Travis Throckmorton
- Listed as
- architect, engineer
- Firm
- Ankrom Moisan
- Based in
- Portland
- On San Francisco permits
- Aug 2016 to Feb 2026
35 permits since 2000 (architect on 34 permits, engineer on 1 permit): 27 completed, 1 in progress, 4 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 10, 2026 | Completed final sign-off May 2026 | 4135 California St | revision to pa# 2016-1227-5923-s2; relocate the ramp at ground floor, in courtyard.Details
revision to pa# 2016-1227-5923-s2; relocate the ramp at ground floor, in courtyard. | ||
| Oct 17, 2025 | Completed final sign-off May 2026 | 4135 California St | Seamus Collins Construction, Inc. | 2 set of metal stairs to be installed at the 4135 california st stair#1 along cornwall st and stair #2 along california st.Details
2 set of metal stairs to be installed at the 4135 california st stair#1 along cornwall st and stair #2 along california st. | $150,000 |
| Feb 20, 2025 | Expired or cancelled expired Jul 2026 | 333 Bryant St | C C I Commercial Construction & Improv | revision to 202409120604. scope includes accessibilty upgrades as listed: mens restroom, provide knee/toe clearance by provid9ing new sinks. 2 womens restroom, provide knee and toe clearance by installing new sinks and lowering e countertop. both restrooms.reinstall restroom accessories within accesDetails
revision to 202409120604. scope includes accessibilty upgrades as listed: mens restroom, provide knee/toe clearance by provid9ing new sinks. 2 womens restroom, provide knee and toe clearance by installing new sinks and lowering e countertop. both restrooms.reinstall restroom accessories within acces | $65,664 |
| Sep 20, 2024 | Completed final sign-off Feb 2026 | 3820 24th St | Adam Lewis Construction Company | 1275 sf basement tenant improvements expansion of existing 2576 sf ground flr veterinary clinic.completed veterinary clinc will be total of 3851sf (ref 2023-007870cua). ti work includes new partitions, new mech, elect, and plumb. new accessible restroom, new finishes, and new hvac eqip locaetd in(e)Details
1275 sf basement tenant improvements expansion of existing 2576 sf ground flr veterinary clinic.completed veterinary clinc will be total of 3851sf (ref 2023-007870cua). ti work includes new partitions, new mech, elect, and plumb. new accessible restroom, new finishes, and new hvac eqip locaetd in(e) | $400,000 |
| Sep 12, 2024 | Expired or cancelled expired Jul 2026 | 333 Bryant St | C C I Commercial Construction & Improv | the project consists of approx 5500 sf situated on the 1st fl. the project scope is limited to the following work, the suite entry will be widened for a new door and (e) hallwlay surface doors to be covered, new conference rm will be created, one of (e) rooms to be enlarged, all flooring to beDetails
the project consists of approx 5500 sf situated on the 1st fl. the project scope is limited to the following work, the suite entry will be widened for a new door and (e) hallwlay surface doors to be covered, new conference rm will be created, one of (e) rooms to be enlarged, all flooring to be | $65,664 |
| Apr 1, 2024 | Completed final sign-off May 2026 | 4135 California St | Seamus Collins Construction, Inc. | revision to 201612275923 addendaum. change glass stain house to stucco, change wood panels to stucco. no interior changes, just exterior material.Details
revision to 201612275923 addendaum. change glass stain house to stucco, change wood panels to stucco. no interior changes, just exterior material. | |
| Mar 6, 2024 | In progress issued Mar 2024 | 333 Bryant St | City Building Inc. | tenant improvement for 1460 sqft office space on 3rd fl. expansion of existing architect's office into the adjacent suite taking up 1/3 of the space. new conference room. bathroom upgradesDetails
tenant improvement for 1460 sqft office space on 3rd fl. expansion of existing architect's office into the adjacent suite taking up 1/3 of the space. new conference room. bathroom upgrades | $167,373 |
