Js Sullivan Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2006 to May 2026
- Last 24 months
- 2 permits filed
84 permits since 2000: 60 completed, 1 in progress, 21 never finaled, 2 expired or cancelled.
Of the 21 never-finaled permits, 8 are 3 to 5 years old, 9 are 5 to 10 years old, 4 are over 10 years old. 4 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 14, 2026 | Completed final sign-off Jun 2026 | 1590 Pacific Av | permit is being filed to revise pa# 202403208206 to indicate minor work performed & all scope of work not performed & being removed from project. work performed: 1. reinforced steel & concrete ramp to be removed, 2. abandoned non-structural light gauge metal partition to be removed.Details
permit is being filed to revise pa# 202403208206 to indicate minor work performed & all scope of work not performed & being removed from project. work performed: 1. reinforced steel & concrete ramp to be removed, 2. abandoned non-structural light gauge metal partition to be removed. | $3,000 |
| Jan 28, 2025 | Completed final sign-off Aug 2025 | 915 North Point St | revision to 201912200210: administrative correction of unit count on sheet g0.01Details
revision to 201912200210: administrative correction of unit count on sheet g0.01 | |
| Aug 3, 2023 | Completed final sign-off Jun 2025 | 915 North Point St | revision to pa 2019-1220-0206 for demolition of west wall, north wall and partil south wallDetails
revision to pa 2019-1220-0206 for demolition of west wall, north wall and partil south wall | |
| Jul 24, 2023 | In progress issued Dec 2023 | 915 North Point St | storm water control plan submittal for pa#201912200210-s.Details
storm water control plan submittal for pa#201912200210-s. | |
| Jul 20, 2023 | Completed final sign-off Aug 2023 | 1580 Pacific Av | to obtain a final inspection for work approved under pa 201004079790 & 201506259895.all work is complete.Details
to obtain a final inspection for work approved under pa 201004079790 & 201506259895.all work is complete. | |
| Jul 20, 2023 | Never finaled issued Jul 2023, no final | 241 10th St | to obtain final inspetion for work approved under pa# 201703282569. all work is complete.Details
to obtain final inspetion for work approved under pa# 201703282569. all work is complete. | |
| Jul 20, 2023 | Completed final sign-off Aug 2023 | 1580 Pacific Av | to obtain a final inspection for work approved under pa 202106303535. all work is complete.Details
to obtain a final inspection for work approved under pa 202106303535. all work is complete. | |
| Jul 17, 2023 | Never finaled issued Jul 2023, no final | 2024 Polk St | document commercial addresses at 2022 polk st. on pages a2.00-a2.01 on pa# 201912129356 per bldg inspector's request. no work done under this permit.Details
document commercial addresses at 2022 polk st. on pages a2.00-a2.01 on pa# 201912129356 per bldg inspector's request. no work done under this permit. | |
| Jul 17, 2023 | Never finaled issued Jul 2023, no final | 2022 Polk St | document commercial addresses at 2022 polk st. on pages a2.00-a2.01 on pa# 201912129356 per bldg inspector's request. no work to be done under this permit.Details
document commercial addresses at 2022 polk st. on pages a2.00-a2.01 on pa# 201912129356 per bldg inspector's request. no work to be done under this permit. | |
| Jul 17, 2023 | Never finaled issued Jul 2023, no final | 1590 Pacific Av | document commercial addresses at 1590 pacific avenue on pages a2.00-a2.01 on pa# 201912129356 per bldg inspector's request. no work under this permit.Details
document commercial addresses at 1590 pacific avenue on pages a2.00-a2.01 on pa# 201912129356 per bldg inspector's request. no work under this permit. | |
