Christopher Slater
- License
- 20018
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- On San Francisco permits
- Sep 2018 to Feb 2021
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Wells Construction Inc (2)
- Architects
- Jo Garst, Travis Throckmorton
- Engineers
- Steven Wiseniewsky (3), Emily Guglielmo, Weihong Yang
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 23, 2021 | Expired or cancelled withdrawn Aug 2021 | 2440 Mariposa St | change of use from office to cannibis dispensary. interior fitout. alterations of existing space. reconfigurate plumbing, mechanical & electrical.Details
change of use from office to cannibis dispensary. interior fitout. alterations of existing space. reconfigurate plumbing, mechanical & electrical. | $80,000 | |
| Jan 27, 2021 | Completed final sign-off Sep 2022 | 1434 Irving St | Wells Construction Inc | ground floor tenant improvement. includes new partitions, new ceilings, lighting & finishes.Details
ground floor tenant improvement. includes new partitions, new ceilings, lighting & finishes. | $238,407 |
| Sep 12, 2018 | Completed final sign-off Dec 2018 | 100 Church St | Wells Construction Inc | tenant improvement suite suite b demolish non load bearing walls, relocate doors, lighing, power data as needed. demo e flooring material to expose e concrete floors for animal hospital tenantDetails
tenant improvement suite suite b demolish non load bearing walls, relocate doors, lighing, power data as needed. demo e flooring material to expose e concrete floors for animal hospital tenant | $75,000 |