) one story commercial & build n structure and 4 story wood frame residential vertical addition on top. addition of 8 (n) dwelling units. existing comm'l is vacant retail, new proposed comm'l is designated for local non-profit useDetails
demolish roof of (e) one story commercial & build n structure and 4 story wood frame residential vertical addition on top. addition of 8 (n) dwelling units. existing comm'l is vacant retail, new proposed comm'l is designated for local non-profit use | $4,000,000 | |
| Oct 21, 2016 | Never finaled issued Dec 2018, no final | 1740 Market St | to erect 9 stories of 100 dwelling units--8 stories r-2 over one story commercial. type i-b construction.Details
to erect 9 stories of 100 dwelling units--8 stories r-2 over one story commercial. type i-b construction. | $15,000,000 | |
| Sep 13, 2016 | Completed final sign-off Jan 2017 | 582 Market St | City Building Inc. | shell improvement only. new wood entery door with sidelite. new wall to create elevator lobby. new radiator casework. n drop ceiling. furring frame at all e conc columns. box frame to conceal plumbing pipes. new lighting fixtures. new carpet tiles and solid surface countertopDetails
shell improvement only. new wood entery door with sidelite. new wall to create elevator lobby. new radiator casework. n drop ceiling. furring frame at all e conc columns. box frame to conceal plumbing pipes. new lighting fixtures. new carpet tiles and solid surface countertop | $148,000 |
| Aug 29, 2016 | Never finaled filed Aug 2016, never issued | 2410 Mission St | vertical addition. demolish roof of existing 1-story commercial & build (n) structure & 4-story wood frame residential on top. addition of 8 dwelling units.Details
vertical addition. demolish roof of existing 1-story commercial & build (n) structure & 4-story wood frame residential on top. addition of 8 dwelling units. | $4,000,000 | |
| Aug 29, 2016 | Completed final sign-off Jun 2025 | 2799 24th St | Michael E Gutierrez, Seamus Collins Construction, Inc. | to erect 3 stories, no basement, type va, 4 units residential over 2 commercial tenant space building.Details
to erect 3 stories, no basement, type va, 4 units residential over 2 commercial tenant space building. | $1,440,000 |
| May 20, 2016 | Expired or cancelled expired Feb 2023 | 973 Mission St | demo (e) storefront & construct new one - glazing and doors. change of use and future ti to be performed under sep permit 0516 7545Details
demo (e) storefront & construct new one - glazing and doors. change of use and future ti to be performed under sep permit 0516 7545 | $10,000 | |
| May 16, 2016 | Completed final sign-off Aug 2018 | 973 Mission St | shell improvement only. no change of use. provide new restrooms on all levels. provide new ada lift between 1st floor & mezzanine. provide new exit stairs on all levels.Details
shell improvement only. no change of use. provide new restrooms on all levels. provide new ada lift between 1st floor & mezzanine. provide new exit stairs on all levels. | $500,000 | |
| Apr 1, 2016 | Completed final sign-off Mar 2017 | 1975 Bryant St | Picone Renovations | to comply with bldg inspector's comment on correction required during final inspectn on the bldg permit #201507282683. this permit application was asked to be filed in order to validate minor adjstmnt that were done to the office. comply w/nov #201552741 in combination per app#201507282683. no maharDetails
to comply with bldg inspector's comment on correction required during final inspectn on the bldg permit #201507282683. this permit application was asked to be filed in order to validate minor adjstmnt that were done to the office. comply w/nov #201552741 in combination per app#201507282683. no mahar | |
| Feb 9, 2016 | Completed final sign-off Oct 2016 | 981 Mission St | change of use from vacant retail to retail remaining on ground floor, office use for only for mezzanine and basement. change of use only with addition of class 1 and 2 bicycle parking spaces and baby diaper changing stations only. ab-017 applies.Details
change of use from vacant retail to retail remaining on ground floor, office use for only for mezzanine and basement. change of use only with addition of class 1 and 2 bicycle parking spaces and baby diaper changing stations only. ab-017 applies. | ||