| Jul 14, 2023 | Completed final sign-off Feb 2025 | 988 Harrison St | deferred submittal for pa# 201912129351, interior & exterior cold formed framing submittalDetails
deferred submittal for pa# 201912129351, interior & exterior cold formed framing submittal | |
| Jun 26, 2023 | Completed final sign-off Aug 2023 | 1580 Pacific Av | rev to pa 201912129356-s, to add exterior lighting. all downcast lightingDetails
rev to pa 201912129356-s, to add exterior lighting. all downcast lighting | |
| Jun 26, 2023 | Completed final sign-off Jul 2023 | 1580 Pacific Av | rev to pa 201912129356-s3, arch mep to comply with ada manuevering clearance in some of the bathrooms.Details
rev to pa 201912129356-s3, arch mep to comply with ada manuevering clearance in some of the bathrooms. | |
| Feb 21, 2023 | Completed final sign-off Feb 2025 | 988 Harrison St | storm water control plan submittal for bpa# 2019-1212-9351Details
storm water control plan submittal for bpa# 2019-1212-9351 | |
| Oct 14, 2022 | Never finaled filed Oct 2022, never issued | 530 Turk St | to erect 13 stories, no basement, type i-b, 88 unit residential approximately 88,500 square feet of gross area, 35 automobile parking spaces, 88 class-1 bicycle parking spaces, and 5 class-2 bicycle parking spaces.Details
to erect 13 stories, no basement, type i-b, 88 unit residential approximately 88,500 square feet of gross area, 35 automobile parking spaces, 88 class-1 bicycle parking spaces, and 5 class-2 bicycle parking spaces. | $16,000,000 |
| Jun 21, 2022 | Never finaled filed Jun 2022, never issued | 819 Ellis St | to demolish 3 stories garage building. ** maher: n/a **Details
to demolish 3 stories garage building. ** maher: n/a ** | $25,000 |
| Jun 14, 2022 | Never finaled filed Jun 2022, never issued | 819 Ellis St | to erect 16 stories, 1 basement, type i-b, 120 residential with retail mixed use building. (r-2, m, s-2) *** maher: n/a **Details
to erect 16 stories, 1 basement, type i-b, 120 residential with retail mixed use building. (r-2, m, s-2) *** maher: n/a ** | $16,000,000 |
| Nov 19, 2021 | Never finaled issued Nov 2021, no final | 230 07th St | revision to pa 2019 0329 6630. as builts install drain pans under plumbing pipes per plan @ 1st level elec room.Details
revision to pa 2019 0329 6630. as builts install drain pans under plumbing pipes per plan @ 1st level elec room. | |
| Sep 1, 2021 | Completed final sign-off Aug 2023 | 1580 Pacific Av | crane site safety plan for fixed tower crane per ab023 crane foundation (under pa#201912129356-s-1) foundation addendumDetails
crane site safety plan for fixed tower crane per ab023 crane foundation (under pa#201912129356-s-1) foundation addendum | $10,000 |
| Jul 13, 2021 | Completed final sign-off Jul 2023 | 1580 Pacific Av | plumbing only review of sand interceptor for sfpuc storm water control. ref new bldg pa# 2019.12.12.9356 sDetails
plumbing only review of sand interceptor for sfpuc storm water control. ref new bldg pa# 2019.12.12.9356 s | $1,000 |
| May 13, 2021 | Completed final sign-off Dec 2022 | 170 Clara St | exploratory demo & water damage repair at ground fl rear wall & ceiling. demo & repair damaged sheetrock & insulation in-kind. repair & replace damaged decking at rear in kind. new paint.Details
exploratory demo & water damage repair at ground fl rear wall & ceiling. demo & repair damaged sheetrock & insulation in-kind. repair & replace damaged decking at rear in kind. new paint. | $8,000 |
| Mar 30, 2021 | Completed final sign-off May 2021 | 555 Golden Gate Av | sf planning administrative permit to revise # of class ii bicycle racks installed for approved pa 201712156653. a total of 6 class ii bike spaces were required. only 4 paces were installed. project sponsor paid partial in lieu fee for the 2 missing spaces and shall pay remaining fees under this pa.Details
