Gene Laico Construction Dba Gl Builders
- Based in
- San Rafael
- On San Francisco permits
- Jul 2019 to Aug 2022
- Last 24 months
- 0 permits filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2022 | Completed final sign-off Jan 2023 | 239 Myrtle St | revision to bpa#202206247037 t.i. mechanical/electricalDetails
revision to bpa#202206247037 t.i. mechanical/electrical | $15,000 |
| Jun 24, 2022 | Completed final sign-off Jan 2023 | 239 Myrtle St | tenant improvement for proposed fitness studio including (1) ada restroom, raised floor, lighting in new tenant space (1st time tenant improvement). location of mop sink within (e) building. mech, elec, plumb, sprinkler, alarm to be design/ build under deferred permit.Details
tenant improvement for proposed fitness studio including (1) ada restroom, raised floor, lighting in new tenant space (1st time tenant improvement). location of mop sink within (e) building. mech, elec, plumb, sprinkler, alarm to be design/ build under deferred permit. | $150,000 |
| Mar 3, 2020 | Completed final sign-off Nov 2020 | 1601 Mariposa St | rev to #2018-0613-1808 (2016 cbc code) resubmit under 2019 cbc code full occupied deck w/ usable area of 1,971 sq ft, including 2 means of egress as a-3 occupancy including area for circulation. space intended for tenants & guests & is not open to public. original occupied deck was designed for...Details
rev to #2018-0613-1808 (2016 cbc code) resubmit under 2019 cbc code full occupied deck w/ usable area of 1,971 sq ft, including 2 means of egress as a-3 occupancy including area for circulation. space intended for tenants & guests & is not open to public. original occupied deck was designed for... | $50,000 |
| Oct 28, 2019 | Completed final sign-off Mar 2021 | 1601 Mariposa St | added wood slat fence along live oak school propertyline, including footing design, 1'-3" off the propertyline. n/a for maherDetails
added wood slat fence along live oak school propertyline, including footing design, 1'-3" off the propertyline. n/a for maher | $50,000 |
| Oct 28, 2019 | Completed final sign-off Mar 2021 | 1601 Mariposa St | sign a: in front of building. stone monument sign with concrete footing and within indirect illumination. n/a for maherDetails
sign a: in front of building. stone monument sign with concrete footing and within indirect illumination. n/a for maher | $7,000 |
| Oct 28, 2019 | Completed final sign-off Mar 2021 | 1601 Mariposa St | sign b: at back on 18th street of building. stone monument sign with concrete footing and within indirect illumination. n/a for maherDetails
sign b: at back on 18th street of building. stone monument sign with concrete footing and within indirect illumination. n/a for maher | $3,000 |
| Oct 21, 2019 | Completed final sign-off Jul 2020 | 210 Arkansas St | revision to app#201603010904 to issued addendum 10(errcs)Details
revision to app#201603010904 to issued addendum 10(errcs) | |
| Oct 21, 2019 | Completed final sign-off Jul 2020 | 1601 Mariposa St | as-built revision to app#201603031058 / s-10 to issued addendum 10Details
as-built revision to app#201603031058 / s-10 to issued addendum 10 | |
| Jul 31, 2019 | Completed final sign-off Aug 2020 | 210 Arkansas St | revision to #2016-0301-0904 s3 (mep). addition of air conditioning @all units; ducting for units per stc/non-stc ext wall rating designations & use of natural ventilation in lieu of ducted osa where allowable. add 2-ducts at stc units that don't have feasible dusted osa routing. add fresh-100'sDetails
revision to #2016-0301-0904 s3 (mep). addition of air conditioning @all units; ducting for units per stc/non-stc ext wall rating designations & use of natural ventilation in lieu of ducted osa where allowable. add 2-ducts at stc units that don't have feasible dusted osa routing. add fresh-100's | $3,600,000 |