| Dec 3, 2015 | Never finaled issued Dec 2015, no final | 973 Mission St | Rinaldi Construction | ab-017 applies to this permit.interior demo(e)interior features(e)stairs,struc,windows&bldg exterior to remain.(e)elec be removed back to all panels&sub-panels.(e)mech.equip for ventiln,heating&cooling to be removed.remove(e)flr finish to sub-floor,wall finishes.Details
ab-017 applies to this permit.interior demo(e)interior features(e)stairs,struc,windows&bldg exterior to remain.(e)elec be removed back to all panels&sub-panels.(e)mech.equip for ventiln,heating&cooling to be removed.remove(e)flr finish to sub-floor,wall finishes. | $12,000 |
| Nov 24, 2015 | Completed final sign-off May 2016 | 1650 Broadway | Centrix Builders Inc. | minor revision to roof assembly permitted under pa#201203055396Details
minor revision to roof assembly permitted under pa#201203055396 | |
| Oct 13, 2015 | Never finaled issued Oct 2015, no final | 1 Franklin St | Js Sullivan Construction Inc | revision to pa 2009 1203 2516: use parlex panels (hpl) i lieu of cembrit (fiber cement panels) on exterior rain screen per plan.Details
revision to pa 2009 1203 2516: use parlex panels (hpl) i lieu of cembrit (fiber cement panels) on exterior rain screen per plan. | |
| Jul 31, 2015 | Completed final sign-off Jul 2016 | 600 Alabama St | Cross-Cut Const/Mat Dudek | 2nd floor t.i. remodel include new treatment room, add 2 mew exam rooms, 2 new storage rooms, new lounge room, relocate manager office and enlarge the dental room. mep and sprinkler plan under separate permit. maher n/a.Details
2nd floor t.i. remodel include new treatment room, add 2 mew exam rooms, 2 new storage rooms, new lounge room, relocate manager office and enlarge the dental room. mep and sprinkler plan under separate permit. maher n/a. | $250,000 |
| Oct 6, 2014 | Completed final sign-off Oct 2017 | 1302 22nd St | James E Roberts-Obayashi Corporation | to demolish of 2 stories paint shop.Details
to demolish of 2 stories paint shop. | $49,200 |
| Oct 6, 2014 | Completed final sign-off Oct 2017 | 1300 22nd St | James E Roberts-Obayashi Corporation | to demolish 2 stories warehouse, office bldg.Details
to demolish 2 stories warehouse, office bldg. | $70,800 |
| Sep 12, 2014 | Completed final sign-off Sep 2016 | 346 Potrero Av | Build Group Inc. | to demolish 1 story, self-serve car wash building. ** maher: compliance with ordinance no# 155-13 not required **Details
to demolish 1 story, self-serve car wash building. ** maher: compliance with ordinance no# 155-13 not required ** | $13,000 |
| Jun 26, 2014 | Never finaled issued Apr 2016, no final | 2601 Van Ness Av | erect 7-story, 27 dwelling units, residential/r.2, a-2/b/s-2. life safety permits deferred.Details
erect 7-story, 27 dwelling units, residential/r.2, a-2/b/s-2. life safety permits deferred. | $12,000,000 | |
| Apr 10, 2014 | Completed final sign-off Jan 2016 | 760 Harrison St | City Building Inc. | 1st floor interior t.i. - new interior partition, new kitchen & pharmacy cabinets & counter, new kitchen appliances, new electrical outlets & relocation of existing lighting, new wellness center w/new restroom & upgrade to existing accessible restrooms. n/a maher ord 155-13Details
1st floor interior t.i. - new interior partition, new kitchen & pharmacy cabinets & counter, new kitchen appliances, new electrical outlets & relocation of existing lighting, new wellness center w/new restroom & upgrade to existing accessible restrooms. n/a maher ord 155-13 | $350,000 |
| Feb 25, 2014 | Never finaled issued Jul 2016, no final | 259 Roosevelt Wy | demolish 2 stories single family residence.Details
demolish 2 stories single family residence. | $10,000 | |
| Feb 25, 2014 | Completed final sign-off Mar 2018 | 259 Roosevelt Wy | to erect type v, 3-stories, no basement, single family residence.Details
to erect type v, 3-stories, no basement, single family residence. | $500,000 | |
| Nov 20, 2013 | Completed final sign-off Dec 2016 | 346 Potrero Av | Build Group Inc. | to erect 9 stories, 1 basement, of 70 residential, retail, mix use building.Details
to erect 9 stories, 1 basement, of 70 residential, retail, mix use building. | $22,000,000 |