sf planning administrative permit to revise # of class ii bicycle racks installed for approved pa 201712156653. a total of 6 class ii bike spaces were required. only 4 paces were installed. project sponsor paid partial in lieu fee for the 2 missing spaces and shall pay remaining fees under this pa. | |
| Jan 13, 2021 | Completed final sign-off Sep 2022 | 198 Valencia St | plumbing only review of sand interceptor for sfpuc storm water control. ref new bldg pa# 202007109964 s & pa# 201408053094 s.Details
plumbing only review of sand interceptor for sfpuc storm water control. ref new bldg pa# 202007109964 s & pa# 201408053094 s. | |
| Nov 24, 2020 | Completed final sign-off Mar 2021 | 555 Golden Gate Av | revision to pa #201712156653s2 (arch & mep), revised plans to show fsd matrix, include smoke control panel, design.Details
revision to pa #201712156653s2 (arch & mep), revised plans to show fsd matrix, include smoke control panel, design. | |
| Aug 25, 2020 | Never finaled issued Nov 2020, no final | 230 07th St | crane site safety plan for fixed tower crane. crane foundation approved under pa #2019-0329-6630 s1 integrated w/ the building mat foundation.Details
crane site safety plan for fixed tower crane. crane foundation approved under pa #2019-0329-6630 s1 integrated w/ the building mat foundation. | |
| Jul 17, 2020 | Never finaled issued Jul 2020, no final | 555 Golden Gate Av | street spaceDetails
street space | |
| Jul 10, 2020 | Completed final sign-off Sep 2022 | 100 Duboce Av | altered site permit revision to pa #201408053094s, ncrease unit count fr 28 to 29 unts, eliminate basement, garage parking, relocate to g/f, revise to unit layout, stair, roofdeck & ext facde essign, add addresses 100 duboce(residential lobby), 196 valencia st (comm space).Details
altered site permit revision to pa #201408053094s, ncrease unit count fr 28 to 29 unts, eliminate basement, garage parking, relocate to g/f, revise to unit layout, stair, roofdeck & ext facde essign, add addresses 100 duboce(residential lobby), 196 valencia st (comm space). | |
| May 14, 2020 | Completed final sign-off Jul 2021 | 1523 Franklin St | crane site safety plan for fixed tower crane. crane foundation approved under pa#2018.05.24.0061-s1 integrated with the building mat foundation.Details
crane site safety plan for fixed tower crane. crane foundation approved under pa#2018.05.24.0061-s1 integrated with the building mat foundation. | |
| Mar 4, 2020 | Completed final sign-off Jun 2020 | 2444 Lombard St | adminstrative permit to correct consturction type on pa #201712156664, approved plans is type 3a.Details
adminstrative permit to correct consturction type on pa #201712156664, approved plans is type 3a. | |
| Mar 4, 2020 | Completed final sign-off Jun 2020 | 2444 Lombard St | revision to pa #201712156664. revise bmr units 202 & 204 bedrooms closets into bathroom per plan. unit 202 & 204 to be two bedrooms, 2 bath units, to match nsr.Details
revision to pa #201712156664. revise bmr units 202 & 204 bedrooms closets into bathroom per plan. unit 202 & 204 to be two bedrooms, 2 bath units, to match nsr. | |
| Feb 20, 2020 | Completed final sign-off Dec 2021 | 230 07th St | strom water control plan review only. for pa# 2019/03/29/6630-s1 & pa# 2018/06/26/3029-s1. ** maher: n/a **Details
strom water control plan review only. for pa# 2019/03/29/6630-s1 & pa# 2018/06/26/3029-s1. ** maher: n/a ** | |
| Dec 20, 2019 | Completed final sign-off Aug 2025 | 915 North Point St | erect a 4 story, 34 dwelling units, 1 basement residential condo with parking.type 3aDetails
erect a 4 story, 34 dwelling units, 1 basement residential condo with parking.type 3a | $8,000,000 |
| Dec 20, 2019 | Completed final sign-off Jun 2025 | 915 North Point St | demo a 2 story parking garage. type 1-bDetails