| Dec 8, 2022 | Completed final sign-off Sep 2023 | 434 Minna St | M C S Construction Services | 1/f: install (4) pivot security panels between lobby & corner retail space. security panels will only be operated by staff/held open when retail space is openDetails
1/f: install (4) pivot security panels between lobby & corner retail space. security panels will only be operated by staff/held open when retail space is open | $188,000 |
| Apr 8, 2022 | Expired or cancelled expired Mar 2026 | 2799 24th St | Seamus Collins Construction, Inc. | revision to pa# 201608296214. revision to mechanical systems. new grease duct for future t.i..Details
revision to pa# 201608296214. revision to mechanical systems. new grease duct for future t.i.. | $4,000 |
| Jan 7, 2022 | Completed final sign-off Sep 2022 | 434 Minna St | Build Group Inc. | revision to pa 2018-0806-6535 s3 record keeping permit only to obtain sffd assembly space stamp for existing outdoor terrace spaceDetails
revision to pa 2018-0806-6535 s3 record keeping permit only to obtain sffd assembly space stamp for existing outdoor terrace space | |
| Dec 22, 2021 | Completed final sign-off Nov 2022 | 3820 24th St | Sphinx Inc Dba Pharaoh Construction | tenant improvement for veterinary clinic. new partition, new ceilings, new lighting, new m&p, new accessible restroom, and new finishes. the possible future expansion of the clinic by constructing a shaft for a future elevator b/t the street and basement levels.Details
tenant improvement for veterinary clinic. new partition, new ceilings, new lighting, new m&p, new accessible restroom, and new finishes. the possible future expansion of the clinic by constructing a shaft for a future elevator b/t the street and basement levels. | $400,000 |
| Nov 29, 2021 | Completed final sign-off Feb 2022 | 1110 04th St | Bay Area Builders Inc. | revision to permit 202009265080. work includes layout revision to pet washing and isolation suite. added handwash sink station in the corridor. multiple doors to be switced from hinged to sliding doorsDetails
revision to permit 202009265080. work includes layout revision to pet washing and isolation suite. added handwash sink station in the corridor. multiple doors to be switced from hinged to sliding doors | |
| Sep 14, 2021 | Never finaled issued Sep 2021, no final | 1428 Irving St | Wells Construction Inc | revision to pa 202101112449. revised wood frame slab to concrete slab to match (e) condition. updated ramp detail and structural details to match for a new proposed slab.Details
revision to pa 202101112449. revised wood frame slab to concrete slab to match (e) condition. updated ramp detail and structural details to match for a new proposed slab. | |
| Sep 3, 2021 | Never finaled filed Sep 2021, never issued | 650 Divisadero St | demolition of 2-story commercial buildingDetails
demolition of 2-story commercial building | $80,000 | |
| Aug 20, 2021 | Completed final sign-off Sep 2022 | 1434 Irving St | ground floor ti to the (e) building. adding an interconnect opening on the east side of building. (pa 2021-0820-6841, 1428 irving st)Details
ground floor ti to the (e) building. adding an interconnect opening on the east side of building. (pa 2021-0820-6841, 1428 irving st) | $13,000 | |
| Aug 20, 2021 | Completed final sign-off Sep 2022 | 1428 Irving St | ground floor ti to (e) building to add an interconnect opening on the west side of the building (pa 2021-0820-6841, 1428 irving st)Details
ground floor ti to (e) building to add an interconnect opening on the west side of the building (pa 2021-0820-6841, 1428 irving st) | $12,000 | |
| Mar 18, 2021 | Completed final sign-off Sep 2022 | 434 Minna St | Build Group Inc. | priority: rev to arch/mep add 201808066535/s3. mary st added retail storefront entry & revision to double doors at south retail entry. roof penthouse elec room subdivision. roof penthouse service stair removal. added card readers, exit devices, misc. door hardware revis. (bldg on 3 lots 089,090,091)Details