| Jul 3, 2013 | Completed final sign-off Oct 2013 | 1380 Howard St | City Building Inc. | 5th floor tenant space improvement employeeonly cafe. demolish (e) kitchen (no oven) & cafe finishes including t-bar ceiling & vct flooring, install new t-bar ceiling & flooring throughout. install new caseworks, new 3 compartment dish sink, & new electrical circuits for appliances.Details
5th floor tenant space improvement employeeonly cafe. demolish (e) kitchen (no oven) & cafe finishes including t-bar ceiling & vct flooring, install new t-bar ceiling & flooring throughout. install new caseworks, new 3 compartment dish sink, & new electrical circuits for appliances. | $27,000 |
| May 7, 2013 | Completed final sign-off Jul 2015 | 981 Mission St | Rinaldi Construction | repair & upgrade (e) store front, install new exit stair, install new handicap lift, upgrade (e) bathrooms, install new ada baths, install new lighting & electrical & other misc. internal alterations.Details
repair & upgrade (e) store front, install new exit stair, install new handicap lift, upgrade (e) bathrooms, install new ada baths, install new lighting & electrical & other misc. internal alterations. | $200,000 |
| Mar 5, 2012 | Completed final sign-off May 2016 | 1650 Broadway | erect 7 stories, 2 basements, 34 dwelling units, type 1-b building on a vacant lot.Details
erect 7 stories, 2 basements, 34 dwelling units, type 1-b building on a vacant lot. | $14,800,000 | |
| Dec 14, 2011 | Completed final sign-off May 2012 | 500 Battery St | Glen-Crete Products, Inc. | to comply with complaint #201168774- install cross-traffix metal barriers for cane detection and overhead hazard area underneath an existing exterior stairs only.Details
to comply with complaint #201168774- install cross-traffix metal barriers for cane detection and overhead hazard area underneath an existing exterior stairs only. | $1,500 |
| Dec 14, 2011 | Completed final sign-off May 2012 | 200 Washington St | Glen-Crete Products, Inc. | to comply with complaint #201168773- install cross-traffix metal barriers for cane detection and overhead hazard area underneath an existing exterior stairs only.Details
to comply with complaint #201168773- install cross-traffix metal barriers for cane detection and overhead hazard area underneath an existing exterior stairs only. | $1,500 |
| Dec 6, 2011 | Completed final sign-off May 2012 | 100 Washington St | Glen-Crete Products, Inc. | to comply with complaint #201168772- install cross-traffix metal barriers for cane detection and overhead hazard area underneath (2) existing exterior stairs only.Details
to comply with complaint #201168772- install cross-traffix metal barriers for cane detection and overhead hazard area underneath (2) existing exterior stairs only. | $3,000 |
| Aug 11, 2011 | Expired or cancelled withdrawn Jan 2020 | 9 Burnett North Av | erect 4 story two family dwelling house.Details
erect 4 story two family dwelling house. | $650,000 | |
| Jul 26, 2011 | Completed final sign-off Aug 2012 | 2140 Market St | Brian Spiers Construction | new 409 square foot patio. front fence and tool shed on vacant lot. to address nov #201113242. outdoor activity area for adjacent building.Details
new 409 square foot patio. front fence and tool shed on vacant lot. to address nov #201113242. outdoor activity area for adjacent building. | $12,000 |
| Jul 12, 2011 | Completed final sign-off Aug 2012 | 2140 Market St | Brian Spiers Construction | comply with nov#201110541 to legalize door at west property line to adjacent lot. verify existing occupant loadDetails
comply with nov#201110541 to legalize door at west property line to adjacent lot. verify existing occupant load | $1,000 |
| Jun 1, 2011 | Completed final sign-off Sep 2011 | 53 Bluxome St | change of use of partial area of (e) permitted wine production/industrial use (f-1) into a social hall (a-1) assembly. no struction proposed except reverse swing of 1 (e) exit doorDetails
change of use of partial area of (e) permitted wine production/industrial use (f-1) into a social hall (a-1) assembly. no struction proposed except reverse swing of 1 (e) exit door | $2,500 | |
| May 24, 2011 | Never finaled issued Jan 2012, no final | 701 Congo St | to erect 3 stories single family dwelling.Details