demo a 2 story parking garage. type 1-b | $50,000 |
| Dec 16, 2019 | Completed final sign-off May 2020 | 5 Olive St | provide electrical & mechanical infrastructure for future ti. install electrical outlet & lighting per plan. install hvac system. no change of use. no exterior work. refer to nc pa #201612225735Details
provide electrical & mechanical infrastructure for future ti. install electrical outlet & lighting per plan. install hvac system. no change of use. no exterior work. refer to nc pa #201612225735 | $15,000 |
| Dec 16, 2019 | Completed final sign-off Apr 2020 | 1425 Bush St | provide elec and mech infrastructure for future ti. raise floor level to match landing. install elec outlets and lighting per plan. install hvac system. no exterior work no change of useDetails
provide elec and mech infrastructure for future ti. raise floor level to match landing. install elec outlets and lighting per plan. install hvac system. no exterior work no change of use | $20,000 |
| Dec 16, 2019 | Completed final sign-off May 2020 | 3 Olive St | provide electrical & mechanical infrastructure for future ti. install electrical outlet & lighting per plan. install hvac system. no change of use. no exterior work. refer to nc pa #201612225735Details
provide electrical & mechanical infrastructure for future ti. install electrical outlet & lighting per plan. install hvac system. no change of use. no exterior work. refer to nc pa #201612225735 | $15,000 |
| Dec 16, 2019 | Completed final sign-off Apr 2020 | 118 Fern St | provide electrical & mechanical infrastructure for future ti. install electrical outlet & lighting per plan. install hvac system. no change of use. no exterior work. refer to nc pa 201605318777Details
provide electrical & mechanical infrastructure for future ti. install electrical outlet & lighting per plan. install hvac system. no change of use. no exterior work. refer to nc pa 201605318777 | $15,000 |
| Dec 12, 2019 | Completed final sign-off Feb 2025 | 988 Harrison St | alter site. revision to approved site pa# 201712146448-s. re-arrange of residential units. re-arrange garage parking. relocate elevator & stair cores. modification to exterior facade. revise type i-a to i-b. use from s to s-2. ** maher: yes. route to dph **Details
alter site. revision to approved site pa# 201712146448-s. re-arrange of residential units. re-arrange garage parking. relocate elevator & stair cores. modification to exterior facade. revise type i-a to i-b. use from s to s-2. ** maher: yes. route to dph ** | |
| Dec 12, 2019 | Completed final sign-off Aug 2023 | 1570 Pacific Av | to erect 6 stories, no basement, type iii-a over type i-a, 53 residential units with mixed use building. (r-2,b,m,s-2) ** maher: yes; route to dph **Details
to erect 6 stories, no basement, type iii-a over type i-a, 53 residential units with mixed use building. (r-2,b,m,s-2) ** maher: yes; route to dph ** | $9,200,000 |
| Aug 8, 2019 | Completed final sign-off Jun 2020 | 2444 Lombard St | revision to pa #201712156664-s3. revise townhouse stair 03 per plan. tread rise and run to be 7.75"h and 11"d. stair 03 serves the town home units only (occupancy r3).Details
revision to pa #201712156664-s3. revise townhouse stair 03 per plan. tread rise and run to be 7.75"h and 11"d. stair 03 serves the town home units only (occupancy r3). | |
| May 30, 2019 | Completed final sign-off Jul 2019 | 719 Larkin St | revision to 201612225735 s3 revise bike storage room layout per plan. no other changes. n/a for maher.Details
revision to 201612225735 s3 revise bike storage room layout per plan. no other changes. n/a for maher. | |
| May 8, 2019 | Completed final sign-off Mar 2021 | 555 Golden Gate Av | crane site safety plan for fixed tower crane includes anchors bases. crane foundation under pa#201712156653 s1. maher n/a.Details