priority: rev to arch/mep add 201808066535/s3. mary st added retail storefront entry & revision to double doors at south retail entry. roof penthouse elec room subdivision. roof penthouse service stair removal. added card readers, exit devices, misc. door hardware revis. (bldg on 3 lots 089,090,091) | $10,000 |
| Jan 27, 2021 | Completed final sign-off Sep 2022 | 1434 Irving St | Wells Construction Inc | ground floor tenant improvement. includes new partitions, new ceilings, lighting & finishes.Details
ground floor tenant improvement. includes new partitions, new ceilings, lighting & finishes. | $238,407 |
| Jan 11, 2021 | Completed final sign-off Mar 2022 | 1428 Irving St | Wells Construction Inc | animal hospital ti at ground floor only. work includes (n) partitions, ceilings, lighting, restrooms, finishes & associated mep.Details
animal hospital ti at ground floor only. work includes (n) partitions, ceilings, lighting, restrooms, finishes & associated mep. | $238,407 |
| Mar 3, 2020 | Completed final sign-off Nov 2020 | 1601 Mariposa St | Gene Laico Construction Dba Gl Builders | rev to #2018-0613-1808 (2016 cbc code) resubmit under 2019 cbc code full occupied deck w/ usable area of 1,971 sq ft, including 2 means of egress as a-3 occupancy including area for circulation. space intended for tenants & guests & is not open to public. original occupied deck was designed for...Details
rev to #2018-0613-1808 (2016 cbc code) resubmit under 2019 cbc code full occupied deck w/ usable area of 1,971 sq ft, including 2 means of egress as a-3 occupancy including area for circulation. space intended for tenants & guests & is not open to public. original occupied deck was designed for... | $50,000 |
| Feb 4, 2020 | Completed final sign-off Feb 2021 | 490 South Van Ness Av | Nibbi Bros Assoc Inc. | revision to issued s2(arch/mep)for: pa#2017-10-11-0918 s2 & pa#2010-10-05-2342 s2; elevator smoke detector access hatch detail.Details
revision to issued s2(arch/mep)for: pa#2017-10-11-0918 s2 & pa#2010-10-05-2342 s2; elevator smoke detector access hatch detail. | |
| Jan 8, 2020 | Never finaled issued Jul 2020, no final | 302 Silver Av | Cahill Contractors Llc. | development of a 1500 gal above ground fuel tank, slab on grade pad, supply lines, pumps and controls to provide fuel to an existing generator; this is an amendment to 201603152080 s10 for generator with 607 gal belly tank; fuelport to be deleted under this permit; fuel supplied via new tankDetails
development of a 1500 gal above ground fuel tank, slab on grade pad, supply lines, pumps and controls to provide fuel to an existing generator; this is an amendment to 201603152080 s10 for generator with 607 gal belly tank; fuelport to be deleted under this permit; fuel supplied via new tank | |
| Jan 8, 2020 | Never finaled issued Jan 2020, no final | 302 Silver Av | won door submittal requested by sffd. this is a revision to addendum iii (3) #2016/0315/2080/s-3.**maher n/a**Details
won door submittal requested by sffd. this is a revision to addendum iii (3) #2016/0315/2080/s-3.**maher n/a** | ||
| Oct 28, 2019 | Completed final sign-off Feb 2021 | 302 Silver Av | architectural ti revision to pa 2016-0315-2080/s3 install smoke detector with access hatch for elevator at top of hoistwayDetails
architectural ti revision to pa 2016-0315-2080/s3 install smoke detector with access hatch for elevator at top of hoistway | $5,000 | |
| Sep 4, 2019 | Completed final sign-off Mar 2025 | 434 Minna St | Allied Fire Protection | installation of 2-8" fire service underground piping from curb to basement level p1 with 2-8" deringer 30g dlda for permit #201808066535 's' (to erect a type 1a, 21-story mixed use building on lots 089, 090, 091).Details
installation of 2-8" fire service underground piping from curb to basement level p1 with 2-8" deringer 30g dlda for permit #201808066535 's' (to erect a type 1a, 21-story mixed use building on lots 089, 090, 091). | $10,000 |