to erect 3 stories single family dwelling. | $600,000 | |
| Feb 17, 2011 | Never finaled issued May 2011, no final | 53 Bluxome St | change of use from (e) "retail wine shop" (597.sf.accessory use) to a "wine bar" (597 sf accessory use). no int. constr except bar counter & no change of occupancy or occupancy load. refer dwg. from pa# 2010/06/09/4158 for all disability requirements. refer pa# 2010/12/23/7279 for change of use toDetails
change of use from (e) "retail wine shop" (597.sf.accessory use) to a "wine bar" (597 sf accessory use). no int. constr except bar counter & no change of occupancy or occupancy load. refer dwg. from pa# 2010/06/09/4158 for all disability requirements. refer pa# 2010/12/23/7279 for change of use to | $100 | |
| Jan 19, 2011 | Completed final sign-off Sep 2014 | 888 07th St | R Group, Inc | interior t.i. for 3 (e) story vacant retail spaces ( #r-2-1, #r-2-2, #r-2-3), mep & structural(space 2-2) under separate permit, new ada bathrooms, new partition walls, new floor & wall finishes. no ext. work. fire sprinkler & fire alarm on separate permit.Details
interior t.i. for 3 (e) story vacant retail spaces ( #r-2-1, #r-2-2, #r-2-3), mep & structural(space 2-2) under separate permit, new ada bathrooms, new partition walls, new floor & wall finishes. no ext. work. fire sprinkler & fire alarm on separate permit. | $230,000 |
| Dec 23, 2010 | Never finaled issued Jan 2011, no final | 53 Bluxome St | change of extg office use to new retail wine shop which is an accessory to extg f1-manufacturing use. reference drawing #201006094158 for all disable access requirements.Details
change of extg office use to new retail wine shop which is an accessory to extg f1-manufacturing use. reference drawing #201006094158 for all disable access requirements. | $500 | |
| Jun 10, 2010 | Completed final sign-off Sep 2018 | 5050 Mission St | James E Roberts-Obayashi Corporation | to erect 6 stories, no basement, 61 units of commerical & residential mix used building. includes mep and structural. f/a and sprinklers on separate permit.Details
to erect 6 stories, no basement, 61 units of commerical & residential mix used building. includes mep and structural. f/a and sprinklers on separate permit. | $11,500,000 |
| Dec 3, 2009 | Completed final sign-off Jul 2016 | 1 Franklin St | construction of 8-story 35 dwelling units w/retail & parking.Details
construction of 8-story 35 dwelling units w/retail & parking. | $10,050,000 | |
| Oct 14, 2009 | Completed final sign-off Jan 2013 | 729 Congo St | erect a 4 story single family dwellingDetails
erect a 4 story single family dwelling | $515,585 | |
| Aug 10, 2009 | Completed final sign-off Dec 2009 | 600 Alabama St | Pankow Special Projects Lp | interior ground floor remodel including reworking of existing storage and laundry rooms in two surgry suits with total area of remodel of approximately 930 s.f. scope includes drywall, flooring, patching, cabinetry, sinks, lighting, oxygen oulet relocation, hvac modification mep uner separate permitDetails
interior ground floor remodel including reworking of existing storage and laundry rooms in two surgry suits with total area of remodel of approximately 930 s.f. scope includes drywall, flooring, patching, cabinetry, sinks, lighting, oxygen oulet relocation, hvac modification mep uner separate permit | $74,527 |
| May 20, 2009 | Never finaled issued Mar 2013, no final | 251 Arkansas St | Cullinane Plastering | to demolish 3 story single family dwelling.Details
to demolish 3 story single family dwelling. | $5,000 |
| May 20, 2009 | Completed final sign-off Jun 2015 | 251 Arkansas St | Cullinane Plastering | to erect 3 story, 3 family dwelling over basement garageDetails
to erect 3 story, 3 family dwelling over basement garage | $900,000 |
| Dec 31, 2008 | Completed final sign-off Aug 2009 | 77 Van Ness Av | t.i. to existing commercial space interior partitions, restroom, lighting, mech/heating, relocation of sprinklers. new const approved under 200007175308.Details
t.i. to existing commercial space interior partitions, restroom, lighting, mech/heating, relocation of sprinklers. new const approved under 200007175308. | $9,500 | |