crane site safety plan for fixed tower crane includes anchors bases. crane foundation under pa#201712156653 s1. maher n/a. | $10,000 |
| Mar 29, 2019 | Completed final sign-off Dec 2021 | 230 07th St | altered site permit & revision to pa #2018-0626-3029 s. rearrangement of residential unit layouts, removal of ground flr commercial, relocate elevator & stair cores, elimination of interior court, reconfigure light court, revise front & rear facade.Details
altered site permit & revision to pa #2018-0626-3029 s. rearrangement of residential unit layouts, removal of ground flr commercial, relocate elevator & stair cores, elimination of interior court, reconfigure light court, revise front & rear facade. | |
| Mar 22, 2019 | Completed final sign-off Jan 2021 | 555 Golden Gate Av | storm water plumbing review for sfpuc stormwater requirment planters & flow thru planter drainage system with sand interceptor per plans.Details
storm water plumbing review for sfpuc stormwater requirment planters & flow thru planter drainage system with sand interceptor per plans. | |
| Oct 5, 2018 | Completed final sign-off Sep 2020 | 241 10th St | g/f: #101: tenant improvement to formerly unoccupied space for professional services office. space is fully compliant per cbc chapter 11b ada. ada compliant bath is existing.Details
g/f: #101: tenant improvement to formerly unoccupied space for professional services office. space is fully compliant per cbc chapter 11b ada. ada compliant bath is existing. | $80,000 |
| Sep 21, 2018 | Never finaled issued Oct 2018, no final | 2444 Lombard St | plumbing review for stormwater plantersDetails
plumbing review for stormwater planters | |
| Sep 19, 2018 | Completed final sign-off Jun 2020 | 2444 Lombard St | new 4" fire service for sprinkler system- sprinklers under separate permit. site plan 201712156664sDetails
new 4" fire service for sprinkler system- sprinklers under separate permit. site plan 201712156664s | $12,000 |
| Aug 21, 2018 | Completed final sign-off Sep 2019 | 1433 Bush St | revision to pa 2016-0531-8777s correct number of basement count from 0 to 1 for record purposes only. no work done. no changes to plan.Details
revision to pa 2016-0531-8777s correct number of basement count from 0 to 1 for record purposes only. no work done. no changes to plan. | |
| Aug 10, 2018 | Completed final sign-off Jul 2019 | 1433 Bush St | plumbing review of storm water flow through planter system.Details
plumbing review of storm water flow through planter system. | |
| Jun 26, 2018 | Completed final sign-off Dec 2021 | 230 07th St | remodel & vertical addition,convert (e) garage to new 6 story mixed use bldg, 5 stories of residential over ground level commercial & residential private parking garageDetails
remodel & vertical addition,convert (e) garage to new 6 story mixed use bldg, 5 stories of residential over ground level commercial & residential private parking garage | $6,500,000 |
| Jun 21, 2018 | Completed final sign-off Jul 2019 | 719 Larkin St | plumbing design for storm water management (sfpuc) for plumbing inspection reviewDetails
plumbing design for storm water management (sfpuc) for plumbing inspection review | |
| May 25, 2018 | Expired or cancelled cancelled Sep 2019 | 1433 Bush St | revision to app#201605318777 s. change official no. of stories of occupancy from 8 stories to 9 stories. no work done.Details
revision to app#201605318777 s. change official no. of stories of occupancy from 8 stories to 9 stories. no work done. | |
| May 24, 2018 | Completed final sign-off Jul 2021 | 1523 Franklin St | alteration of (e) 2-story over basement commercial bldg to construction of an 8-stroy, 83'-7" tall, 24,458 sf mixed use reisdential/commercial bldg. include (7) dwelling units, 649 sf commercial space @ ground flr & 7 parking spaces.Details