| Aug 1, 2019 | Completed final sign-off Feb 2020 | 1868 Van Ness Av | Wall 2 Wall Construction Inc | tenant improvements (first tenant): childcare facility in vacant tenant space on ground floor of existing 8-story mixed-use residential building. interior work only. mep included.Details
tenant improvements (first tenant): childcare facility in vacant tenant space on ground floor of existing 8-story mixed-use residential building. interior work only. mep included. | $50,000 |
| Jul 31, 2019 | Completed final sign-off May 2020 | 300 16th St | Build Group Inc. | revision to 201902223642 added a storage room where second bathroom wasDetails
revision to 201902223642 added a storage room where second bathroom was | |
| Mar 8, 2019 | Completed final sign-off Aug 2020 | 210 Arkansas St | revision to 201603010904 to replace solid bride parapet with open metal guard rail, per plansDetails
revision to 201603010904 to replace solid bride parapet with open metal guard rail, per plans | ||
| Feb 22, 2019 | Completed final sign-off May 2020 | 300 16th St | Build Group Inc. | 1/f -new 1st generation ti buildi out for new bank tenant. work includes 2 exterior overhead doors in storefront, new partitions, new ceilings, new lighting. new mech,plumb, accessible restrooms, finishes, new teller stations, throughwall atm and after hour drop maherDetails
1/f -new 1st generation ti buildi out for new bank tenant. work includes 2 exterior overhead doors in storefront, new partitions, new ceilings, new lighting. new mech,plumb, accessible restrooms, finishes, new teller stations, throughwall atm and after hour drop maher | $750,000 |
| Sep 18, 2018 | Completed final sign-off Oct 2020 | 2799 24th St | Seamus Collins Construction, Inc. | demolish a 1 story commercial bldg type 5Details
demolish a 1 story commercial bldg type 5 | $5,000 |
| Sep 10, 2018 | Completed final sign-off Jun 2019 | 973 Mission St | Rinaldi Construction | ref pa 2016-0516-7545 & 2017-0215-9434 (n) extended concrete landing, 4" min above adjacent grade, dowel into (e) concrete landing as requiredDetails
ref pa 2016-0516-7545 & 2017-0215-9434 (n) extended concrete landing, 4" min above adjacent grade, dowel into (e) concrete landing as required | |
| Sep 6, 2018 | Completed final sign-off Dec 2019 | 1601 Mariposa St | two added corridor residential unit wood frame wall assemblies in comformance w/ 2013 code requirements & pertaining to acoustical & structural code limitations. **maher n/a**Details
two added corridor residential unit wood frame wall assemblies in comformance w/ 2013 code requirements & pertaining to acoustical & structural code limitations. **maher n/a** | ||
| Sep 6, 2018 | Completed final sign-off Feb 2020 | 210 Arkansas St | two added corridor residential unit wood frame wall assemblies in conformance w/ 2013 code requirements & pertaining to acoustical & structural code limitations. maher n/a.Details
two added corridor residential unit wood frame wall assemblies in conformance w/ 2013 code requirements & pertaining to acoustical & structural code limitations. maher n/a. | ||
| Aug 6, 2018 | Completed final sign-off Sep 2022 | 434 Minna St | Build Group Inc. | to erect a type 1-a, 21-story, 302 units mixed use building (retail, residential & parking) with 2 basement levels. (building will be on 3 lots: 089,090 & 091.)Details
to erect a type 1-a, 21-story, 302 units mixed use building (retail, residential & parking) with 2 basement levels. (building will be on 3 lots: 089,090 & 091.) | $82,000,000 |
| Aug 29, 2016 | Completed final sign-off Jun 2025 | 2799 24th St | Michael E Gutierrez, Seamus Collins Construction, Inc. | to erect 3 stories, no basement, type va, 4 units residential over 2 commercial tenant space building.Details
to erect 3 stories, no basement, type va, 4 units residential over 2 commercial tenant space building. | $1,440,000 |