| Dec 16, 2008 | Never finaled issued Dec 2008, no final | 434 Brannan St | interior t.i. on 1st floor of (e) 3-story office bldg. no structural or exterior work. work includes: installation of a new non-bearing partition at (e) elevator lobby. relocation of electrical & lighting as required for new partition.Details
interior t.i. on 1st floor of (e) 3-story office bldg. no structural or exterior work. work includes: installation of a new non-bearing partition at (e) elevator lobby. relocation of electrical & lighting as required for new partition. | $7,500 | |
| Oct 21, 2008 | Completed final sign-off Aug 2009 | 77 Van Ness Av | revision 200007175308s, delete smoke guard doors (3) at elevator s in lobby on ground floor only. no chairs & tables allowed in the lobby 101.Details
revision 200007175308s, delete smoke guard doors (3) at elevator s in lobby on ground floor only. no chairs & tables allowed in the lobby 101. | $1,000 | |
| Oct 8, 2008 | Completed final sign-off Nov 2008 | 2655 Van Ness Av | Joyce Construction, Inc. | install new gate at ground floor commercial entranceDetails
install new gate at ground floor commercial entrance | $5,000 |
| Aug 26, 2008 | Completed final sign-off Jan 2009 | 808 Van Ness Av | remove redundant "smoke guard" assembly at the ground floor elevator lobby. elevator lobby protected by ninety minute fire and smoke door as shown on approved plans w/pa 200409245134s.Details
remove redundant "smoke guard" assembly at the ground floor elevator lobby. elevator lobby protected by ninety minute fire and smoke door as shown on approved plans w/pa 200409245134s. | ||
| Jul 28, 2008 | Expired or cancelled expired Jun 2010 | 642 Harrison St | interior tenant improvement on 2nd floor, no structural or exterior improvements; all plumbing and/or electrical for new shower performed under separate eprmit. work includes installation of new non-bearing walls & alteration of existing non-bearing walls.Details
interior tenant improvement on 2nd floor, no structural or exterior improvements; all plumbing and/or electrical for new shower performed under separate eprmit. work includes installation of new non-bearing walls & alteration of existing non-bearing walls. | $45,000 | |
| Jul 11, 2008 | Completed final sign-off Oct 2008 | 2657 Van Ness Av | Joyce Construction, Inc. | space one - ground floor commercial space tenant improvement.Details
space one - ground floor commercial space tenant improvement. | $120,000 |
| May 12, 2008 | Completed final sign-off Oct 2008 | 88 Howard St | 15th - 23rd floors: electrical only - title 24 requirements for selective units and corridor lighting.Details
15th - 23rd floors: electrical only - title 24 requirements for selective units and corridor lighting. | $30,000 | |
| Apr 30, 2008 | Expired or cancelled cancelled Mar 2009 | 88 Howard St | removal and replacement of stone pavers and sidewalk. refinish and repaint existing glass canopy and new lighting. exterior work only.Details
removal and replacement of stone pavers and sidewalk. refinish and repaint existing glass canopy and new lighting. exterior work only. | $200,000 | |
| Apr 22, 2008 | Never finaled issued May 2008, no final | 88 Howard St | renovation of existing residential lobby. new entrance, finishes, lighting. fire alarm & sprinklers, mechancial & lighting under seperate permit.Details
renovation of existing residential lobby. new entrance, finishes, lighting. fire alarm & sprinklers, mechancial & lighting under seperate permit. | $400,000 | |
| Mar 26, 2008 | Completed final sign-off Oct 2008 | 88 Howard St | non structural remodel 45 units on floors 15-23, new kitchens, bathrooms and finishes. lighting, sprinkler and fire alarm under separate permit.Details
non structural remodel 45 units on floors 15-23, new kitchens, bathrooms and finishes. lighting, sprinkler and fire alarm under separate permit. | $1,350,000 | |
| Jan 14, 2008 | Completed final sign-off Nov 2008 | 88 Howard St | new lighting in unit #709 only. provide new high efficacy fixtures in existing locations.Details
new lighting in unit #709 only. provide new high efficacy fixtures in existing locations. | $1,500 | |