alteration of (e) 2-story over basement commercial bldg to construction of an 8-stroy, 83'-7" tall, 24,458 sf mixed use reisdential/commercial bldg. include (7) dwelling units, 649 sf commercial space @ ground flr & 7 parking spaces. | $6,000,000 |
| Mar 26, 2018 | Completed final sign-off Jul 2019 | 1433 Bush St | crane site safety plan for fixed tower crane. includes anchor bases. carane foundation under pa#2016-0531-8777 s1. maher n/aDetails
crane site safety plan for fixed tower crane. includes anchor bases. carane foundation under pa#2016-0531-8777 s1. maher n/a | $30,000 |
| Feb 23, 2018 | Completed final sign-off May 2019 | 719 Larkin St | erection of tower crane for construction of new building under 201612225735. crane safety plan inlcude anchor bases. crane foundation under 201612225735, s1Details
erection of tower crane for construction of new building under 201612225735. crane safety plan inlcude anchor bases. crane foundation under 201612225735, s1 | $20,000 |
| Feb 7, 2018 | Never finaled issued Mar 2018, no final | 1198 Valencia St | revision to pa 2015-0714-1495 to document recorded bmr nsr (below market rate notice of special restrictions) per planning. no work done.Details
revision to pa 2015-0714-1495 to document recorded bmr nsr (below market rate notice of special restrictions) per planning. no work done. | |
| Dec 15, 2017 | Completed final sign-off May 2020 | 2444 Lombard St | to erect 4 stories, no basement, type v-a over i-a, 2 townhouse & 41 residential units with commercial office mixed use building(r-3,r-2,b,s-2) ** maher: disturbance of at least 50 cu.yd of soil, route to dph **Details
to erect 4 stories, no basement, type v-a over i-a, 2 townhouse & 41 residential units with commercial office mixed use building(r-3,r-2,b,s-2) ** maher: disturbance of at least 50 cu.yd of soil, route to dph ** | $10,000,000 |
| Dec 15, 2017 | Completed final sign-off Mar 2021 | 555 Golden Gate Av | to erect 11 stories, type i-b, 55 residential units with retail mixed use building (r-2,m,s-2)Details
to erect 11 stories, type i-b, 55 residential units with retail mixed use building (r-2,m,s-2) | $12,000,000 |
| Dec 14, 2017 | Completed final sign-off Feb 2025 | 377 06th St | to erect 8 stories, no basement, type i-a, 90 units residential with commercial mixed use building and parking. (r-2, a-2, s)Details
to erect 8 stories, no basement, type i-a, 90 units residential with commercial mixed use building and parking. (r-2, a-2, s) | $26,068,060 |
| Jul 20, 2017 | Completed final sign-off Mar 2018 | 1198 Valencia St | revision to pa #2015-0714-1495. delta 3 architectural revisions per plan. revise layout for units 101,102 &103. (n) stair penthouse for unit 103. revise storefront glazing to operable sliding glass panel along 23rd st. updated door schedule eliminated roof sky lights. relocate bike rack to basement.Details
revision to pa #2015-0714-1495. delta 3 architectural revisions per plan. revise layout for units 101,102 &103. (n) stair penthouse for unit 103. revise storefront glazing to operable sliding glass panel along 23rd st. updated door schedule eliminated roof sky lights. relocate bike rack to basement. | $5,000 |
| Mar 28, 2017 | Never finaled issued Mar 2017, no final | 241 10th St | revision to app#201506159021 to install fire rated access panel door at elevator shaft for smoke detector.Details
revision to app#201506159021 to install fire rated access panel door at elevator shaft for smoke detector. | $300 |
| Mar 8, 2017 | Completed final sign-off May 2017 | 1 Franklin St | trench & patch of (e) concrete slab and installation of two area drains for commercial unit space a (franklin), future ti work separate permit.Details