| Dec 3, 2007 | Completed final sign-off Sep 2008 | 1400 Van Ness Av | Sjk Development | g/f, 2nd, 3,4th flr: alter to (e) office space, construct interior partitions, alter to exit stair, ada toilets, mechanical/heating system & electrical panel/systems. increase in floor area of mezz.level on 2/f and classification as floor level. alteration are ref. to previously appl#200705111030.Details
g/f, 2nd, 3,4th flr: alter to (e) office space, construct interior partitions, alter to exit stair, ada toilets, mechanical/heating system & electrical panel/systems. increase in floor area of mezz.level on 2/f and classification as floor level. alteration are ref. to previously appl#200705111030. | $350,000 |
| Nov 16, 2007 | Completed final sign-off Oct 2008 | 88 Howard St | 7th floor - t. i. to units on east wing only. kitchen and bathroom remodel, and replace entry door for the following units: #711-a, #713-b, 715-c, 717-h, 719-f, 721-g. remove architectural furring in public corridor.Details
7th floor - t. i. to units on east wing only. kitchen and bathroom remodel, and replace entry door for the following units: #711-a, #713-b, 715-c, 717-h, 719-f, 721-g. remove architectural furring in public corridor. | $120,000 | |
| Sep 12, 2007 | Completed final sign-off Nov 2008 | 88 Howard St | 7th floor - interior non-strl. remodel of unit #709b. no change to m.e.p., sprinklers or alarm. new kitchen, bath and finishesDetails
7th floor - interior non-strl. remodel of unit #709b. no change to m.e.p., sprinklers or alarm. new kitchen, bath and finishes | $50,000 | |
| Dec 11, 2006 | Expired or cancelled withdrawn Mar 2007 | 2525 California St | revisions to sork under construction 200303180073, 12 tandem parking lifts, remove trash chute, add skylights, revised gas and elc rooms, additonal property line windows, misc revision sprinklers under sep permitDetails
revisions to sork under construction 200303180073, 12 tandem parking lifts, remove trash chute, add skylights, revised gas and elc rooms, additonal property line windows, misc revision sprinklers under sep permit | $125,000 | |
| Nov 1, 2006 | Completed final sign-off Sep 2008 | 2525 Marin St | Collins Construction Inc | revision to (e) issued permit for accessible ramp this rvision describes an accessible lift with upper landing flatform (old permit #2006/05/17/1793) and 36" wide truncated dome along pathway to hc restroom structural work under separate permit barrier removal work only under this permitDetails
revision to (e) issued permit for accessible ramp this rvision describes an accessible lift with upper landing flatform (old permit #2006/05/17/1793) and 36" wide truncated dome along pathway to hc restroom structural work under separate permit barrier removal work only under this permit | $10,000 |
| Jul 5, 2005 | Completed final sign-off Sep 2012 | 421 Arguello Bl | remodel (e) fabrication shop, preserve (e) facade, build 8 units of residential over private garage.Details
remodel (e) fabrication shop, preserve (e) facade, build 8 units of residential over private garage. | $1,500,000 | |
| Jun 28, 2005 | Never finaled issued Jun 2005, no final | 642 Harrison St | provide lighting and electrical work per plan.ref 200408050735.Details
provide lighting and electrical work per plan.ref 200408050735. | $5,000 | |
| Mar 10, 2005 | Completed final sign-off Oct 2009 | 1299 Bush St | to erect 8 stories, 26 dwelling residential & commercial building.Details
to erect 8 stories, 26 dwelling residential & commercial building. | $4,500,000 | |
| Mar 10, 2005 | Completed final sign-off Oct 2009 | 1299 Bush St | Granite Excavation & Demolition Inc | demolish 2 stories commercial / retail building.Details
demolish 2 stories commercial / retail building. | |
| Dec 31, 2004 | Expired or cancelled cancelled Oct 2011 | 642 Harrison St | conversion of existing office bldg to include 43 resid'l units with parking and vertical addition of 2 stories.Details
conversion of existing office bldg to include 43 resid'l units with parking and vertical addition of 2 stories. | $1,000,000 | |
| Nov 17, 2004 | Expired or cancelled cancelled Mar 2009 | 2140 Market St | demolish a 1 story barDetails
demolish a 1 story bar | ||
| Feb 10, 2004 | Completed final sign-off Dec 2005 | 1911 Mission St | demolish one story commercial retail storeDetails
demolish one story commercial retail store |