trench & patch of (e) concrete slab and installation of two area drains for commercial unit space a (franklin), future ti work separate permit. | $10,000 |
| Dec 22, 2016 | Completed final sign-off Jul 2019 | 719 Larkin St | to erect 8 stories, no basement, type ib, 42 residential units with mixed used building. ** maher: n/a **Details
to erect 8 stories, no basement, type ib, 42 residential units with mixed used building. ** maher: n/a ** | $6,000,000 |
| Dec 1, 2016 | Never finaled issued Dec 2016, no final | 1198 Valencia St | revision to pa#201507141495 & 201606281116, change 1/f wall @ line 1 from cmu to shotcrete, add drilled piers @ line h per structural plans. n/a ordinance #155-13Details
revision to pa#201507141495 & 201606281116, change 1/f wall @ line 1 from cmu to shotcrete, add drilled piers @ line h per structural plans. n/a ordinance #155-13 | $15,000 |
| Nov 22, 2016 | Never finaled issued Mar 2017, no final | 1198 Valencia St | storm water drainage reveiw for new bldg per pa #2015-0714-1495. ** maher: n/a **Details
storm water drainage reveiw for new bldg per pa #2015-0714-1495. ** maher: n/a ** | |
| Nov 22, 2016 | Never finaled issued Dec 2016, no final | 241 10th St | storm water drainage review for new bldg per pa #2015-0615-9021.Details
storm water drainage review for new bldg per pa #2015-0615-9021. | |
| Jul 1, 2016 | Expired or cancelled withdrawn Apr 2018 | 1523 Franklin St | construct 8-story (n) 7 residential condo over commercial, with 1 basement.Details
construct 8-story (n) 7 residential condo over commercial, with 1 basement. | $6,000,000 |
| Jun 28, 2016 | Completed final sign-off Mar 2018 | 1198 Valencia St | change of dwelling units to 49. revision to pa#201507141495 administrative permit to correct unit count from 52 to 49 units. n/a ordinance #155-13Details
change of dwelling units to 49. revision to pa#201507141495 administrative permit to correct unit count from 52 to 49 units. n/a ordinance #155-13 | |
| May 31, 2016 | Completed final sign-off Sep 2019 | 1433 Bush St | to erect 8 stories, 0 basement, 40 units residential condos over ground floor commercial & parking.Details
to erect 8 stories, 0 basement, 40 units residential condos over ground floor commercial & parking. | $10,000,000 |
| Dec 9, 2015 | Never finaled issued Nov 2018, no final | 469 Eddy St | vertical addition. historic restoration of (e) bldg: construction of an 6 story, 65 ft tall, 32,600 sf mixed use residential-commercial bldg. new bldg will include 29 dwelling units , approx 450 sf of ground flr commerical space & parking garage for 7 cars. n/a for maher ordinance.155-13Details
vertical addition. historic restoration of (e) bldg: construction of an 6 story, 65 ft tall, 32,600 sf mixed use residential-commercial bldg. new bldg will include 29 dwelling units , approx 450 sf of ground flr commerical space & parking garage for 7 cars. n/a for maher ordinance.155-13 | $6,700,000 |
| Oct 13, 2015 | Never finaled issued Oct 2015, no final | 1 Franklin St | revision to pa 2009 1203 2516: use parlex panels (hpl) i lieu of cembrit (fiber cement panels) on exterior rain screen per plan.Details
revision to pa 2009 1203 2516: use parlex panels (hpl) i lieu of cembrit (fiber cement panels) on exterior rain screen per plan. | |
| Sep 23, 2015 | Never finaled filed Sep 2015, never issued | 1 Franklin St | street spaceDetails
street space | |
| Jul 14, 2015 | Completed final sign-off Mar 2018 | 1198 Valencia St | construct (n) 5-story 52 residential mixed use buildingDetails
construct (n) 5-story 52 residential mixed use building | $6,800,000 |
| Jul 2, 2015 | Completed final sign-off Nov 2018 | 241 10th St | to demolish 1 story car renter facility. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
to demolish 1 story car renter facility. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $40,000 |
| Jul 2, 2015 | Completed final sign-off Nov 2018 | 239 10th St | to demolish 1 story garage. ** maher: compliance with ordinance no# 155-13 required; route to dph **Details
to demolish 1 story garage. ** maher: compliance with ordinance no# 155-13 required; route to dph ** | $10,000 |
| Jun 15, 2015 | Completed final sign-off Aug 2017 | 241 10th St | erect 5 stories of 28 dwelling units. mix use building. 4 stories type v-a over 1 story type 1-a.Details
erect 5 stories of 28 dwelling units. mix use building. 4 stories type v-a over 1 story type 1-a. | $4,000,000 |
| Apr 21, 2015 | Completed final sign-off May 2015 | 870 Harrison St | ground flr: ti, commercial space cu-101. install ada compliant bathroom fixture, add elec & data outlets, paint. maher - not req'dDetails
ground flr: ti, commercial space cu-101. install ada compliant bathroom fixture, add elec & data outlets, paint. maher - not req'd | $30,000 |
| Mar 17, 2015 | Never finaled issued May 2015, no final | 1 Franklin St | erection of construction crance for construction of (n) bldg. under pa # 2009-1203-2516. crane safety plan per sfbc ab-023 crane foundation per plans.Details
erection of construction crance for construction of (n) bldg. under pa # 2009-1203-2516. crane safety plan per sfbc ab-023 crane foundation per plans. | $5,000 |
| Mar 5, 2015 | Never finaled issued Mar 2015, no final | 1 Franklin St | ground improvement work consists of improvement the density, strength and stiffness of weak & loose soil for foundation support using drill displacement columns (ddc) per plan.Details
ground improvement work consists of improvement the density, strength and stiffness of weak & loose soil for foundation support using drill displacement columns (ddc) per plan. | $100,000 |
| Aug 5, 2014 | Completed final sign-off Sep 2022 | 198 Valencia St | to erect 5 stories, no basement, type 5-a, 28 units residential condo and commercial building. (r-2,m) ** maher: compliance with ordinance is required **Details
to erect 5 stories, no basement, type 5-a, 28 units residential condo and commercial building. (r-2,m) ** maher: compliance with ordinance is required ** | $3,000,000 |
| Apr 10, 2014 | Completed final sign-off Jan 2015 | 870 Harrison St | rev. to pa#200607146552-s2 revision to mep. use radiant floor heating in lieu of split system. n/a ordinance#155-13.Details
rev. to pa#200607146552-s2 revision to mep. use radiant floor heating in lieu of split system. n/a ordinance#155-13. | |
| Dec 30, 2013 | Completed final sign-off Jun 2014 | 400 South Van Ness Av | revision to pa#201111038205 s1 shotcrete wall along south van ness neighbor side approx 124 ft and 15th st side approx 35 ft in lieu of wood frame wall. revise planter per plan, revise bathroom doors per plan.Details
revision to pa#201111038205 s1 shotcrete wall along south van ness neighbor side approx 124 ft and 15th st side approx 35 ft in lieu of wood frame wall. revise planter per plan, revise bathroom doors per plan. | $3,000 |
| Jul 15, 2013 | Completed final sign-off Jan 2015 | 870 Harrison St | altered site permit; revision to pa#2006-07-14-6552/s. revison to floor plans layout. revision to windows. (project scope is to erect a new 6 story, 26 units w/ commercial bldg)Details
altered site permit; revision to pa#2006-07-14-6552/s. revison to floor plans layout. revision to windows. (project scope is to erect a new 6 story, 26 units w/ commercial bldg) | |
| Jul 14, 2006 | Completed final sign-off Jan 2015 | 870 Harrison St | to erect a new 6 story 26 dwelling units w/ commercial bldg.Details
to erect a new 6 story 26 dwelling units w/ commercial bldg. | $3,500,000 |